1611490 Spec 10 44 16.pdf

PDF 18 KB Posted

Attached to
RFP N69450-23-R-0005 P658 NUCLEAR REGIONAL MAINTENANCE FACILITY, NSB Kings Bay, GA
Solicitation number
N6945023R0005
Issued by

View the file

Other files

File Type Posted
N69450-23-R-0005-0007.pdf PDF
N69450-23-R-0005-0006.pdf PDF
1611490 Dwg C-607.pdf PDF
1611490 Dwg C-106.pdf PDF
1611490 Dwg A-109.pdf PDF
1611490 Spec 09 78 00.pdf PDF
1611490 Dwg_C-707.pdf PDF
1611490 Dwg A-108.pdf PDF
1611490 Dwg_IN703.pdf PDF
1611490 Dwg C-705.pdf PDF
1611490 Spec 03 35 00.pdf PDF
1611490 Dwg_IN725.pdf PDF
1611490 Dwg IN730.pdf PDF
1611490 Dwg IN731.pdf PDF
N69450-23-R-0005-0005.pdf PDF
1611490 Dwg IN706.pdf PDF
1611490 Dwg A-205.pdf PDF
1611490 Dwg A-512.pdf PDF
1611490 Dwg S-509.pdf PDF
1611490 Dwg_IN700.pdf PDF
1611490 Dwg_IN742.pdf PDF
1611490 Dwg _IN722.pdf PDF
1611490 Spec 07 14 00.pdf PDF
1611490 Dwg A-110.pdf PDF
1611490 Dwg A-102.pdf PDF
1611490 Dwg IN707.pdf PDF
1611490 Spec 07 41 13.pdf PDF
1611490 Dwg TS233.pdf PDF
1611490 Dwg IN741.pdf PDF
1611490 Dwg IN728.pdf PDF
1611490 Dwg_IN704.pdf PDF
1611490 Dwg A-206.pdf PDF
1611490 Dwg A-104.pdf PDF
1611490 Dwg_IN702.pdf PDF
1611490 Dwg_IN724.pdf PDF
1611490 Dwg_C-708.pdf PDF
1611490 Dwg _IN721.pdf PDF
1611490 Spec 31 68 13.pdf PDF
1611490 Dwg_IN723.pdf PDF
1611490 Dwg IN720.pdf PDF
1611490 Dwg A-106.pdf PDF
1611490 Dwg A-301.pdf PDF
1611490 Dwg C-109.pdf PDF
1611490 Dwg TS238.pdf PDF
1611490 Dwg_IN705.pdf PDF
1611490 Dwg A-202.pdf PDF
1611490 Dwg C-704.pdf PDF
1611490 Dwg C-703.pdf PDF
1611490 Dwg A-203.pdf PDF
1611490 Dwg A-201.pdf PDF
Show 40 more

Latest 50 of 201 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P658 Nuclear Regional Maintenance Facility 1611490 NSB Kings Bay, GA

SECTION 10 44 16

FIRE EXTINGUISHERS

11/19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 1 (2021) Fire Code

NFPA 10 (2022; ERTA 1 2021) Standard for Portable Fire Extinguishers

NFPA 101 (2021) Life Safety Code

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.157 (2003) Portable Fire Extinguishers

UNDERWRITERS LABORATORIES (UL)

UL 154 (2005; Reprint May 2021) UL Standard for Safety Carbon-Dioxide Fire Extinguishers

UL 299 (2012; May 2021) Dry Chemical Fire Extinguishers

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Fire Extinguishers; G, NAV

Accessories; G, NAV

Cabinets; G, NAV

Wall Brackets; G, NAV

Schedule; G, NAV

SD-03 Product Data

Fire Extinguishers; G, NAV

SECTION 10 44 16 Page 1 06 June 2023

AlvarezA2 Underline

Accessories; G, NAV

Cabinets; G, NAV

Wall Brackets; G, NAV

Replacement Parts List; G, NAV

SD-04 Samples

Equipment Samples; G, NAV

SD-07 Certificates

Fire Extinguishers Certifications; G, NAV

Manufacturer's Warranty with Inspection Tag; G, NAV

1.3 DELIVERY, STORAGE, AND HANDLING

Protect materials from weather, soil, and damage during delivery, storage, and construction.

Deliver materials in their original packages, containers, or bundles bearing the brand name and the name and type of the material.

1.3.1 Samples

Provide the following equipment samples: one full-sized sample of each type of cabinet being installed; three samples of wall brackets and accessories of each type being used.

Use approved samples for installation, with proper identification and storage.

1.4 WARRANTY

Guarantee that Fire Extinguishers are free of defects in materials, fabrication, finish, and installation and that they will remain so for a period of not less than 6 years after completion.

Submit the manufacturer's warranty with inspection tag.

1.5 PROJECT SCHEDULE

For fire extinguishers. Coordinate final fire extinguisher schedule with fire protection cabinet schedule to ensure proper fit and function. Use same designations indicated on Drawings.

PART 2 PRODUCTS

Submit fabrication drawings consisting of fabrication and assembly details performed in the factory and product data for the following items:

Accessories, cabinets, Wall Brackets.

SECTION 10 44 16 Page 2 06 June 2023

2.1 SYSTEM DESCRIPTION

2.1.1 Types

Submit fire extinguishers certifications showing compliance with local codes and regulations.

Provide fire extinguishers conforming to NFPA 10 . Provide quantity and placement in compliance with the applicable sections of NFPA 1, NFPA 101 , and 29 CFR 1910.157 .

Provide carbon-dioxide type fire extinguishers compliant with UL 154 .

Provide dry chemical type fire extinguishers compliant with UL 299 .

2.1.2 Material

Provide corrosion-resistant steel extinguisher shell.

2.1.3 Size

10 pounds extinguishers.

2.1.4 Accessories

Forged brass valve

Fusible plug

Safety release

Pressure gage

2.2 EQUIPMENT

2.2.1 Cabinets

2.2.1.1 Material

Provide corrosion-resistant steel cabinets in non fire resisted-rated walls of a width 4 inches and greater.

2.2.1.2 Type

Provide semi-recessed cabinet for wall thicknesses between 4 inch and 6 inch. For walls thicker than 6 inches provide recessed cabinets.

2.2.1.3 Size

Dimension cabinets to accommodate the specified fire extinguishers.

2.2.2 Wall Brackets

Provide wall-hook fire extinguisher wall brackets in fire resisted-rated walls.

Provide wall bracket and accessories as approved.

SECTION 10 44 16 Page 3

2.2.2.1 Identification

Provide lettering complying with authorities having jurisdiction for letter style, size, spacing, and location. Locate as indicated by the drawings.

Identify bracket-mounted fire extinguishers with the words "FIRE EXTINGUISHER" in red letter decals applied to mounting surface.

Orientation: Vertical

PART 3 EXECUTION

3.1 INSTALLATION

Install fire extinguishers in locations indicated and in compliance with requirements of authorities having jurisdiction.

Comply with the manufacturer's recommendations for all installations.

3.2 PROTECTION

3.2.1 Repairing

Remove and replace damaged and unacceptable portions of completed work with new work at no additional cost to the Government.

Submit replacement parts list indicating specified items replacement part, replacement cost, and name, address and contact for replacement parts distributor.

3.2.2 Cleaning

Clean all surfaces of the work, and adjacent surfaces which are soiled as a result of the work. Remove from the site all construction equipment, tools, surplus materials and rubbish resulting from the work.

-- End of Section --

SECTION 10 44 16 Page 4

10 44 16 - FIRE EXTINGUISHERS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Samples
1.4 WARRANTY
1.5 PROJECT SCHEDULE
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Types
2.1.2 Material
2.1.3 Size
2.1.4 Accessories
2.2 EQUIPMENT
2.2.1 Cabinets
2.2.1.1 Material
2.2.1.2 Type
2.2.1.3 Size
2.2.2 Wall Brackets
2.2.2.1 Identification
PART 3 EXECUTION
3.1 INSTALLATION
3.2 PROTECTION
3.2.1 Repairing
3.2.2 Cleaning

File details come from the government source that posted it. Updated .