JL-2_N6945022R0032_GPI Responses_0003.pdf
PDF 274 KB Posted
- Solicitation number
- N6945022R0032
About this file
This is a solicitation notice for base operations support services at Naval Station Guantanamo Bay, Cuba. The services include family housing, facility management, facility investment, custodial services, pest control, integrated solid waste management, grounds maintenance, utility management, electrical services, wastewater services, water services, and base support vehicles and equipment. The contract will have a one year base period and seven one year option periods, not to exceed eight years total. It will be a single-award indefinite-quantity contract with firm-fixed price recurring work and indefinite delivery indefinite quantity non-recurring work, as well as award fee provisions. The primary NAICS code is 561210 and the annual small business size standard is $41.5 million. The site visit is scheduled for August 2022 and questions are due by August 15, 2022.
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N69450‐22‐R‐0032
NSGB BOS
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.
1 8/15/2022 68 L.13 (b) (3) h
Section L.13 (b) (3) h. states: "Two pages of Performance Recognition documents will not count towards the page limitation; pages in excess of two (2) are not excluded from the page count."
QUESTION: Are offerors correct in assuming the first two pages of the Performance Recognition document are excluded from page limitations for EACH contract cited?
No. As stated, two pages of performance recognition documents will not count towards the page limitation.
2 8/15/2022 76 Section M (1) Factor 1, Corporate Experience
The RFP states: "Offerors who submit at least one recent/relevant project which demonstrate experience self-performing or managing Base Operating Services (BOS) (or equivalent) contracts at a remote and/or OCONUS location may be evaluated more favorably."
QUESTION: Will the Government advise if offerors may be evaluated more favorably for having multiple, rather than one, OCONUS BOS project?
As stated in Factor 1 evaluation criteria, the evaluation will consider the depth and breadth of the relevant experience. This could be demonstrated through a higher number of contracts, but could also be demonstrated through other means in accordance with solicitation criteria. The evaluation process is qualitative rather than quantitative.
3 8/15/2022 76 Section M (a) Basis of Evaluation
The RFP states: "The assessment of the offeror’s recent and relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of this solicitation. The Government will consider the depth and breadth of the relevant experience, focusing on performance of technical specifications to be performed under this contract, to evaluate the level of risk of unsuccessful performance."
QUESTION: Will the Government evaluate projects under Evaluation Factors (1) Corporate Experience for degree of relevancy (i.e., very relevant, relevant, somewhat relevant, not relevant)?
No. The offeror shall submit a minimum of two (2) to a maximum of five (5) examples of recent, relevant projects that the offeror (including joint ventures and partnerships) completed and served as the prime contractor...; those projects must meet the relevancy definition provided within Section M of the Solicitation.
4 8/15/2022 76 Section M (a) Basis of Evaluation
The RFP states: "The assessment of the offeror’s recent and relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of this solicitation. The Government will consider the depth and breadth of the relevant experience, focusing on performance of technical specifications to be performed under this contract, to evaluate the level of risk of unsuccessful performance."
QUESTION: Will the Government Corporate Evaluation assessment factor the degrees of relevance, or is Corporate Experience evaluated under a pass/fail assessment approach?
Refer to Question #3 response.
5 8/15/2022 76 Section M (b) Basis of Evaluation
The RFP states: "The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance."
QUESTION: Will the Government define what rating scale they will use to rate Past Performance?
Consistent with the DoD Source Selection Procedures provided in Director, Defense Procurement and Acquisition Policy memorandum dated April 1, 2016, the SSEB may use the following performance confidence assessment ratings: Satisfactory Confidence, Neutral Confidence, Limited Confidence, and No Confidence. In addition, past performance relevancy will be rated as either “Acceptable” or “Unacceptable”.
Amend No.
REFERENCE
Question No. QUESTION GOVERNMENT RESPONSEDate Received
SOURCE SELECTION INFORMATION ‐ SEE FAR 2.101 AND 3.104
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
6 8/15/2022 81 Section M (10)
The RFP states: "Demonstrates realistic labor (direct and indirect) in relation to the work to be performed that reflects a clear understanding of the requirements, and is consistent with other portions of the offeror’s proposal (i.e. Attachments JL-1, JB-2, etc.).” As written, the evaluation language is ambiguous because it doesn’t specify what portions of the offeror’s proposal this will be compared against.
QUESTION: Will the Government please confirm whether this evaluation factor is intended to be a price realism analysis?
No. The Government is not conducting a price realism analysis.
7 8/15/2022 82 Section M (2)
The RFP states: "(2) Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength."
QUESTION: Will the Government clarify that the “declining trends…would indicate a strength” language for TCR and DART is just an example of what would indicate a strength, and not the only means to get a strength for the Safety factor as a whole or for the DART/TCR elements?
The Agency will evaluate consistent with the criteria stated in the solicitation. Any aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance may be assessed as a strength in accordance with the criteria of the solicitation.
8 8/15/2022 82 Section M (b)
The RFP states: "(b) Basis of Evaluation. The Government is seeking to determine that the offeror has consistently demonstrated a commitment to safety and that the offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating."
QUESTION: Will the Government advise as to what other factors are considered to receive a strength for the Safety factor?
See response to Question #7.
9 8/15/2022 73 Section M 4. (a) Price (2) Basis of Evaluation
The RFP states: "The Government will evaluate price based on the total proposed price, which consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation."
QUESTION: Does the evaluation also include the award fee CLINs?
RESPONSE UPDATED VIA AMENDMENT 0003:
Yes, see updated basis of evaluation for price in Amendment 0003.
10 8/15/2022 73 Section M 3
The RFP states: "Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered."
QUESTION: Given the Government’s focus on performance quality, especially through the use of an award fee structured to incentivize performance at or above a certain level, will the Government please clarify why the RFP does not contain an explicit price realism criteria?
A price realism analysis is not required on a Firm-Fixed price contract.
11 8/15/2022 1-2 Award Fee Plan 2
Per the Award Fee Plan, the award-fee organization consists of 12 advisory members.
QUESTION: Would the Government confirm that the award-fee organization for NSGB will consist of 12 voting members?
The award fee plan has been revised to remove the term voting members. All members are advisory and make a recommendation to the fee determining official, who makes an independent determination of the fee to be awarded.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
12 8/15/2022 1-2 Award Fee Plan 2
The Award Fee Plan outlines the members that could be a part of the award-fee organization.
QUESTION: Please identify which individuals are voting members of the Award Fee Evaluation Board (AFEB).
See response to Question #11.
13 8/15/2022 1-2 Award Fee Plan 2
Per the Award Fee Plan, the award-fee organization consists of 12 advisory members.
QUESTION: Would the Government confirm that all non-voting individuals are advisory members?
See response to Question #11.
14 8/15/2022 1-2 Award Fee Plan 2
It appears that the COR is an advisory (i.e., non-voting) member of the
AFEB.
QUESTION: Would the Government please confirm that that the COR is a non-voting member of the AFEB?
See response to Question #11.
15 8/15/2022 1-2 Award Fee Plan 2
The Award Fee Plan specifies the award-fee organization consists of: the Fee Determining Official (FDO), who is the Chief of the Contracting Office (HCO) NAVFAC Southeast; an Award Fee Evaluation Board (AFEB), which consists of the Deputy Public Works Officer (DPWO) of NSGB as chairperson, the Administrative Contracting Officer (ACO), other functional area participants, and other advisory members as required.
QUESTION: Does the Government plan to allow the number of voting members of the award-fee organization to vary from award period to award period, or to have different individuals/roles join or leave the award-fee organization?
See response to Question #11.
16 8/15/2022 1-2 Award Fee Plan 2
The Award Fee Plan specifies the award-fee organization consists of: the Fee Determining Official (FDO), who is the Chief of the Contracting Office (HCO) NAVFAC Southeast; an Award Fee Evaluation Board (AFEB),which consists of the Deputy Public Works Officer (DPWO) of NSGB as chairperson, the Administrative Contracting Officer (ACO), other functional area participants, and other advisory members as required.
QUESTION: If changes in the composition of the award-fee organization are permitted, would you please clarify how these changes will occur?
As stated in the Award fee Plan, the FDO may unilaterally change this plan prior to the beginning of an evaluation period. The contractor will be notified of changes to the plan by the Contracting Officer, in writing, before the start of the affected evaluation period. Changes to this plan that are applicable to a current evaluation period will be incorporated by mutual consent of both parties.
17 8/15/2022 1-2 Award Fee Plan 2
The Award Fee Plan specifies the award-fee organization consists of: the Fee Determining Official (FDO), who is the Chief of the Contracting Office (HCO) NAVFAC Southeast; an Award Fee Evaluation Board (AFEB), which consists of the Deputy Public Works Officer (DPWO) of NSGB as chairperson, the Administrative Contracting Officer (ACO), other functional area participants, and other advisory members as required.
QUESTION: If changes in the composition of the award-fee organization are permitted, how will the contractor be notified of any changes?
See response to Question #16.
18 8/15/2022 68 Section L Section L.13 (b) (3) h.
The RFP states: "The non-price proposal submittal shall not exceed 150 pages."
QUESTION: Are offerors correct in assuming that an Executive Summary will be excluded from the page-count evaluation?
No, as stated in Section L.13 (b)(3) h., only Blank tab dividers, Past Performance Questionnaires, Contractor Performance Assessment Reports and Performance recognition documents are excluded from the page limitation. In addition, two pages of Performance recognition documents will not count towards the page limitation; pages in excess of two (2) are not excluded from the page count.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
19 8/15/2022 68 Section L Section L.13 (b) (3) h.
The RFP states: "The non-price proposal submittal shall not exceed 150 pages."
QUESTION: Are offerors correct in assuming that the Corporate Experience Project Data Sheets are excluded from the 150-page Non- Price Proposal Binder page limit?
No. Corporate Experience Project Data Sheets are not excluded from the 150 page count.
20 8/15/2022 77 Section M Section M (ii) (1) (a)
The RFP states: "For organizational purposes, address the requested information in the following format limiting the Factor 2 submission to a maximum of 20 pages."
QUESTION: Is the Quality Management System (QMS) response excluded from the 20-page limit for the Non-Price Proposal Binder, Factor 2: Management?
Per Section M, (2) Factor 2, Management, (a)(ii) the QMS summary is included in the Factor 2, 20-page limit.
21 8/15/2022 81 Section M Section M.3 (4) (a)
The RFP states: "Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions."
QUESTION: When required to "explain in detail," are offerors correct in assuming that they may exceed the 2-page limit for Factor 4: Safety?
No. The safety narrative is limited to two pages total, any information beyond two pages will not be considered.
22 8/15/2022 81 Section M Section M.3 (4) (a)
The RFP states: "Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions."
QUESTION: Does the Government require reporting for pandemic related fatalities?
No, the Government does not require reporting of pandemic related fatalities.
23 8/15/2022 67 Section L Section L.13 (b) (2) b.
The RFP states: "b. Submit all Price factor requirements."
QUESTION: Will the Government clarify or expand on what is required for "Submit all Price factor requirements"?
All price factor requirements are listed in Section M3. 4.(a)(1).
24 8/15/2022 77 Section M (ii) Quality Management System (QMS) 2
The RFP states: "Explain the role of QC organization as it pertains to workforce staffing."
QUESTION: Will the Government clarify what is required in response to this requirement?
The offeror is to explain where the QC personnel fit into the overall project organization and show that QC and production functions are independent.
25 8/15/2022 38 Section I Clauses incorporated by reference
QUESTION: Will the Government include FAR Clause 52.216-4 Economic Price Adjustment Labor and Material in the RFP?
No. This clause will not be incorporated in the RFP.
26 8/15/2022 1 Attachment J-0200000-14 Contractor Housing Site N/A
The Government provided an aerial map of a designated Contractor Housing Site with no additional information.
QUESTION: Will the Government please provide additional detail on this proposed Contractor Housing Site?
The Government estimates that all required Utilities are within 100 yards of the site. KTR will be responsible for connecting into base infrastructure. Attachment J-0200000-14 shows the location of land available for new man camp construction. Lift station and/or gravity sewer, transformer installation, and waterline connection required. KTR will submit a site approval request and work request immediately after award to PWD Requirements Branch.
27 8/15/2022 1 Attachment J-0200000-14 Contractor Housing Site N/A
The Government provided an aerial map of a designated Contractor Housing Site with no additional information.
QUESTION: Has the Government performed a soil sample analysis, and will it release this report?
The government has not conducted soil analysis on this site; soil sample analysis is not available.
28 8/15/2022 1 Attachment J-0200000-14 Contractor Housing Site N/A
The Government provided an aerial map of a designated Contractor Housing Site with no additional information.
QUESTION: Will the Government provide an estimate of the housing capacity for this site?
This site is available to the contractor but, the use of the site and capacity is to be determined by the contractor.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
29 8/15/2022 1 Attachment J-0200000-14 Contractor Housing Site N/A
The Government provided an aerial map of a designated Contractor Housing Site with no additional information.
QUESTION: Will the Government advise if American Nationals (AN) can be housed at the man camp?
Housing of American Nationals is not specifically prohibited on this site. This site is available to the contractor, who is housed there is to be determined by the contractor.
30 8/15/2022 16 !N6945022R0032_Section_C 2.3.13
2.3.13 referenced attachment J-0200000-15-01 was not provided.
REQUEST: We request the Government provide attachment J-0200000- 15-01.
This attachment should have been referenced as J-0200000-15 which was included in the solicitation vice J-0200000-15-01. This will be corrected via amendment.
31 8/15/2022 1 J-0200000-
16_N6945022R0032_CAT_Ca ll_Request
ALL
The Government released a BOS CAT Call Request form with no additional information.
QUESTION: Are offerors correct in assuming that a Statement of Work (SOW) will be released in conjunction with the BOSS CAT Call ?
The Government requestor is responsible for completing the SOW on the BOS CAT CALL Request Form. Annex 0200000, Spec Item 2.15.3, provides additional detail on CAT Calls.
32 8/15/2022 1 J-0200000-
16_N6945022R0032_CAT_Ca ll_Request
ALL
The Government released a BOS CAT Call Request form with no additional information.
QUESTION: Are offerors correct in assuming that the CAT calls can be used to cover additional value above the SO LOL for recurring work?
Yes. Annex 0200000, Spec Item 2.15.3, provides additional detail on CAT Calls.
33 8/15/2022 53 !N6945022R0032_Section_C 2.15.3
The Government released a BOS CAT Call Request form with no additional information.
QUESTION: Will the Government provide an estimate of the expected volume of CAT calls, historical CAT calls, category, scope, materials, labor hours, and other essential information required to propose to this requirement per FAR 16.202-2 Application?
CAT Calls are new to this solicitation, no historical information exists and therefore cannot be provided. Historical workload estimates are provided in Attachment J-1502000-03-01.
34 8/15/2022 1 Attachment J-1602000-05 1.a
Attachment J-1602000-05LNG Offload Standard Operating Procedures (SOPs) states: "Compliance with all SOPs is mandatory."
QUESTION: Will the Government please specify which SOPs apply?
This is referring to the standard operating procedures listed in J- 1602000-05.
35 8/15/2022 1 Attachment J-1602000-05 1.a
Attachment J-1602000-05 LNG Offload Standard Operating Procedures (SOPs) states: "Compliance with all SOPs is mandatory."
QUESTION: Will the Government please provide all SOPs?
This is referring to the standard operating procedures listed in J- 1602000-05.
36 8/15/2022 1 Attachment J-1602000-06 all
Attachment J-1602000-06 provides only a very rudimentary schematic of the LNG off-loading.
QUESTION: Will the Government please provide a more detailed schematic, designed to scale?
Revised Attachment J-1602000-06 that provides more detailed information will be provided in a forthcoming amendent.
37 8/15/2022 1 J-1502000-03-Historical Work
NSGB ALL
Attachment J-1502000-03-Historical Work NSGB lacks the detailed specifications for the historical work performed.
QUESTION: Will the Government please provide additional information relating to Facilities Recurring Work and UEM Recurring Work?
The data provided is the most up to date information available to the Government at the time of contract solicitation and/or award.
The Contractor will be responsible for maintaining an accurate and up to date asset inventory and work order history and status within NAVFAC Maximo per the reference spec item.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
38 8/15/2022 1 J-1401000-03 Housing Inventory ALL
Attachment J-1401000-03 Housing Inventory lacks the detailed specifications required for offerors to provide an accurate estimate of repairs. As an example, Electric Water Heater Inventory does not include the make, model, or other identifying details.
QUESTION: Will the Government please provide a comprehensive list of assets and their characteristics?
Additional detail on the recently installed Family Housing Water Heaters will be provided via solicitation amendment. The data provided is the most up to date information available to the Government at the time of contract solicitation and/or award. The Contractor will be responsible for maintaining an accurate and up to date asset inventory within NAVFAC Maximo per the reference spec item. Per sub-annex 1501000, spec item 3.1.1, "The Contractor shall be responsible for all changes to asset inventory updates within NAVFAC MAXIMO including adding, deactivating, and updating assets via direct entry...The Contractor is responsible for updates to asset data for all facilities and equipment regardless of whether or not they are maintained under this contract... For assets installed, removed, or replaced outside of this contract, the Contractor shall receive and validate inventory information provided by the Government and update asset data within NAVFAC MAXIMO...The Contractor shall update NAVFAC MAXIMO upon identification of discrepancies in inventory (e.g. assets with incorrect data elements, assets that no longer exist, or assets found that are not within current inventory)."
39 8/15/2022 1 J-1401000-11 HVAC ALL
The information in J-1401000-11 HVAC is not complete and contains numerous missing values (e.g., Bldg. No. Facility Description Equipment Manufacturer Equipment Model Number Equipment Serial Number, Size [tons]) .
QUESTION: Will the Government please provide a comprehensive list of HVAC assets and their characteristics?
The data provided is the most up to date information available to the Government at the time of contract solicitation and/or award.
The Contractor will be responsible for maintaining an accurate and up to date asset inventory within NAVFAC Maximo per the reference spec item. Per sub-annex 1501000, spec item 3.1.1, "The Contractor shall be responsible for all changes to asset inventory updates within NAVFAC MAXIMO including adding, deactivating, and updating assets via direct entry... The Contractor is responsible for updates to asset data for all facilities and equipment regardless of whether or not they are maintained under this contract... For assets installed, removed, or replaced outside of this contract, the Contractor shall receive and validate inventory information provided by the Government and update asset data within NAVFAC MAXIMO... The Contractor shall update NAVFAC MAXIMO upon identification of discrepancies in inventory (e.g. assets with incorrect data elements, assets that no longer exist, or assets found that are not within current inventory)."
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
40 8/15/2022 1 J-1501000-03 Facility Property ALL
Attachment J-1501000-03 Facility Property includes numerous generic references (e.g., 3920 Runway lights) and lacks the detailed information required for offerors to prepare an accurate bid.
QUESTION: Will the Government please provide additional detail on the facilities, assets, and installed equipment shown in J-1501000-03 Facility Property?
The data provided is the most up to date information available to the Government at the time of contract solicitation and/or award.
Individual J Section equipment inventories provide additional information. NOTE: The Contractor will be responsible for maintaining an accurate and up to date asset inventory within NAVFAC Maximo per the reference spec item. Per sub-annex 1501000, spec item 3.1.1, "The Contractor shall be responsible for all changes to asset inventory updates within NAVFAC MAXIMO including adding, deactivating, and updating assets via direct entry...The Contractor is responsible for updates to asset data for all facilities and equipment regardless of whether or not they are maintained under this contract... For assets installed, removed, or replaced outside of this contract, the Contractor shall receive and validate inventory information provided by the Government and update asset data within NAVFAC MAXIMO...The Contractor shall update NAVFAC MAXIMO upon identification of discrepancies in inventory (e.g. assets with incorrect data elements, assets that no longer exist, or assets found that are not within current inventory)."
41 8/15/2022 1 J-1502000-30-02 ECM 13
Detail ALL
Column AD (Material to be Installed) of J-1502000-30-02 ECM 13 Detail has the value "China: N/A, Seat: N/A, Valve/Faucet: Neoperl 40- 114 Accessories: N/A."
QUESTION: Will the Government please clarify the content of the "Material to Be Installed" column?
Column AD lists energy efficient plumbing fixtures to be installed.
Items listed as N/A are not planned for replacement; only those items with a make/model such as the valves/faucets listed in this column. The contractor should assume that those items listed "to be installed" have been installed by the time contract performance begins.
42 8/15/2022 1
J-1502000-31-01 ECM 5
Summary & J-1502000-31-02 ECM 5 Material
ALL
The total quantity of lights and sensors in attachment J-1502000-31-02 ECM 5 Material and J-1502000-31-01 ECM 5 do not match.
REQUEST: We request the Government clarify this requirement.
Attachment J-1502000-31-01 lists lamps, fixtures and sensors to be installed per the ESPC task order and the revised scope following a field audit. Attachment J-1502000-31-02 lists specific lamps, fixtures and sensors by make/model based on the original ESPC task order scope at the time the fixture schedule was developed. The contractor can assume that the quantities listed in Attachment J-1502000-31-01 following the field audit have been installed by the time contract performance begins.
43 8/15/2022 1 J-1502000-31-04 ECM 5 by Room ALL
Attachment J-1502000-31-04 ECM 5 by Room contains "#REF!" errors.
QUESTION: Will the Government please provide a revised Attachment J-1502000-31-04?
The "#REF" "errors" are cells reserved for future use and are not relevant to this solicitation.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
44 8/15/2022 1 J-1502000-04(JTF) HVAC ALL
Attachment J-1502000-04(JTF) HVAC is incomplete.
QUESTION: Will the Government please provide additional detail on the equipment associated with J-1502000-04(JTF) HVAC?
The data provided is the most up to date information available to the Government at the time of contract solicitation and/or award.
NOTE: The Contractor will be responsible for maintaining an accurate and up to date asset inventory within NAVFAC Maximo per the reference spec item. Per sub-annex 1501000, spec item 3.1.1, "The Contractor shall be responsible for all changes to asset inventory updates within NAVFAC MAXIMO including adding, deactivating, and updating assets via direct entry...The Contractor is responsible for updates to asset data for all facilities and equipment regardless of whether or not they are maintained under this contract... For assets installed, removed, or replaced outside of this contract, the Contractor shall receive and validate inventory information provided by the Government and update asset data within NAVFAC MAXIMO...The Contractor shall update NAVFAC MAXIMO upon identification of discrepancies in inventory (e.g. assets with incorrect data elements, assets that no longer exist, or assets found that are not within current inventory)."
45 8/15/2022 1 J-1502000-04(OMC) HVAC ALL
J-1502000-04(OMC) HVAC is incomplete.
QUESTION: Will the Government please provide additional detail on the equipment associated with J-1502000-04(OMC) HVAC?
See response to Question #44.
46 8/15/2022 1 J-1601000-06 Elec Utility ALL Attachment J-1601000-06 Elec Utility is incomplete.
QUESTION: Will the Government please provide additional detail on the equipment associated with J-1601000-06 Elec Utility?
See response to Question #44.
47 8/15/2022 1 J-1601000-07 Wastewater Utility ALL
Attachment J-1601000-07 Wastewater Utility is incomplete.
QUESTION: Will the Government please provide additional detail on the equipment associated with J-1601000-07 Wastewater Utility?
See response to Question #44.
48 8/15/2022 1 J-1601000-07 Wastewater Utility ALL
ASSETNUM UMA457003564 shows a serial number of "SEE
PICURES."
QUESTION: Will the Government please provide the pictures for asset
ASSETNUM UMA457003564?
The reference to a photograph will be deleted and the relevant reference number will be provided via solicitation amendment.
49 8/15/2022 1 J-1601000-08 Water Utility ALL AttachmentJ-1601000-08 Water Utility is incomplete.
QUESTION: Will the Government please provide additional detail on the equipment associated with J-1601000-08 Water Utility?
See response to Question #44.
50 8/15/2022 1 Attachment J-1700000-03
MHE WHE ALL
Attachment J-1700000-03 MHE WHE is incomplete.
QUESTION: Will the Government please provide additional detail on the equipment associated with J-1700000-03 MHE WHE?
See response to Question #44.
51 8/15/2022 3 !N6945022R0032_Section_C 1.2
The RFP Section C states: "Items of work not covered by this contract but within the general intent are considered in the scope of this contract."
QUESTION: Will the Government please clarify the scope and expectations associated with this requirement?
The scope can be considered all work that was fairly and reasonably within the contemplation of the parties at the time the contract was made. As stated in C-0100000, Spec Item 1.2., the Government reserves the right to acquire additional services at additional locations within the scope of the annexes in addition the to services and locations identified in the requirements of this contract.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
52 8/15/2022 16 !N6945022R0032_Section_C 2.3.13
Section 2.3.13 states: "The installation will provide up to 350 beds for the BOS contractor workforce; however, makes no guarantee of bed or berthing location."
QUESTION: Out of 350 beds provided, will all of them be located on the Windward side of the installation?
The Government has alloted up to 350 beds for BOS contractor use at Gold Hill Towers on the Windward side of the Island.
Additional billeting on the Leeward side must be coordinated with the NGIS General Manager. Awardee should do their due diligence in making contact with: Vinnie Hall – General Manager
NGIS
Naval Station Guantanamo Bay, Cuba PSC 1005 Box 53, FPO AE 09593 Office: 757-458-2091/DSN: 660-2091
53 8/15/2022 16 !N6945022R0032_Section_C 2.3.13
Section 2.3.13 states: "The installation will provide up to 350 beds for the BOS contractor workforce; however, makes no guarantee of bed or berthing location."
QUESTION: Out of 350 beds provided, how many beds are available on the Leeward side of the installation?
See response to Question #52.
54 8/15/2022 16 !N6945022R0032_Section_C 2.3.13
Section 2.3.13 states: "The installation will provide up to 350 beds for the BOS contractor workforce; however, makes no guarantee of bed or berthing location."
QUESTION: Will the "350-beds" be a turn-key facility/facilities to house the workforce?
The billeting is provided through Navy Gateway Inn and Suites (NGIS) at a daily market rate plus utilities. The Government has alloted up to 350 beds for BOS contractor use at Gold Hill Towers on the Windward side of the Island. Additional billeting on the Leeward side must be coordinated with the NGIS General Manager. Awardee should do their due diligence in making contact with: Vinnie Hall – General Manager NGIS Naval Station Guantanamo Bay, Cuba PSC 1005 Box 53, FPO AE 09593 Office: 757-458-2091/DSN: 660-2091
55 8/15/2022 16 !N6945022R0032_Section_C 2.3.13
Section 2.3.13 states: "Requirements for Contractor Constructed and Maintained Unaccompanied Employee Berthing Facilities are provided in J-0200000-15-01."
QUESTION: Will the Government please provide additional detail on the requirements for Constructed and Maintained Unaccompanied Employee Berthing Facilities?
Any contractor constructed facilities are considered temporary and at a minimum meet UFC requirements for temporary expeditionary facilities. Refer to UFC 1-201-01 Non Permit DOD Facilities in Support of Military Operations.
56 8/15/2022 40 !N6945022R0032 Section I
The Government includes multiple references to Government property, assets, and equipment, yet there is no Government Property FAR clause included in Section I.
QUESTION: Will the Government please include the FAR Government Property clause as prescribed in FAR 45.107?
Refer to Section H.10 of the RFP. In accordance with FAR 45.000(b)(5), Government property is not included in this solicitation and resulting contract.
57 8/15/2022 93 !N6945022R0032_Section_C 3.1.1
Section C states: "3.1.1. The Contractor is responsible for updates to asset data for all facilities and equipment regardless of whether or not they are maintained under this contract. For assets installed, removed, or replaced outside of this contract, the Contractor shall receive and validate inventory information provided by the Government and update asset data within NAVFAC Maximo."
QUESTION: Will the Government please provide an estimated annual quantity, detailed description, and other information that will allow offerors to propose to this requirement?
Historical ICAP and UICAP information will be provided as Attachment J-1501000-09 via solicitation amendment. Historical data and supporting information provided is intended to illustrate the volume and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
58 8/15/2022 35 !N6945022R0032 Section H
RFP Section H.12 states: "H.12 CONSEQUENCES TO PERFORM In the case of unsatisfactory or non-performed work, the Government: (1) may give the Contractor written notice of observed deficiencies prior to withholding payment for unsatisfactory or non-performed work and/or assessing liquidated damages."
Section H.12 appears to be in conflict with FAR 11.5 - Liquidated Damages.
QUESTION: Will the Government confirm that the liquidated damages procedures provided for in Section H.12 are governed by and subordinate to the FAR 11.501 provisions for liquidated damages?
Liquidated damages are to compensate the Government for administrative costs and other expenses resulting from the unsatisfactory or non-performed work. Section H.12 is a special contract requirement consistent with FAR 11.501. In reviewing this question the Government has made the following revision to H.12(a)(3), to reduce the percentage from 20% to 10% to appropriately reflect the administrative costs (4% Project Oversight and 6% Performance Assessment Fees, which is in most cases significantly lower than the actual costs of Government personnel).
59 8/15/2022 All J-1502000-03 Historical Work NSGB Column "Craft"
The Historical Work table listed a number of two-character craft codes.
QUESTION: Will the Government provide the description of the craft code listed in column C of Facilities Recurring Work?
The Government will add a craft code key to the historic work listings via solicitation amendment.
60 8/15/2022 All J Technical N6945022R0032 section J-Attachments J-1401000-11 HVAC
The Section J attachment does not provide details to identify equipment past its usable life cycle.
QUESTION: Will the Government identify which equipment listed are past their life cycle?
Attachment J-1501000-09 ICAP and UICAP listings will be provided via solicitation amendment. All systems and equipment in need of operation and maintenance are in operating condition with install date listed in Section J inventory where applicable or available. Per Annex 0100000, spec item 1.7, "All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified." As part of the PWS Infrastructure Condition Assessment Program (ICAP) and Utilities (ICAP) Services shall be provided by the Contractor. The Contractor must use the information provided in the contract as well as the site visit for risk assessment. All work includes repair and/or replacement up to the LOL. However, there is no LOL on operation and maintenance other than the Contractor's Fixed price for Recurring Work.
61 8/15/2022 All J Technical N6945022R0032 section J-Attachments J-1502000-08 HVAC
The Section J attachment does not provide details to identify equipment past its usable life cycle.
QUESTION: Will the Government identify which equipment listed are past their life cycle?
Equipment condition assessments will be provided in Attachment J- 1501000-09 ICAP and UICAP listings via solicitation amendment.
NOTE: All systems and equipment in need of operation and maintenance are in operating condition with install date listed in Section J inventory where applicable or available. Per Annex 0100000, spec item 1.7, "All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified." As part of the PWS Infrastructure Condition Assessment Program (ICAP) and Utilities (ICAP) Services shall be provided by the Contractor. The Contractor must use the information provided in the contract as well as the site visit for risk assessment. All work includes repair and/or replacement up to the LOL. However, there is no LOL on operation and maintenance other than the Contractor's Fixed price for Recurring Work.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
62 8/15/2022 All J Technical N6945022R0032 section J-Attachments
J-1502000-04 (JTF)
HVAC
The Section J attachment does not provide details to identify equipment past its usable life cycle.
QUESTION: Will the Government identify which equipment listed are past their life cycle?
See Response to Question #61
63 8/15/2022 All J Technical N6945022R0032 section J-Attachments
J-1502000-04 (OMC)
HVAC
The Section J attachment does not provide details to identify equipment past its usable life cycle.
QUESTION: Will the Government identify which equipment listed are past their life cycle?
See Response to Question #61
64 8/15/2022 All J Technical N6945022R0032 section J-Attachments J-1601000-06 Elec Utility
The Section J attachment does not provide details to identify equipment past its usable life cycle.
QUESTION: Will the Government identify which equipment listed are past their life cycle?
See Response to Question #61
65 8/15/2022 All J Technical N6945022R0032 section J-Attachments
J-1601000-07 Waste Water Utility
The Section J attachment does not provide details to identify equipment past its usable life cycle.
QUESTION: Will the Government identify which equipment listed are past their life cycle?
See Response to Question #61
66 8/15/2022 All J Technical N6945022R0032 section J-Attachments
J-1601000-08 Water Utility
The Section J attachment does not provide details to identify equipment past its usable life cycle.
QUESTION: Will the Government identify which equipment listed are past their life cycle?
See Response to Question #61
67 8/15/2022 81 RFP M (iii) (6)
The RFP states: "(6) Demonstrates an approach/methodology to effectively achieve the ICAP and UICAP requirements identified in Sub-annexes 1501000 and 1601000, respectively. Offerors who propose innovative solutions to ensure accurate and up-to-date Maximo data may be evaluated more favorably."
QUESTION: Will the Government please provide the latest ICAP and UICAP report?
Attachment J-1501000-09 ICAP and UICAP listings will be provided via solicitation amendment.
68 8/15/2022 185 1502000- Facility Investment
(DHA)
3.4.3 Vertical
Transportation
Equipment (VTE)
The related information states the VTE system inventory can be found in J-150200-09. However, J-1502000-09 in 4. N6945020R0010SectionJ is Fire Protecting Systems Description and Inventory.
QUESTION: Will the Government please provide the VTE Transportation inventory?
The DHA FP system inventory is listed in Attachement J-1502000- 08(DHA) and the DHA VTE system inventory is listed in Attachment J-1502000-09(DHA) vice 1502000-09. This will be corrected in an upcoming amendment. 0002
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
69 8/15/2022 448 J-1700000-04 Section 3.1.2
Annex 1700000 Spec Item 3.1.2 states “Exact times for Commission Buses will be provided to the contractor in advance of the next trial day, and will specify the estimated number of passengers, required departure time and location, destination, and estimated departure time from destination for return trip.” The workload provided by the government indicates one shuttle bus is operated seven days a week for 21 hours each day. The workload then hints at additional shuttle bus requirements beyond the stated bus route listed in J-1700000-04. The OMC additional base shuttle bus during Commission is missing several details such as, frequency of occurrence, number of hours per week the bus may be in operation, how many weeks per year the requirement may be needed, how many drivers are needed, a bidder needs to accurately bid to this requirement as a firm fixed price requirement. The government indicates the OMC additional base shuttle bus may be required during Commission (Leeward/Winward) All runs Monday through Friday before and after trial (Daily times will vary). The Government does not indicate the length of a trial, or the frequency of trials either to help bidder gain a better understanding of how many drivers they may or may not need.
QUESTION: Based on the sensitivity of the OMC mission and several unknowns for these additional OMC routes will the government please consider providing a stated number of drivers required daily to include the number of hours per week, and number of weeks per year bidders should consider when pricing for this requirement?
The exact length and frequencies of trials are unknown.
Historically, approximately 40 weeks per year there is a requirement for additional shuttle services for OMC’s legislative activities.
70 8/15/2022 65 Section C 1401000 Spec item 3.2
Furnishings, Appliances & Equipment (FA&E)
Family Housing spec item 3.2 Furnishings, Appliances & Equipment (FA&E) states that the "minimum stocking levels are maintained 100% of the time."
QUESTION: Are the loaner items considered a part of the inventory/minimum stocking level in the warehouse?
FA&E is considered part of the inventory and also requires minimum stocking levels.
71 8/15/2022 229 1502000 Facility Investment
JTF
Spec item 3.5.4 FA&E Management
Facility Investment JTF Spec item 3.5.4 FA&E Management states that "all FA&E is inventoried 100% of the time."
QUESTION: Are the loaner items considered a part of the inventory/minimum stocking level in the warehouse?
See response to Question #70.
72 8/15/2022 269 1502000 Facility Investment
OMC
Spec item 3.5.4 FA&E Management
Facility Investment Spec item 3.5.4 FA&E Management states that "all FA&E is inventoried 100% of the time."
QUESTION: Are the loaner items considered a part of the inventory/minimum stocking level in the warehouse?
See response to Question #70.
73 8/15/2022 241 1502000 Facility Investment
OMC
Spec item 2.3.3 OMC Critical Facilities
Facility Investment OMC Spec item 2.3.3 OMC Critical Facilities states that "Foreign Nationals are not allowed to perform work unescorted in OMC or any subset of OMC facilities, including ELC."
QUESTION: Will the Government confirm that ONLY cleared ANs can access and perform work in the ELC 1 building?
Escorted FN may perform maintenance and repair work in ELC 1 provided the area has been sanitized or has been checked for any sensitive materials/documents.
74 8/15/2022 285 1503020 Pest Control Spec item 2.2.1
Certification, Training and Licensing
1503020 Pest Control spec item 2.2.1 Certification, Training and Licensing states: "The contractor shall have a stateside/US recognized certification to use fumigants on NSGB." To obtain US state-recognized pesticide certification, a person has to be a resident of the state.
QUESTION: Are offerors correct in assuming that only ANs can meet this requirement, since state residency is required for certification?
Personnel performing pest control work must meet the certification, training and licensing requirements listed in Spec item 2.2.1.
The Government does not provide certification for fumigation. The contractor shall have a stateside/US recognized certification to use fumigants on NSGB.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
75 8/15/2022 358 1602000 Electrical Spec item 2.2
1602000 Electrical Section 2.2. states: "The contractor shall provide Electrical HV equipment no older than five (5) years and manufactured by ALTEC or US equivalent."
QUESITION: Will the Government confirm that Electrical HV equipment can be no older than 5 years at contract start and can be used continuously through the end of the contract?
High voltage Electrical Equipment must be no older than 5 years at the time of installation.
76 8/15/2022 24 0200000 Spec item 2.6.6.3
0200000 spec item 2.6.6.3 states: "The process for obtaining access and establishing NAVFAC Maximo accounts are detailed in the NAVFAC MAXIMO System Access Procedures provided in J-0200000-11."
QUESTION: Will the Government please confirm that only ANs are able to access NAVFAC Maximo?
To obtain NAVFACF Maximo account access, personnel must meet the secrity requirements for access to government IT systems listed in Annex 0200000 Spec Item 2.8.8.
77 8/15/2022 24 0200000 Spec item 2.6.6.3
0200000 spec item 2.6.6.3 states: "The process for obtaining access and establishing NAVFAC Maximo accounts are detailed in the NAVFAC MAXIMO System Access Procedures provided in J-0200000-11."
QUESTION: Will the Government please specify the level of access that NAVFAC Maximo Clerks will have to NAVFAC Maximo modules?
10701 - Access to FEC Southeast, READONLY_USER -Read only user group, EVERYONE - Everyone (Printing Rights/Group), SE_CUB - Cuba BOS Contractor
78 8/15/2022 General Section C General
Section C indicates that in addition to Pest Control surveys, additional surveys may be required or desired.
QUESTION: Will the Government provide the listing of surveys for which contractors have to provide administrative support (i.e., fire suppression survey, water survey, JHACO) and their frequencies?
Individual spec items list surveys to be completed, for example Annex 0200000, Spec Item 2.9.4.2 specifies the requirement to conduct an annual fire prevention plan and survey.
79 8/15/2022 General Facility Investment (ALL) General
Section C indicates that contractors will need access to SCADA systems, General Electric power plant, NAVFAC Maximo, Refrigerant Tracking and Inventory System (RTIS), and MS Office software.
QUESTION: Are there proprietary software systems that offerors don’t have access to?
Cleared contractor personnel will be granted access to any necessary software required to perform the contract requirements.
80 8/15/2022 General Multiple Multiple
Section C emphasizes the requirement for critical spares.
QUESTION: Are critical spares above the LOL the responsibility of the contractor to provide as inventory (e.g., pump motor at the G45 plant)?
Yes.
81 8/15/2022 40 !N6945022R0032 Section I
N6945022R0032 includes requirements for engineering and transportation services.
QUESTION: Will the Government please include FAR 52.243-1 Changes-Fixed-Price Alternate II per FAR 43.205(a)(1)?
No. FAR 52.243-1 Alt I, included in the solicitation is the appropriate changes clause.
82 8/15/2022 442 1700000 2.3.6
Per 1700000 spec item 2.3.6: "The number of Transportation assets by customer may vary as much as 5% without a contract modification.
When asset replacement happens, the Government will provide the contractor in writing the asset replacement by asset number and expected removal from inventory."
QUESTION: When taking into consideration ongoing fleet modernization efforts by the Government, and the requirement that the contractor maintain critical spares, will the Government confirm that contractors shall price critical spares based on the inventory available in J-attachment?
This is a contractor business decision. The government does not provide additional pricing guidance. Critical spares will not be reimbursed on a cost basis. Contractor will be responsible for providing all labor, material and equipment to meet the requirements in the this solicitation. The Contractor will be responsible for meeting all downtime standards in the contract. No exceptions will be taken due lack of parts.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.Question No. QUESTION GOVERNMENT RESPONSEDate Received
83 8/15/2022 442 1700000 2.3.6
Changes in manufacturer, in the year of manufacturing, and the type of vehicle can result in significant additional cost for a contractor, since the contractor has to update critical spares associated with new assets.
QUESTION: Will the contractor be reimbursed for an initial list of critical spares based on the Government's modernizing its fleet?
No, the government does not anticipate a significant change in inventory during the performance period. Critical spares will not be reimbursed on a cost basis. Contractor will be responsible for providing all labor, material and equipment to meet the requirements in the this solicitation. The Contractor will be responsible for meeting all downtime standards in the contract.