This document is an amendment to a federal contract solicitation for an Aircraft Generator Test Stand (AGTS). The amendment provides updates to the statement of work, specifications, and applicable documents list. Key changes include replacing references to ANSI/NCSL Z540 calibration standards with ISO/IEC 17025, updating forklift opening dimensions, and clarifying data collection and initial calibration requirements. The related solicitation is from the Department of the Navy Naval Air Systems Command for the AGTS, with no further description provided.

Amendment 0007

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Generator Test Stand (AGTS), newest first.
File Type Posted
Amendment_0008__AGTS.doc DOC document
Amendment_0006__AGTS.doc DOC document
Amendment_0005__AGTS.doc DOC document
Amendment_0004__AGTS.doc DOC document
Amendment_0003__AGTS.doc DOC document
Amendment_0002__AGTS.doc DOC document
Amendment_0001__AGTS.doc DOC document
N6833519R0109_AGTS.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0007

1. The following is a question that was received by this Agency and our answer:

Question 1: SOW 3.2.5 Lists CLIN 0019 (Key Performance Component Analysis) as part of PDR events.

CDRL A006 does not state that PDR is required, its states 30 days prior to SRR II and any updates shall be submitted 30 days prior to CDR and 30 days prior to SVR.

Answer1: SOW paragraph 3.2.5 has changed as follows:

From: PRELIMINARY DESIGN REVIEW (PDR) (CLINs 0029, 0032, 0019, 0036)

To: PRELIMINARY DESIGN REVIEW (PDR) (CLINs 0029, 0032, 0036)

SOW paragraph 3.9 has changed as follows:

From: SYSTEM VERIFICATION REVIEW / PRODUCTION READINESS REVIEW (SVR/PRR) (CLINs 0014, 0016, 0017, 0020, 0021, 0023, 0024, 0025, 0026, 0027, 0030, 0032, 0033, 0034, 0037

To: SYSTEM VERIFICATION REVIEW / PRODUCTION READINESS REVIEW (SVR/PRR) (CLINs 0014, 0016, 0017, 0019, 0020, 0021, 0023, 0024, 0025, 0026, 0027, 0030, 0032, 0033, 0034, 0037

2. Specification Section 4.2.2 Test Instrument and Data Collection has changed as follows (changes in bold):

From: The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of ANSI/NCSL Z540-3. Data shall be gathered in a manner to permit the Government to determine if the system meets each requirement outlined in Section 3 of this System specification. Proposed data collection tools and methodologies shall be submitted to the Government for approval. Graphical, visual, audible and empirical data shall be provided to permit off-line analysis of raw data by the Government to assess performance.

To: The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of 17025:2017. Data shall be gathered in a manner to permit the Government to determine if the system meets each requirement outlined in Section 3 of this System specification. Proposed data collection tools and methodologies shall be submitted to the Government for approval. Graphical, visual, audible and empirical data shall be provided to permit off-line analysis of raw data by the Government to assess performance.

3. Statement of Work Section 3.4.14.3 INITIAL CALIBRATION OF DELIVERABLE ASSETS (CDRL L00F) (CLIN 0052) has changed as follows (changes in bold):

From: The Contractor is responsible for the initial calibration of the deliverable assets. The initial calibration shall be performed such that it can be verified in accordance with American National Standards Institute (ANSI) Z-540, Requirements for the Calibration of Measuring and Test Equipment. The Contractor’s calibration tag/label shall be affixed to the end item verifying that it has met the calibration requirements. Note: If initial calibration is to be performed on-site, the Contractor will provide all applicable reference CALSTDs and associated support/ancillary equipment.

To: The Contractor is responsible for the initial calibration of the deliverable assets. The initial calibration shall be performed such that it can be verified in accordance with

International Organization for Standardization / International Electro-technical Commission ISO/IEC 17025:2017, Requirements for the Calibration of Measuring and Test Equipment. The Contractor’s calibration tag/label shall be affixed to the end item verifying that it has met the calibration requirements. Note: If initial calibration is to be performed on-site, the Contractor will provide all applicable reference CALSTDs and associated support/ancillary equipment.

4. Statement of Work Section 2.0 Applicable Document Table has changed as follows (changes in bold):

From:

Document Number
Date
Purpose
Document Title
PMA260C2/9020
TBD
Required
AGTS System Specification
MIL-HDBK-2155
12/11/1995
Required
DOD Handbook: Failure Reporting, Analysis and Corrective Action Taken
ANSI/ISO/ASQ Q9001-2008
2013
Guidance
Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
MIL-STD-130N
12/17/2007
Required
DOD Standard Practice: Identification Marking of U.S. Military Property
GEIA-STD-0007B
05/01/2013
Required
SAE Standard for Logistics Product Data
NAVAIR 17-35NCE-1
N/A
Required
Navy Calibration Equipment List
ANSI/NCSL Z540.3-2006
2013
Required
American National Standards Institute/ National Conference of Standards Laboratories (ANSI/NCSL) Requirements for the Calibration of Measuring and Test Equipment
SAE/AS5553
04/02/2009
Guidance
SAE: Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition
EIA-649-B
04/01/2011
Guidance
SAE: Configuration Management Standard
PMA-260 Configuration Management Plan
04/18/2013
Required
PMA-260 Configuration Management Plan
ASTM D 3951-10
2010
Guidance
Standard Practice for Commercial Packaging
MIL-STD-2073-1E
05/23/2008
Required
DOD Standard Practice for Military Packaging
ISPM 15:2009
2009
Guidance
International Standards for Phystosanitary Measures: Regulation of Wood Packaging Materials in International Trade
MIL-STD-129R
02/18/2014
Required
DOD Standard Practice: Military Marking for Shipment and Storage
MIL-STD-2073-1E Change 3
11/20/2018
Required
DOD Standard Practice: Military Packaging
FED-STD-313F
10/12/2018
Required
Federal Standard: Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
MIL-STD-1366E
10/31/2006
Required
DOD Interface Standard for Transportability Criteria
NAVAIR SWP4940-024
06/21/2016
Required
NAVAIR Software Measurement Plan Template
MIL-HDBK-29612-5
08/31/2001
Required
Advanced Distributed Learning (ADL) Products and Systems
CNATT Course Identification Number C-602-3126
09/19/2013
Guidance
A/F37T-21 Aircraft Engine Components Test Stand (AECTS) Operator/Maintainer Intermediate Maintenance Course
SAE-TA-STD-0017
11/01/2012
Required
Product Support Analysis
NAVAIRINST 4355.19E
02/06/2015
Guidance
NAVAIR Systems Engineering Technical Review Process

To:

Document Number
Date
Purpose
Document Title
PMA260C2/9020
TBD
Required
AGTS System Specification
MIL-HDBK-2155
12/11/1995
Required
DOD Handbook: Failure Reporting, Analysis and Corrective Action Taken
ANSI/ISO/ASQ Q9001-2008
2013
Guidance
Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
MIL-STD-130N
12/17/2007
Required
DOD Standard Practice: Identification Marking of U.S. Military Property
GEIA-STD-0007B
05/01/2013
Required
SAE Standard for Logistics Product Data
NAVAIR 17-35NCE-1
N/A
Required
Navy Calibration Equipment List
ISO/IEC 17025:2017
2017
Required
International Organization for Standardization / International Electro-technical Commission ISO/IEC. Requirements for the Calibration of Measuring and Test Equipment.
SAE/AS5553
04/02/2009
Guidance
SAE: Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition
EIA-649-B
04/01/2011
Guidance
SAE: Configuration Management Standard
PMA-260 Configuration Management Plan
04/18/2013
Required
PMA-260 Configuration Management Plan
ASTM D 3951-10
2010
Guidance
Standard Practice for Commercial Packaging
MIL-STD-2073-1E
05/23/2008
Required
DOD Standard Practice for Military Packaging
ISPM 15:2009
2009
Guidance
International Standards for Phystosanitary Measures: Regulation of Wood Packaging Materials in International Trade
MIL-STD-129R
02/18/2014
Required
DOD Standard Practice: Military Marking for Shipment and Storage
MIL-STD-2073-1E Change 3
11/20/2018
Required
DOD Standard Practice: Military Packaging
FED-STD-313F
10/12/2018
Required
Federal Standard: Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
MIL-STD-1366E
10/31/2006
Required
DOD Interface Standard for Transportability Criteria
NAVAIR SWP4940-024
06/21/2016
Required
NAVAIR Software Measurement Plan Template
MIL-HDBK-29612-5
08/31/2001
Required
Advanced Distributed Learning (ADL) Products and Systems
CNATT Course Identification Number C-602-3126
09/19/2013
Guidance
A/F37T-21 Aircraft Engine Components Test Stand (AECTS) Operator/Maintainer Intermediate Maintenance Course
SAE-TA-STD-0017
11/01/2012
Required
Product Support Analysis
NAVAIRINST 4355.19E
02/06/2015
Guidance
NAVAIR Systems Engineering Technical Review Process

5. Specification Section 3.12.1 Handling Provisions has changed as follows (changes in bold):

From: Two forklift openings shall be provided on the two opposite sides of the test stand or section. The centerline of each opening shall be a maximum of 27 ±1/2 inch from the center of gravity of the test stand or section and shall be equally spaced. Each opening shall be a minimum of 2.5 inches high, 9.75 inches wide, and capable of accepting fork-lengths up to 80 inches long.

To: Two forklift openings shall be provided on the two opposite sides of the test stand or section. The centerline of each opening shall be a maximum of 27 ±1/2 inch from the center of gravity of the test stand or section and shall be equally spaced. Each opening shall be a minimum of a minimum of 3.2 inches high, 10.2 inches wide, and capable of accepting fork-lengths up to 80 inches long.

(End of Summary of Changes)