This document provides details for a solicitation seeking Base Operations Support services. The solicitation seeks services including facility management, facility investment, custodial, pest control, integrated solid waste management, grounds maintenance, wastewater, and water services at Naval Support Activity New Orleans, Naval Air Station Joint Reserve Base New Orleans, Naval Operational Support Center Shreveport, and Naval Information Warfare Center Atlantic at the University of New Orleans. The proposed contract is an indefinite-delivery, indefinite-quantity contract with firm-fixed-price recurring work and non-recurring work ordered via task orders. The contract term is one base year plus seven one-year options for a total of eight years. The solicitation will utilize a best value source selection evaluating technical proposal, past performance, and price, and will be set aside for small businesses. The site visit is scheduled for January 24-25, 2023, and questions are due by February 1, 2023.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6945023R0014
Section F
Amendment 0002
0200000 – Management and Administration
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.2.1
N/A Proof of all certification, training and licensing
Within 15 calendar days prior to contract start.
KO and
COR
2 As required
2.2.1.2
N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO 1 As required
2.3.1 N/A Sign-in Sheets and
Minutes for
Review and
Comments
Within two working days
KO, COR
and all attendees
1 As Required
2.3.1 N/A Sign-in Sheets and
Minutes Final
Revision
Within two working days
KO, COR
and all attendees
1 As Required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
2 As specified
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
1 As required
2.3.10 N/A Phase-In Plan Within 5 days
after award or as requested by the
KO
1 As specified
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.3.10 N/A Phase-Out Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As specified
2.6.1 N/A Plans of Action
and Milestones
(POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command
Security
Manager
1 As required
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command
Security
Manager
1 As required
2.6.4 N/A Scheduling and
Work Status
Updates
Weekly, within
30 minutes of the inquiry during regular working hours, and by
08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As Specified
2.6.4 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.5 N/A Notification of any
Difficulty in
Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.8.2 N/A Pipe Delimited
Flat-File
By the end of each workday
KO or a representa tive designate d by the
KO
1 Daily
2.6.8.2 N/A Asset and
Specification Data
When an asset is repaired, replaced, installed, or otherwise affected
KO or a representa tive designate d by the
KO
1 As required
2.6.8.3 N/A List of personnel
requiring access to
Government’s
Maximo
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.9.3 N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
1 Monthly
2.6.10 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and
Qualifications
Within 15 calendar days prior to contract start
KO and
COR
2 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
2 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO 1 As specified
2.7.2.6 N/A Proof of United
States of America
Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.8.1 N/A Employee List Upon request. KO and
COR
2 As required
2.8.8 N/A OF-306
Declaration for
Federal
Employment and
Digital
Fingerprints
Prior to commencement of work
KO, COR,
and
Security
Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to
Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security
Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and for changes.
KO and
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.9.4 N/A SOH Risk and
Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and for changes.
KO and
COR
2 As specified
2.9.4.7 N/A Control of
Hazardous Energy
(lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
2.9.6 J-0200000-04 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
2 As required
2.9.6 J-0200000-04 Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO and
COR
2 As required
2.9.6 J-0200000-04 Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO and
COR
2 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
2 Monthly
2.9.9 N/A OSHA Citations
and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
2 As required
2.9.10 N/A Safety Inspection
and Monitoring
Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications expire.
KO and
COR
2 As specified
2.10 N/A EMS Goals and
Policy
Measurement
Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
2 As specified
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.2.1 N/A Sampling Plan Prior to Sampling KO and
COR
1 As required
2.10.2.1 N/A Laboratory
Analysis
Upon Request KO and
COR
1 As specified
2.10.2.2 N/A Class I ODS and II
Refrigerant Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
2 As required
2.10.2.3 J-0200000-04 Monthly Solid
Waste
Management and
Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
2.10.2.3 J-0200000-04 Annual Summary
Solid Waste
Management and
Recycling Report
By October 10th KO and
COR
1 Annually
2.10.2.5 N/A Waste Stream
Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
2.10.2.7 J-0200000-11 Spill Containment
and Clean-up; Fuel and hazardous substance spill notification
Within 15 minutes of discovery
Regional
Dispatch
Center
1 As required
2.10.2.7 J-0200000-11 Spill Containment
and Clean-up; Fuel and hazardous substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.7 J-0200000-11 Spill Containment
and Clean-up; Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and
1 As required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.2.5 N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
2 As specified
2.10.2.8 N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.8 J-0200000-12 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.12 N/A Asbestos
Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO and
COR
1 As specified
2.10.2.13 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of
160 to 200 calendar days
KO, COR,
Installatio n
Environm ental
Division, City, State, and
EPA
1 Semi-annually
2.10.2.13 N/A Hazardous Air
Pollutants Monthly
Data
First workday of each month.
KO, COR,
Installatio n
Environm ental
Division
1 Monthly
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.3 N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days prior to contract start and within
15 calendar days after exercised option periods.
KO and
COR
2 Annually
2.10.3 N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
2 Annually
2.10.3.2 N/A Recovered
Material
Certification
As specified KO and
COR
2 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Mission Essential
Contractor
Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
2.11 N/A Mission
Critical/Mission
Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.14.1 Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
1 As required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.14.2 N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
Rough Order of
Magnitude
Within two hours of identification
KO and
COR
1 As required
2.15.1.1 N/A Non-Recurring
Work Quantities
Ordered via
FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
1501000 – Facility Management
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
2.3.1 N/A System Access
Personnel Listing
Within 30 calendar days after contract award
COR/KO 2 Upon award and any change in personnel
1502000 – Facility Investment
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
2.3 N/A Joint Commission
Environment of
Care Policy and
Procedures Manual
Within 15 calendar days prior to contract start
KO and COR 2 As specified and upon revision
3 N/A
Recommended
Enhancements
First work day of each
Quarter
KO and COR Quarterly
3.1 N/A
Monthly Service
Order Summary
Report
First work day of each month
KO and COR 2 Monthly
3.2 N/A
Preventive
Maintenance
Program Plan
Within 15 calendar days prior to contract start
KO and COR 2 Annually
3.2 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO and COR 2 Monthly
3.2.2 N/A Hangar and Roll-
Up Doors
Per
Occurrence
KO and COR 2 Semi-
Annually
3.2.3 N/A UPS Inspection
and Testing Report
Per
Occurrence
KO and COR 2 Semi-
Annually
3.3 N/A
Integrated
Program Plan
Within 15 calendar days prior to contract start
KO and COR 2 Annually
3.3 N/A Monthly IMP
Schedule and IMP
Maintenance and
Repair Status
Five work days prior to the beginning of each month
KO and COR 2 Monthly
3.3.1 N/A Fire Protection
Systems IMP
Report of inspection, testing and maintenance
Seven work days prior to testing, and within seven days following maintenance completion
KO/COR/FMD/
Fire
Department
4 As specified
3.3.1 N/A Semi-Annual
Smoke Detector
Report
As Specified KO and COR 2 Semi-
Annually
3.3.1 N/A Freeze Protection
Plan
Within 15 calendar days prior to
KO and COR 2 Annually
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original) contract start
3.3.2 N/A Tracer Summit
Control Alarm
Activity Report
First work day of each month
KO and COR 2 Monthly
3.3.2.3 N/A HVAC Water
Testing and
Treatment Program
Within 15 calendar days prior to contract start
KO and COR 2 Annually
3.3.2.3 N/A HVAC Water
Testing and
Treatment Program
As Required KO and COR 2 As
Required
3.3.3 N/A Filtered Exhaust
and Ventilation
Systems Lead
Waste Manifest
As Required Base
Environmental and COR
2 As
Required
3.3.4.2 N/A Boiler Water
Testing and
Treatment Program
Within 15 calendar days prior to contract start
KO and COR 2 Annually and As
Required
3.4 N/A
Inspection, Testing, and
Certification
Support Program
Summary Reports
First work day of each month
3.5.1 N/A
Schedule and log of Oil Water
Separator servicing
Within 15 calendar days prior to contract start
KO and COR 2 Annually
3.5.3 N/A
Monthly Re-lamping Report
First work day of each month
4 N/A
Weekly CAT Call
Summary Report
First work day of each month
KO and COR 2 Weekly
4 N/A
Monthly CAT Call
Summary Report
First work day of each month
1503010 – Custodial Services
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.2.1 N/A Pathogen Training
Certificates
Upon request KO/COR 1 Upon request
3.1 N/A Annual Work
Schedule
Within 15 calendar days prior to contract start and annually thereafter
KO and
COR
2 Annually
3.1 N/A Monthly Work
Plan
First work day of each month
KO and
2 Monthly
1503020 – Pest Control
Form
Attachment
Number
Deliverable Title
Date(s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.2.1 N/A Copy of State
Certification for
Contractor Personnel
15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO 2 As required
2.3.1 N/A Copy of Local/State
Business License
Prior to contract award.
Copies of renewed licenses shall also be submitted.
KO 2 1 per state
2.3.2 N/A Permits 5 days prior to
the start of work requiring permits.
KO 2 As required
2.3.4 N/A Ultra-Low Volume
(ULV) Equipment
Calibration and
Droplet Analysis
Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO 2 As required
2.3.5, 3.4 N/A Planned Pesticide Use
Sheets including
Pesticide Labels and
Material Safety Data
Sheets (MSDS)
15 calendar days prior to start of work.
Any proposed changes in pesticide usage shall be submitted for
KO approval at least 5 business days in advance of pesticide use.
KO 2 1 for each pesticide per pest as required
Form
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
3 N/A Contractor's Work
Plan
15 calendar days prior to start of work.
KO 2 1 per proposal
3 N/A Report of Conditions
Conducive to Pest
Infestation
1 working day after citing conditions.
KO 2 As required
4 N/A Five-year Termite
Treatment Warranties
10 days following the treatment.
KO 2 As required
4 N/A Termite and Wood
Decay Inspection (DD
Form 1070) (per the appropriate Pest
Group Sheet)
10 working days after inspection completed.
KO 2 As required
3, 4 N/A Adult Mosquito Catch
(per the appropriate
Pest Group Sheet)
The same day as collected in a labeled, re-sealable plastic bag.
Installati on
Preventiv e
Medicine
Departm ent
2 As required
3, 4 N/A Larval Mosquito
Survey Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO 2 As required
3, 4 N/A Stored Product Pest
Survey (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO 2 As required
3, 4 N/A Pharaoh Ant
Treatment: Floor Plan
Diagram (per the appropriate Pest
Group Sheet)
2 calendar days prior to beginning the treatment.
KO 2 As required
3, 4 N/A Tick Survey Report
(per the appropriate
Pest Group Sheet)
Within 1 day of the survey.
KO 2 As required
3, 4 N/A Mole Cricket Survey
Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO 2 As required
3, 4 N/A Aerial Spray
Operations - FAA
Approval (per the appropriate Pest
Group Sheet)
24 hours prior to performing aerial operations.
KO 2 As required
Form
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
3.2 N/A Monthly Service
Order Summary
Report
First work day of each month
KO and
COR
2 Monthly
3.3 J-1503020-03 Report of Pest
Management
Operations
Electronically once per month by the
15th of the following month
(Example:
July data must be submitted by August 15) on the format approved by
PMC.
KO,
PAR,
PMC
3 Monthly
1503030 – Integrated Solid Waste Management
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.3.2 N/A Weight Tickets As
specified
KO 12 Monthly
3.1 N/A Solid Waste
Collection
Schedule
Within 15 calendar days prior to contract start and annually thereafter
KO 1 Annually
1503040 – Other (Swimming Pool)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
2.2.1 N/A
Certification and
Licenses
Within 15 calendar days prior to contract start or as requested by the
KO
KO and
COR
2 Once for initial submittal, then as requested
Water Analysis
Report
As Required KO and
2 As Required
1503050 – Grounds Maintenance
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.2.1 N/A Certification, Training, and
Licensing
Within 15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO/COR 2 Annually and as required by
Section H –
Special Contract
Requirements, FAC 5252.237-
9301 Substitutions of Key Personnel
(JUN 1994)
2.3.1.1 N/A Business
Licensing
Within 15 calendar days prior to contract start.Copies of renewed licenses shall also be submitted.
KO/COR 2 As required
2.3.1.4 N/A Planned
Pesticide/
Herbicide Use
Sheets including
Pesticide/
Herbicide
Labels and
Safety Data
Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO, COR,
PPMC
3 Annually for each pesticide/herbicide, as required.
2.3.1.5 N/A Pest
Management
Operations
Report
Electronically by the 15th of the following month
(Example:
July data must be submitted by
August 15) on the format approved by
PMC.
KO, COR,
PPMC
2 Monthly
2.3.2 N/A Permits Within 15
calendar days prior to start of work.
KO/COR 2 As required
2.3.9.1 N/A Water
Conservation
Plan
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, seed and mulch
Prior to bringing on-board installation and prior to use
KO/COR 2 As Required
3 N/A Contractor
Work
Schedules
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
3.1.2 N/A Vegetation
Control
Schedule
Within 15 calendar days prior to contract start or as requested by the KO
KO and
COR
2 Annually
3.2 N/A Debris
Removal
Schedule
Within 15 calendar days prior to contract start or as requested by the KO
KO and
COR
2 Annually
3.4 N/A Soil Analysis
test results
15 days after receipt of the test results by the
Contractor
KO/COR 2 As specified
1604000 – Wastewater
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
3 N/A Standard Operating
Procedures
Within 30 days after contract start and within five days after making changes to any plant operating procedure, equipment or component.
KO and
Onsite
4 Once. Update if the requirements change.
3 N/A Laboratory Analysis of Wastewater
Effluent Report
Within 2 days of discovery when found non-compliant.
4 days after the end of the month if compliant.
KO 4 Monthly or within 2 days if found non-compliant
Weekly Service
Report
First work day of each month
KO and
COR
2 Weekly
Monthly Service
Report
First work day of each month
KO and
COR
2 Monthly
3.2, 3.2.1 N/A
Program Plan
Within 15 calendar days prior to contract start
KO and
COR
2 Annually
3.2, 3.2.1 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO and
COR
2 Monthly
3.2.1 N/A Wet Well
Photographs and
Reports
15 days after performance of the work
KO 4 As required
1606000 – Water
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
2.2.1 N/A Proof of all
Certification, Training, and
Licensing
Requirements
Within 30 days following award
KO 2 Once. Update as changes occur.
3 N/A Critical Spare Parts
Inventory
Within 30 days following award
KO 4 Once. Update if the requirements change.
3.1 N/A Standard Operating
Procedures
15 days after award and 5 days after changes
KO 4 As required
3.1 N/A Notification of
Unsafe Conditions
Report
Within 24 hours of occurrence
KO 4 ea per occurrence
As Specified
Weekly Service
Report
First work day of each month
KO and
COR
2 Weekly
Program Plan
Within 15 calendar days prior to contract start
KO and
COR
2 Annually
3.2 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO and
COR
2 Monthly
3.4 N/A Inspection, Testing
and Certification
Program and
Schedule
Within 30 days following award
KO 4 As Specified
3.4 N/A Inspection, Testing, and Certification
Program Summary
Report
As specified KO 4 As specified