P658 Nuclear Regional Maintenance Facility 1611490 NSB Kings Bay, GA
SECTION 07 14 00
FLUID-APPLIED WATERPROOFING
02/ 12, CHG 2: 02/ 18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C836/C836M (2018; R 2022) Standard Specification for High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use With Separate Wearing Course
ASTM D1056 (2020) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D1751 (2018) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Fluid-Applied Membrane; G, AE
Membrane Primer; G, AE
Elastomeric Sheet; G, AE
Flexible Foam-Backed Elastomeric Sheet; G, AE
Solvent; G, AE
SECTION 07 14 00 Page 1 08 June 2023
Moisture Meter; G, AE
Protection Board; G, AE
Bond Breaker; G, AE
Submit material description and physical properties, application details, and recommendations regarding shelf life, application procedures, and precautions on flammability and toxicity.
SD-11 Closeout Submittals
Warranty; G, AE
Include copies of Safety Data Sheets for maintenance/repair materials.
1.3 PREWATERPROOFING CONFERENCE
Prior to starting application of waterproofing system, arrange and attend a prewaterproofing conference to ensure a clear understanding of drawings and specifications. Give the Contracting Officer 7 days advance written notice of the time and place of meeting. Ensure that the mechanical and electrical subcontractor, flashing and sheetmetal subcontractor, and other trades that may perform other types of work on or over the membrane after installation, attend this conference.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver waterproofing materials in manufacturer's original, unopened containers, with labels intact and legible. Containers of materials covered by a referenced specification number shall bear the specification number, type, and class of the contents. Deliver materials in sufficient quantity to continue work without interruption. Store and protect materials in accordance with manufacturer's instructions, and use within their indicated shelf life. When hazardous materials are involved, adhere to special precautions of the manufacturer, unless precautions conflict with local, state, and federal regulations. Promptly remove from the site materials or incomplete work adversely affected by exposure to moisture or freezing. Store materials on pallets and cover from top to bottom with canvas tarpaulins.
1.5 ENVIRONMENTAL CONDITIONS
Apply materials when ambient temperature is 40 degrees F or above for a period of 24 hours prior to the application and when there is no ice, frost, surface moisture, or visible dampness on the substrate surface.
Apply materials when air temperature is expected to remain above 40 degrees F during the cure period recommended by the manufacturer.
Moisture test for substrate is specified under paragraph entitled "Moisture Test." Work may be performed within heated enclosures, provided the surface temperature of the substrate is maintained at a minimum of 40 degrees F for 24 hours prior to the application of the waterproofing, and remains above that temperature during the cure period recommended by the manufacturer.
SECTION 07 14 00 Page 2
1.6 WARRANTY
Provide ELEVATOR PIT WATERPROOFING SYSTEM material and workmanship warranties meeting specified requirements. Provide revisions or amendment to standard membrane manufacturer warranty to comply with the specified requirements. Minimum manufacturer warranty shall have no dollar limit, cover full system water-tightness, and shall have a minimum duration of 10 years.
PART 2 PRODUCTS
2.1 FLUID-APPLIED MEMBRANE
ASTM C836/C836M.
2.2 MEMBRANE PRIMER
As recommended by the fluid-applied membrane manufacturer unless specifically prohibited by the manufacturer of the fluid-applied membrane.
2.3 SEALANT
As specified in Section 07 92 00 JOINT SEALANTS.
2.4 SEALANT PRIMER
As specified in Section 07 92 00 JOINT SEALANTS.
2.5 BACKING MATERIAL
Premolded, closed-cell, polyethylene, or polyurethane foam rod having a diameter 25 percent larger than joint width before being compressed into joint. Provide bond breaker of polyethylene film or other suitable material between backing material and sealant.
2.6 JOINT FILLER
As specified in Section 03 30 00 CAST-IN-PLACE CONCRETE, ASTM D1751 or
ASTM D1752.
2.7 BOND BREAKER
As recommended by the fluid-applied membrane manufacturer. Bond breaker shall not interfere with the curing process or other performance properties of the fluid-applied membrane.
2.8 ELASTOMERIC SHEET
Preformed; as recommended by the fluid-applied membrane manufacturer.
Bond strength between the fluid-applied membrane and the preformed elastomeric sheet shall be a minimum of one psi when tested in accordance with ASTM C836/C836M.
2.9 ELASTOMERIC SHEET ADHESIVE
As recommended by the elastomeric sheet manufacturer.
SECTION 07 14 00 Page 3
2.10 FLEXIBLE FOAM-BACKED ELASTOMERIC SHEET
Flexible foam-backed elastomeric sheet for protection over preformed elastomeric sheet at expansion joints shall be 1/2 inch thick, minimum, closed cell foam conforming to ASTM D1056, Type 2, Class B, Grades 2 or 3, factory-bonded to 1/16 inch thick, minimum, preformed elastomeric sheet.
2.11 PROTECTION BOARD
Premolded bitumen composition board, 1/8 inch minimum thickness or other composition board compatible with the fluid-applied membrane.
2.12 DRAINAGE COURSE AGGREGATE
ASTM C33/C33M, size No. 8.
PART 3 EXECUTION
3.1 PREPARATION
Coordinate work with that of other trades to ensure that components to be incorporated into the waterproofing system are available when needed.
Inspect and approve surfaces immediately before application of waterproofing materials. Remove laitance, loose aggregate, sharp projections, grease, oil, dirt, curing compounds, and other contaminants which could adversely affect the complete bonding of the fluid-applied membrane to the concrete surface.
3.1.1 Flashings
Make penetrations through sleeves in concrete slab watertight before application of waterproofing. After flashing is completed, cover elastomeric sheet with fluid-applied waterproofing during waterproofing application.
3.1.1.1 Penetrations and Projections
Flash penetrations and projections through structural slab with an elastomeric sheet adhered to the concrete slab and the penetration. Leave elastomeric sheet unadhered for one inch over joint between penetration and concrete slab. Adhere elastomeric sheet a minimum of 4 inches onto horizontal deck.
3.1.1.2 Walls and Vertical Surfaces
Flash wall intersections which are not of monolithic pour or constructed with reinforced concrete joints with an elastomeric sheet adhered to both vertical wall surfaces and concrete slab. Flash intersections which are monolithically poured or constructed with reinforced concrete joints with either an elastomeric sheet or a vertical grade of fluid-applied waterproofing adhered to vertical wall surfaces and concrete slab. Leave sheet unadhered for a distance of one inch from the corner on both vertical and horizontal surfaces.
3.1.2 Cracks and Joints
Prepare visible cracks and joints in substrate to receive fluid-applied waterproofing membrane by placing a bond breaker and an elastomeric slip sheet between membrane and substrate. Cracks that show movement shall
SECTION 07 14 00 Page 4 receive a 2 inch bond breaker followed by an elastomeric sheet adhered to the deck. Nonmoving cracks shall be double coated with fluid-applied waterproofing.
3.1.3 Priming
Prime surfaces to receive fluid-applied waterproofing membrane. Apply primer as required by membrane manufacturer's printed instructions.
3.2 SPECIAL PRECAUTIONS
Protect waterproofing materials during transport and application. Do not dilute primers and other materials, unless specifically recommended by materials manufacturer. Keep containers closed except when removing contents. Do not mix remains of unlike materials. Thoroughly remove residual materials before using application equipment for mixing and transporting materials. Do not permit equipment on the project site that has residue of materials used on previous projects. Use cleaners only for cleaning, not for thinning primers or membrane materials. Ensure that workers and others who walk on cured membrane wear clean, soft-soled shoes to avoid damaging the waterproofing materials.
3.3 APPLICATION
Over primed surfaces, provide a uniform, wet, monolithic coating of fluid-applied membrane, 60 mils thick, plus or minus 5 mils by following manufacturer's printed instructions. Apply material by trowel, squeegee, roller, brush, spray apparatus, or other method recommended by membrane manufacturer. Check wet film thickness as specified in paragraph entitled "Film Thickness" and adjust application rate as necessary to provide a uniform coating of the thickness specified. Where possible, mark off surface to be coated in equal units to facilitate proper coverage. At expansion joints, control joints, prepared cracks, flashing, and terminations, carry membrane over preformed elastomeric sheet in a uniform 60 mil thick, plus or minus 5 mils, wet thickness to provide a monolithic coating. If membrane cures before next application, wipe previously applied membrane with a solvent to remove dirt and dust that could inhibit adhesion of overlapping membrane coat. Use solvent recommended by the membrane manufacturer, as approved.
3.3.1 Work Sequence
Perform work so that protection board is installed prior to using the waterproofed surface. Do not permanently install protection board until the membrane has passed the flood test specified under paragraph entitled "Flood Test." Move material storage areas as work progresses to prevent abuse of membrane and overloading of structural deck.
3.3.2 Protection Board
Protect fluid-applied membrane by placing protection board over membrane at a time recommended by the membrane manufacturer. Protect membrane application when protection board is not placed immediately. Butt protection boards together and do not overlap.
SECTION 07 14 00 Page 5
3.4 FIELD QUALITY CONTROL
3.4.1 Moisture Test
Prior to application of fluid-applied waterproofing, measure moisture content of substrate with a moisture meter in the presence of the Contracting Officer. Do not begin application until meter reading indicates "dry" range.
3.4.2 Film Thickness
Measure wet film thickness every 100 square feetduring application by placing flat metal plates on the substrate or using a mil-thickness gage especially manufactured for the purpose.
-- End of Section --
SECTION 07 14 00 Page 6
| 07 14 00 - FLUID-APPLIED WATERPROOFING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 PREWATERPROOFING CONFERENCE |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 ENVIRONMENTAL CONDITIONS |
| 1.6 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 FLUID-APPLIED MEMBRANE |
| 2.2 MEMBRANE PRIMER |
| 2.3 SEALANT |
| 2.4 SEALANT PRIMER |
| 2.5 BACKING MATERIAL |
| 2.6 JOINT FILLER |
| 2.7 BOND BREAKER |
| 2.8 ELASTOMERIC SHEET |
| 2.9 ELASTOMERIC SHEET ADHESIVE |
| 2.10 FLEXIBLE FOAM-BACKED ELASTOMERIC SHEET |
| 2.11 PROTECTION BOARD |
| 2.12 DRAINAGE COURSE AGGREGATE |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 Flashings |
| 3.1.1.1 Penetrations and Projections |
| 3.1.1.2 Walls and Vertical Surfaces |
| 3.1.2 Cracks and Joints |
| 3.1.3 Priming |
| 3.2 SPECIAL PRECAUTIONS |
| 3.3 APPLICATION |
| 3.3.1 Work Sequence |
| 3.3.2 Protection Board |
| 3.4 FIELD QUALITY CONTROL |
| 3.4.1 Moisture Test |
| 3.4.2 Film Thickness |