The file's text, extracted by GovTribe without its formatting.
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0007
1. The following is a question that was received by this Agency and our answer:
Question 1: SOW 3.2.5 Lists CLIN 0019 (Key Performance Component Analysis) as part of PDR events.
CDRL A006 does not state that PDR is required, its states 30 days prior to SRR II and any updates shall be submitted 30 days prior to CDR and 30 days prior to SVR.
Answer1: SOW paragraph 3.2.5 has changed as follows:
From: PRELIMINARY DESIGN REVIEW (PDR) (CLINs 0029, 0032, 0019, 0036)
To: PRELIMINARY DESIGN REVIEW (PDR) (CLINs 0029, 0032, 0036)
SOW paragraph 3.9 has changed as follows:
From: SYSTEM VERIFICATION REVIEW / PRODUCTION READINESS REVIEW (SVR/PRR) (CLINs 0014, 0016, 0017, 0020, 0021, 0023, 0024, 0025, 0026, 0027, 0030, 0032, 0033, 0034, 0037
To: SYSTEM VERIFICATION REVIEW / PRODUCTION READINESS REVIEW (SVR/PRR) (CLINs 0014, 0016, 0017, 0019, 0020, 0021, 0023, 0024, 0025, 0026, 0027, 0030, 0032, 0033, 0034, 0037
2. Specification Section 4.2.2 Test Instrument and Data Collection has changed as follows (changes in bold):
From: The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of ANSI/NCSL Z540-3. Data shall be gathered in a manner to permit the Government to determine if the system meets each requirement outlined in Section 3 of this System specification. Proposed data collection tools and methodologies shall be submitted to the Government for approval. Graphical, visual, audible and empirical data shall be provided to permit off-line analysis of raw data by the Government to assess performance.
To: The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of 17025:2017. Data shall be gathered in a manner to permit the Government to determine if the system meets each requirement outlined in Section 3 of this System specification. Proposed data collection tools and methodologies shall be submitted to the Government for approval. Graphical, visual, audible and empirical data shall be provided to permit off-line analysis of raw data by the Government to assess performance.
3. Statement of Work Section 3.4.14.3 INITIAL CALIBRATION OF DELIVERABLE ASSETS (CDRL L00F) (CLIN 0052) has changed as follows (changes in bold):
From: The Contractor is responsible for the initial calibration of the deliverable assets. The initial calibration shall be performed such that it can be verified in accordance with American National Standards Institute (ANSI) Z-540, Requirements for the Calibration of Measuring and Test Equipment. The Contractor’s calibration tag/label shall be affixed to the end item verifying that it has met the calibration requirements. Note: If initial calibration is to be performed on-site, the Contractor will provide all applicable reference CALSTDs and associated support/ancillary equipment.
To: The Contractor is responsible for the initial calibration of the deliverable assets. The initial calibration shall be performed such that it can be verified in accordance with
International Organization for Standardization / International Electro-technical Commission ISO/IEC 17025:2017, Requirements for the Calibration of Measuring and Test Equipment. The Contractor’s calibration tag/label shall be affixed to the end item verifying that it has met the calibration requirements. Note: If initial calibration is to be performed on-site, the Contractor will provide all applicable reference CALSTDs and associated support/ancillary equipment.
4. Statement of Work Section 2.0 Applicable Document Table has changed as follows (changes in bold):
From:
| Document Number |
| Date |
| Purpose |
| Document Title |
| PMA260C2/9020 |
| TBD |
| Required |
| AGTS System Specification |
| MIL-HDBK-2155 |
| 12/11/1995 |
| Required |
| DOD Handbook: Failure Reporting, Analysis and Corrective Action Taken |
| ANSI/ISO/ASQ Q9001-2008 |
| 2013 |
| Guidance |
| Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing |
| MIL-STD-130N |
| 12/17/2007 |
| Required |
| DOD Standard Practice: Identification Marking of U.S. Military Property |
| GEIA-STD-0007B |
| 05/01/2013 |
| Required |
| SAE Standard for Logistics Product Data |
| NAVAIR 17-35NCE-1 |
| N/A |
| Required |
| Navy Calibration Equipment List |
| ANSI/NCSL Z540.3-2006 |
| 2013 |
| Required |
| American National Standards Institute/ National Conference of Standards Laboratories (ANSI/NCSL) Requirements for the Calibration of Measuring and Test Equipment |
| SAE/AS5553 |
| 04/02/2009 |
| Guidance |
| SAE: Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition |
| EIA-649-B |
| 04/01/2011 |
| Guidance |
| SAE: Configuration Management Standard |
| PMA-260 Configuration Management Plan |
| 04/18/2013 |
| Required |
| PMA-260 Configuration Management Plan |
| ASTM D 3951-10 |
| 2010 |
| Guidance |
| Standard Practice for Commercial Packaging |
| MIL-STD-2073-1E |
| 05/23/2008 |
| Required |
| DOD Standard Practice for Military Packaging |
| ISPM 15:2009 |
| 2009 |
| Guidance |
| International Standards for Phystosanitary Measures: Regulation of Wood Packaging Materials in International Trade |
| MIL-STD-129R |
| 02/18/2014 |
| Required |
| DOD Standard Practice: Military Marking for Shipment and Storage |
| MIL-STD-2073-1E Change 3 |
| 11/20/2018 |
| Required |
| DOD Standard Practice: Military Packaging |
| FED-STD-313F |
| 10/12/2018 |
| Required |
| Federal Standard: Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities |
| MIL-STD-1366E |
| 10/31/2006 |
| Required |
| DOD Interface Standard for Transportability Criteria |
| NAVAIR SWP4940-024 |
| 06/21/2016 |
| Required |
| NAVAIR Software Measurement Plan Template |
| MIL-HDBK-29612-5 |
| 08/31/2001 |
| Required |
| Advanced Distributed Learning (ADL) Products and Systems |
| CNATT Course Identification Number C-602-3126 |
| 09/19/2013 |
| Guidance |
| A/F37T-21 Aircraft Engine Components Test Stand (AECTS) Operator/Maintainer Intermediate Maintenance Course |
| SAE-TA-STD-0017 |
| 11/01/2012 |
| Required |
| Product Support Analysis |
| NAVAIRINST 4355.19E |
| 02/06/2015 |
| Guidance |
| NAVAIR Systems Engineering Technical Review Process |
To:
| Document Number |
| Date |
| Purpose |
| Document Title |
| PMA260C2/9020 |
| TBD |
| Required |
| AGTS System Specification |
| MIL-HDBK-2155 |
| 12/11/1995 |
| Required |
| DOD Handbook: Failure Reporting, Analysis and Corrective Action Taken |
| ANSI/ISO/ASQ Q9001-2008 |
| 2013 |
| Guidance |
| Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing |
| MIL-STD-130N |
| 12/17/2007 |
| Required |
| DOD Standard Practice: Identification Marking of U.S. Military Property |
| GEIA-STD-0007B |
| 05/01/2013 |
| Required |
| SAE Standard for Logistics Product Data |
| NAVAIR 17-35NCE-1 |
| N/A |
| Required |
| Navy Calibration Equipment List |
| ISO/IEC 17025:2017 |
| 2017 |
| Required |
| International Organization for Standardization / International Electro-technical Commission ISO/IEC. Requirements for the Calibration of Measuring and Test Equipment. |
| SAE/AS5553 |
| 04/02/2009 |
| Guidance |
| SAE: Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition |
| EIA-649-B |
| 04/01/2011 |
| Guidance |
| SAE: Configuration Management Standard |
| PMA-260 Configuration Management Plan |
| 04/18/2013 |
| Required |
| PMA-260 Configuration Management Plan |
| ASTM D 3951-10 |
| 2010 |
| Guidance |
| Standard Practice for Commercial Packaging |
| MIL-STD-2073-1E |
| 05/23/2008 |
| Required |
| DOD Standard Practice for Military Packaging |
| ISPM 15:2009 |
| 2009 |
| Guidance |
| International Standards for Phystosanitary Measures: Regulation of Wood Packaging Materials in International Trade |
| MIL-STD-129R |
| 02/18/2014 |
| Required |
| DOD Standard Practice: Military Marking for Shipment and Storage |
| MIL-STD-2073-1E Change 3 |
| 11/20/2018 |
| Required |
| DOD Standard Practice: Military Packaging |
| FED-STD-313F |
| 10/12/2018 |
| Required |
| Federal Standard: Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities |
| MIL-STD-1366E |
| 10/31/2006 |
| Required |
| DOD Interface Standard for Transportability Criteria |
| NAVAIR SWP4940-024 |
| 06/21/2016 |
| Required |
| NAVAIR Software Measurement Plan Template |
| MIL-HDBK-29612-5 |
| 08/31/2001 |
| Required |
| Advanced Distributed Learning (ADL) Products and Systems |
| CNATT Course Identification Number C-602-3126 |
| 09/19/2013 |
| Guidance |
| A/F37T-21 Aircraft Engine Components Test Stand (AECTS) Operator/Maintainer Intermediate Maintenance Course |
| SAE-TA-STD-0017 |
| 11/01/2012 |
| Required |
| Product Support Analysis |
| NAVAIRINST 4355.19E |
| 02/06/2015 |
| Guidance |
| NAVAIR Systems Engineering Technical Review Process |
5. Specification Section 3.12.1 Handling Provisions has changed as follows (changes in bold):
From: Two forklift openings shall be provided on the two opposite sides of the test stand or section. The centerline of each opening shall be a maximum of 27 ±1/2 inch from the center of gravity of the test stand or section and shall be equally spaced. Each opening shall be a minimum of 2.5 inches high, 9.75 inches wide, and capable of accepting fork-lengths up to 80 inches long.
To: Two forklift openings shall be provided on the two opposite sides of the test stand or section. The centerline of each opening shall be a maximum of 27 ±1/2 inch from the center of gravity of the test stand or section and shall be equally spaced. Each opening shall be a minimum of a minimum of 3.2 inches high, 10.2 inches wide, and capable of accepting fork-lengths up to 80 inches long.
(End of Summary of Changes)