__2014-05-23_NASP_M Opavement_ballfields_f013.pdf
PDF 140 KB Posted
- Solicitation number
- N69450-14-R-0761
About this file
2014-05-23 NASP M O Pavement Battlefields F013
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILL AND OVERLAY ASPHALT
NEAR BALLFIELDS
1. GENERAL DESCRIPTION:
Provide all labor, materials, equipment and supervision necessary to mill and overlay the existing asphalt area shown on the attached picture with 2" of asphalt. The intent of this project is to convert the newly paved area to part of the MWR bike path.
Existing Conditions:
This section of pavement is mostly approximately 932' in length and approximately 18' in width. There is a section where the pavement ties into Slemmer Avenue that gets wider at the transition .
2. SCOPE OF WORK
• Mill and overlay the existing asphalt area shown on the attached picture with 2" of asphalt, approximately 2, 100 SY
All work shall be performed and materials shall comply with the current IDIQ Paving Contract. The scope of work is anticipated to involve the following contract line items.
Contractor shall attend site visit and determine actual quantities to complete the scope of work:
3. ATTACHMENT S:
Site Plan
"n'
| 1. GENERAL DESCRIPTION: |
| 2. SCOPE OF WORK |
| 3. ATTACHMENT S: |
File details come from the government source that posted it. Updated .