SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 126 PAGES
P658 Nuclear Regional Maintenance Facility
01 11 00 SD-01 Preconstruction Submittals
1.7 G OICSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 G OICList of Contractor Employees
3.1.2 G OICList of Contractor Employees
1.4.1.1 G OICDesignated Contractor Security
Representative
1.4.1.2.4 G OICDesignated Contractor Security
Representative
3.1.1 G OICDesignated Contractor Security
Representative
3.1.2 G OICDesignated Contractor Security
Representative
3.1.4.1 G OICContractor Intake Form
1.3 G OICWork Sequencing Plan
01 20 00 SD-01 Preconstruction Submittals
1.3 G OICEarned Value Report
01 30 00 SD-01 Preconstruction Submittals
1.3 G OICView Location Map
1.4 G OICProgress and Completion
Pictures
1.6.1 G OICSuperintendent Resume
1.9.1 G OICFacilitator's Resume
1.11.2 G OICConstruction Wage Rate
Requirements Statute Payroll
Processing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
08 June 2023
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 126 PAGES
01 30 00 SD-11 Closeout Submittals
1.11.2 G OICData from the Electronic
Construction Wage Rate
Requirements Statute Payroll
Processing System
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2 G OICList of Contractor's Personnel
01 32 17.00 20 SD-01 Preconstruction Submittals
1.2.2 G OICBaseline NAS
1.9 G OICDesignated Project Scheduler
SD-07 Certificates
1.3 G OICFour-Week Look Ahead
Schedule
1.4.1 G OICMonthly Network Analysis
Updates
SD-11 Closeout Submittals
1.4.2 G OICAs-Built Schedule
01 33 00 SD-01 Preconstruction Submittals
1.8 G OICSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 G OICPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G OICSustainability Action Plan
1.5.3.2 G OICPreliminary Sustainability
eNotebook
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 126 PAGES
01 33 29 1.5.3.2 G OICThird Party Certification Design
Compliance Report
SD-11 Closeout Submittals
1.5.3.2 G OICFinal High Performance and
Sustainable Building Checklist
1.5.3.2 G OICFinal Sustainability eNotebook
1.5.3.2 G OICAmended Final Sustainability
eNotebook
1.5.3.2 G OICAmended Final High
Performance and Sustainable
Building Checklist
3.2 G OICThird Party Certification
Certificate, Assessment, or
Validation and Compliance Report
01 35 26 SD-01 Preconstruction Submittals
1.7.1.1 G OICSite Safety and Health Officer
(SSHO) and Alternate SSHO
Resumes
1.8.1 G OICAPP - Construction
1.8 G OICAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 G OICAccident Reports
1.13.3LHE Inspection Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 126 PAGES
01 35 26 1.5Contractor Safety Self-Evaluation
Checklist
1.7.1.4Crane Operators/Riggers
1.8.3.2 G OICStandard Lift Plan
1.8.3.3 G OICCritical Lift Plan
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
01 45 00.00 20 SD-01 Preconstruction Submittals
1.5.1.2 G OICQuality Control (QC) Manager
Resume
1.5.3 G OICAlternate QC Manager Resume
1.5.4 G OICAssistant QC Manager Resume
1.5.5 G OICQC Specialists Resumes
1.6.1 G OICConstruction Quality Control (QC)
Plan
1.16 G OICIndoor Air Quality (IAQ)
Management Plan
1.16 SFinal IAQ Management Plan
01 45 35 SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Steel Joist Institute Membership
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 126 PAGES
01 45 35 2.1Certified Plant
2.1Certificate of Compliance
1.5 G OICSpecial Inspector
1.5.3.1NDT Level III
SD-11 Closeout Submittals
3.1.2 G OICInterim Report
3.1.2 G OICComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 G OICConstruction Site Plan
3.3.1 G OICTraffic Control Plan
2.2.1 G OICHaul Road Plan
1.6.1.4 G OICContractor Computer
Cybersecurity Compliance
Statements
1.6.6 G OICContractor Temporary Network
Cybersecurity Compliance
Statements
3.5.4 G OICUpper Base Parking/Laydown
Area Photos
2.6.2.2 G OICTemporary NRMD Facility
2.6.2.3 G OICGovernment Field Office
3.7 G OICGovernment Field Office
3.10.1 G OICHaul Route Pavement Condition
Survey
SD-03 Product Data
1.4 G OICBackflow Preventers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 126 PAGES
01 50 00 SD-06 Test Reports
3.4Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1 G OICPreconstruction Survey
1.10 G OICSolid Waste Management Permit
1.6.2 G OICRegulatory Notifications
1.7 G OICEnvironmental Protection Plan
3.2.1 G OICSequence of Construction for
Temporary and Permanent
Drainage Distributions
3.2.2.1 G OICStormwater Pollution Prevention
Plan
3.2.2.2 G OICStormwater Notice of Intent
1.8 G OICLand Disturbance Activity (LDA)
1.7.9.1 G OICDirt and Dust Control Plan
1.6.5 G OICEmployee Training Records
1.6.4 G OICEnvironmental Manager
Qualifications
SD-06 Test Reports
3.8.1.1.2Laboratory Analysis
3.2.2.3Inspection Reports
1.10.1 G OICMonthly Solid Waste Disposal
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 126 PAGES
01 57 19 SD-07 Certificates
1.6.5 G OICEmployee Training Records
1.4.1.2 G OICECATTS Certificate Of
Completion
1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.2.4 G OICStormwater Pollution Prevention
Plan Compliance Notebook
3.2.2.5 G OICStormwater Notice of Termination
3.8.1 G OICWaste Determination
Documentation
3.8.3.6 G OICDisposal Documentation for
Hazardous and Regulated Waste
1.6.5 G OICAssembled Employee Training
Records
1.10 G OICSolid Waste Management Permit
3.8.2.1 G OICProject Solid Waste Disposal
Documentation Report
3.9.1 G OICContractor Hazardous Material
Inventory Log
3.8.3.1 G OICHazardous Waste/Debris
Management
1.6.2 G OICRegulatory Notifications
3.8.2.1 G OICSales Documentation
3.8.2.1Contractor Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 126 PAGES
01 57 19 3.2.2.5As-Built Topographic Survey
01 58 00 SD-02 Shop Drawings
1.4.1 G OICPreliminary Drawing Indicating
Layout And Text Content
01 74 19 SD-01 Preconstruction Submittals
1.7 G OICConstruction Waste Management
Plan
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.3Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-11 Closeout Submittals
3.1 G OICAs-Built Drawings
3.2 G OICRecord Drawings
1.6.1 G OICAs-Built Record of Equipment
and Materials
2.1 G OICCertification of EPA Designated
Items
2.2 G OICCertification Of USDA Designated
Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 126 PAGES
01 78 00 3.4.1 G OICInterim DD FORM 1354
3.4.2 G OICChecklist for DD FORM 1354
3.4.2 G OICHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 G OICTraining Plan
3.1.3 G OICTraining Outline
3.1.2 G OICTraining Content
SD-11 Closeout Submittals
3.1.4 G OICTraining Video Recording
3.1.6 G OICValidation of Training Completion
01 78 24.00 20 SD-11 Closeout Submittals
1.4.1 G OICeOMSI, Progress Submittal
1.4.2 G OICeOMSI, Prefinal Submittal
1.4.3 G OICeOMSI, Final Submittal
01 91 00.15 20 SD-06 Test Reports
1.11 G AEIssues Log
3.5 G AECompleted Pre-Functional
Checklists
SD-07 Certificates
1.12 G AECertificate Of Readiness
02 41 00 SD-01 Preconstruction Submittals
1.2.2 G OICDemolition Plan
1.9Existing Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 126 PAGES
02 41 00 SD-07 Certificates
1.6 G OICNotification
SD-11 Closeout Submittals
3.3.5Receipts
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 G OICQuality Control Plan
1.6.6 G OICQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 G OICLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 G AEReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.3Recycled Aggregate Materials
2.3.1Cementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 126 PAGES
03 30 00 2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
1.8.1Local/Regional Materials
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 G AEConcrete Mix Design
SD-06 Test Reports
1.6.1.1 G AEConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.14.3.3 G AECompressive Strength Tests
3.14.3.4Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 126 PAGES
03 30 00 1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
03 35 00 SD-03 Product Data
1.5.4Safety Data Sheets (SDS)
1.5.5Preparation and concrete grinding procedures
03 42 13.00 10 SD-01 Preconstruction Submittals
1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 G AEStandard Precast Units
2.1.2 G AECustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
2.1.3Proprietary Precast Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 126 PAGES
03 42 13.00 10 3.1.3Embedded Items
2.2.4Accessories
SD-05 Design Data
2.1.2 G AEDesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
1.3.2.4Test Reports
SD-07 Certificates
1.3.2.2Quality Control Procedures
03 45 00 SD-01 Preconstruction Submittals
1.12.5Pre-Installation Meeting
SD-02 Shop Drawings
1.12.1 G AEPrecast Drawings
SD-03 Product Data
2.3 G AECast-In Embedded Items And
Connectors
2.3.2 G AEConnection Devices
2.2.6Admixtures
2.5Gasket
2.6Bearing Pads
SD-04 Samples
1.12.2 G OICConcrete Wall Panel Surface
Finish
1.12.4Mock-up
2.4.1Form Liner
1.12.2 G OICFull Size Sample Wall Panel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 126 PAGES
03 45 00 SD-05 Design Data
1.5.4 G AEDesign Calculations
2.1.1 G AEContractor-Furnished Mix Design
2.4.9 G AERepair of Surface Defects
1.5.5 G AEThermal Calculations
SD-06 Test Reports
1.11.2 G AEStrength Tests
1.11.2Slump
1.11.2Air Content
1.11.1Test for Concrete Materials
2.2.7Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4 G AEManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
1.10Erector's Post Audit Declaration
SD-08 Manufacturer’s Instructions
3.3Installation
3.8Cleaning
SD-11 Closeout Submittals
1.12.3Batch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 126 PAGES
03 45 00 2.2.1 SRecycled Content for Silica Fume
04 20 00 SD-02 Shop Drawings
3.3.4.1 G AECut CMU
3.4.1.1 G AEDetail Drawings
SD-03 Product Data
1.5.1Hot Weather Procedures
1.5.2Cold Weather Procedures
2.2.2.2.1 G AECement
SD-04 Samples
1.3.1.1 G OICMock-Up Panel
2.2.2.2 G OICConcrete Masonry Units (CMU)
2.6.3 G OICJoint Reinforcement
SD-05 Design Data
2.1.2 G AEMasonry Compressive Strength
3.2.5 G AEBracing Calculations
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.2.3Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.2Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 126 PAGES
04 20 00 2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.2Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G OICErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G AEFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 126 PAGES
05 12 00 1.4.3 G AEDesign Calculations for Steel
Connections
1.4.2Shoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 126 PAGES
05 21 00 1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 G AESteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
2.2 G AEDesign Calculations
SD-06 Test Reports
3.4Erection Inspection
3.4Welding Inspections
05 30 00 SD-02 Shop Drawings
1.3.5 G AEFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.5Galvanizing Repair Paint
2.2.17Mechanical Fasteners
2.1.5Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-04 Samples
2.1.1Metal Roof Deck Units
2.1.3Metal Floor Deck Units
2.2.4Flexible Closure Strips
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 126 PAGES
05 30 00 2.1 G AEDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
2.2.12Stud Manufacture's Certification
2.2.12Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.6.1 G AEFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 G AEMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13 SD-02 Shop Drawings
2.5 G AECover Plates and Frames
2.6 G AEExpansion Joint Covers
2.7 G AEFloor Gratings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 126 PAGES
05 50 13 2.7 G AERoof Walkways
2.8 G AEBollards/Pipe Guards
2.9 G AEAngles and Plates
SD-03 Product Data
2.4Corner Guards
2.5 G AECover Plates and Frames
2.6 G AEExpansion Joint Covers
2.7 G AEFloor Gratings
2.7 G AERoof Walkways
2.1 SRecycled Content
SD-04 Samples
2.6Expansion Joint Covers
SD-07 Certificates
2.2 G OICCertified Mill
05 51 00 SD-02 Shop Drawings
2.1 G AEIron and Steel Hardware
2.1 G AESteel Shapes, Plates, Bars, and
Strips
2.2.1 G AEMetal Stair System
SD-03 Product Data
2.4.1 G AEStructural Steel Plates, Shapes, and Bars
2.4.2 G AEStructural Steel Tubing
2.4.5 G AEHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 G AECold-Finished Steel Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 126 PAGES
05 51 00 2.4.3 G AEHot-Rolled Carbon Steel Bars
2.4.6 G AECold-Rolled Carbon Steel Sheets
2.4.7 G AEGalvanized Carbon Steel Sheets
2.4.8 G AECold-Drawn Steel Tubing
2.4.9 G AEGray Iron Castings
2.4.10 G AEMalleable Iron Castings
2.3.3 G AEConcrete Inserts
2.3.4 G AEMasonry Anchorage Devices
2.2.4 G AEProtective Coating
2.2.2 G AESteel Pan Stairs
2.3.1 G AESteel Stairs
SD-05 Design Data
2.3.1.1 G AEDesign Calculations
SD-07 Certificates
1.3.1 G OICWelding Procedures
1.3.1 G OICWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1 G OICStructural Steel Plates, Shapes, and Bars
2.4.2 G OICStructural Steel Tubing
2.4.5 G OICHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 G OICCold-Finished Steel Bars
2.4.3 G OICHot-Rolled Carbon Steel Bars
2.4.6 G OICCold-Rolled Carbon Steel Sheets
2.4.7 G OICGalvanized Carbon Steel Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 126 PAGES
05 51 00 2.4.8 G OICCold-Drawn Steel Tubing
2.4.9 G OICGray Iron Castings
2.4.10 G OICMalleable Iron Castings
2.2.4 G OICProtective Coating
2.3.4 G OICMasonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 G AEFabrication Drawings
3.2 G AEIron and Steel Hardware
3.2 G AESteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 G AEStructural-Steel Plates, Shapes, and Bars
2.2.2 G AEStructural-Steel Tubing
1.2.1 G AECold-Finished Steel Bars
1.2.1 G AEHot-Rolled Carbon Steel Bars
1.2.1 G AECold-Drawn Steel Tubing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 126 PAGES
05 52 00 2.2.4 G AEConcrete Inserts
2.2.5 G AEMasonry Anchorage Devices
2.1.2 G AEProtective Coating
2.2.7 G AESteel Railings and Handrails
1.2.1 G AEAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 G OICWelding Procedures
1.4.2 G OICWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
05 72 00 SD-01 Preconstruction Submittals
1.3.3 G OICExisting Conditions
SD-02 Shop Drawings
2.2 G AEOrnamental Metal Items
3.1 G AEInstallation Drawings
3.1 G AEShop and Field Connections
3.1 G AEConstruction Details
SD-03 Product Data
2.1 G AEMaterials
2.2 G AEOrnamental Metal Items
2.2.2Aluminum-Alloy Extrusions
2.2.3Aluminum-Alloy Sheets And
Plates
2.2.4Aluminum-Alloy Castings
2.2.5Aluminum-Alloy Forgings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 126 PAGES
05 72 00 SD-04 Samples
1.3.2 G OICManufacturer's Standard Color
Charts
1.3.2 G OICShop Paint
1.3.2 G OICFinish Paint
1.3.1 G OICAluminum Finishes
2.2.9 G OICAluminum Finishes
1.3.1 G OICAnchorage Devices and
Fasteners
SD-07 Certificates
2.2 G OICOrnamental Metal Items
SD-08 Manufacturer’s Instructions
3.3Cleaning Materials
3.3Preventative Maintenance and
Inspection
3.4Maintenance Instructions
3.3Application Methods
06 10 00 SD-02 Shop Drawings
2.2.1 G AENailing Strips
2.4.1.1 G AENailing Strips
SD-03 Product Data
1.8Fire-retardant Treatment
2.4.2Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 126 PAGES
06 10 00 1.11.1Certificates of Grade
1.7Preservative Treatment
2.4.2 SIndoor Air Quality for Aerosol
Adhesives
2.4.2 SIndoor Air Quality for Non-aerosol
Adhesives
06 41 16.00 10 SD-02 Shop Drawings
1.4.2 G AEShop Drawings
2.11 G AEShop Drawings
3.1Installation
SD-03 Product Data
2.1 G AEWood Materials
2.9Wood Finishes
2.11.7.3 G AEFinish Schedule
1.4.3Certification
SD-04 Samples
2.3 G AEPlastic Laminates
2.6Cabinet Hardware
SD-07 Certificates
1.4Quality Assurance
2.9Laminate Clad Casework
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.4.2 G AEDetail Fabrication Drawings
3.1 G AEInstallation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 126 PAGES
06 61 16 2.1.1 G AESolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 G AEMaterial
2.3.5 G AECounter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 G OICSolid Polymer
07 05 23 SD-01 Preconstruction Submittals
1.4 G OICWork Plan
SD-03 Product Data
2.2 G AEThermal Imaging Camera
SD-05 Design Data
3.2 G AEEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 126 PAGES
07 05 23 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 G OICPressure Test Procedures
1.6.4 G OICAir Leakage Test Report
3.5.7 G OICAir Leakage Test Report
1.6.4 G OICDiagnostic Test Report
3.6.5 G OICDiagnostic Test Report
07 14 00 SD-03 Product Data
2.1 G AEFluid-Applied Membrane
2.2 G AEMembrane Primer
2.8 G AEElastomeric Sheet
2.10 G AEFlexible Foam-Backed
Elastomeric Sheet
3.3 G AESolvent
3.4.1 G AEMoisture Meter
2.11 G AEProtection Board
2.7 G AEBond Breaker
SD-11 Closeout Submittals
1.6 G AEWarranty
07 21 13 SD-03 Product Data
1.3 G AEManufacturer's Standard Details
2.1 G AEBlock or Board Insulation
2.2 G AEPressure Sensitive Tape
1.4 G AEProtection Board or Coatings
2.4 G AEAccessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 126 PAGES
07 21 13 2.1.4 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
2.1 G OICBlock or Board Insulation
2.3 G OICProtection Board or Coating
3.4.2 G OICProtection Board or Coating
1.7 G OICSpecial Warranties
1.7 G OICSpecial Warranties
2.1.5 SIndoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.4.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.3Accessories
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
2.3.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 G AEInsulation Board Layout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 126 PAGES
07 22 00 SD-03 Product Data
2.1 G AEInsulation
1.4 G AECover Board
2.3 G AEFasteners
2.1.2 SRecycled Content For Insulation
SD-06 Test Reports
1.8.1 G OICFlame Spread Rating
SD-07 Certificates
1.6 G OICInstaller Qualifications
1.6 G OICCertificates Of Compliance For
Felt Materials
2.1.3 SIndoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.3 G OICFasteners
2.1 G OICInsulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 G AEAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 G AEAir Barrier System Product Data
SD-04 Samples
3.1.2 G OICMock-Up
2.1 G OICMaterial Samples For Air Barrier
System
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 126 PAGES
07 27 10.00 10 1.8 G AEDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 G OICDesign Review Report
3.1.3 G OICTesting and Inspection
SD-07 Certificates
1.7 G OICAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.8.1 G OICQualifications of Manufacturer
1.8.2 G OICQualifications of Installer
SD-02 Shop Drawings
1.4 G AESelf-adhering Air Barrier
SD-03 Product Data
1.4 G AESelf-adhering Air Barrier
2.2 G AEPrimers, Adhesives, and Mastics
1.4.2 G AESafety Data Sheets
SD-04 Samples
1.4 G OICSelf-adhering Air Barrier
SD-06 Test Reports
1.6 G OICField Peel Adhesion Test
1.4.4 G OICFlame Propagation of Wall
Assemblies
1.4.4 G OICFlame Spread and Smoke
Developed Index Ratings
3.4.1 G OICSite Inspections and Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 126 PAGES
07 27 19.01 1.4 G OICSelf-adhering Air Barrier
SD-08 Manufacturer’s Instructions
1.4 G OICSelf-adhering Air Barrier
2.2 G OICPrimers, Adhesives, and Mastics
07 41 13 SD-02 Shop Drawings
1.4.5 G AERoofing Panels
1.4.5 G AEFlashing and Accessories
1.4.5 G AEGutter/Downspout Assembly
2.3 G AESoffit Panels
2.4 G AEMetal Canopy
SD-03 Product Data
2.1 G AERoof Panels
2.3 G AESoffit Panels
2.4 G AEMetal Canopy
2.1.1 SRecycled Content for Aluminum
Roof Panels
2.2.2 SEnergy Star Label for Metal
Roofing Product
2.2.2 SHeat Island Reduction
1.4.5 G AEFactory-Applied Color Finish
2.6 G AEAccessories
1.4.5 G AEFasteners
1.4.5 G AEPressure Sensitive Tape
2.8 G AEUnderlayments
2.9 G AEGaskets and Sealing/Insulating
Compounds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 126 PAGES
07 41 13 1.4.5 G AECoil Stock
1.4.5 G AEGalvanizing Repair Paint
SD-04 Samples
2.1 G AERoof Panels
1.4.5 G AEFactory-applied Color Finish
2.3 G AESoffit Panels
2.6 G AEAccessories
1.4.5 G AEFasteners
1.4.5 G AEGaskets and Sealant/Insulating
Compounds
SD-05 Design Data
1.4.6 G AEEngineering Calculations
1.2.1.2 G AEWind Uplift Resistance
SD-06 Test Reports
1.2.1.1 G OICLeakage Test Report
1.2.1.2 G OICWind Uplift Test Report
2.2 G OICFactory Finish and Color
Performance Requirements
SD-07 Certificates
2.1 G OICRoof Panels
1.4.5 G OICCoil Stock Compatibility
1.4.1 G OICQualification of Manufacturer
1.4.2 G OICQualification of Applicator
SD-08 Manufacturer’s Instructions
1.4.5 G OICInstallation Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 126 PAGES
07 41 13 SD-09 Manufacturer’s Field
Reports
3.9.1 G OICManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.8 G OICWarranties
3.10 G OICInformation Card
07 42 13 SD-01 Preconstruction Submittals
1.5.3 G OICQualification of Manufacturer
1.5.4 G OICQualification of Installation
Contractor
1.8 G OICWarranty
SD-02 Shop Drawings
1.5.1.1 G AEInstallation Drawings
SD-03 Product Data
2.1Recycled Content;
2.2.1 G AEWall Panels
2.2.2Factory Color Finish
1.5.5Closure Materials
2.5.4.4Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
1.5.3.1Galvanizing Repair Paint
1.5.3.1Enamel Repair Paint
1.5.5Accessories
2.5Accessories
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 126 PAGES
07 42 13 2.2.1 G AEWall Panels
1.5.3.1 G AEFasteners
2.5.3 G AEMetal Closure Strips
2.2.2.5 G AEColor chart
SD-05 Design Data
1.5.1.2 G AEWind load design analysis
SD-06 Test Reports
3.7.2 G OICLeakage Tests
1.3.2 G OICWind Load Tests
2.2.2.6 G OICCoating
2.2.2.6 G OICChalking
1.3.2 G OICSeismic Tests
SD-07 Certificates
1.5.3.1 G OICCoil Stock
1.5.3.1 G OICFasteners
1.5.3.1 G OICGalvanizing Repair Paint
1.5.3.1 G OICEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 G OICInstallation
SD-09 Manufacturer’s Field
Reports
3.8.1 G OICManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 G OICWarranty
1.5.6 G OICMaintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 126 PAGES
07 42 13 1.8.120 year 'No Dollar Limit' warranty for labor and material
07 52 00 SD-02 Shop Drawings
1.4.7Roof Plan
1.4.7Field Inspection and Existing
Conditions Report
SD-03 Product Data
2.2Modified Bitumen Sheets
2.14 SEnergy Star Label for Top
Coating
2.4Cold-Applied Membrane
Adhesive
2.2Fiberglass Felt
2.6Primer
2.7Modified Bitumen Roof Cement
2.10Pre-Manufactured Accessories
2.9Fasteners And Plates
1.8Warranty
SD-05 Design Data
1.4.6Wind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.4Qualification of Engineer of
Record
1.4.6Wind Uplift Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 126 PAGES
07 52 00 1.4.5Fire Resistance
SD-08 Manufacturer’s Instructions
3.3.5Modified Bitumen Membrane
Application
3.3.6Flashing
3.3.3.1Cold Adhesive Applied Modified
Bitumen Membrane
2.6Primer
2.9.1Fasteners
3.3.8.1Coating Application
1.6Cold Weather Installation
SD-11 Closeout Submittals
1.8Warranty
3.8Information Card
3.7Instructions To Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1 G AEExposed Sheet Metal
3.1.16 G AEGutters
3.1.17 G AEDownspouts
2.2.1 G AEGravel Stops and fascia
3.1.21 G AESplash Pans
3.1.18 G AEFlashing for Roof Drains
3.1.11 G AEBase Flashing
3.1.12 G AECounterflashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 126 PAGES
07 60 00 3.1.25 G AEFlashing at Roof Penetrations and Equipment Supports
2.2.12 G AEReglets
3.1.19 G AEScuppers
3.1.27 G AECopings
3.1.15 G AEDrip Edges
3.1.20 G AEConductor Heads
3.1.22 G AEOpen Valley Flashing
3.1.23 G AEEave Flashing
2.1 SRecycled Content
SD-03 Product Data
2.2.9 G AECool Roof
SD-04 Samples
1.4.2 G AEFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 G OICInstructions for Installation
3.5 G OICQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 G OICCleaning and Maintenance
07 81 00 SD-03 Product Data
3.3 G NAVFireproofing Material
SD-04 Samples
2.1 G NAVSpray-Applied Fireproofing
SD-06 Test Reports
1.2.2 G NAVFire Resistance Rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 126 PAGES
07 81 00 3.6 G OICField Tests
1.2.3 G OICEvaluation Reports
SD-07 Certificates
1.4.1 G OICInstaller Qualifications
3.1 G NAVSurface Preparation Report
3.5.2 G NAVManufacturer's Inspection Report
07 84 00 SD-02 Shop Drawings
2.1 G AEFirestopping System
SD-03 Product Data
2.2 G AEFirestopping Materials
SD-06 Test Reports
3.3 G AEInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 G AEInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 G AESealants
2.2 G AEPrimers
2.3 G AEBond Breakers
2.4 G AEBackstops
SD-06 Test Reports
3.1 G AEField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 126 PAGES
07 92 00 2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 G AEDoors
2.1 G AEDoors
2.6 G AEFrames
2.6 G AEFrames
2.4Accessories
SD-03 Product Data
2.1 G AEDoors
2.1 SRecycled Content for Steel Door
Product
2.6 G AEFrames
2.6 SRecycled Content for Steel Frame
Product
2.4Accessories
08 14 00 SD-02 Shop Drawings
2.1 G AEDoors
SD-03 Product Data
2.1 G AEDoors
2.1.1.1 SRecycled Content for Door Cores
2.2Accessories
1.5Warranty
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 126 PAGES
08 14 00 2.1Doors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
2.1.1.1 SIndoor Air Quality for
Particleboard and Agrifiber Door
Cores
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3 G AEAccess Doors And Panels
SD-03 Product Data
1.3 G AEAccess Doors And Panels
1.3.2 G AEHardware
2.2.8 G AEAccessories
1.3.1 G AEPower Transfer Components
2.1 SRecycled Content
SD-04 Samples
2.5 G OICFinishes
SD-06 Test Reports
1.3.1 G OICFire-rating(s) of Assemblies
1.3.1 G OICAcoustical Ratings of Assemblies
08 33 23 SD-02 Shop Drawings
2.2.1Overhead Coiling Doors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 126 PAGES
08 33 23 2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.1.3Bottom Bars
2.1.1.1Guides
2.2.3.1Mounting Brackets
2.2.2.2Hood
2.1.1.1Installation Drawings
SD-03 Product Data
2.2.1Overhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.5Fire-Rated Door Assembly
SD-05 Design Data
2.2.1Overhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
1.3Fire-Rated Door
SD-10 Operation and Maintenance
Data
1.3.2Operation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1Warranty
08 34 73 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO…