DLM_Q's_and_A's_Updated_9-2-16.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Depot Level Maintenance Support Services, FRCSW, North Island, CA
Solicitation number
N6893616R0012
Issued by

About this file

DLM Q's and A's Updated 9-2-16

View the file

Other files

File Type Posted
Amendment_6_Q A.xlsx XLSX spreadsheet
16-R-0012_RFP_Amendment.docx DOCX document
RFP_16-R-0012_Solicitation.docx DOCX document
DLM_Q's_and_A's_9-16.xlsx XLSX spreadsheet
16-R-0012_RFP_Amendment.docx DOCX document
Attachment_5_Level_of_Effort_Updated_9-16-16.docx DOCX document
DLM_Q's_and_A's_9-8-16.xlsx XLSX spreadsheet
16-R-0012_RFP_Amendment_3.docx DOCX document
FRCSWINST_4855.1D_Quality_Program_Manual.pdf PDF
FRCSWLCP_4790_Ch_10.11_Foreign_Object_Damage_Prevention_Program.pdf PDF
DLM_Follow_on_Tool_Requirements.xlsx XLSX spreadsheet
FRCSWINST_10290.1C_Tool_Control_Program.pdf PDF
NDMS_TAA_User_Manual_v_5.08.pdf PDF
FRCSWINST_12792.1A_Civilian_Drug_Free_Workplace.pdf PDF
FRCSWINST_5090.1C_Environmental_Protection_Program.pdf PDF
Attachment_5_-_Level_of_Effort_Update_9-2-16.xlsx XLSX spreadsheet
FRCSWINST_5100.1D_Navy_Occupational_Safety_and_Health_Program.pdf PDF
FRCSWINST_13600.1C_Support_Equipment_Misuse_and_Abuse.pdf PDF
16-R-0012_RFQ_Amendment_2.docx DOCX document
FRCSWLCP_4790_Ch_10.16_Support_Equipment_Operator_Training_and_Licensing.pdf PDF
16-R-0012_RFP_Amendment.docx DOCX document
DLM_Q's_and_A's_Updated_8-29-16.xlsx XLSX spreadsheet
L-4_Vol_3_PP-1_Updated_8-29-16.xlsx XLSX spreadsheet
16-R-0012_RFP_Solicitation.docx DOCX document
Current_Collective_Bargaining_Agreements_(CBAs).pdf PDF
Industry_Day_Questions_and_Answers.xlsx XLSX spreadsheet
Trade_Skills.docx DOCX document
Trade_Specialities.docx DOCX document
L-2_Vol_2_CE-1.xlsx XLSX spreadsheet
L-3_Vol_3_PPQ.docx DOCX document
Exhibit_(a)_-_DD_Form_1423 _Contract_Data_Requirements_Listing.pdf PDF
L-4_Vol_3_PP-1.xlsx XLSX spreadsheet
L-1_Vol_1_ES_Tables.xlsx XLSX spreadsheet
Work_Task_Guidance.xls XLS spreadsheet
Level_Of_Effort_Final.xlsx XLSX spreadsheet
Trade_Specialty_Functional_Req.xlsx XLSX spreadsheet
Table-_Final.xlsx XLSX spreadsheet
L-5_CA_1.xls XLS spreadsheet
Attachment_9_-Presolicitation_Conference_PP_Slides.pptx PPTX presentation
Attachment_8_-_Industry_Day_Participation_List.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DLM Industry Day Questions
QuestionsAnswers
1Who provides Artisans their tools?Artisan "hand tools" are not provided by the Government.
2Do current Artisans own their own tools?Yes, on the current contract the artisans own their own tool sets.
3What are the current tools required by each labor category?A tool listing by labor category will be provided in the technical library for solicitation purposes.
4What is the current Artisan (contractor Employee) turn over by labor category?Turnover by trade can be misleading due to changes in internal hiring requirements but the current monthly contractor turnover is approximately 4%.
5What is the % of work broken down by shifts and how many artisans per shift?Shift work requirements are not constant. Historically, 80% of the Contractor workforce has been assigned to work the "A" Shift and 20% of the Contractor workforce has been assigned to work the other Shifts. The “C” shift is used sparingly to overcome scheduling and facility capacity constraints.
6Are there any CBA's?Yes, Lemore and Yuma are under CBA's. CBA information will be included in the Solicitation.
7Will office space for the PM/QA and leads be provided on site by the Government?Yes, 4 desks will be provided for the PM/QA's (admin). Additionally, Leads will have work space within their respective facilities.
8In Attachment 5,there is no lead position identified for Nellis location.Currently, there is no Contractor lead at the Nellis location.
9CLINS 0X06 and 0X07 - no (pay) steps identified in WG.The "GS/WG Equivalent" Column in Attachment 5 is provided as generic guidance and are not necessarily reflective of the individual companies strategy for the proposal. In the civilian sector, pay steps are earned based on time in service and/or grade.
10The RFP labor categories do not reflect the experience of the employee and could affect their pay wage. Will you be adding wage steps for proposing accuracy, i.e. WG-10 step 5?The "GS/WG Equivalent" Column in Attachment 5 is provided as generic guidance and are not necessarily reflective of the individual companies strategy for the proposal. In the civilian sector, pay steps are earned based on time in service and/or grade. The same level of competency is required from an employee regardless of whether they were at Step 1 or Step 5. With that said, FRCSW will not be adding steps to Attachment 5.
11Will there be a Transition CLIN?There will be no Transition CLIN.
12Are the SCA wage determinations up to date?The latest SCA WG's will be included in the final solicitation.
13Can personal (employee) experience be substituted for Company Corporate experience?No. In accordance with Section M, II, A, "The experience provided shall only relate to Corporate Experience, which is experience gained through contracted work, vice the experience of the offerors personnel."
14In the Pricing Evaluation, will 3% escalation be used in the Government MPC?The 3% escalation rate mentioned in the Pre-Solicitation Conference and One-on-One discussions is based on the Government's current assessment of the escalation rates from review of the Global Insight rates. In accordance with Section L, Part B 5.3.2.3, "The offeror should provide all escalation-related assumptions used in the proposal." However, if an offeror proposes escalation rates that are not substantiated, the government may make an MPC adjustment to those escalation rates if they are determined to be unrealistic. In accordance with Section M, "the Government may use commercial published data, same or similar DoD contracts, Government estimates, industry standards, field pricing reports, or other information as deemed appropriate by the Government."
15Is there a requirement for shift differential?The Solicitation does not detail contractor personnel pay requirements outside of referencing the latest Labor Department Wage Grade Determinations. Employee pay strategies are considered a part of the individual companies strategy for the proposal and the solicitation/contractor also does not relieve the contractor from being required to comply with Local, state and federal laws.
16Will experience working with Unions be considered under Corporate Experience?No, working with unions was not an element specified in section L (Sections 2.2.1 and 2.2.2) that would be evaluated. Working with Unions will not be given special consideration under Corporate Experience.
17Will the possible unionization be taken into account during this evaluation?No. Unionization isn't anticipated during execution and therefore evaluations won't take this into consideration.
18How will Subcontractor Experience be used under Corporate Experience?Subcontractor experience will be evaluated as it relates to their proposed role on the FRCSW effort. A direct relation between their proposed role and the experience reference provided must be made for that experience to be deemed relevant. ( Section "L" 2.0 Volume 2 Corporate Experience)
19Will Artisan training records be turned over?Yes, Individual Qualification Records are required to be turned over by the incumbent to FRCSW. FRCSW will provide the records for those artisans transitioning to the new contract to prime that receives the award during the transition phase. SOW point of reference is 7.0.
20How often do Artisans deploy to a ship?Rarely, if ever.
21Will training spaces be provided?Yes, training space will be provided. Currently two spaces are provided, 1 classroom and 1 practical exercise lab totaling approximately 1,080 sq.ft.
22Is there a page limit to for Past performance and Experience under the proposal submission?No, but there is a recommended page count for each section (Table G-2 in Section "L").
23Will Native 8a companies be allowed to use experience from previous 8a?IAW, Section L, Part B, 1.0, a(2) "The Offeror shall provide a written explanation if multiple CAGE codes/DUNS for the same physical location are provided in Table ES-1 (Offeror Summary). The written explanation shall detail the distinct roles and responsibilities for entities with different CAGE codes/DUNs at the same physical location for where the work is being performed or from where the work is being directed. The description shall include all changes in the organization as a result of a corporate acquisition, reorganization, merger, or other administrative reason."
24What positions will require Security Clearances?Not all positions require security clearances but all employees will be required to pass a background check and be Secret Eligible. Positions which may require SECRET clearances are Painters and Electronics Technicians.
25Does the contractor need to have an approved purchasing/accounting/estimating system?An approved accounting system is required for this effort because this is a cost type contract. Approved purchasing or estimating systems are not a requirement at this time.
26Will there be any OCONUS work required?No, all work will be performed CONUS.
27Will a GOP list be provided?Yes, a list of GOP's will be provided in the technical data library.
28Will identified risk reducers have a positive on the technical evaluation?Yes, Risk Reducers will be evaluated under the Risk rating for the Technical Factor and are considered positive findings.
29Does aviation maintenance consider missiles and drones?Aviation maintenance would pertain to drones and other UAV's which some are included within the RFP but will be evaluated on a case by case basis depending on their similarity to the Aircraft/Systems FRCSW performs maintenance on. Please ensure your proposal provides specific similarities to systems referenced in the solicitation.
30Will current employee’s training and safety records be provided to the winner?Yes, Individual Qualification Records are required to be turned over by the incumbent to FRCSW. FRCSW will provide the records for those artisans transitioning to the new contract to prime that receives the award during the transition phase. SOW point of reference is 7.0.
31Will the winner be allowed to install an electronic time keeping wireless system?No
32On page 21, should the WL-08 Lead be WL-10 Lead?Yes, it will be corrected in the Final RFP.
33In the last 5 years, how many contractors have gone direct to the government?The Government dos not maintain this information however there is turnover and recruiting/retention strategies are considered a part of the individual companies strategy for the proposal.
34Will Nellis be added to the RFP as a possible future site?Yes
35Are the qualification requirements for key personnel listed anywhere?See Section J Attachment 2.
36How will offerors include the cost for Training and QA? Will this be shown in the cost section?Indirect personnel not specifically listed in the solicitation can be absorbed by the contractors indirect cost structure.
37Is ISO 9000 Certification necessary?Obtaining certification is not the responsibility of the contractor. FRC-SW obtains and maintains the certitication. The Contractor shall be compliant and operate in accordance with the certification standards.
38Please define what the Material CLIN will be used for and provide some examples.PPE and safety equipment such safety glasses, respirators, and fall protection harnesses, gas detection meter, as well as training materials and equipment necessary for the practical lab (i.e. tools, solder equipment, sheet metal, pneumatic drills, cleco-style connectors, etc.) as identified in Section 8.2. Material CLIN is Contractor supplied items that support the contractor personnel performing the work (minus tools). FRCSW will provide all material related to the actual performance of the work.
39Are the Safety Manager and Training Managers part of the Key personnel? If not, should they be included?Indirect personnel not specifically listed in the solicitation can be absorbed by the contractors indirect cost structure.
40How should the offerors account for the indirect costs of the non Key personnel managers like Safety, Training, etc.?Indirect personnel not specifically listed in the solicitation can be absorbed by the contractors indirect cost structure.
41Is the QA manager missing from Attachment 5?Yes, the QA Manager is under CLIN 0X06 of Attachment 5 of the final RFP release.
42Is there an alternate or back-up Program Manager? How is this position accounted for?Contractors can propose a back-up Program manager as part of their individual proposal strategy however; that position will not be a direct charge and will need to be absorbed by the contractors indirect cost structure.
43What CLIN does QA (manager??) fall in?0X06
44Have there been any DOL issues on the current contract?No
45Is there an electronic timekeeping system in place?No, not for the purpose of tracking contractor time for invoicing purposes.
46Has the California Act relative to Sick Leave been flowed down into the contract?The Solicitation does not specify any Sick Leave requirements. Compliance with Local, state and federal laws is the responsibility of the contractor and should be reflected accordingly in their proposals.
47Is there a limit on the number of contracts an Offeror can provide for Corporate Experience and Past Performance?There is no limit on the number of contracts an Offeror can submit.
48Would the Government consider deleting the "requested" information being delivered three weeks prior to the submission date (highlighted below)? If the Government will not delete it, will an Offeror who does not submit the requested information ahead of the final Offer be viewed negatively or as non-compliant?Advanced information is requested due to the amount to time it takes the government evaluation team to gather additional contract information such as CPARS, CPAR Updates, PPQ's, ect. for evaluation. Receiving early proposal information is essential for keeping the Source Selection on schedule which is to the benefit of both the government and contractor. If the contractor decides not to submit the requested advanced information, the proposal will not be looked at in a negative manner or be considered non-compliant but keep in mind, it will now take the evaluation team more time, in an already tight schedule, to gather the required information. This may cause delays that will negatively impact the Source Selection schedule.
RFP Q&A
1On September 7, 2015, President Barack Obama signed Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors (https://www.dol.gov/whd/flsa/eo13706/faq.htm). The Executive Order requires certain parties that contract with the Federal Government to provide their employees with up to 7 days of paid sick leave annually, including paid leave allowing for family care. The Executive Order directs the Secretary of Labor to issue regulations by September 30, 2016, to implement the Executive Order’s requirements. 1) Has the Government taken into account the 3 sick days (24 hours) already granted by the State of California in their 1,920 FTE calculation for California sites and 2) Given the pending Executive Order, will the Government amend the 1,920 FTE figure?Executive Order (EO) only apply to "new contracts," that is, contracts with the Federal Government that result from solicitations issued on or after January 1, 2017 and therefore does not pertain to this Solicitation. The Government will not amend the 1920 FTE calculation.
2Section L, 3.0 Vol 3 Past Performance states … “whose past performance is within five years.” However, in the Past Performance, L-4 Attachment, in the instructions tab it states… “whose past performance is within three years.” Will the Government please let us know which number of years is correct?Attachment L-4 (Vol 3 PP) has been corrected to match Section L, 3.0 Vol 3 Past Performance. Past Performance must be within 5 Years.
3In the STATEMENT OF WORK, 1.0 SCOPE, 1.1 it lists….aircraft maintenance and associated business program support for Fleet Readiness Center Southwest (FRCSW) San Diego, currently including, but not limited to, the following remote sites in the Western Pacific Region:

- NAS Point Mugu, CA

However, in the “Level of Effort_Final” attachment, there is no mention of FTE at Pt. Mugu. Will the Government clarify whether Pt. Mugu is a detachment site or whether there will be a permanent Pt. Mugu effort and if so, what is the LOE?Point Mugu is a detachment site for FRCSW however no permanent Contractor support has been identified at this time which is why the LOE does not list billets for that location. The sites listed in Section 1.1 of the SOW identify remote sites that fall under FRCSW (where support may be needed) whereas the LOE effort identifies where the current Contractor support is needed. There is no current Pt. Mugu LOE.
4Background: Neither Section L nor M reference the submission of a QCP, PWS 5.3.1 states " It shall be provided at the time of proposal submission, incorporated into the contract as an Attachment and updated during the existence of the contract when applicable." PWS 6.1.5 states "This plan will be provide at the time of proposal and updated as required." Question: Is the QCP, as identified in PWS 6.1.5 and CDRL A005, due with the proposal or does the Government just require an overview of our QCP within the proposal?At the time of proposal we would like to see the offeror's management approach to how they intend to perform QA functions and how they'll mitigate deficiencies and deal with them when they occur. We're not asking for the final Quality Control Plan which will be required during mobilization, just an overview on how they plan on performing QA functions.
5Background: RFP states: "However it is requested that one hard copy and one electronic copy on a CD-ROM of Volume 3 Past Performance, Table PP-1 (Past Performance Contract Data); as well as Volume I Executive Summary, Table ES-1 (Offeror's Summary); and Volume I Executive Summary, Table ES-2 (Relevant Contract Summary) be submitted two weeks prior to the submission date/time...." Question: Are the entire volumes requested to be submitted early or only the specified tables?The information requested prior to proposal receipt is specific to the tables, Identified. The entire volumes should not be provided early, only the specified tables?
6Question: What is the required proposal validity?Proposal validity will be 210 days from the date the RFP closes.
7Question: Could the Government lease provide the naming conventions for Annexes B and C?The naming convention for Annex B and C are as follows:

AnnB KeyPersonnel.pdf and AnnB KeyPersonnel.docx AnnC TransitionPlan.pdf and AnnC TransitionPlan.docx

8Background: RFP states: "The proposal provided by the Offeror shall follow the outline below:" The section then lists Sections 1-3 with the required content.
Question: Does the Government expect to see our proposal follow these Sections, and sub-paraheaders, embedding all requirements within these 3 Sections?Yes the Proposals should follow the same format reflected in the specific RFP sections
9Background: RFP states: "If the Offeror is currently being audited, or has been audited by the DCAA, it is requested that the name and location of the assigned DCAA office be furnished with the proposal, along with any such completed audits to be used to facilitate the cost/price evaluation." However, Section 5.3 does not provide a location for the audit information.
Question: In what section does the Government want the audit and DCAA infomation?Audit and DCAA information should be added to proposals as an Exhibit or attachment.
10Background: The total hours in C14 and FTEs in D14 don’t reconcile if you consider 2,208 hours (1,920 RT + 288 (15%)OT) per FTE. The 117,024 total hours for CLIN 0X06 appears to cover 53 FTEs rather than the 54 FTEs published in the worksheet. Question: Is the contractor to assume 2,167 hours/FTE for CLIN 0X06 or is the FTE total of 54 or total hours of 117,024 misstated?Amendment 1 of the Solicitation corrects Section B, CLINs 0X06 to 119232 hours (54 FTE).
11Background: Instructions state "Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. Question: Can the Government please confirm they want a separate row entry for each person? This would equate to 600+ entries within the attachment. Or did the Government want to see it similar to the layout in the Attachment 5 Level of Effort and ODC Estimate?Instructions on attachment CA-1 will be corrected to allow the submission of Composite Direct Labor Rates. "In column A, starting at row 5 to 40, In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. Also, for non "Key" labor categories, categories with more than one person providing service can be listed together as Composite Direct Labor Rates reflecting the total hours for that location/category. "
12Background: Summary worksheet shows a total of 110400 hours per year for OY2, OY4 & OY4 for CLIN 0X05. On the Labor Breakdown worksheet, the hours for each skill - Aircraft Mechanic II (WG-10), Electrical, Maintenance (WG-10), & Sheetmetal Mechanic (WG-10) has reduced by 1920 from OY1 (Year 2) to OY2 (Year 3) and then held constant through OY4 (Year 5). Therefore, the total hours for CLIN 0X05 do not equate to the 110400. In addition, the FTE count did not change from OY1 to OY2. Question: Can the Government clarify this discrepancy?Yes, all option years under OXO5 series CLINs have been appropriately corrected on Attachment 5 so that hours associated with each labor trade are correct and amounts to the 110400 hours.
13Thank you for responding to our previous question about Executive Order (EO) 13706. We had also asked about the current State requirement for California (Healthy Workplace Healthy Family Act of 2014) that mandates 24 hours of Sick leave. Can you address whether the Government will consider this when assessing Offeror’s cost realism? As a rough order of magnitude, that could be a difference in hours in excess of 70,000 over the life of the contract.In general, the 1,920 hour man year already takes into account 2 weeks holidays and 2 weeks leave and will not be specifically adjusted within this solicitation.
14In the RFP on pg. 21 of 119, the estimated total labor hours is 6,524,640. In the “Level_of_effort_final” attachment the summary total for labor hours is 6,513,600. Will the Government confirm the correct labor hours?Yes, 6,524,640 is the correct number of hours and has been corrected on the Summary tab. This is based on the 591 FTE's.
15Also on the “Level_of_effort_final” attachment, the Summary and the Labor Breakdown tabs are inconsistent for all years. The summary tab FTE count equals 590 and the Labor Breakdown tab FTE column equals 591. Will the Government confirm the correct total LOE; 590 vs. 591?Yes, the number of FTE's has been corrected on the Summary tab to reflect 591 FTE's.