This document is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract issued by the Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Sigonella in Naples, Italy on June 24, 2026. The amendment modifies solicitation N6817126RN006, originally dated June 18, 2026, and is identified as Amendment 0001 with an effective date of June 24, 2026. The contracting officer is Annamaria Guarino, and the document notes that contractors are not required to sign and return copies to the issuing office.
The amendment provides responses to three Pre-Proposal Inquiries (PPIs) regarding a naval ship modernization project. PPI #1 clarifies that proposals involving Turkish or Cyprus shipyards are acceptable for consideration, provided contractors have a facility along the Mediterranean basin and meet conditions established in the geographic limitations outlined in the RFP Section C. PPI #2 provides specific technical specifications for item 0003 LCC-SWI-APPROACH BERTHING AND MOORING REQUIREMENTS, including arrival draft measurements (Forward Draft: 26 feet 00 inches; Aft Draft: 26 feet 10 inches), estimated displacement of 18,893 long tons, and air draft of 147 feet 08 inches. PPI #3 addresses shore steam supply requirements specified in Section 7.1.3, confirming that shore steam should be supplied at approximately 145 psi (10 barg) with maximum capacity of 6,000 lb/hr at the ship's connection. The amendment clarifies that there is no minimum required steam load; demand will be driven by ambient weather conditions at the contractor's facility, and equipment should be capable of cycling on and off during periods of low steam demand.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Annamaria Guarino
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this Amendment is to provide responses to three (3) Pre-Proposal Inquiries (PPIs):
PPI #1: Can a proposal involving a Turkish or Cyprus shipyard be taken into consideration?
Response: The place of performance geographic restriction is delineated in the Request for Proposals (RFP) Section C - Description/Specifications /Statement of Work (Page 4 of 48), includes all contractors who have a facility along the Mediterranean basin. The Republic of Turkiye and the Republic of Cyprus are within the area of consideration, subject to the conditions established in the geographic limitation.
PPI #2: The following information for item NO. 0003 LCC-SWI-APPROACH BERTHING AND MOORING REQUIREMENTS is required:
Arrival Draft (ABL) Aft Mast Top; Estimated Arrival Conditions: Forward Draft; Aft Draft; Displacement; Air Draft;
Response: Arrival Draft (ABL) Aft Mast Top; Estimated Arrival Conditions: Forward Draft: 26 FT - 00 IN; Aft Draft: 26 FT - 10 IN; Draft below lowest Projection (S.W.) 28 FT - 02 IN (MTW's propeller extends below the keel by 2'4"); Displacement: 18,893 LT ; Air Draft: 147 FT 08 IN
PPI #3: Ref: Section 7.1.3 - Shore Steam Request clarification regarding the steam load expectations.
Based on the specification, the requirement is:
-Supply of shore steam at approximately 145 psi (~10 barg) -Maximum capacity of 6,000 lb/hr (~2.7 t/h) at the ship's connection However, the specification does not indicate any minimum steam load or minimum continuous demand.
For the purpose of correctly sizing and operating the boiler equipment, confirm:
-Whether there is a minimum required steam load (continuous or base load) expected during operation ?
This information will help ensure the selected equipment is properly matched to the operational profile and avoids inefficiencies associated with low-load operation.
Response: There is no minimum required steam load. The majority of the steam demand will be for house heating, therefore the demand will be based on ambient weather conditions at the contractor's facility. The contractor should provide equipment that is capable of cycling on/off during periods of low steam demand
N6817126RN0060001
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0001 |
| EffDate: 24 Jun 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N68171 |
| AdmCode: |
| IssuedBy: NAVSUP FLC SIGONELLA NAPLES OFFICE |
NAVAL REGIONAL CONTRACTING CEN DET, PSC 817 BOX 50
FPO, AE 09622-0050
UNITED STATES
Anna Guarino, Email: anna.guarino4.ln@us.navy.mil Telephone: 0815683573 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6817126RN006 |
| SolDate: 18 Jun 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| ContDate: |
| CODate: 24 Jun 2026 |