N6945025R0003 Section F DRAFT MBOS.pdf
PDF 846 KB Posted
- Solicitation number
- N69450
About this file
This is a Section F deliverables matrix document detailing the required reports, documentation, and submissions for various service areas under contract N6945025R0003 for Base Operations Support Services. The matrix covers deliverables across multiple functional areas including Management/Administration, Port Operations, Facility Management, Facility Investment, Custodial Services, Pest Control, Integrated Solid Waste Management, Swimming Pools, Grounds Maintenance, Utilities Management, Electrical, Water, and Environmental services.
For each deliverable, the matrix specifies the annex/spec item number, form attachment number, deliverable title, submission timeline, recipients (typically KO and COR), and frequency (as required, monthly, quarterly, annually, etc.). Key deliverables include quality management plans, safety reports, environmental compliance documentation, maintenance schedules, inspection results, utility consumption reports, waste management data, and various program-specific status updates. Most deliverables require electronic submission, with some requiring both hard copy and electronic formats. Submission deadlines range from immediate notification for urgent issues to 30+ days for periodic reports, with many deliverables due within 15 days of contract award or by the first working day of each month.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000
Management and Administration
N6945025R0003
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To
Frequency
0200000/
2.2.1.2
N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
As required
0200000/
2.3.1
N/A Sign-in Sheets and
Minutes for
Review and
Comments
Within two working days
KO, COR
and all attendees
As
Required
0200000/
2.3.1
N/A Sign-in Sheets and
Minutes Final
Revision
Within two working days
KO, COR
and all attendees
As
Required
0200000/
2.3.4
N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
As specified
0200000/
2.3.5
N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
As specified
0200000/
2.3.5
N/A Written Notice of cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
As required
0200000
2.3.10
N/A Phase-In Plan Within 5 days of award
KO and
COR
As required
0200000
2.3.10
N/A Phase-out Plan 120 days prior to contract completion date
KO and
COR
As required
0200000/
2.6.1
N/A Plans of Action and Milestones
(POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command
Security
Manager
As required
0200000/
2.6.1
N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command
Security
Manager
As required
Form
Attachment
Number Deliverable Title
2.6.4
N/A Scheduling and
Work Status
Updates
Weekly, within
30 minutes of the inquiry during regular working hours, and by
08:00 the following work day for inquiries after regular working hours
KO and
COR
As
Specified
0200000/
2.6.4
N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR Monthly
0200000/
2.6.5
N/A Notification of any
Difficulty in
Scheduling Work
By the end of each workday
KO and
COR
As required
0200000/
2.6.6
N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO and
COR
As required
0200000/
2.6.7
N/A Service
Interruptions
At least five working days in advance
KO and
COR
As required
0200000/
2.6.8.2
N/A Sample Pipe
Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representat ive designated by the KO
As required to demonstrat e the ability to properly format the flat-file
0200000/
2.6.8.3
N/A List of personnel requiring access to
Government’s
Maximo
Within 30 calendar days prior to contract start.
KO and
COR
specified
Form
Attachment
Number Deliverable Title
2.6.10.1
N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
As specified
0200000/
2.6.10.1
N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.6.10.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO and
COR
As specified
0200000/
2.6.10.3
N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
Monthly
0200000/
2.6.11
N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
As specified
0200000/
2.7.1
N/A List of Key
Personnel and
Qualifications
Within 15 calendar days prior to contract start
KO and
COR
As specified
0200000/
2.7.1
N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
As specified
0200000/
2.7.2.6
N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
As specified
0200000/
2.7.2.6
N/A Proof of United
States of America
Citizenship
Prior to be admitted to site of work.
KO and
COR
As specified
0200000/
2.8.1
N/A Employee List Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As required
0200000/
2.8.8
N/A OF-306
Declaration for
Federal
Employment and
Digital
Fingerprints
Prior to commencement of work
KO, COR,
and
Security
Manager
As required
0200000/
2.8.9
N/A List of personnel requiring access to and the justification for their access to
Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security
Manager
As required
Form
Attachment
Number Deliverable Title
2.9.2
N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.9.3
N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
As specified
0200000/
2.9.4
N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
As specified
0200000/
2.9.4.7
N/A Control of
Hazardous Energy
(lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
Annually
0200000/
2.9.6
J-0200000-07 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
As required
0200000/
2.9.6
J-0200000-07 Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO and
COR
As required
0200000/
2.9.6
J-0200000-07 Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO and
COR
As required
0200000/
2.9.8
N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
Monthly
0200000/
2.9.9
N/A OSHA Citations and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
As required
0200000/
2.9.10
N/A Safety Inspection and Monitoring
Report
Upon request. KO and
COR
As required
0200000/
2.9.11
N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
As specified
0200000/
2.10
N/A Integrated
Environmental
Management Plan
Within 15 calendar days after award and for changes.
KO and
COR
Form
Attachment
Number Deliverable Title
2.10.1.1
N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
As specified
0200000/
2.10.2
N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.10.2.1
N/A Sampling Plan Prior to Sampling KO and
COR
As required
0200000/
2.10.2.1
N/A Laboratory
Analysis
Upon Request KO and
COR
As specified
0200000/
2.10.2.2
N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
As required
0200000/
2.10.2.3
J-0200000-07 Solid Waste
Management and
Recycling Reports with receipts
First work day of each month.
KO and
COR
Quarterly
0200000/
2.10.2.3
J-0200000-07 Summary Solid
Waste
Management and
Recycling Report
By October 10th KO and
COR
Annually
0200000/
2.10.2.5
N/A Waste Stream
Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
As required
0200000/
2.10.2.7
N/A Fuel and hazardous substance spill notification
Within 15 minutes of discovery
Regional
Dispatch
Center
As required
0200000/
2.10.2.7
N/A Fuel and hazardous substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
As required
0200000/
2.10.2.7
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and
COR
Form
Attachment
Number Deliverable Title
2.10.2.8
N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
As specified
0200000/
2.10.2.8
J-0200000-07 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
Annually
0200000/
2.10.2.12
N/A Asbestos
Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO and
COR
As specified
0200000/
2.10.2.13
N/A Lead-Based Paint Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO, COR
and
MCSF-BI
IEPM
As specified
0200000
2.10.2.17
N/A Dewatering Plan Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.10.2.18
N/A Title V documentation submittals
First workday of each month
KO, COR,
Installation
Environme ntal
Division, Monthly
0200000/
2.10.2.18
N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of
160 to 200 calendar days
KO, COR,
Installation
Environme ntal
Division, City, State, and EPA
Semi-annually
Form
Attachment
Number Deliverable Title
2.10.2.18
N/A Hazardous Air
Pollutants Monthly
Data
First workday of each month.
KO, COR,
Installation
Environme ntal
Division
Monthly
0200000/
2.10.3
N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days prior to contract start and within
15 calendar days after exercised option periods.
KO and
COR
Annually
0200000/
2.10.3
N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
Annually
0200000/
2.10.3.2
N/A Recovered
Material
Certification
As specified KO and
COR
When a product containing recovered materials is equal to or better than the original and could be used.
0200000/
2.11
N/A Mission Essential
Contractor
Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As
Required
0200000/
2.11
N/A Mission
Critical/Mission
Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.14.1
Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
As required
0200000/
2.14.2
N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
Rough Order of
Magnitude
Within two hours of identification
KO and
COR
Form
Attachment
Number Deliverable Title
2.15.1.1
N/A Catalog of Unit
Price Tasks loaded for FedMall
Within 30 days of award and five days following the start of each option period
KO and
COR
As required
0200000/
2.15.1.1
N/A Non-Recurring
Work Quantities
Ordered via
FedMall
By the fifth day of the following month
KO and
COR
Monthly
0200000/
2.15.2.1
N/A Non-Recurring
Work Proposals
Within three business days following receipt of request
KO As required
0200000/
2.15.3.1
N/A CAT Call Work
Status Report
By the fifth day of the following month
KO and
Section F – 0600000
Port Operations
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0600000/
2.2.1
N/A Certification, Training and
Licenses
Within 15 days after award or as requested by the KO
KO and COR Once for initial submittal, then as requested
0600000/
3.1 N/A Summary of
Completed and
Pending Port Ops
Service Work
Orders
5 day of following month
Port Ops WF
Equipment, KO and COR
Monthly
0600000/
3.2.2 N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
Rough Order of
Magnitude
Within two hours of identification
KO and COR As required
0600000/
3.2.2 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO As required
0600000/
3.2.2 N/A Report of Out of
Service Equipment and status of repairs
5 day of following month
Port Ops WF
Equipment, KO and COR
Monthly
0600000/
3.2.3 N/A Report of Safety and
Structural Repairs
Within two hours of identification
Port Ops WF
Equipment, KO and COR
As required
0600000/
3.2.4 J-020000-07 Berthing Services
Report
5 day of following month
Port Ops, KO and COR Monthly
Section F – 0600000
Port Operations
Deliverables Form Preparation Instructions
Deliverable Title: 0600000/2.2.1, 3.1, 3.2.2, 3.2.3 and 3.2.4, Port Operations
Reports
Form Attachment No.: N/A
Government Approval Required: ___ Yes _X__ No
Media: _____ Hard Copy _X__ Electronic ___ Direct System Input
Instructions:
1. List shall be prepared using Microsoft Office software.
2. Submit to KO with copies to others specified.
Section F – 1501000
Facility Management
Form
Attachmen t Number Deliverable Title
Date (s) of
Submission To Frequency
1501000/
3.1
N/A NAVFAC Maximo
Pipe-Delimited Flat
File
As specified KO, COR, RCC &
FMD
As required
1501000/
3.2.1
N/A NAVFAC Maximo
Asset Changes
Report
By COB the third workday of each month
KO, COR
& FMD
Monthly
1501000/
3.3
N/A Technical Library
Inventory
30 days after contract start and annually thereafter
KO, COR
& FMD
Annually
Section F – 1501000
Deliverable Title: Technical Library Inventory
Form Attachment No.: J-1501000-05
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic ___ Direct System Input
Instructions:
a. The report shall be prepared using Microsoft Office 365 Word software.
b. Listing of inventory items, description and date of item.
Submit a copy of the summary report via email to the KO for Government review and comment.
Section F – 1501000 (MCSF-BI)
Form
Attachmen t Number Deliverable Title
Date (s) of
Submission To Frequency
1501000/
3.1
N/A USMC Maximo
Pipe-Delimited Flat
File
As specified KO, COR, RCC &
FMD
As required
1501000/
3.2.1
N/A USMC Maximo
Asset Changes
Report
By COB the third workday of each month
KO, COR
& FMD
Monthly
1501000/
3.3
N/A Technical Library
Inventory
30 days after contract start and annually thereafter
KO, COR
& FMD
Section F – 1501000 (MCSF-BI)
Deliverable Title: Technical Library Inventory
Form Attachment No.: J-1501000-05
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic ___ Direct System Input
Instructions:
c. The report shall be prepared using Microsoft Office 365 Word software.
d. Listing of inventory items, description and date of item.
Submit a copy of the summary report via email to the KO for Government review and comment.
Section F – 1502000
Facility Investment
Form
Attachment
Number Deliverable Title
1502000/
2.2.2
N/A Certification and
Training
Within 30 calendar days after award and within four hours of request
KO &
COR
Once for initial submittal, then as requested
1502000/
3.1
N/A E/U/R Work
Order Summary
Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.1
High Visibility
E/U/R Work Order
Report
By 1400 each day KO &
COR
Daily
1502000/
3.2
N/A Project Order
Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.3
N/A Preventive
Maintenance
Program Plan
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.3
N/A Monthly PM Work
Schedule
Five working days prior to the beginning of each month
KO &
COR
Monthly
1502000/
3.3.2
N/A Auxiliary
Generator Log
By the First working day of each month
KO &
COR
Monthly
1502000/
3.3.2
N/A Auxiliary
Generator Test
Results
Within 10 calendar days after completing the test
KO &
COR
Monthly
1502000/
3.3.7
N/A Fire Protection
Inspection, Testing and Certification
Documentation
Within 10 calendar days after completing the test
KO &
COR
Monthly
1502000/
3.4
N/A Inspection, Testing, and
Certification
Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.4
N/A Inspection, Testing, and
Certification
Program Summary
Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.4
N/A Inspection, Testing and Certification
Schedule and
Equipment
Certifications
By the First working day of each month
KO &
COR
Monthly
1502000/
3.4.1
N/A Backflow
Prevention Device
Inspection, Testing and Certification
Schedule
15 days after award and 5 days after changes
KO &
COR
Specified
Form
Attachment
Number Deliverable Title
3.4.1
N/A Notification of
Backflow
Prevention Devices ready for testing and certification
Five Working
Days in Advance of being ready for testing and certification
KO &
COR
As
Required
1502000/
3.4.1
N/A Backflow
Prevention Device
Inspection, Testing and Certification
Program Summary
Report
Five Working
Days in Advance of being ready for testing and certification
KO &
COR
As
Required
1502000/
3.4.1
N/A Backflow
Prevention Device
Monthly and
Cumulative
Inventory and
Certification Status
Report
Last day of each month
KO &
3.4.1
N/A Cross Connection
Discovery Report
Five Working
Last day of each month
KO &
COR
As
Required
1502000/
3.4.1
FDEP Form
62-555.900
F.A.C.
Annual Cross
Connection
Control Program
Reports
By 15 Feb of each year for the period ending 31
Dec of the previous year
KO &
COR
Annually, As
Specified
1502000/
3.4.2
N/A Notification of
Boilers and/or
UPVs ready for testing and certification
Five Working
Days in being ready for testing and certification
KO &
COR
As
Required
1502000/
3.4.4
N/A Ground Point
Inspection and
Testing Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.4.4
N/A Ground Point
Inspection and
Testing Results
Within two working days following completed test
KO &
COR
Monthly
1502000/
3.4.5
N/A Notification of
VTE ready for testing and certification
Five Working
Days in Advance of being ready for testing and certification
KO &
COR
As
Required
1502000/
3.4.5
N/A Submission of
Vertical
Transportation
Equipment Test
Report
By the first working day of each month
KO &
Form
Attachment
Number Deliverable Title
3.4.6
J-0200000-07 Certification of
Load Test and
Condition Record
Within two working days following completed test
KO &
COR
Monthly
1502000/
3.5
N/A Other Recurring
Services Program
Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.5.2
N/A Boiler Water
Testing and
Treatment Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.5.4.1
N/A Monthly FRCS
Maintenance
Schedule
By the First working day of each month
KO, COR,
NSA CIO
Monthly
1502000/
3.5.4.2
N/A Report of FRCS in override or bypass mode
By 0900 daily KO, COR, NSA CIO
Daily
1502000/
3.5.4.2
N/A Report of FRCS
Access Violations
& Intrusions
By 0900 daily KO, COR, NSA CIO
Daily
1502000/
3.5.5
N/A Notification of
Fuel Storage Tank
Sensor Failure or
Leaking
Tank/Piping
Within 30
Minutes of
Discovery
KO &
COR/
IEMP
As
Required
1502000/
3.5.5
N/A Monthly
Inspections, Annual Sensor
Tests and Repairs and Modifications
Maintain Hard
Copies and submit Monthly
Inspections
Electronically buy the 1st day of the month
KO &
COR/
IEMP
As
Required
1502000/
3.5.5
N/A Fuel Storage Tanks and Berms
Deficiency
Spreadsheet
Within 48 Hours of Completing
Inspection.
KO &
COR/
IEPM
As
Required
1502000/
3.5.6
N/A Grease and Grit
Trap Maintenance
Schedule
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.5.6
N/A Grease and Grit
Trap Treatment
Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.5.8
N/A HVAC Water
Testing and
Treatment Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.5.8
N/A HVAC Water
Testing and
Treatment Report
By the First working day of each month
KO &
Form
Attachment
Number Deliverable Title
3.5.9
N/A Condenser Tube
Inspection
Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.5.10
N/A Lint Trap
Maintenance and
Repair Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.5.11
N/A Oil Water
Separators Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.5.12
N/A Traffic Control
Lighting Systems
Maintenance and
Repair Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.5.12
N/A Traffic Control
Lighting Systems
Maintenance and
Repair Schedule
By the 25th of each month for the following month
KO &
COR
Monthly
1502000/
N/A CAT Call
Summary Reports
By the first day of the following week and by the first day of each month
KO &
COR
Weekly and
Section F – 1502000 (MCSF-BI)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1502000/
2.2.1
N/A Certification &
Training
Within 30 calendar days after award & within four hours of request
KO &
COR
Once for initial submittal, then as requested
1502000/
3.1
N/A E/U/R Work Order
Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.2
N/A Project Work
Order Summary
Completion Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.3
N/A Preventive
Maintenance
Program Plan
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.3
N/A Monthly PM Work
Schedule
Five working days prior to the beginning of each month
KO &
COR
Monthly
1502000/
3.3.1
N/A Auxiliary
Generator Log
By the First working day of each month
KO &
COR
Monthly
1502000/
3.3.1
N/A Auxiliary
Generator Test
Results
Within 10 calendar days after completing the test
KO &
COR
Monthly
1502000/
3.3.5
N/A Fire Protection
Deficiency Report
Daily upon identification
KO &
COR
Daily as required
1502000/
3.3.5
N/A Fire Protection
Maintenance
Report
Upon completion of repairs
KO &
COR
Daily as required
1502000/
3.4
N/A Integrated
Maintenance
Program Plan
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.4
N/A Monthly IMP
Schedule & IMP
Maintenance &
Repair Status
Within Five working days prior to the beginning of each month
KO &
COR
Monthly
1502000/
3.4.1
N/A Blast, Paint and
Drying System
Inspection, Maintenance and
Repair Status
By the First working day of each month
KO &
COR
Monthly
1502000/
3.4.2.3
N/A Boiler Water
Testing &
Treatment Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.4.2.3
N/A Boiler Water
Testing &
Treatment Report
By the First working day of each month
KO &
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1502000/
3.4.3
N/A Scheduled Outage
Plan/ Service
Disruption Plan
Within 15 days after contract start
KO &
COR
Annually
1502000/
3.4.3
N/A Specific plans for each outage or service disruption
Five days prior to outage
KO &
COR
As
Required
1502000/
3.4.4
N/A Service Reports By 08:00 of the working day following completing service
KO &
COR
Daily
1502000/
3.4.4
N/A Inspection Report Prior to the end of the Government working day following the date the PM
KO &
COR
As
Required
1502000/
3.4.4.3
N/A HVAC Water
Testing &
Treatment Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.4.4.3
N/A HVAC Water
Testing &
Treatment Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.4.4.5
N/A Condenser Tube
Inspection
Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.5
N/A Inspection, Testing, &
Certification
Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
3.5
N/A Inspection, Testing, &
Certification
Program Summary
Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.5
N/A Inspection, Testing
& Certification
Schedule &
Equipment
Certifications
By the First working day of each month
KO &
COR
Monthly
1502000/
3.5.1
N/A Notification of
Backflow
Prevention Device is ready for testing
& certification
Five working day advance of
Backflow
Prevention
Device being ready for testing
& certification
KO &
COR
Required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1502000/
3.5.2
N/A Repot of Backflow
Prevention Device
Inspection, Certification and
Incidental Repairs
By the First working day of each month
KO &
COR
Monthly
1502000/
3.5.2
N/A Notification of
Boilers &/or UPVs are ready for testing & certification
Five Working
Days in Advance of Boilers &/or
UPVs being ready for testing & certification
KO &
COR
As
Required
1502000/
3.5.3
N/A Notification of crane & railroad trackage is ready for testing & certification
Five working day advance of crane
& railroad trackage being ready for testing
& certification
KO &
COR
As
Required
1502000/
3.5.4
N/A Notification of
VTE is ready for testing & certification
Five Working
Days in Advance of VTE being ready for testing
& certification
KO &
COR
As
Required
1502000/
3.5.4
N/A Vertical
Transportation
Equipment
Inspection, Testing
& Certification
Results
By the First working day of each month
KO &
COR
Monthly
1502000/
3.6
N/A Other Recurring
Services Program
Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.6.1
N/A Lighting Systems
Program
Within 15 days after contract start
KO &
COR
Annually
1502000/
3.6.2
N/A Corrosion Control
Program
Within 15 days after contract start
KO &
COR
Annually
1502000/
3.6.3
N/A Roof Maintenance
Program
Within 15 days after contract start
KO &
COR
Annually
1502000/
3.6.4
N/A Lift Station
Maintenance
Program
Within 15 days after contract start
KO &
COR
Annually
1502000/
3.6.4
N/A Lift Station
Maintenance
Inspection Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.6.6
N/A Holding Tank
Pumping &
Cleaning Program
Within 15 days after contract start
KO &
COR
Annually
1502000/
3,6,6
N/A Key Inventory
MFR
Within 15 days after contract start
KO, COR,
FMD &
PSO
Annually
1502000/
3.6.8
N/A Monthly DDC
Maintenance
Schedule
By the First working day of each month
KO &
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1502000/
3.6.8
N/A Report of DDC in override or bypass mode
By 0900 daily KO, COR, MCSF-BI
CIO
Daily
1502000/
3.6.8
N/A Report of DDC
Access Violations
& Intrusions
By 0900 daily KO, COR, MCSF-BI
CIO
Daily
1502000/
3.6.9
N/A Fuel Storage Tank
Incident Report
Within 30 minutes of discovery
KO &
COR
As required
1502000/
3.6.9
N/A Fuel Storage Tank and Berm
Inspection Report
By the First working day of each month
KO &
COR
Monthly
1502000/
3.6.9
N/A Fuel Storage Tank and Berm
Deficiency
Spreadsheet
By the First working day of each month
KO &
Section F – 1503010 (MCSF-BI)
Custodial
Spec
Item
Form
Number Deliverable Title
Date (s) of
Submission To Frequency
1503010/
2.2.1
N/A Pathogen
Training
Certificates
Upon
Request
KO & COR Upon Request
1503010/
3.1
N/A Annual Work
Schedule
1 each year KO & COR Within 15 days after award and annually thereafter
1503010/
3.1
N/A Monthly Work
Plan
First work day of each month
KO & COR Monthly
1503010/
3.2
N/A Custodial Service
Order Report
First work day of each month
KO &COR Monthly
Section F – 1503020 (MCSF-BI)
Pest Control
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1503020/
2.2.1
N/A Copy of State
Certification for
Contractor
Personnel
15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO, COR
& PMC
As required
1503020/
2.3.1
N/A Copy of
Local/State
Business License
Prior to contract award. Copies of renewed licenses shall also be submitted.
KO &
COR
1 per state
1503020/
2.3.2
N/A Permits 5 days prior to the start of work requiring permits.
KO &
COR
As required
1503020/
2.3.4
N/A Ultra-Low Volume
(ULV) Equipment
Calibration and
Droplet Analysis
Report
15 days prior to the start of work and thereafter every 50 hours of
ULV equipment use.
KO &
COR
As required
1503020/
2.3.5
N/A Planned Pesticide
Use Sheets including Pesticide
Labels and Safety
Data Sheets (SDS)
With Contractor’s
Work Plan.
Note: Any proposed changes in pesticide usage shall be submitted for KO approval at least 5 business days in advance of pesticide use.
KO, COR
& PMC
1 for each pesticide per pest as required
1503020/
N/A Contractor's Work
Plan
Within 15 calendar days after award and
Within seven calendar days of changes.
KO &
COR
1 per proposal
1503020/
N/A Report of
Conditions
Conducive to Pest
Infestation
1 working day after citing conditions.
KO &
COR
As required
1503020/
3, 4
N/A Five-year Termite
Treatment
Warranties
10 days following the treatment.
KO &
COR
As required
1503020/
3, 4
N/A Termite and Wood
Decay Inspection
(DD Form 1070)
(per the appropriate Pest
Group Sheet)
10 working days after inspection completed.
KO &
Section F – 1503020 (MCSF-BI)
Pest Control
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1503020/
3, 4
N/A Adult Mosquito
Catch (per the appropriate Pest
Group Sheet)
The same day as collected in a labeled, re-sealable plastic bag.
Installation
Preventive
Medicine
Dept, KO
& COR
As required
1503020/
3, 4
N/A Larval Mosquito
Survey Report (per the appropriate
Pest Group Sheet)
Within 1 day of the survey.
KO &
COR
As required
1503020/
3, 4
N/A Stored Product
Pest Survey (per the appropriate
Pest Group Sheet)
Within 1 day of the survey.
KO &
COR
As required
1503020/
3, 4
N/A Pharaoh Ant
Treatment: Floor
Plan Diagram (per the appropriate
Pest Group Sheet)
2 calendar days prior to beginning the treatment.
KO &
COR
As required
1503020/
3, 4
N/A Tick Survey
Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
Installation
Preventive
Medicine
Dept, KO
& COR
As required
1503020/
3, 4
N/A Mole Cricket
Survey Report (per the appropriate
Pest Group Sheet)
Within 1 day of the survey.
KO &
COR
As required
1503020/
3.2
N/A Summary of
Completed Pest
Control Service
Orders
By the 15th of the following month
KO &
COR
Monthly
1503020/
3.3
N/A Pest Management
Reporting; Report of Pest
Management
Operations
Electronically once per month by the 15th of the following month
(Example: July data must be submitted by
August 15).
KO, COR
& PMC
Section F – 1503030 (MCSF-BI)
Integrated Solid Waste Management (ISWM)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1503030/
2.2.1
N/A FPOW Solid
Waste Operator
Training
Before work commences and within four hours of KO request
KO &
COR
As
Specified
1503030/
2.3.1
N/A Recycling Revenue
Receipts
With Monthly
Invoice, by the
15th of October of each calendar year, and within four hours of KO request
KO, COR
and
QRP
Manager
Monthly, Annually and as
Specified
1503030/
2.3.1
N/A Weight of Tires With Monthly
Invoice, by the
15th of October of each calendar year, and within four hours of KO request
KO &
COR
Monthly, Annually and as
Specified
1503030/
2.3.1
N/A Weight of
Landscape Debris
With Monthly
Invoice, by the
15th of October of each calendar year, and within four hours of KO request
KO &
COR
Monthly, Annually and as
Specified
1503030/
2.3.2
N/A Weight Tickets With Monthly
Invoice, by the
15th of October of each calendar year, and within four hours of KO request
KO, COR Monthly, Annually and as
Specified
1503030/
2.3.2
N/A Weight of Solid
Waste
By the 15th of
October of each calendar year and within four hours of KO request
KO &
COR
As
Specified
1503030/
2.3.3
N/A Permits and
Licenses
Within 15 calendar days after contract award
KO &
COR
15 days after award and
Annually
1503030/
3.1
N/A Solid Waste
Collection
Schedule
Within 15 calendar days after contract award
KO &
COR
15 days after award and
Annually
1503030/
3.1
N/A Changes to the solid waste collection schedule
As Required KO &
COR
Section F – 1503030 (MCSF-BI)
Integrated Solid Waste Management (ISWM)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1503030/
3.4
N/A Recommended changes to the size and location of solid waste containers
As Identified KO &
COR
Section F – 1503040
Other (Swimming Pools)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1503040/
2.2.1
N/A Certification and
Training
Within 30 calendar days after award and within four hours of request
COR and
KO
Once for initial submittal, then as requested
1503040/
2.4
N/A Operating Records, Logs, and Reports
By the First working day of each month
COR and
KO
Monthly
1503040/
3.3
N/A Preventive
Maintenance (PM)
Program Plan
Within 30 calendar days after contract award
COR and
KO
Annually
1503040/
3.3
N/A Monthly PM
Schedule and PM
Maintenance and
Repair Status
Within Five working days prior to the beginning of each month
COR and
KO
Monthly
1503040/
3.4
N/A Water
Consumption
Report
By 08:00 of the following working day
COR and
KO
Daily
1503040/
3.4
N/A Water Analysis
Reports
By the First working day of each month
COR and
KO
Section F – 1503050 (MCSF-BI)
Grounds Maintenance and Landscaping
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1503050/
2.2.1
N/A Certification, Training, and
Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO &
COR
Annually and as required by
Section H –
Special
Contract
Requirements
, FAC
5252.237-
Substitutions of Key
Personnel
(JUN 1994)
1503050/
2.3.1.1
N/A Business Licensing Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO &
COR
As required
1503050/
2.3.1.4
N/A Contractor’s Work
Plan/Planned
Pesticide/
Herbicide Use
Sheets including
Pesticide/ Herbicide
Labels and Safety
Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least
10 business days for any proposed changes.
KO,
COR,
PMC
Annually for each pesticide/herb icide, as required.
1503050/
2.3.1.5
N/A Pest Management
Operations Report
Electronically by the 15th of the following month
(Example: July data must be submitted by
August 15) on the format approved by PMC.
KO,
COR,
PPMC
Monthly
1503050/
2.3.2
N/A Permits Within 15 calendar days prior to start of work.
KO &
COR
As required
1503050/
2.3.9.1
Water Conservation
Plan
Within 15 calendar days prior to start of work.
KO &
COR
Annually and five calendar days prior to implementing changes to the schedule
1503050/
J-1503050-05 Weight Tickets and
Recycling Report
Form
With each invoice
KO &
Section F – 1503050 (MCSF-BI)
Grounds Maintenance and Landscaping
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1503050/
N/A SDS sheets and catalog cut sheets or samples for fertilizer and mulch
Prior to bringing on-board installation and prior to use
KO &
COR
As Specified
1503050/
N/A Work Schedules Within 15 calendar days prior to contract start.
KO &
COR
Annually and five calendar days prior to implementing any changes to the schedule
1503050/
3.1.1.3
N/A Soil Analysis test results and proposed fertilizer
Within 15 days after receipt of the test results by the Contractor
KO &
COR
As Specified
1503050/
3.1.1.3
N/A Top Dressing and
Over Seeding Seed
Type
Within 15 calendar days prior to contract start
KO &
COR
Annually and five calendar days prior to implementing changes to the schedule
1503050/
3.1.1.4
N/A Notification of
Inoperable Irrigation
System Components
Within 24 hours of discovery
KO &
COR
As Specified
1503050/
3.3
N/A Notification of obstructions in subsurface drain lines
Within 24 hours KO &
COR
As Required
1503050/
3.3
N/A Notification of missing or damaged yard drain covers and grates
Immediately KO &
COR
As Required
1503050/
3.3
N/A Storm Drainage
Systems
Maintenance
Schedule
15 days after award
KO &
COR
As Specified
1503050/
3.4
N/A Grounds
Maintenance
Service Order
Summary of
Completion Report
By the fifth day of each month
KO &
Section F – 1601000
Utilities Management
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1601000/
3.1.1
N/A Meter Readings Within 3 days of the scheduled meter reading date
KO, COR
& UEM
Monthly
1601000/
3.1.1
N/A Meter Re-readings Within 1 day of request
KO &
COR
As
Required
1601000/
3.1.2
N/A General Service
Disruption/Outage
Plan
15 days after contract award and as changes occur
KO &
COR
As
Specified
1601000/
3.1.2
N/A Specific Service
Disruption/Outage
Plan
At least 10 days in advance of the scheduled outage
KO &
COR
As
Required
1601000/
3.1.3
N/A Excavation Permit
Documentation
At least 10 days in advance of the scheduled work start
KO &
COR
As
Required
1601000/
3.2.1
N/A Asset Description
Change Report
Within five days of discovery
KO, COR
& FMD
As
Required
1601000/
3.2.1
N/A Notification of utility assets not included in the listing
As Specified KO &
COR
As
Required
1601000/
3.2.2
N/A Utility
Infrastructure
Condition
Assessment
Within 3 days following the end of the month
KO &
COR
As
Required
1601000/
3.3
N/A Report of FRCS in bypass mode
Within 24 hours of identification
KO &
COR
As
Required
1601000/
3.4
J-200000-0X Maximo Pipe
Delimited Flat File
Daily by COB KO, COR, RCC &
FMD
Section F – 1602000
Electrical
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1602000
2.2.1
N/A Certification and
Training
Thirty calendar days before making splices or terminations
KO &
COR
As required
1602000/
N/A Standard Operating
Procedures (SOP)
Within thirty days after contract start, after any
SOP change, and annually thereafter
KO &
COR
As
Required
1602000/
N/A Monitoring
Schedules
Within 30 days after contract start and monthly thereafter
KO &
COR
Monthly
1602000/
N/A List of Critical
Spare Parts
Within thirty days after contract award, after any change and annually thereafter
KO &
COR
As required
1602000/
3.1
J-0200000-07 Condition Report 1st working day each week
KO &
COR
Weekly
1602000/
3.1
J-0200000-07 Non-Recurring
Work Status
Report
1st working day each week
KO &
COR
Weekly
1606000/
3.2
N/A Summary of
Completed E/U/R work
Within 3 days after the end of the month
KO &
1602000/
3.3
N/A Preventive
Maintenance (PM)
Program Plan
15 days after contract start
KO &
COR
Annually and any time a change is made to the schedule
1602000/
3.3
N/A Monthly PM schedule and unaccomplished maintenance report
By the 25th day of each month
KO &
COR
Monthly
1602000/
3.4
N/A Leak Report Within 30 minutes of identification
KO, COR
& EV
As required
1602000/
3.4.1
N/A Exercise switch schedule
30 days after contract start and annually thereafter
KO &
COR
As required
1602000/
3.4.2
N/A SF-6
Switch maintenance schedule
30 days after contract start and annually thereafter
KO &
COR
Section F – 1602000
Electrical
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1602000/
3.4.4
N/A Manholes, Splice
Cabinets and
Transformers
Inspection
Schedule
30 days after contract start and annually thereafter
KO &
COR
As required
1602000/
3.4.4
N/A Manholes, Splice
Cabinets and
Transformers
Inspection Report
Within 5 working days of inspection completion
KO &
COR
As required
1602000/
3.4.5
N/A Operating Records, Logs, Reports and
Procedures
Upon request KO &
COR
As requested
1602000/
3.4.5
N/A Unplanned Outage
Report
Within 3 days after the end of the month
KO &
COR
As required
1602000/
3.4.5
N/A Status and
Configuration
Report
Within four hours of request.
KO &
COR
As requested
1602000/
3.4.5
N/A Operational
Configuration
Review
Six months after contract start and within five days of the end of the semi-annual reporting period
KO &
COR
Semi-annual
1602000/
3.4.5
N/A Ships Utility
Connection Report
Within five days after the end of each billing cycle
KO &
Section F – 1606000
Water
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1606000/
2.2.2
N/A Proof of all
Certification, Training, and
Licensing
Requirements
Within 30 days following award
KO &
COR
Once.
Update as changes occur.
1606000/
N/A Critical Spare Parts
Inventory
Within 30 days following award
KO &
COR
Once, Update if the requiremen ts change.
1606000/
3.1, 3.1.3
N/A Standard Operating
Procedures
15 days after award and 5 days after changes
KO &
COR
As required
1606000/
3.1
N/A Notification of
Unsafe Conditions
Report
Within 24 hours of occurrence
KO &
COR
As
Specified
1606000/
3.1
N/A Semi-Annual
Operational
Configuration
Review
3 days following the end of the performance period
KO &
COR
Semi-
Annually
1606000/
3.1.1
N/A Boil Water Notice Prior to putting water back in service following repair or exceedance
KO &
COR
As
Required
1606000/
3.1.1
N/A Notification of out of compliance water sampling
Immediately upon confirmation
KO, COR,
IEPD and
UEM
As
Required
1606000/
3.1.1
N/A Laboratory
Analysis
Within 4 hours of request
KO &
COR
Upon
Request
1606000/
3.1.3
N/A Operating Records, Logs, and Reports
3 days following the end of the month
KO &
3.1.3 N/A Monthly
Unplanned Outage
Report
Within 3 days after the end of the month
KO &
COR
Monthly
1606000/
3.1.3
N/A Condition Report Weekly KO &
COR
Weekly
1606000/
3.1.3
N/A Non-Recurring
Work Status
Report
Weekly KO &
COR
Weekly
1606000/
3.2
N/A Summary of
Completed E/U/R work
Within 3 days after the end of the month
KO &
1606000/
3.3
N/A Preventive
Maintenance (PM)
Plan
Within 15 days following award
KO &
COR
specified
Section F – 1606000
Water
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1606000/
3.3
N/A Monthly PM
Schedule and PM
Maintenance and
Repair Status
Report
3 days following the end of the month
KO &
COR
Monthly
1606000/
3.3
N/A Meter Calibration
Schedule
30 days after contract award
KO &
COR
Annually
1606000/
3.4
N/A Inspection, Testing and Certification
Program and
Schedule for Fire
Hydrants
Within 30 days following award
KO &
COR
3.4
N/A Inspection, Testing and Certification
Summary Report for Fire Hydrants
Within 30 days following award
KO &
COR
3/4
N/A Notification of
Ready for Testing and Certification of
Fire Hydrants
5 working days prior to testing
KO, COR
& UEM
As
Specified
1606000/
3.4
N/A Report of Fire
Hydrant Failed
Flow Test.
Within two hours of identification
KO, COR,
UEM &
Fire Dept
As
Specified
16060000/
3.4
N/A Cathodic
Protection
Inspection/Test
Schedule
30 day after contract award
KO &
Monthly
1606000/
3.4
N/A Cathodic
Protection
Calibration
Schedule
30 days after contract start
KO &
COR
Annually
1606000/
3.4
N/A Cathodic
Protection Test
Results
End of each month
KO &
COR
Monthly
1606000/
3.4
N/A Cathodic
Protection System
Report
Upon completion of annual calibration
KO &
Section F – 1700000
Transportation
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1700000/
2.3.2
N/A Permits and
Licenses
Before work commences and within four hours of request
KO, COR
& TR
Manager
As specified
1700000/
2.3.4.4
N/A Temporary
Suspension of
Downtime
Accumulation
Within two hours of notice to the
Contractor that the material delays will cause the downtime standard to be missed
KO, COR
& TR
Manager
As
Required
1700000/
3.1
N/A Monthly Crane Lift
Report
By the first working day of each month
KO, COR
& TR
Manager
Monthly
1700000/
3.1.2
N/A Fuel Report By the first working day of each month
KO, COR
& TR
Manager
Monthly
1700000/
3.2.1
N/A Dispatcher’s Log Made available upon request
KO, COR
& TR
Manager
As
Required
1700000/
3.3.1
N/A Monthly
Maintenance
Schedules
By the first working day of each month
KO, COR
& TR
Manager
Monthly
1700000/
3.3.1, 3.3.6
Vehicle Accident
Report
As Required KO, COR
& TR
Manager
As
Required
1700000/
3.3.4, 3.3.5
N/A PM, Certification and Testing
Schedules
By the 25th calendar day of the previous month for PM’s due the following month.
KO, COR
& TR
Manager
Monthly
1700000/
3.3.4
N/A Maintenance
Inspection
Specification and
Record
By the first working day of each month
KO, COR
& Gov’t
Certifying
Official
As
Required
1700000/
3.3.4
N/A Personnel Testing and Certification
Qualifications
Before work commences and within four hours of request
KO, COR
& TR
Manager
As
Required
170000/
3.3.6
N/A Priority 1 Non-
Recurring Work
Status and NTVE
Report
Daily KO, COR
& TR
Manager
Section F – 1700000
Transportation
Deliverable Title: Fuel Delivery and Fuel Accountability Reports
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Excel software.
Prepare a report, by USN registration number, for each unit of NAVSTA Mayport transportation equipment reporting the following data:
a. USN registration number and Alpha Code
b. Activity to which assigned
c. Gallons of fuel used and type of fuel
Report shall also include the fuel delivered to utility and facility generators including the amount of fuel used and type of fuel.
Prepare report monthly with quarterly and annual total/summary of data. Contractor must obtain current hour/mileage readings on equipment.
Submit a copy of the summary report via email to COR and Transportation Branch Head for Government review and comment.
Section F – 1800000
Environmental
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1800000/
2.1
N/A Training Plan 15 days after award/
Annually
KO & COR Annually
1800000/
2.2.1, 2.4.1
N/A Training
Documentation
15 days after award/
Annually
KO, COR &
IEPD
As Specified
1800000/
2.4.3
N/A Spill Response
Leader and Team
Members
Nominations/
Qualifications
15 days after award/
Annually
KO, COR &
IEPD
As Specified
1800000/
N/A Out of
Compliance
Notification and
Recommendations
As Specified KO, COR &
IEPD
As Specified
1800000/
3.1
Spill Response
Equipment
Inspection and
Inventory
15 days after award/
Annually
KO, COR &
IEPD
Annually
1800000/
3.1, 3.1.1
Initial Spill
Notification
Immediately upon identification of spill
COR,
Environmental
Division, RDC
& FIC
As Required
1800000/
3.1, 3.13
Spill Assessment
Report
Within 30 minutes of arrival onsite during regular working; one hour of start of next work day for after hours
KO, COR,
IEPD & FIC
As Specified
1800000/
3.13
Final Spill Clean
Up Report
Within 5 days of completing spill response
KO, COR &
IEPD
As Specified
1800000/
3.2.1
N/A Used Oil
Accumulation and
Collection
Inspection Report
Within 48 hours of completing inspection
KO, COR &
IEPD
Annually
1800000/
3.2.2
N/A Used oil sampling plan
Within 15 calendar days prior to contract start.
KO & COR As required
1800000/
3.2.2
N/A Used oil analysis As Specified KO & COR As required
Section F – 1800000
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1800000/
3.2.2
J-0200000-05 Used Oil Disposal and Recycling
Summary Report
10 days after the end of the reporting period
KO, COR &
IEPD
Annually
1800000/
3.3
N/A Best Management
Practices and
POA&M
10 days after the end of the reporting period
KO, COR &
IEPD
Quarterly
1800000/
3.3
N/A Storm Water
Deficiency
POAM and Cost
Estimate
10 days after the end of the reporting period
KO, COR &
IEPD
Quarterly
1800000/
3.3
N/A Storm Water
Monitoring
Report and
Sample Analysis
10 days after the end of the reporting period
KO, COR &
IEPD
Quarterly
1800000/
3.3
N/A Storm Water
Training Report
As Specified KO, COR &
IEPD
Quarterly
Section F – 1800000 (MCSF-BI)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1800000/
2.2.1
N/A Training Plan 15 days after award/
Annually
KO & COR Annually
1800000/
2.4.1
N/A Training
Documentation
15 days after award/
Annually in
October
KO, COR,
Installation
Environmental
Office
As Specified
1800000/
2.4.3
N/A Leader and Team
Members
15 days after award/
Annually
KO, COR,
Installation
Environmental
Office
As Specified
1800000/
N/A Out of
Compliance
Notification and
Recommendation
As Specified KO, COR, Installation
Environmental
Office
As Specified
1800000/
3.1
N/A Sampling Plan 15 days after award/
Annually
KO, COR,
Installation
Environmental
Office
As Specified
1800000/
3.1.1
N/A Sample Collection
Logs/Results
Within 48 hours of receipt of results
KO, COR,
Installation
Environmental
Office
As Required
1800000/
3.1.2
N/A Field Testing
Sample Results
Within 48 hours of receipt of results
KO, COR,
Installation
Environmental
Office
As Required
1800000/
3.1.3
N/A Laboratory
Services Reports
Within 48 hours of receipt of results
KO, COR,
Installation
Environmental
Office
As Required
1800000/
3.2.2
J-0200000-05 Used Oil Disposal and Recycling
Summary Report
10 days after the end of the reporting period
KO, COR,
Installation
Environmental
Office
Annually
1800000/
3.2.2
N/A Used oil sampling plan
Within 15 calendar days prior to contract start.
KO & COR As required
1800000/
3.2.2
N/A Used oil analysis As Specified KO & COR As required
1800000/
3.2.2
N/A Used Oil Bill of
Laden
By
December
31st
KO, COR &
Installation
Environmental
Office
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1800000/
3.3
N/A HM Control and
Management
Program
Within 15 calendar days prior to contract start.
KO & COR As required
1800000/
3.3.1.1
N/A Regulated
Substance Spill
Within 30 minutes
KO, COR &
Installation
Environmental
Office
As Required
1800000/
3.3.1.3
N/A Hazardous
Accumulation
Site Inspections
First working day of the following week
KO, COR,
Installation
Environmental
Office
Weekly
1800000/
3.3.1.3
N/A Oral Notification of Condition
Which May
Endanger Health or the
Environment
Immediately KO, COR &
Installation
Environmental
Office
As Required
1800000/
3.3.1.3
N/A Documentation, including investigation, root cause analysis, and corrective action(s), of any reportable incident.
Within Five working days
KO, COR &
Installation
Environmental
Office
As Required
1800000/
3.3.1.3
N/A Waste
Identification
Document (WID)
Within Five working days
KO & COR As Required
1800000/
3.3.3
J-1800000-10 Hazardous Waste
Disposal Report including Waste
Profile Records
First working day of the following month
KO, COR,
Installation
Environmental
Office
Monthly
1800000/
3.3.4
N/A Sludge Sample
Analysis
As Specified KO, COR, Installation
Environmental
Office
As Required
1800000/
3.4.1
N/A Initial Spill
Assessment
Report
Within 30 minutes upon arrival onsite
KO, COR &
Installation
Environmental
Office
As Required
1800000/
3.4.3
N/A Spill Response
Report
Upon completion of clean up operations
KO, COR &
Installation
Environmental
As Required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1800000/
3.5
N/A Best Management
Practices Report
As Specified KO, COR &
Installation
Environmental
Office
Quarterly
1800000/
3.5
N/A Outfall Visual
Monitoring
Report
As Specified KO, COR &
Installation
Environmental
Office
Quarterly
1800000/
3.5
N/A Stormwater
Training Data
As Specified KO, COR &
Installation
Environmental
Office
Quarterly
1800000/
3.6
N/A Fuel storage tank
Inspection
Within 24 hours of
Inspection or 15 minutes upon leak identificatio n
KO, COR &
Installation
Environmental
Office
Monthly
1800000/
3.6
N/A Tank sensors inspection
By
December
31st and within 30 minutes of discovery of sensor failure or leak
KO, COR &
Installation
Environmental
Office
Annually
1800000/
3.6
N/A Secondary containment Logs and Inventory
Reports
Each
Monday for the previous week
KO, COR &
Installation
Environmental
Office
Weekly
1800000/
3.6
N/A Tank and
Secondary
Containment repair report
Within 15 minutes
KO, COR &
Installation
Environmental
As Required