1611490 Spec 01 33 00 (App A).pdf

PDF 1 MB Posted

Attached to
RFP N69450-23-R-0005 P658 NUCLEAR REGIONAL MAINTENANCE FACILITY, NSB Kings Bay, GA
Solicitation number
N6945023R0005
Issued by

View the file

Other files

File Type Posted
N69450-23-R-0005-0007.pdf PDF
N69450-23-R-0005-0006.pdf PDF
1611490 Dwg C-607.pdf PDF
1611490 Dwg C-106.pdf PDF
1611490 Dwg A-109.pdf PDF
1611490 Spec 09 78 00.pdf PDF
1611490 Dwg_C-707.pdf PDF
1611490 Dwg A-108.pdf PDF
1611490 Dwg_IN703.pdf PDF
1611490 Dwg C-705.pdf PDF
1611490 Spec 03 35 00.pdf PDF
1611490 Dwg_IN725.pdf PDF
1611490 Dwg IN730.pdf PDF
1611490 Dwg IN731.pdf PDF
N69450-23-R-0005-0005.pdf PDF
1611490 Dwg IN706.pdf PDF
1611490 Dwg A-205.pdf PDF
1611490 Dwg A-512.pdf PDF
1611490 Dwg S-509.pdf PDF
1611490 Dwg_IN700.pdf PDF
1611490 Dwg_IN742.pdf PDF
1611490 Dwg _IN722.pdf PDF
1611490 Spec 07 14 00.pdf PDF
1611490 Dwg A-110.pdf PDF
1611490 Dwg A-102.pdf PDF
1611490 Dwg IN707.pdf PDF
1611490 Spec 07 41 13.pdf PDF
1611490 Dwg TS233.pdf PDF
1611490 Dwg IN741.pdf PDF
1611490 Dwg IN728.pdf PDF
1611490 Dwg_IN704.pdf PDF
1611490 Dwg A-206.pdf PDF
1611490 Dwg A-104.pdf PDF
1611490 Dwg_IN702.pdf PDF
1611490 Dwg_IN724.pdf PDF
1611490 Dwg_C-708.pdf PDF
1611490 Dwg _IN721.pdf PDF
1611490 Spec 31 68 13.pdf PDF
1611490 Dwg_IN723.pdf PDF
1611490 Dwg IN720.pdf PDF
1611490 Dwg A-106.pdf PDF
1611490 Spec 10 44 16.pdf PDF
1611490 Dwg A-301.pdf PDF
1611490 Dwg C-109.pdf PDF
1611490 Dwg TS238.pdf PDF
1611490 Dwg_IN705.pdf PDF
1611490 Dwg A-202.pdf PDF
1611490 Dwg C-704.pdf PDF
1611490 Dwg C-703.pdf PDF
1611490 Dwg A-203.pdf PDF
Show 40 more

Latest 50 of 201 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 126 PAGES

P658 Nuclear Regional Maintenance Facility

01 11 00 SD-01 Preconstruction Submittals

1.7 G OICSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 G OICList of Contractor Employees

3.1.2 G OICList of Contractor Employees

1.4.1.1 G OICDesignated Contractor Security

Representative

1.4.1.2.4 G OICDesignated Contractor Security

Representative

3.1.1 G OICDesignated Contractor Security

Representative

3.1.2 G OICDesignated Contractor Security

Representative

3.1.4.1 G OICContractor Intake Form

1.3 G OICWork Sequencing Plan

01 20 00 SD-01 Preconstruction Submittals

1.3 G OICEarned Value Report

01 30 00 SD-01 Preconstruction Submittals

1.3 G OICView Location Map

1.4 G OICProgress and Completion

Pictures

1.6.1 G OICSuperintendent Resume

1.9.1 G OICFacilitator's Resume

1.11.2 G OICConstruction Wage Rate

Requirements Statute Payroll

Processing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 June 2023

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 126 PAGES

01 30 00 SD-11 Closeout Submittals

1.11.2 G OICData from the Electronic

Construction Wage Rate

Requirements Statute Payroll

Processing System

01 31 23.13 20 SD-01 Preconstruction Submittals

1.4.2 G OICList of Contractor's Personnel

01 32 17.00 20 SD-01 Preconstruction Submittals

1.2.2 G OICBaseline NAS

1.9 G OICDesignated Project Scheduler

SD-07 Certificates

1.3 G OICFour-Week Look Ahead

Schedule

1.4.1 G OICMonthly Network Analysis

Updates

SD-11 Closeout Submittals

1.4.2 G OICAs-Built Schedule

01 33 00 SD-01 Preconstruction Submittals

1.8 G OICSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 G OICPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G OICSustainability Action Plan

1.5.3.2 G OICPreliminary Sustainability

eNotebook

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 126 PAGES

01 33 29 1.5.3.2 G OICThird Party Certification Design

Compliance Report

SD-11 Closeout Submittals

1.5.3.2 G OICFinal High Performance and

Sustainable Building Checklist

1.5.3.2 G OICFinal Sustainability eNotebook

1.5.3.2 G OICAmended Final Sustainability

eNotebook

1.5.3.2 G OICAmended Final High

Performance and Sustainable

Building Checklist

3.2 G OICThird Party Certification

Certificate, Assessment, or

Validation and Compliance Report

01 35 26 SD-01 Preconstruction Submittals

1.7.1.1 G OICSite Safety and Health Officer

(SSHO) and Alternate SSHO

Resumes

1.8.1 G OICAPP - Construction

1.8 G OICAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.13Notifications and Reports

1.13.2 G OICAccident Reports

1.13.3LHE Inspection Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 126 PAGES

01 35 26 1.5Contractor Safety Self-Evaluation

Checklist

1.7.1.4Crane Operators/Riggers

1.8.3.2 G OICStandard Lift Plan

1.8.3.3 G OICCritical Lift Plan

1.9Activity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4Certificate of Compliance

01 45 00.00 20 SD-01 Preconstruction Submittals

1.5.1.2 G OICQuality Control (QC) Manager

Resume

1.5.3 G OICAlternate QC Manager Resume

1.5.4 G OICAssistant QC Manager Resume

1.5.5 G OICQC Specialists Resumes

1.6.1 G OICConstruction Quality Control (QC)

Plan

1.16 G OICIndoor Air Quality (IAQ)

Management Plan

1.16 SFinal IAQ Management Plan

01 45 35 SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Steel Joist Institute Membership

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 126 PAGES

01 45 35 2.1Certified Plant

2.1Certificate of Compliance

1.5 G OICSpecial Inspector

1.5.3.1NDT Level III

SD-11 Closeout Submittals

3.1.2 G OICInterim Report

3.1.2 G OICComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G OICConstruction Site Plan

3.3.1 G OICTraffic Control Plan

2.2.1 G OICHaul Road Plan

1.6.1.4 G OICContractor Computer

Cybersecurity Compliance

Statements

1.6.6 G OICContractor Temporary Network

Cybersecurity Compliance

Statements

3.5.4 G OICUpper Base Parking/Laydown

Area Photos

2.6.2.2 G OICTemporary NRMD Facility

2.6.2.3 G OICGovernment Field Office

3.7 G OICGovernment Field Office

3.10.1 G OICHaul Route Pavement Condition

Survey

SD-03 Product Data

1.4 G OICBackflow Preventers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 126 PAGES

01 50 00 SD-06 Test Reports

3.4Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1 G OICPreconstruction Survey

1.10 G OICSolid Waste Management Permit

1.6.2 G OICRegulatory Notifications

1.7 G OICEnvironmental Protection Plan

3.2.1 G OICSequence of Construction for

Temporary and Permanent

Drainage Distributions

3.2.2.1 G OICStormwater Pollution Prevention

Plan

3.2.2.2 G OICStormwater Notice of Intent

1.8 G OICLand Disturbance Activity (LDA)

1.7.9.1 G OICDirt and Dust Control Plan

1.6.5 G OICEmployee Training Records

1.6.4 G OICEnvironmental Manager

Qualifications

SD-06 Test Reports

3.8.1.1.2Laboratory Analysis

3.2.2.3Inspection Reports

1.10.1 G OICMonthly Solid Waste Disposal

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 126 PAGES

01 57 19 SD-07 Certificates

1.6.5 G OICEmployee Training Records

1.4.1.2 G OICECATTS Certificate Of

Completion

1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.2.4 G OICStormwater Pollution Prevention

Plan Compliance Notebook

3.2.2.5 G OICStormwater Notice of Termination

3.8.1 G OICWaste Determination

Documentation

3.8.3.6 G OICDisposal Documentation for

Hazardous and Regulated Waste

1.6.5 G OICAssembled Employee Training

Records

1.10 G OICSolid Waste Management Permit

3.8.2.1 G OICProject Solid Waste Disposal

Documentation Report

3.9.1 G OICContractor Hazardous Material

Inventory Log

3.8.3.1 G OICHazardous Waste/Debris

Management

1.6.2 G OICRegulatory Notifications

3.8.2.1 G OICSales Documentation

3.8.2.1Contractor Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 126 PAGES

01 57 19 3.2.2.5As-Built Topographic Survey

01 58 00 SD-02 Shop Drawings

1.4.1 G OICPreliminary Drawing Indicating

Layout And Text Content

01 74 19 SD-01 Preconstruction Submittals

1.7 G OICConstruction Waste Management

Plan

SD-11 Closeout Submittals

1.9 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.6.1Warranty Management Plan

1.6.4Warranty Tags

3.3Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.6.1Instructions

SD-11 Closeout Submittals

3.1 G OICAs-Built Drawings

3.2 G OICRecord Drawings

1.6.1 G OICAs-Built Record of Equipment

and Materials

2.1 G OICCertification of EPA Designated

Items

2.2 G OICCertification Of USDA Designated

Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 126 PAGES

01 78 00 3.4.1 G OICInterim DD FORM 1354

3.4.2 G OICChecklist for DD FORM 1354

3.4.2 G OICHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 G OICTraining Plan

3.1.3 G OICTraining Outline

3.1.2 G OICTraining Content

SD-11 Closeout Submittals

3.1.4 G OICTraining Video Recording

3.1.6 G OICValidation of Training Completion

01 78 24.00 20 SD-11 Closeout Submittals

1.4.1 G OICeOMSI, Progress Submittal

1.4.2 G OICeOMSI, Prefinal Submittal

1.4.3 G OICeOMSI, Final Submittal

01 91 00.15 20 SD-06 Test Reports

1.11 G AEIssues Log

3.5 G AECompleted Pre-Functional

Checklists

SD-07 Certificates

1.12 G AECertificate Of Readiness

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G OICDemolition Plan

1.9Existing Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 126 PAGES

02 41 00 SD-07 Certificates

1.6 G OICNotification

SD-11 Closeout Submittals

3.3.5Receipts

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 G OICQuality Control Plan

1.6.6 G OICQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 G OICLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 G AEReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.3Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 126 PAGES

03 30 00 2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

1.8.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 G AEConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G AEConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.14.3.3 G AECompressive Strength Tests

3.14.3.4Air Content

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 126 PAGES

03 30 00 1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets

1.8.2Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

03 35 00 SD-03 Product Data

1.5.4Safety Data Sheets (SDS)

1.5.5Preparation and concrete grinding procedures

03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 G AEStandard Precast Units

2.1.2 G AECustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data

2.1.1Standard Precast Units

2.1.3Proprietary Precast Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 126 PAGES

03 42 13.00 10 3.1.3Embedded Items

2.2.4Accessories

SD-05 Design Data

2.1.2 G AEDesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports

1.3.2.4Test Reports

SD-07 Certificates

1.3.2.2Quality Control Procedures

03 45 00 SD-01 Preconstruction Submittals

1.12.5Pre-Installation Meeting

SD-02 Shop Drawings

1.12.1 G AEPrecast Drawings

SD-03 Product Data

2.3 G AECast-In Embedded Items And

Connectors

2.3.2 G AEConnection Devices

2.2.6Admixtures

2.5Gasket

2.6Bearing Pads

SD-04 Samples

1.12.2 G OICConcrete Wall Panel Surface

Finish

1.12.4Mock-up

2.4.1Form Liner

1.12.2 G OICFull Size Sample Wall Panel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 126 PAGES

03 45 00 SD-05 Design Data

1.5.4 G AEDesign Calculations

2.1.1 G AEContractor-Furnished Mix Design

2.4.9 G AERepair of Surface Defects

1.5.5 G AEThermal Calculations

SD-06 Test Reports

1.11.2 G AEStrength Tests

1.11.2Slump

1.11.2Air Content

1.11.1Test for Concrete Materials

2.2.7Water

3.6.4Testing Precast Units for Strength

SD-07 Certificates

1.4 G AEManufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

1.10Erector's Post Audit Declaration

SD-08 Manufacturer’s Instructions

3.3Installation

3.8Cleaning

SD-11 Closeout Submittals

1.12.3Batch Ticket Information

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 126 PAGES

03 45 00 2.2.1 SRecycled Content for Silica Fume

04 20 00 SD-02 Shop Drawings

3.3.4.1 G AECut CMU

3.4.1.1 G AEDetail Drawings

SD-03 Product Data

1.5.1Hot Weather Procedures

1.5.2Cold Weather Procedures

2.2.2.2.1 G AECement

SD-04 Samples

1.3.1.1 G OICMock-Up Panel

2.2.2.2 G OICConcrete Masonry Units (CMU)

2.6.3 G OICJoint Reinforcement

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

3.2.5 G AEBracing Calculations

SD-06 Test Reports

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.2.3Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.1.2Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 126 PAGES

04 20 00 2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.2Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G OICErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 126 PAGES

05 12 00 1.4.3 G AEDesign Calculations for Steel

Connections

1.4.2Shoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 126 PAGES

05 21 00 1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G AESteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-05 Design Data

2.2 G AEDesign Calculations

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

05 30 00 SD-02 Shop Drawings

1.3.5 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.5Galvanizing Repair Paint

2.2.17Mechanical Fasteners

2.1.5Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1Metal Roof Deck Units

2.1.3Metal Floor Deck Units

2.2.4Flexible Closure Strips

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 126 PAGES

05 30 00 2.1 G AEDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.12Stud Manufacture's Certification

2.2.12Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

1.6.1 G AEFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

1.6.2 G AEMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13 SD-02 Shop Drawings

2.5 G AECover Plates and Frames

2.6 G AEExpansion Joint Covers

2.7 G AEFloor Gratings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 126 PAGES

05 50 13 2.7 G AERoof Walkways

2.8 G AEBollards/Pipe Guards

2.9 G AEAngles and Plates

SD-03 Product Data

2.4Corner Guards

2.5 G AECover Plates and Frames

2.6 G AEExpansion Joint Covers

2.7 G AEFloor Gratings

2.7 G AERoof Walkways

2.1 SRecycled Content

SD-04 Samples

2.6Expansion Joint Covers

SD-07 Certificates

2.2 G OICCertified Mill

05 51 00 SD-02 Shop Drawings

2.1 G AEIron and Steel Hardware

2.1 G AESteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

SD-03 Product Data

2.4.1 G AEStructural Steel Plates, Shapes, and Bars

2.4.2 G AEStructural Steel Tubing

2.4.5 G AEHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G AECold-Finished Steel Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 126 PAGES

05 51 00 2.4.3 G AEHot-Rolled Carbon Steel Bars

2.4.6 G AECold-Rolled Carbon Steel Sheets

2.4.7 G AEGalvanized Carbon Steel Sheets

2.4.8 G AECold-Drawn Steel Tubing

2.4.9 G AEGray Iron Castings

2.4.10 G AEMalleable Iron Castings

2.3.3 G AEConcrete Inserts

2.3.4 G AEMasonry Anchorage Devices

2.2.4 G AEProtective Coating

2.2.2 G AESteel Pan Stairs

2.3.1 G AESteel Stairs

SD-05 Design Data

2.3.1.1 G AEDesign Calculations

SD-07 Certificates

1.3.1 G OICWelding Procedures

1.3.1 G OICWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 G OICStructural Steel Plates, Shapes, and Bars

2.4.2 G OICStructural Steel Tubing

2.4.5 G OICHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G OICCold-Finished Steel Bars

2.4.3 G OICHot-Rolled Carbon Steel Bars

2.4.6 G OICCold-Rolled Carbon Steel Sheets

2.4.7 G OICGalvanized Carbon Steel Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 126 PAGES

05 51 00 2.4.8 G OICCold-Drawn Steel Tubing

2.4.9 G OICGray Iron Castings

2.4.10 G OICMalleable Iron Castings

2.2.4 G OICProtective Coating

2.3.4 G OICMasonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

3.2 G AEIron and Steel Hardware

3.2 G AESteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 G AEStructural-Steel Plates, Shapes, and Bars

2.2.2 G AEStructural-Steel Tubing

1.2.1 G AECold-Finished Steel Bars

1.2.1 G AEHot-Rolled Carbon Steel Bars

1.2.1 G AECold-Drawn Steel Tubing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 126 PAGES

05 52 00 2.2.4 G AEConcrete Inserts

2.2.5 G AEMasonry Anchorage Devices

2.1.2 G AEProtective Coating

2.2.7 G AESteel Railings and Handrails

1.2.1 G AEAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 G OICWelding Procedures

1.4.2 G OICWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

05 72 00 SD-01 Preconstruction Submittals

1.3.3 G OICExisting Conditions

SD-02 Shop Drawings

2.2 G AEOrnamental Metal Items

3.1 G AEInstallation Drawings

3.1 G AEShop and Field Connections

3.1 G AEConstruction Details

SD-03 Product Data

2.1 G AEMaterials

2.2 G AEOrnamental Metal Items

2.2.2Aluminum-Alloy Extrusions

2.2.3Aluminum-Alloy Sheets And

Plates

2.2.4Aluminum-Alloy Castings

2.2.5Aluminum-Alloy Forgings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 126 PAGES

05 72 00 SD-04 Samples

1.3.2 G OICManufacturer's Standard Color

Charts

1.3.2 G OICShop Paint

1.3.2 G OICFinish Paint

1.3.1 G OICAluminum Finishes

2.2.9 G OICAluminum Finishes

1.3.1 G OICAnchorage Devices and

Fasteners

SD-07 Certificates

2.2 G OICOrnamental Metal Items

SD-08 Manufacturer’s Instructions

3.3Cleaning Materials

3.3Preventative Maintenance and

Inspection

3.4Maintenance Instructions

3.3Application Methods

06 10 00 SD-02 Shop Drawings

2.2.1 G AENailing Strips

2.4.1.1 G AENailing Strips

SD-03 Product Data

1.8Fire-retardant Treatment

2.4.2Adhesives

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 126 PAGES

06 10 00 1.11.1Certificates of Grade

1.7Preservative Treatment

2.4.2 SIndoor Air Quality for Aerosol

Adhesives

2.4.2 SIndoor Air Quality for Non-aerosol

Adhesives

06 41 16.00 10 SD-02 Shop Drawings

1.4.2 G AEShop Drawings

2.11 G AEShop Drawings

3.1Installation

SD-03 Product Data

2.1 G AEWood Materials

2.9Wood Finishes

2.11.7.3 G AEFinish Schedule

1.4.3Certification

SD-04 Samples

2.3 G AEPlastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.4Quality Assurance

2.9Laminate Clad Casework

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 G AEDetail Fabrication Drawings

3.1 G AEInstallation

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 126 PAGES

06 61 16 2.1.1 G AESolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 G AEMaterial

2.3.5 G AECounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 G OICSolid Polymer

07 05 23 SD-01 Preconstruction Submittals

1.4 G OICWork Plan

SD-03 Product Data

2.2 G AEThermal Imaging Camera

SD-05 Design Data

3.2 G AEEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 126 PAGES

07 05 23 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G OICPressure Test Procedures

1.6.4 G OICAir Leakage Test Report

3.5.7 G OICAir Leakage Test Report

1.6.4 G OICDiagnostic Test Report

3.6.5 G OICDiagnostic Test Report

07 14 00 SD-03 Product Data

2.1 G AEFluid-Applied Membrane

2.2 G AEMembrane Primer

2.8 G AEElastomeric Sheet

2.10 G AEFlexible Foam-Backed

Elastomeric Sheet

3.3 G AESolvent

3.4.1 G AEMoisture Meter

2.11 G AEProtection Board

2.7 G AEBond Breaker

SD-11 Closeout Submittals

1.6 G AEWarranty

07 21 13 SD-03 Product Data

1.3 G AEManufacturer's Standard Details

2.1 G AEBlock or Board Insulation

2.2 G AEPressure Sensitive Tape

1.4 G AEProtection Board or Coatings

2.4 G AEAccessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 126 PAGES

07 21 13 2.1.4 SRecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 G OICBlock or Board Insulation

2.3 G OICProtection Board or Coating

3.4.2 G OICProtection Board or Coating

1.7 G OICSpecial Warranties

1.7 G OICSpecial Warranties

2.1.5 SIndoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.4.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2 SRecycled Content for Insulation

Materials

2.3Accessories

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

2.3.1 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 G AEInsulation Board Layout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 126 PAGES

07 22 00 SD-03 Product Data

2.1 G AEInsulation

1.4 G AECover Board

2.3 G AEFasteners

2.1.2 SRecycled Content For Insulation

SD-06 Test Reports

1.8.1 G OICFlame Spread Rating

SD-07 Certificates

1.6 G OICInstaller Qualifications

1.6 G OICCertificates Of Compliance For

Felt Materials

2.1.3 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.3 G OICFasteners

2.1 G OICInsulation

07 27 10.00 10 SD-02 Shop Drawings

2.1 G AEAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 G AEAir Barrier System Product Data

SD-04 Samples

3.1.2 G OICMock-Up

2.1 G OICMaterial Samples For Air Barrier

System

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 126 PAGES

07 27 10.00 10 1.8 G AEDesign Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8 G OICDesign Review Report

3.1.3 G OICTesting and Inspection

SD-07 Certificates

1.7 G OICAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 G OICQualifications of Manufacturer

1.8.2 G OICQualifications of Installer

SD-02 Shop Drawings

1.4 G AESelf-adhering Air Barrier

SD-03 Product Data

1.4 G AESelf-adhering Air Barrier

2.2 G AEPrimers, Adhesives, and Mastics

1.4.2 G AESafety Data Sheets

SD-04 Samples

1.4 G OICSelf-adhering Air Barrier

SD-06 Test Reports

1.6 G OICField Peel Adhesion Test

1.4.4 G OICFlame Propagation of Wall

Assemblies

1.4.4 G OICFlame Spread and Smoke

Developed Index Ratings

3.4.1 G OICSite Inspections and Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 126 PAGES

07 27 19.01 1.4 G OICSelf-adhering Air Barrier

SD-08 Manufacturer’s Instructions

1.4 G OICSelf-adhering Air Barrier

2.2 G OICPrimers, Adhesives, and Mastics

07 41 13 SD-02 Shop Drawings

1.4.5 G AERoofing Panels

1.4.5 G AEFlashing and Accessories

1.4.5 G AEGutter/Downspout Assembly

2.3 G AESoffit Panels

2.4 G AEMetal Canopy

SD-03 Product Data

2.1 G AERoof Panels

2.3 G AESoffit Panels

2.4 G AEMetal Canopy

2.1.1 SRecycled Content for Aluminum

Roof Panels

2.2.2 SEnergy Star Label for Metal

Roofing Product

2.2.2 SHeat Island Reduction

1.4.5 G AEFactory-Applied Color Finish

2.6 G AEAccessories

1.4.5 G AEFasteners

1.4.5 G AEPressure Sensitive Tape

2.8 G AEUnderlayments

2.9 G AEGaskets and Sealing/Insulating

Compounds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 126 PAGES

07 41 13 1.4.5 G AECoil Stock

1.4.5 G AEGalvanizing Repair Paint

SD-04 Samples

2.1 G AERoof Panels

1.4.5 G AEFactory-applied Color Finish

2.3 G AESoffit Panels

2.6 G AEAccessories

1.4.5 G AEFasteners

1.4.5 G AEGaskets and Sealant/Insulating

Compounds

SD-05 Design Data

1.4.6 G AEEngineering Calculations

1.2.1.2 G AEWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 G OICLeakage Test Report

1.2.1.2 G OICWind Uplift Test Report

2.2 G OICFactory Finish and Color

Performance Requirements

SD-07 Certificates

2.1 G OICRoof Panels

1.4.5 G OICCoil Stock Compatibility

1.4.1 G OICQualification of Manufacturer

1.4.2 G OICQualification of Applicator

SD-08 Manufacturer’s Instructions

1.4.5 G OICInstallation Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 126 PAGES

07 41 13 SD-09 Manufacturer’s Field

Reports

3.9.1 G OICManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 G OICWarranties

3.10 G OICInformation Card

07 42 13 SD-01 Preconstruction Submittals

1.5.3 G OICQualification of Manufacturer

1.5.4 G OICQualification of Installation

Contractor

1.8 G OICWarranty

SD-02 Shop Drawings

1.5.1.1 G AEInstallation Drawings

SD-03 Product Data

2.1Recycled Content;

2.2.1 G AEWall Panels

2.2.2Factory Color Finish

1.5.5Closure Materials

2.5.4.4Pressure Sensitive Tape

2.5.4.1Sealants and Caulking

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

1.5.5Accessories

2.5Accessories

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 126 PAGES

07 42 13 2.2.1 G AEWall Panels

1.5.3.1 G AEFasteners

2.5.3 G AEMetal Closure Strips

2.2.2.5 G AEColor chart

SD-05 Design Data

1.5.1.2 G AEWind load design analysis

SD-06 Test Reports

3.7.2 G OICLeakage Tests

1.3.2 G OICWind Load Tests

2.2.2.6 G OICCoating

2.2.2.6 G OICChalking

1.3.2 G OICSeismic Tests

SD-07 Certificates

1.5.3.1 G OICCoil Stock

1.5.3.1 G OICFasteners

1.5.3.1 G OICGalvanizing Repair Paint

1.5.3.1 G OICEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 G OICInstallation

SD-09 Manufacturer’s Field

Reports

3.8.1 G OICManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 G OICWarranty

1.5.6 G OICMaintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 126 PAGES

07 42 13 1.8.120 year 'No Dollar Limit' warranty for labor and material

07 52 00 SD-02 Shop Drawings

1.4.7Roof Plan

1.4.7Field Inspection and Existing

Conditions Report

SD-03 Product Data

2.2Modified Bitumen Sheets

2.14 SEnergy Star Label for Top

Coating

2.4Cold-Applied Membrane

Adhesive

2.2Fiberglass Felt

2.6Primer

2.7Modified Bitumen Roof Cement

2.10Pre-Manufactured Accessories

2.9Fasteners And Plates

1.8Warranty

SD-05 Design Data

1.4.6Wind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.4Qualification of Engineer of

Record

1.4.6Wind Uplift Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 126 PAGES

07 52 00 1.4.5Fire Resistance

SD-08 Manufacturer’s Instructions

3.3.5Modified Bitumen Membrane

Application

3.3.6Flashing

3.3.3.1Cold Adhesive Applied Modified

Bitumen Membrane

2.6Primer

2.9.1Fasteners

3.3.8.1Coating Application

1.6Cold Weather Installation

SD-11 Closeout Submittals

1.8Warranty

3.8Information Card

3.7Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 G AEExposed Sheet Metal

3.1.16 G AEGutters

3.1.17 G AEDownspouts

2.2.1 G AEGravel Stops and fascia

3.1.21 G AESplash Pans

3.1.18 G AEFlashing for Roof Drains

3.1.11 G AEBase Flashing

3.1.12 G AECounterflashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 126 PAGES

07 60 00 3.1.25 G AEFlashing at Roof Penetrations and Equipment Supports

2.2.12 G AEReglets

3.1.19 G AEScuppers

3.1.27 G AECopings

3.1.15 G AEDrip Edges

3.1.20 G AEConductor Heads

3.1.22 G AEOpen Valley Flashing

3.1.23 G AEEave Flashing

2.1 SRecycled Content

SD-03 Product Data

2.2.9 G AECool Roof

SD-04 Samples

1.4.2 G AEFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 G OICInstructions for Installation

3.5 G OICQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 G OICCleaning and Maintenance

07 81 00 SD-03 Product Data

3.3 G NAVFireproofing Material

SD-04 Samples

2.1 G NAVSpray-Applied Fireproofing

SD-06 Test Reports

1.2.2 G NAVFire Resistance Rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 126 PAGES

07 81 00 3.6 G OICField Tests

1.2.3 G OICEvaluation Reports

SD-07 Certificates

1.4.1 G OICInstaller Qualifications

3.1 G NAVSurface Preparation Report

3.5.2 G NAVManufacturer's Inspection Report

07 84 00 SD-02 Shop Drawings

2.1 G AEFirestopping System

SD-03 Product Data

2.2 G AEFirestopping Materials

SD-06 Test Reports

3.3 G AEInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 G AEInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 G AESealants

2.2 G AEPrimers

2.3 G AEBond Breakers

2.4 G AEBackstops

SD-06 Test Reports

3.1 G AEField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 126 PAGES

07 92 00 2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1 G AEDoors

2.1 G AEDoors

2.6 G AEFrames

2.6 G AEFrames

2.4Accessories

SD-03 Product Data

2.1 G AEDoors

2.1 SRecycled Content for Steel Door

Product

2.6 G AEFrames

2.6 SRecycled Content for Steel Frame

Product

2.4Accessories

08 14 00 SD-02 Shop Drawings

2.1 G AEDoors

SD-03 Product Data

2.1 G AEDoors

2.1.1.1 SRecycled Content for Door Cores

2.2Accessories

1.5Warranty

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 126 PAGES

08 14 00 2.1Doors

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

2.1.1.1 SIndoor Air Quality for

Particleboard and Agrifiber Door

Cores

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 G AEAccess Doors And Panels

SD-03 Product Data

1.3 G AEAccess Doors And Panels

1.3.2 G AEHardware

2.2.8 G AEAccessories

1.3.1 G AEPower Transfer Components

2.1 SRecycled Content

SD-04 Samples

2.5 G OICFinishes

SD-06 Test Reports

1.3.1 G OICFire-rating(s) of Assemblies

1.3.1 G OICAcoustical Ratings of Assemblies

08 33 23 SD-02 Shop Drawings

2.2.1Overhead Coiling Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 126 PAGES

08 33 23 2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

2.2.1.3Bottom Bars

2.1.1.1Guides

2.2.3.1Mounting Brackets

2.2.2.2Hood

2.1.1.1Installation Drawings

SD-03 Product Data

2.2.1Overhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

2.2.5Fire-Rated Door Assembly

SD-05 Design Data

2.2.1Overhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

1.3Fire-Rated Door

SD-10 Operation and Maintenance

Data

1.3.2Operation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1Warranty

08 34 73 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO…

This is the start of the file's text. The full file is on GovTribe.