AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N69450-23-R-0005, DESIGN BID BUILD FIRM-FIXED PRICE CONSTRUCTION CONTRACT - P658 NUCLEAR REGIONAL MAINTENANCE
FACILITY, SUBMARINE BASE, KINGS BAY, GEORGIA
Please see continuation page. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945023R0005
X 9B. DATED (SEE ITEM 11)
10-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jun-2023
CODE
NAVFAC ENGINEERING SYSTEMS COMMAND SE
CORE CONSTRUCTION
BLDG 903 YORKTOWN
PO BOX 0030
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945023R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES (REVISED)
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
The purpose of this amendment is as follows:
1. Extend the proposal submission due date from 3:00 PM Eastern Time on June 12, 2023 to 3:00 PM Eastern Time on June 15, 2023.
2. Revise the following sections as follows:
Update PROJECT TABLE OF CONTENTS
Section 03 35 00 POLISHED CONCRETE FINISHING, is added to the Project Table of Contents.
[PPI Comment 1774027]
Section 07 14 00 FLUID-APPLIED WATERPROOFING is added to the Project Table of Contents.
[PPI Comment 1777460]
Section 07 41 13 METAL ROOF PANELS is deleted and Section 07 1 13 METAL ROOF PANELS, dated 06 June 2023, as shown in the footer, is added to the Project Table of Contents [PPI Comment 1775894]
Section 09 78 00 METAL DESIGNS AND LAMINATES, is added to the Project Table of Contents.
[PPI Comment 1777455]
Section 10 44 16 FIRE EXTINGUISHERS is deleted and Section 10 44 16 FIRE EXTINGUISHERS, dated 06 June 2023, as shown in the footer, is added to the Project Table of Contents.
[PPI Comment 1779211]
Section 31 68 13 SOIL AND ROCK ANCHORS is deleted and Section 31 68 13 SOIL AND ROCK ANCHORS, dated 06 June 2023, as shown in the footer, is added to the Project Table of Contents [PPI Comments 1774017, 1774018, 1774021, 1774022]
These Sections accompany this Amendment.
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 6/6/2023:
NAVFAC DWG NO. Title
15173777 (C-106) EXISTING CONDITIONS & DEMOLITION PLAN, Revised 6/6/2023
15173780 (C-109) EXISTING CONDITIONS & DEMOLITION PLAN, Revised 6/6/2023
15173819 (C-306) UTILITY PLAN, Revised 6/6/23 [PPI Comment 1773261]
15173867 (C-607) SECTIONS AND DETAILS – SITE, Revised 6/6/2023 [PPI Comment 1772806]
15173915 (C-703) RETAINING WALL PLAN, Revised 6/6/2023
15173916 (C-704) RETAINING WALL PROFILE, Revised 6/6/2023
[PPI Comment 1774023]
15173917 (C-705) RETAINING WALL PROFILE, Revised 6/6/2023
[PPI Comment 1774023]
15173918 (C-706) WALL SECTIONS, Revised 6/6/2023
15173919 (C-707) WALL SECTIONS, Revised 6/6/2023 [PPI Comment 1774023]
15173920 (C-708) WALL SECTIONS, Revised 6/6/2023
15173921 (C-709) RETAINING WALL DETAILS, Revised 6/6/2023
[PPI Comment 1774018, 1774019, 1774021]
15174052 (A-102) FIRST FLOOR PLAN - AREA B, Revised 6/6/2023 [PPI Comment 1772806]
15174054 (A-104) FIRST FLOOR PLAN - AREA D, Revised 6/6/2023 [PPI Comment 1772806]
15174055 (A-105) FIRST FLOOR PLAN - AREA E, Revised 6/6/2023 [PPI Comment 1772806]
15174056 (A-106) FIRST FLOOR PLAN - AREA F, Revised 6/6/2023 [PPI Comment 1772806]
15174058 (A-108) FIRST FLOOR PLAN - AREA H, Revised 6/6/2023 [PPI Comment 1772806]
15174059 (A-109) FIRST FLOOR PLAN - AREA I, Revised 6/6/2023 [PPI Comment 1772806]
15174060 (A-110) FIRST FLOOR PLAN - AREA J, Revised 6/6/2023 [PPI Comment 1772806]
15174101 (A-201) BUILDING ELEVATIONS, Revised 6/6/2023 [PPI Comment 1772806]
15174102 (A-202) BUILDING ELEVATIONS, Revised 6/6/2023 [PPI Comment 1772806]
15174103 (A-203) BUILDING ELEVATIONS, Revised 6/6/2023 [PPI Comment 1772806]
15174104 (A-204) BUILDING ELEVATIONS, Revised 6/6/2023 [PPI Comment 1772806] 15174105 (A-205) BUILDING ELEVATIONS, Revised 6/6/2023 [PPI Comment 1772806]
15174106 (A-206) BUILDING ELEVATIONS, Revised 6/6/2023 [PPI Comment 1772806]
15174108 (A-301) BUILDING SECTIONS, Revised 6/6/2023 [PPI Comment 1772806]
15174109 (A-302) BUILDING SECTIONS, Revised 6/6/2023 [PPI Comment 1772806]
15174142 (A-510) PLAN DETAILS, Revised 6/6/2023 [PPI Comment 1772806]
15174188 (IN700) FIRST FLOOR FINISH PLAN - OVERALL, Revised 6/6/2023
[PPI Comment 1773254]
15174189 (IN701) FIRST FLOOR FINISH PLAN - AREA A, Revised 6/6/2023
15174190 (IN702) FIRST FLOOR FINISH PLAN - AREA B, Revised 6/6/2023
15174191 (IN703) FIRST FLOOR FINISH PLAN - AREA C, Revised 6/6/2023
[PPI Comment 1773254]
15174192 (IN704) FIRST FLOOR FINISH PLAN - AREA D, Revised 6/6/2023
[PPI Comment 1773254]
15174193 (IN705) FIRST FLOOR FINISH PLAN - AREA E, Revised 6/6/2023
[PPI Comment 1773254]
15174194 (IN706) FIRST FLOOR FINISH PLAN - AREA F, Revised 6/6/2023
[PPI Comment 1773254]
15174195 (IN707) FIRST FLOOR FINISH PLAN - AREA G, Revised 6/6/2023
[PPI Comment 1773254]
15174196 (IN708) FIRST FLOOR FINISH PLAN - AREA H, Revised 6/6/2023
[PPI Comment 1773254]
15174197 (IN709) FIRST FLOOR FINISH PLAN - AREA I, Revised 6/6/2023
[PPI Comment 1773254]
15174198 (IN710) FIRST FLOOR FINISH PLAN - AREA J, Revised 6/6/2023
[PPI Comment 1773254]
15174199 (IN720) SECOND FLOOR FINISH PLAN - OVERALL, Rvised 6/6/2023
[PPI Comment 1773254]
15174200 (IN721) SECOND FLOOR FINISH PLAN - AREA A, Revised 6/6/2023
[PPI Comment 1773254]
15174201 (IN722) SECOND FLOOR FINISH PLAN - AREA B, Revised 6/6/2023
[PPI Comment 1773254]
15174202 (IN723) SECOND FLOOR FINISH PLAN - AREA C, Revised 6/6/2023
[PPI Comment 1773254]
15174203 (IN724) SECOND FLOOR FINISH PLAN - AREA D, Revised 6/6/2023
[PPI Comment 1773254]
15174204 (IN725) SECOND FLOOR FINISH PLAN - AREA E, Revised 6/6/2023
[PPI Comment 1773254]
15174205 (IN726) SECOND FLOOR FINISH PLAN - AREA F, Revised 6/6/2023
[PPI Comment 1773254]
15174206 (IN727) SECOND FLOOR FINISH PLAN - AREA G, Revised 6/6/2023
15174207 (IN728) SECOND FLOOR FINISH PLAN - AREA H, Revised 6/6/2023
15174208 (IN730) ENLARGED FINISH PLANS, Revised 6/6/2023
[PPI Comment 1773254]
15174209 (IN731) ENLARGED FINISH PLANS, Revised 6/6/2023
[PPI Comment 1773254]
15174210 (IN740) INTERIOR FINISH LEGEND, Revised 6/6/2023
[PPI Comment 1773254]
15174211 (IN741) INTERIOR FINISH TRANSITIONS, Revised 6/6/2023
[PPI Comment 1773254]
15174213 (IN743) OPERABLE WALL ELEVATIONS & WALL ACCENT DETAILS, Revised
6/6/2023 [PPI Comment 1773254] 15174471 (ES404) ELECTRICAL SITE LIGHTING PLAN, Revised 6/6/2023
[PPI Comment 1776511]
The following drawings are revised as of 6/8/2023:
15174040 (S-509) TYPICAL STEEL JOIST DETAILS / SECTIONS, Revised 6/8/2023 [PPI Comment 1779203]
15174144 (A-512) PLAN DETAILS, Revised 6/8/2023 [PPI Comment 1779208]
15174212 (IN742) INTERIOR FINISH SCHEDULE, Revised 6/8/2023 [PPI Comment 1779213]
15174661 (TS233) TELECOMM. SITE PLAN, Revised 6/8/2023 [PPI Comment 1778342]
15174666 (TS238) TELECOMM. SITE PLAN, Revised 6/8/2023 [PPI Comment 1778344]
These revised Drawings accompany this Amendment.
SECTION 01 11 00 SUMMARY OF WORK [PPI Comment 1774010, 1774026]
1.7 SALVAGE MATERIAL AND EQUIPMENT
Delete subparagraph a. in its entirety and replace it with the following:
“a. Surplus gravel removed from the P658 site and free zone, Parking Lot 1 and all Contractor laydown/parking areas restored to preconstruction conditions (Lot 2, Lot 3 and Free Zone Laydown Area). Collect, transport and store all surplus gravel, on a surface(s) to be prepared by the contractor, in an area designated by the Contracting Officer’s Representative, located on government property within 5 miles of the site. Provide a layer of non-woven geotextile on the prepared surface(s) with jersey barriers around the piles to prevent raveling. For bidding purposes, assume the site(s) provided are relatively flat and covered with brush that will require removal. Contractor shall process the gravel by screening to remove remnant filter fabric, debris, or other deleterious material at the construction sites before transporting to its final location.”
SECTION 01 33 00 SUBMITTAL PROCEDURES
Appendix A is deleted and Appendix A, dated 08 June 2023, as shown in the footer, is added.
This revised Appendix accompanies this Amendment.
SECTION 01 45 35 SPECIAL INSPECTIONS
01 45 35 Appendix B Schedule of Special Inspections
On the table titled, FIRE PROTECTION – FIRE RESISTANT PENETRATIONS AND JOINTS SECTION, check the previously unchecked box associated with ‘ALL OR PORTIONS OF THIS SECTION ARE APPLICABLE IF BOX IS CHECKED’. This Section is required.
SECTION 10 51 13 METAL LOCKERS [PPI Comment 1775898]
2.1.1 Double-Tier
Delete the last sentence starting “Type DTL-2…” in its entirety.
2.2.3.1 Color
Delete the second sentence “DTL-2 is gray.” in its entirety.
SECTION 26 20 00 INTERIOR DISTRIBUTION SYSTEM
2.2.3 Rigid Nonmetal Conduit
To the end of this paragraph add the following:
“Protective devices must be completely self-contained, deriving all power required for operation via inductive coupling to the feeder and branch circuit phase bus taps to which they are connected. Protective devices requiring connection to a separate external power supply for operation are not acceptable.”
2.14.3 Circuit Breakers
To the end of this paragraph add the following:
“Circuit breakers must be completely self-contained, deriving all power required for operation via inductive coupling to the feeder and branch circuit phase bus taps to which they are connected. Circuit breakers requiring connection to a separate external power supply for operation are not acceptable.”
2.15 ENCLOSED CIRCUIT BREAKERS
To the end of this paragraph add the following:
“Circuit breakers must be completely self-contained, deriving all power required for operation via inductive coupling to the feeder and branch circuit phase bus taps to which they are connected. Circuit breakers requiring connection to a separate external power supply for operation are not acceptable.”
(End of Summary of Changes)
File details come from the government source that posted it. Updated .