__2014-05-23_NASP_M Opavement_ballfields_f013.pdf

PDF 140 KB Posted

Attached to
IDIQ Paving for Pensacola, Whiting Field, Panama City FL
Solicitation number
N69450-14-R-0761
Issued by

About this file

2014-05-23 NASP M O Pavement Battlefields F013

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILL AND OVERLAY ASPHALT

NEAR BALLFIELDS

1. GENERAL DESCRIPTION:

Provide all labor, materials, equipment and supervision necessary to mill and overlay the existing asphalt area shown on the attached picture with 2" of asphalt. The intent of this project is to convert the newly paved area to part of the MWR bike path.

Existing Conditions:

This section of pavement is mostly approximately 932' in length and approximately 18' in width. There is a section where the pavement ties into Slemmer Avenue that gets wider at the transition .

2. SCOPE OF WORK

• Mill and overlay the existing asphalt area shown on the attached picture with 2" of asphalt, approximately 2, 100 SY

All work shall be performed and materials shall comply with the current IDIQ Paving Contract. The scope of work is anticipated to involve the following contract line items.

Contractor shall attend site visit and determine actual quantities to complete the scope of work:

3. ATTACHMENT S:

Site Plan

"n'

1. GENERAL DESCRIPTION:
2. SCOPE OF WORK
3. ATTACHMENT S:

File details come from the government source that posted it. Updated .