P658 Nuclear Regional Maintenance Facility 1611490 NSB Kings Bay, GA
SECTION 03 35 00
POLISHED CONCRETE FINISHING
06/23
PART 1 GENERAL
1.1 SUMMARY
a. Section Includes: This Section specifies polished concrete.
b. Related Sections:
(1) Section 03 30 00 CAST-IN-PLACE CONCRETE.
(2) Section 07 92 00 JOINT SEALANTS.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
NFSI B101.3 (2022) Testing Wet DCOF Of Hard Surface Walkways
ASTM INTERNATIONAL (ASTM)
ASTM C779/C779M (2019) Standard Test Method for Abrasion Resistance of Horizontal Concrete Surfaces
ASTM INTERNATIONAL (ASTM)
ASTM C779/C779M (2019) Standard Test Method for Abrasion Resistance of Horizontal Concrete Surfaces
ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss
1.3 SYSTEM DESCRIPTION
1.3.1 Performance Requirements
Provide polished flooring that has been selected, manufactured, and installed to achieve the following:
a. ASTM C779/C779M Standard Test Method for Abrasion Resistance of Horizontal Concrete Surfaces.
b. Reflectivity: ASTM D523, Specular gloss in accordance with architect's required gloss unit (GU) reading 3. NFSI B101.3 - Testing Wet DCOF Of Hard Surface Walkways.
1.3.2 Design Requirements
a. Hardened Concrete Properties
SECTION 03 35 00 Page 1
(1) Minimum Concrete Compressive Strength: 4000 psi (24 MPa).
(2) Normal Weight Concrete: No lightweight aggregate or deleterious materials.
(a) Ensure all aggregates used are polishable.
(3) Non-air entrained.
b. Placement Properties
(1) Natural concrete slump of 4 1/2 inches - 5 inches (114 - 127 mm).
Admixtures may be used.
(2) Any admixtures, plasticizers, slag, fly ash or anything taking the place of Portland-based cement shall not exceed 20%. * a straight cement mix is recommended.
(3) Flatness Requirements: Overall FF 50, Local FF 35.
(4) Levelness Requirements: Overall FL 30, Local FL 20.
(5) Hard-Steel Troweled (3 passes) Concrete: No burn marks. Finish to ACI 302.1R, Class 5 floor.
(6) When placing edges use a 3' metal or wooden 2x 4 screed and run parallel with form or edge after initial screed and before floating.
(7) Hand floating shall be parallel to edge and done in 2' increments to avoid lifting or depressing edges. Do not reach out beyond 2' of edge with hand tools or float in a fan direction pulling excessive mud to the forms.
c. Curing Options
(1) Membrane forming curing compounds (polyethylene film not recommended.)
(2) Damp Curing: Seven day cure.
d. Slab Protection Immediately Following Placement (see also section 3.6)
(1) Silicone chalks should NOT be used if at all possible. The RED and yellow chalks are PERMANENT DYES. RED Chalk, black markers, wax pencils should NOT be used for framing. White or Blue chalks are OK. Do not over mark for the framing. Do NOT use silicone sprays to "Hold" the lines. The sprays repel the stain and leave harsh, permanent scars on the floor.
(2) Do not use Tape, Glue, Solvents, Pine-Sol, Varnish, Non Breathing Plastics, Liquid Nail, Silicone, Plastics, Nails, Plumbers Glue, Foam Insulation, Bond Release Agents, Flux, Oils, Grease, Polyurethane, Paint, Markers (framers often write dimensions of doorways in marker on the slab. Ask them to make that note on the wood framing the doorway), Grease Sticks, Spray Paints, Crayons, Muriatic Acid, and other chemicals both before and after staining.
SECTION 03 35 00 Page 2
(3) It is important that wood, sheet goods, insulation boards, plywood, press board, drywall, sections of framing and the like not lay on the slab for extended periods of time. They can transfer resins and tannins into the slab. This will alter the moisture content in the slab which leaves a pattern in the finished floor. Cardboard should be placed between the slab and the stacked material to minimize any unwanted transfers. Also Food, Beverages, Oil, Glass, Metal, Paint, Caulk, or Primers.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Safety Data Sheets (SDS)
Preparation and concrete grinding procedures
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
a. Installer experienced in performing work of this section who has specialized in installation of work similar to that required for this project.
b. Installer trained and holding current certification in system to be applied (if available).
1.5.2 Mock-Ups
a. Construct mock-ups in accordance with Section 01 45 00.00 20 QUALITY
CONTROL.
b. Mock-Up Size: 100 ft2 (9.3 m2) sample panel at jobsite at location as directed under conditions similar to those which will exist during actual placement.
c. Mock-up will be used to judge workmanship, concrete substrate preparation, operation of equipment, material application, color selection and shine. Perform ASTM D523 Standard Test Method as cited in Section 2.02 Finishes and provide printed results to architect prior to commencement of work.
d. Allow 24 hours for inspection of mock-up before proceeding with work.
e. When accepted, mock-up will demonstrate minimum standard of quality required for this work. Approved mock-up may remain as part of finished work.
1.5.3 Preinstallation Meetings
Conduct a preinstallation meeting to verify project requirements, SECTION 03 35 00 Page 3 manufacturer's installation instructions and manufacturer's warranty requirements. Review the following:
a. Environmental requirements.
b. Scheduling and phasing of work.
c. Coordinating with other work and personnel.
d. Protection of adjacent surfaces.
e. Surface preparation.
f. Repair of defects and defective work prior to installation.
g. Cleaning.
h. Installation of polished floor finishes.
i. Application of liquid hardener, densifier.
j. Protection of finished surfaces after installation.
1.5.4 Safety Data Sheets
Submit Safety Data Sheets (SDS) for all materials that are regulated for hazardous health effects. SDS must be readily accessible during each work shift to employees when they are at the construction site.
1.5.5 Preparation and Concrete Grinding Procedures
Submit data sheets on manufacturer's recommended Preparation and Concrete Grinding Procedures for each specified product.
1.6 DELIVERY, STORAGE, AND HANDLING
a. Ordering: Comply with manufacturer's ordering instructions and lead time requirements to avoid construction delays.
b. Delivery: Deliver materials in manufacturer's original packaging with identification labels and seals intact.
c. Storage and Protection:
(1) Store materials protected from exposure to harmful weather conditions and at temperature conditions recommended by manufacturer.
(2) Protect concrete slab.
(3) Protect from petroleum stains during construction.
(4) Diaper hydraulic power equipment.
(5) Restrict vehicular parking.
(6) Restrict use of pipe cutting machinery.
(7) Restrict placement of reinforcing steel on slab.
SECTION 03 35 00 Page 4
(8) Restrict use of acids or acidic detergents on slab.
d. Waste Management and Disposal:
(1) Separate waste materials for Reuse And Recycling in accordance with Section 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL.
(2) Remove from site and dispose of packaging materials at appropriate recycling facilities.
1.7 PROJECT AMBIENT CONDITIONS
1.7.1 Installation Location
Comply with manufacturer's written recommendations.
1.8 WARRANTY
1.8.1 Project Warranty
Refer to Contract Conditions for project warranty provisions.
1.8.2 Manufacturer's Warranty
Submit, for Owner's acceptance, manufacturer's standard warranty document executed by authorized company official. Manufacturer's warranty is in addition to, and does not limit, other rights Owner may have under Contract Documents.
1.8.3 Warranty
Commencing on date of acceptance by Owner.
1.9 MAINTENANCE
Comply with manufacturer's written instructions to maintain installed product.
1.10 EXTRA MATERIALS
General Contractor to provide maintenance materials in accordance with Section 01 78 00 - CLOSEOUT SUBMITTALS.
PART 2 PRODUCTS
2.1 MANUFACTURERS
Ensure that manufacturer has a minimum of 5 years experience in manufacturing components similar to or exceeding the requirements of this project.
2.2 POLISHED CONCRETE FINISHING PRODUCTS
2.2.1 Products/Systems
a. Hardener, Sealer, Densifier: Water based, odorless liquid, VOC compliant, environmentally safe chemical hardening solution leaving no
SECTION 03 35 00 Page 5 surface film. Silicate or amorphous silica designed specifically to be used in conjunction with concrete polishing. No siliconate hardener will be accepted.
b. Polyurea Joint and Crack Filler: Semi-rigid, 2-component, self-leveling, 100 percent solids, rapid curing, control joint and crack filler with Shore A 80 or higher hardness.
c. Spall Repair: Polymer modified cementitious material compatible with concrete polishing process designed to repair surface defects in concrete.
d. Oil Repellent Sealer: Penetrating concrete sealer designed specifically to be used in conjunction with polished concrete.
e. Cleaning Solution: Mild, highly concentrated liquid concrete cleaner and conditioner; biodegradable, and environmentally safe. Cleaner must be ph neutral.
2.2.2 Finish
To be tested in accordance with ASTM D523 test method. Provide printed results to Architect, General Contractor, and Owner within 24 hours of completion. A minimum of 10 samples must be taken from each section of project to obtain an accurate average. Minimum will be no less than 80 percent of specified finish for any single test and no less than 90 percent as an average. Semi-gloss, 45 GU @ 60º.
2.2.3 Aggregate Exposure
Paste finish: No aggregate exposed (less than 1/16").
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Site Verification of Conditions
a. Verify that concrete substrate conditions, which have been previously installed under other sections or contracts, are acceptable for product installation in accordance with manufacturer's instructions prior to installation of concrete finishing materials.
b. Verify Concrete Slab Performance Requirements:
(1) Verify concrete is cured to 28 day 4000 psi (24 MPa) strength.
(2) Verify concrete surfaces received a hard steel-trowel finish (3 passes) during placement.
3.2 PREPARATION
a. Remove previously installed flooring using self-propelled flooring removal equipment only. Use of chipping guns, rotor hammers, or other equipment not specifically designed for removal of sheet flooring is strictly prohibited as it can damage underlying concrete.
b. Ensure surfaces are clean and free of dirt and other foreign matter harmful to performance of concrete finishing materials.
SECTION 03 35 00 Page 6
c. Examine surface to determine soundness for concrete for polishing.
d. Fill surface defects with acceptable cement based material compatible with polishing process.
e. Fill large cracks (greater than 1/16") with polyurea joint and crack filler flush with concrete surface. F. General Contractor to remove surface contamination.
3.3 INSTALLATION
3.3.1 Sequence of Polishing
Perform grinding and polishing after partition studs are erected, but before gypsum board is installed.
3.3.2 Floor Surface Polishing and Treatment
a. Provide polished concrete floor treatment in entirety of slab indicated by drawings. Provide consistent finish in all contiguous areas.
b. Apply floor finish prior to installation of fixtures and accessories.
c. Apply patching compound and crack filler flush with concrete surface where necessary.
d. Diamond polish concrete floor surfaces with planetary grinding machine with a minimum head pressure of 600 lbs (3-4 headed machine). Sequence with coarse to fine grit.
(1) Comply with manufacturer's recommended polishing grits for each sequence to achieve desired finish level. Level of sheen shall meet specified gloss unit measurements.
(2) Expose aggregate in concrete surface as determined by approved mock-up.
(3) All concrete surfaces shall be as uniform in appearance as possible with no visible scratches anywhere in surface.
e. Grind and polish edges to a maximum of 1/8" of walls to match field area of floor.
f. Edge into corners with a maximum size of 5" diameter grinding & polishing discs.
g. Apply silicate densifier/hardener per manufacturer's specifications.
h. Remove defects and re-polish defective areas.
i. Finish edges of floor finish adjoining other materials in a clean and sharp manner.
3.3.3 Concrete Sealer
a. No topical sealer allowed.
SECTION 03 35 00 Page 7
b. The appearance of any streaking or swirling from the use of topical sealing products will not be accepted. Identification of such issues will require the surface be ground off and re-polished.
3.3.4 Joint Fill
a. Apply polyurea joint filler to saw cut contraction joints only.
Product not to be used on tooled, expansion, keyed, or isolation joints. Refer to section 07 92 00 JOINT SEALANTS for these joints.
b. Slightly overfill joints to create a crown and allow the material to cure for 15-20 minutes or until dry to the touch.
c. Shave excess joint fill off flush with the top of the slab with a razor blade to create a seamless finish.
3.4 ADJUSTMENTS
a. Polish to higher gloss those areas not meeting specified gloss levels per mock-up.
b. Fill joints flush to surface.
3.5 FINAL CLEANING
Do cleanup in accordance with Section 01 74 19 CONSTRUCTION WASTE
MANAGEMENT AND DISPOSAL.
3.6 PROTECTION
a. Do not let wood, sheet goods, insulation boards, plywood, press board, drywall, sections of framing and the like not lay on the slab for extended periods of time. They can transfer resins and tannins into the slab. This will alter the moisture content in the slab which leaves a pattern in the finished floor. Cardboard should be placed between the slab and the stacked material to minimize any unwanted transfers. Also Food, Beverages, Oil, Glass, Metal, Paint, Caulk, or Primers.
b. Do not tape directly to the floor Duct Tape, Masking Tape, Packaging Tape, Strap Tape, Blue Tape, Green Tape, and Electrical Tape there are NO exceptions. The tape alters the natural curing process and transfers chemicals to and from the slab. Tape, Plastics and other Adhesives can contribute to Plasticizer Migration. This will show in the finished product.
3.7 SCHEDULE
Refer to IN Series drawings for SC-2 (Polished Concrete) locations.
-- End of Section --
SECTION 03 35 00 Page 8
| 03 35 00 - POLISHED CONCRETE FINISHING |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SYSTEM DESCRIPTION |
| 1.3.1 Performance Requirements |
| 1.3.2 Design Requirements |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Qualifications |
| 1.5.2 Mock-Ups |
| 1.5.3 Preinstallation Meetings |
| 1.5.4 Safety Data Sheets |
| 1.5.5 Preparation and Concrete Grinding Procedures |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.7 PROJECT AMBIENT CONDITIONS |
| 1.7.1 Installation Location |
| 1.8 WARRANTY |
| 1.8.1 Project Warranty |
| 1.8.2 Manufacturer's Warranty |
| 1.8.3 Warranty |
| 1.9 MAINTENANCE |
| 1.10 EXTRA MATERIALS |
| PART 2 PRODUCTS |
| 2.1 MANUFACTURERS |
| 2.2 POLISHED CONCRETE FINISHING PRODUCTS |
| 2.2.1 Products/Systems |
| 2.2.2 Finish |
| 2.2.3 Aggregate Exposure |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.1.1 Site Verification of Conditions |
| 3.2 PREPARATION |
| 3.3 INSTALLATION |
| 3.3.1 Sequence of Polishing |
| 3.3.2 Floor Surface Polishing and Treatment |
| 3.3.3 Concrete Sealer |
| 3.3.4 Joint Fill |
| 3.4 ADJUSTMENTS |
| 3.5 FINAL CLEANING |
| 3.6 PROTECTION |
| 3.7 SCHEDULE |