J-1502000-02(DHA)-01_Above Ceiling Penetration Permit.pdf

PDF 804 KB Posted

Attached to
Base Operations Support (BOS) Services at Naval Station Guantanamo Bay, Cuba
Solicitation number
N6945022R0032
Issued by

About this file

This document contains a federal solicitation notice and an above ceiling penetration permit template. The solicitation notice is for Base Operations Support (BOS) services at Naval Station Guantanamo Bay, Cuba under solicitation number N6945022R0032. The services required include family housing, facility management, facility investment, custodial services, pest control, integrated solid waste management, grounds maintenance and landscaping, utility management, electrical, wastewater, water, and base support vehicles and equipment. The contract type is an indefinite-delivery, indefinite-quantity contract with both fixed price and non-fixed price CLINs, as well as award fee provisions. The base period of performance is one year with seven one-year options, not to exceed eight total years. The permit template provides guidance on maintaining the integrity of fire barriers during above ceiling work, with requirements for location details, reasons for penetration, signatures, and inspections.

View the file

Other files

File Type Posted
N6945022R0032_Section J_Technical-Attachments_Amend 0005.xlsx XLSX spreadsheet
N6945022R0032 Amend 0005.pdf PDF
N6945022R0032 Section C_Amend 0005.pdf PDF
J-0200000-13_N6945022R0032_Amend 0005.xlsx XLSX spreadsheet
N6945022R0032 Amend 0004.pdf PDF
N6945022R0032 Amend 0003.pdf PDF
N6945022R0032 Section J_Amend 0003.pdf PDF
J-1602000-06-03_N6945022R0032_LNG_SubseaPipeline_Drawings.pdf PDF
N6945022R0032 Section C_Amend 0003.pdf PDF
JL-2_N6945022R0032_GPI Responses_0003.pdf PDF
N6945022R0032 Section F_Amend 0002.pdf PDF
JL-13 NSGB INST(a) 11200.1G MOTOR VEHICLE AND TRAFFIC REGULATIONS.pdf PDF
JL-13 NSGBINST(b) 11106.1B CH-1 - OPERATION MAINT AND UTIL OF NAVAL STAT SWIMMING POOLS.pdf PDF
N6945022R0032 Section J_Amend 0002.pdf PDF
J-1501000-09_ICAP_Report.xlsx XLSX spreadsheet
JL-13 NSGB INST(d) 4500.1A- TURN-IN PROPERTY TO DEFENSE UTILIZATION OF MARKETING OFFICE.PDF PDF
J-1502000-03-01 Historical Work NSGB_Amend 0002.xlsx XLSX spreadsheet
JM-1_N6945022R0032_Corporate_Experience_Amend 0002.docx DOCX document
J-1503050-05_Site_Map_Amend 0002.pdf PDF
JL-1_N6945022R0032_Amend 0002.xlsx XLSX spreadsheet
JL-2_N6945022R0032_GPI Responses_0002.pdf PDF
JL-13 NSGBINST(c) 11106.1B - Operation, Maint and Utilization of Naval Station Swimming Pools.pdf PDF
J-1401000-03-01_FH_Water_Heater_Sched.pdf PDF
JM-2_N6945022R0032_PPQ_Amend 0002.docx DOCX document
JL-13 NSGBINST(f) 5090.1E - HAZARDOUS WASTE MANAGEMENT.pdf PDF
JL-13 NSGBINST(e) 5090.4B - SOLID WASTE MANAGEMENT PROCEDURES.pdf PDF
J-1503050-05-01_Storm_Drainage_Maps.pdf PDF
N6945022R0032 Amend 0002.pdf PDF
J_Technical N6945022R0032__Section J_Technical-Attachments_Amend 0002.xlsx XLSX spreadsheet
J-1602000-06-01 LNG_System_Pier C.pdf PDF
J-1602000-06-02_LNG_Drawing.pdf PDF
J-0200000-13_N6945022R0032_Amend 0002.xlsx XLSX spreadsheet
N6945022R0032 Section C_Amend 0002.pdf PDF
N6945022R0032 Amend 0001.pdf PDF
JL-12_N6945022R0032_Site Visit Sign In Sheets.pdf PDF
JL-11_N6945022R0032_AwardFeePlan DRAFT.pdf PDF
J-1502000-02(DHA)-02_Infection_Copntrol_Risk_Assessment.pdf PDF
JL-5_N6945022R0032_NSGB BOS Site Visit Itineray.docx DOCX document
JL-4_N6945022R0032_SECNAV5512.pdf PDF
JM-1_N6945022R0032_Corporate_Experience.docx DOCX document
J-1502000-03-Historical Work NSGB.xlsx XLSX spreadsheet
N6945022R0032_Section_C.pdf PDF
J-1502000-32_N6945022R0032_ESPC_RandR.pdf PDF
JL-7_ENCL (3) AMC Flight Reservation request blank.doc DOC document
J-1606000-04_Sample Reports.pdf PDF
J-1502000-15_(DHA)MedicalAirGasAndVacuumSystemsMaps.pdf PDF
JL-6_ENCL (1) ENTRY CLEARANCE COVER SHEET.pdf PDF
JL-9 NSGB Industry Day Brief_January.pdf PDF
J-1503050-08_Roads.pdf PDF
J-1601000-12_Outage request.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABOVE CEILING, FIRE AND SMOKE BARRIER PENETRATION PERMIT

Permit Number: ___________________________ Issue Date: ___________________

Approved by: Estimated Completion Date: ______________________

(Facilities Representative)

Permit Issued To:

(Department / Contractor Name) (Individual’s Name) (Phone Number)

Location of Corridor Wall(s) or Barrier(s) to be Penetrated: (building, floor, room number) (Attached Sketch if applicable) (Attached photos of existing condition of wall pentetrations if applicable)

Reasons for Penetration or Work to be Performed:

Final Inspection by Department/Contractor:

Sign: __________________________________________ Date: ______________________

Facilities Management:

Sign: __________________________________________ Date: ______________________

Instructions:

1. Maintain a copy of this permit at the work area at all times.

2. Promptly repair penetration in an approved (NFPA/MFG/CDC/etc…) manner. Contact the hospital’s Facilities

Management office, if there are any questions regarding the repairs.

3. Notify Facilities Management when repairs are complete to schedule a final inspection.

4. Contractors must fill all penetrations with a rated fire stopping product approved by the hospital.

5. Prior to performing related tasks within patient care, laboratory, surgery or other areas where the services rendered are directly impacting patient care; you will be required to obtain an Infection Control Permit.

6. All ceiling tile(s) will be reinstalled or replaced to the satisfaction of the final inspection.

7. Pictures will be taken of the fire and smoke barrier walls before the penetrations are made by department/contractor performing work. Pictures will be taken after the work has been completed by department/contractor performing work. Pictures will be sent to the Facilities Management office.

Pictures required for this permit? Yes No

NAVAL HOSPITAL, GUANTANAMO BAY, CUBA

POLICY AND PROCEDURE

SUBJECT: ABOVE THE CEILING INSTALLATION PERMIT PROGRAM

POLICY STATEMENT:

The above the ceiling permit program is designed to ensure the integrity of fire rated walls, doors and smoke compartments through the use of monitoring; inspecting and providing a permit to all outside contractors or subcontractors, and hospital personnel that may be creating penetrations.

PROCEDURE:

1. Each maintenance, telecommunications, I.T./MID, and contract employee shall submit a schedule of anticipated penetrations to Facilities Management Department (FMD) prior to the start of any construction project. All outside contractors and any Naval Hospital employee doing above ceiling work will be required to obtain a permit from the Facilities Management Department (FMD) before work begins.

2. The location of each penetration will be identified on a floor plan for the area under construction, and submitted to FMD.

3. Upon submission of all required documentation, an "Above Ceiling Installation Permit" will be issued to the contractor by FMD.

4. FMD will accompany the contractor to the construction site and will post the permit in a visibly prominent location, and the permit will remain posted for the duration of the project.

5. Upon completion of the permitted project, the contractor will notify the FMD that the project is complete and ready for inspection. Once inspected, FMD will sign off on the construction project.

6. No payment to any construction contractor will be allowed without documentation of a completed Above the Ceiling Installation Permit, signed by FMD and a completed Letter of Conformance signed by FMD.

LETTER OF CONFORMANCE

Project Name: _________________________________________________________________

Job Location: __________________________________________________________________

Brief Description of Job: __________________________________________________________

Firestop Manufacture Used: ______________________________________________________

I, _______________________ of _____________________, on this Date _______________, by completing and signing this letter certify that all firestop systems used on this project have been installed in accordance with Naval Hospital Guantanamo Bay, Cuba guidelines.

In addition, all firestop systems have been installed to system details and written instructions in accordance with UL 1479 / ASTM E 814 and/or UL 2079 / ASTM E 1966 test Standards.

The following supporting document s must be attached:

Approved UL or OPL systems used on the Job (may differ from initial permit)

Any Engineering Judgments provided for this project.

Signed, completed Above Ceiling Installation Permit (necessary for payment, if applicable)

Contractor Signature FMD Signature

Contractor Name (printed) FMD Representative (printed)

Date Date

Permit Number:
Issue Date:
Estimated Completion Date:
Individuals Name:
Phone Number:
Date:
Date_2:
Department Contractor Name:
FM:
2:
3:
4:
5:
6:
7:
8:
9:
10:
Text1:
12:
11:
Sketch 1:
Sketch 2:
Sketch 3:
Sketch 4:
Reasons 1:
Reasons 2:
Reasons 3:
Reasons 4:
CB1: Off
CB2: Off
CB3: Off

File details come from the government source that posted it. Updated .