PPI # SECTION OF
RFP
PARAGRAPH
REFERENCE
DRAWING
NUMBER (IF
APPLIC)
QUESTION ANSWER ATTACHMENT
Yes or No AMENDMENT #
1 N/A N/A N/A
The SF 1442 states that this solicitation is 100% set-aside for small business, and yet on page 65 of the RFP, Section 00150 – Instructions to Offerors, it states in the first sentence that the procurement is solicited on an unrestricted basis with full and open competition. Which is correct?
This procurement is a 100% Small Business Set-aside. No 0001
2 N/A N/A N/A
Also on page 65 of the RFP, Section 00150 – Instructions to Offerors, it states that the proposal due date is 03 June 2014, while the SF 1442 says the bid date is 05 June 2014.
Which is correct?
Proposal due date is being extended to 16 June 2014. No 0001
3 SF 1442 Block 3 and Block 13A N/A
Solicitation was just posted on 14 May. However, SF 1442 says date issued is 6 May and bid date is 5 Jun.
Will bid date be extended to make up for the lost 8 days in receipt of the RFP.
Proposal due date is being extended to 16 June 2014. No 0001
4 800 Page 57 of 68, 3.(a)v and Page 59 of 68, (2)
N/A Para 3.(a)v mentions teaming agreement while (2) mentions Partnership Agreement. Are these one in the same. Is teaming permitted in the RFP?
Teaming agreements are not permited. No 0003
5 800 Page 57 of 68, 3.(a)vi N/A What constitutes proof of Reps/Certs completed in SAM? A copy of our SAM information?
Per this section offerors must submit: Proof of the Offeror’s filled out Representations and Certifications and Active and Inactive Exclusions from the System for Award Management
(SAM).
No 0001
6 800 Page 62 of 68, Factor 4 Safety N/A
Reference Exhibit 3, Safety Data Sheet. Block 7 of Exhibit 3 states That the Safety Narrative cannot exceed 2 pages. Is it correct to assume that the 2 pages is for Block 7 and not the entire Safety Data Sheet?
That is correct Safety Narrative cannot exceed 2 pages in length. No 0001
7 800 Exhibit 6, ELINS IDIQ
Paving CLINS
Exhibit 6, ELINS IDIQ
Paving CLINS
The schedule of indefinite quantity work, Exhibit 6, is locked.
Certain columns need to be unlocked for entry of prices and other.
Only the Unit Pricing Cells will remain unlocked on Exhibit 6. No 0001
01 45 00.00 25
01 35 26.00 25
Paragraph 1.5.1.1
Paragraph 1.6.1.1.1
N/A
This paragraph permits the quality control manager to be the superintendent.
This paragraph permits the quality control manager to be the SSHO.
Based on the above, one person can serve as the superintendent, quality control manager and SSHO. Please confirm that this is acceptable.
No, one person may not serve as the superintendent, quality control manager and the SSHO. No 0003
PAVING IDIQ
PPI Log
PPI # SECTION OF
RFP
PARAGRAPH
REFERENCE
DRAWING
NUMBER (IF
APPLIC)
QUESTION ANSWER ATTACHMENT
Yes or No AMENDMENT #
PAVING IDIQ
PPI Log
9 Bid schedule N/A N/A
There are no line items in the bid schedule for manpower such as superintendent or others. This means that this cost must be distributed throughout the bid items. Can a line item be added for manpower?
The manpower will be distributed throughtout the bid items. No 0003
Section 00800 of Amendment No.
Seed project information N/A
There were two seed projects included in the RFP by Amendment No. 0001. The mill and overlay asphalt near ballfields seed project provided the line items to develop the proposal. The NAS Whiting Field “B” ditch repair seed project did not include any line items. Will these be provided for pricing like a normal task order? There were no bid sheets for either seed project
The intial task order (seed) projects are NOT priced out. Information on these projects is provided for as informational only. Only the ELINS are priced. No 0003
11 Section 00800 3.(b)(1)f page 59 of 68 of the solicitation N/A What is the location of the hypothetical projects “f”? It indicates one RW apron repair, but does not give a location.
f. One RW apron repair requiring demolition, removal and replacement of 400 SF of airfield concrete
ADD:
located at NALF Evergreen (Middleton Airfield) in Evergreen, AL.
No 0003
12 N/A N/A N/A
How many "INDEFINITE DELIVERY INDEFINITE
QUANTITY (IDIQ) CONTRACT FOR INSTALLATION AND
REPAIR OF ASPHALT AND CONCRETE PAVEMENT FOR
NAVAL AIR STATION (NAS) PENSACOLA, FL; NAS
WHITING FIELD, MILTON, FL; NAS PANANMA CITY, FL
AND NOLFs LOCATED IN FL AND AL. NOSC TALLAHASSEE" will be awarded?
One contract will be awarded. No 0003