N6339422R0001 Solicitation.pdf

PDF 1 MB Posted

Attached to
Vertical Launching System (VLS) Module Transformer Platform (MTP) Federal contract opportunity
Solicitation number
N6339422R0001
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This solicitation requests proposals for the manufacture, assembly, testing, acceptance, and delivery of Vertical Launching System Module Transformer Platform components, including maintenance kits, onboard repair parts, installation and checkout spares, depot spares, and lowest replaceable units. The Naval Surface Warfare Center Port Hueneme Division will evaluate proposals with the goal of awarding a contract for production from 2022 to 2026. Offerors must submit proposals by 14 December 2021 and direct any questions to the Contract Specialist and Contracting Officer by specified deadlines. The specifications and drawing package are available to DoD contractors through controlled distribution methods.

View the file

Other files for this federal contract opportunity

Other files attached to Vertical Launching System (VLS) Module Transformer Platform (MTP), newest first.
File Type Posted
N6339422R0001 RFP Amendment 8 - Summary of Changes.pdf PDF
N6339422R0001 RFP Amendment 8 - Conformed Copy.pdf PDF
N6339422R0001 RFP Amendment 7 - Conformed Copy.pdf PDF
N6339422R0001 RFP Amendment 7 - Summary of Changes.pdf PDF
N6339422R0001 RFP Amendment 6 - Summary of Changes.pdf PDF
Copy of Attachment JS-1 Pricing Summary MTP v.2 BN.xlsx XLSX spreadsheet
N6339422R0001 RFP Amendment 6 - Conformed Copy.pdf PDF
N6339422R0001 RFP Amendment 5 - Conformed Copy.pdf PDF
N6339422R0001 RFP Amendment 5 - Summary of Changes.pdf PDF
N6339422R0001 RFP Amendment 4 - Conformed Copy.pdf PDF
N6339422R0001 RFP Amendment 4 - Summary of Changes.pdf PDF
MTP-STP kits contents_16December2021.xlsx XLSX spreadsheet
N6339422R0001 RFP Amendment 3 - Summary of Changes.pdf PDF
Copy of Attachment JS-1 Pricing Summary MTP v.2.xlsx XLSX spreadsheet
N6339422R0001 RFP Amendment 3 - Conformed Copy.pdf PDF
N6339422R0001 RFP Amendment 2 - Summary of Changes.pdf PDF
N6339422R0001 RFP Amendment 2 - Conformed Copy.pdf PDF
MTP-STP kits contents_24November2021.xlsx XLSX spreadsheet
N6339422R0001 RFP Amendment 1 Conformed Copy.pdf PDF
N6339422R0001 RFP Amendment 1 Summary of Changes.pdf PDF
Exhibit A - CDRLs 24NOV21.pdf PDF
GFP_Attachment_J-3_12October2021.xlsx XLSX spreadsheet
J-2_GFI_Attachment.pdf PDF
Attachment JS-1 Pricing Summary MTP v.2.xlsx XLSX spreadsheet
Attachment JS-2 Past Performance Questionnaire MTP.doc DOC document
Exhibit A - CDRLs v.2.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 14 Dec 2021

X

A

X B

X C X D

EX

X

G

F 108 - 118

119 - 131

X H 132 - 137 nayneet.kaur@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DX-A3 1 137

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N63394 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

N/A conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

NAYNEET KAUR 805-228-8287

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 38

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

39 - 61

62 - 65

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

66 - 70

71 - 82 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 83 - 91 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 92 - 93 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

94 - 106

PART II - CO NTRACT CLAUSES

NAVAL SURFACE WARFARE CENTER

4363 MISSILE WAY

PORT HUENEME CA 93043-4307

(805) 228-8287

805-228-6299FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

12 Nov 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6339422R0001

Section B - Supplies or Services and Prices

NOTE A

STEPLADDER PRICING

Stepladder pricing is utilized in this solicitation to provide Offerors an opportunity to propose different pricing for separate quantity ranges within applicable Contract Line Items (CLINs). Price evaluation of step ladder CLINs will utilize a randomly selected quantity. Notwithstanding the option to propose different unit pricing for different quantities, the Offeror may propose the same unit price for all quantities.

For all option CLINs with stepladder pricing, the Government may unilaterally exercise a given line item more than once. Option CLINs with stepladder pricing may be exercised until the total quantity purchased equals the maximum quantity listed for that option CLIN in Section B.

MAXIMUM QUANTITY MULTIPLE OPTION QUANTITY CLINS

CLINs, SLINs or other provisions in this contract set forth option quantities associated with option exercise periods.

Offerors should use those estimated quantities for planning purposes and in the preparation of its proposals. After award of the contract, the Government may need to move quantity between these option CLINs. The contract resulting from this solicitation will have a maximum dollar value or a maximum number of units that may be purchased. The Government, may, through contract modification, move quantities of items, labor or estimated costs between the option CLINs as long as the contract maximum is not exceeded.

If pricing varies by option exercise period, the pricing applicable is the pricing applicable when the option is exercised. For example, items moved from option year 4 to option year one will be payable at the rates applicable in option year one.

The following table provides the approximate timeframes that the CLINs and associated SLINs, where applicable, will be awarded or exercised. This information is provided for planning purposes only and is subject to change depending on need and funding availability.

Deliverable

CLINs and Award/Option Exercise Schedule

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

VLS MTP-STP CLIN 1000* CLIN 1100 CLIN 1200 CLIN 1300 CLIN 1400

MTP-ST CLIN 2000* CLIN 2100 CLIN 2200 CLIN 2300 CLIN 2400

MTP-STP OBRP

Components

CLIN 3000* CLIN 3100 CLIN 3200 CLIN 3300 CLIN 3400

MTP-STP INCO Spares CLIN 4000* N/A N/A N/A N/A

MTP-STP Depot Spares CLIN 5000* N/A N/A N/A N/A

MTP-STP LRU Set N/A CLIN 6100 CLIN 6200 CLIN 6300 CLIN 6400

Production Readiness

Review

CLIN 7000* CLIN 7100 CLIN 7200 CLIN 7300 CLIN 7400

Physical Configuration

Audit

CLIN 8000*

Data Deliveribles/CDRLs CLIN 9999

*CLINs 1000, 2000, 3000, 4000, 5000, 7000 and 8000 will be funded at contract award

Maximum Quantities: The maximum number of VLS MTP production units and associated kits that can be purchased under this contract is as follows:

Supply Deliverable CLINs Maximum Quantity

VLS MTP-STP 1000, 1100, 1200, 1300 and 1400 260

MTP-ST

2000, 2100, 2200, 2300 and 2400 50

MTP-STP OBRP Components 3000, 3100, 3200, 3300 and 3400 39

MTP-STP INCO Spares 4000 6

MTP-STP Depot Spares 5000 5

MTP-STP LRU Set 6100, 6200, 6300 and 6400 24

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Module Transformer Platform (MTP)

FFP

Manufacture, assemble, test, and deliver Vertical Launcher System (VLS) MTP in accordance with the Statement of Work (SOW) and Technical Data Package

(TDP). Refer to Contract Data Requirements List (CDRLs) for item and data requirements.

NET AMT

1000AA 12 Each USN DDG, Shipset 1, MTP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: 5999

1000AB 12 Each USN DDG, Shipset 2, MTP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

1000AC 4 Each USN FFG, Shipset 1, MTP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

1000AD 4 Each FMS Australia, MTP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP #1 - MTP #2 - STP Set

FFP

Option Year 1: Manufacture, assemble, test and deliver MTP in accordance with the SOW and TDP. Refer to CDRLs for item and data requirements.

STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE

MTP #1 - MTP #2 - STP Set

48 Units

1100 12.00 23.00

24.00 35.00

36.00 48.00

1100AA 48 Each OPTION MTP #1 - MTP #2 - STP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP #1 - MTP #2 - STP Set

FFP

Option Year 2: Manufacture, assemble, test and deliver MTP in accordance with the SOW and TDP. Refer to CDRLs to item and data requirements.

60 Units

1200 12.00 23.00

24.00 35.00

49.00 60.00

1200AA 60 Each OPTION MTP #1 - MTP #2 - STP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP #1 - MTP #2 - STP Set

FFP

Option Year 3: Manufacture, assemble, test and deliver MTP in accordance with

48 Units

1300 12.00 23.00

24.00 35.00

1300AA 48 Each OPTION MTP #1 - MTP #2 - STP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP #1 - MTP #2 - STP Set

FFP

Option Year 4: Manufacture, assemble, test and deliver MTP in accordance with

72 Units

1400 12.00 23.00

24.00 39.00

40.00 52.00

53.00 72.00

1400AA 72 Each OPTION MTP #1 - MTP #2 - STP Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

MTP - ST

FFP

Manufacture, assemble, test and deliver MTP System Transformer (ST) in accordance with the SOW and TDP. Refer to CDRLs for item and data

2000AA 2 Set USN DDG, Shipset 1, MTP ST

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2000AB 2 Set USN DDG, Shipset 2, ST

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2000AC 1 Set USN FFG, Shipset 1, ST

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2000AD 1 Set FMS Australia, ST

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - ST

FFP

Option Year 1: Manufacture, assemble, test and deliver MTP System Transformer

(ST) in accordance with the SOW and TDP. Refer to CDRLs for item and data

MTP-ST 11 Units 2100 2.00 3.00

4.00 7.00

8.00 11.00

2100AA 11 Set

OPTION MTP - ST

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - ST

FFP

Option Year 2: Manufacture, assemble, test and deliver MTP System Transformer

MTP-ST 11 Units 2200 2.00 3.00

8.00 11.00

2200AA 11 Set

OPTION MTP - STP MAM CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - ST

FFP

Option Year 3: Manufacture, assemble, test and deliver MTP System Transformer

MTP-ST 9 Units 2300 2.00 3.00

8.00 9.00

2300AA 9 Set

OPTION MTP - STP MAM CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - ST

FFP

Option Year 4: Manufacture, assemble, test and deliver MTP System Transformer

MTP-ST 13 Units 2400 2.00 4.00

5.00 8.00

9.00 13.00

2400AA 13 Set

OPTION MTP- ST

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

MTP - ST OBRP CMPNTS

FFP

Manufacture, assemble, test and deliver MTP Onboard Repair Part (OBRP)

Components (CMPNTS) in accordance with the SOW and TDP, Refer to CDRLs for item and data requirements.

3000AA 2 Set FMS Australia, MTP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

3000AB 5 Set FMS Spain, MTP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

3000AC 3 Set Korea KDX III, MTP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

3000AD 4 Set Finland SQ2020, MTP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

3000AE 1 Set Germany Saschen, MTP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - STP-ST OBRP CMPNTS

FFP

Option Year 1: Manufacture, assemble, test and deliver MTP OBRP Components in accordance with the SOW and TDP. Refer to CDRLs for item and data

3100AA 6 Set

OPTION MTP - STP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

MTP - STP-ST OBRP

CMPNTS 6 Units

3100AA 1.00 2.00

3.00 4.00

5.00 6.00

OPTION MTP - STP-ST OBRP CMPNTS

FFP

Option Year 2: Manufacture, assemble, test and deliver MTP OBRP Components

3200AA 6 Set

OPTION MTP - STP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

CMPNTS 6 Units

3200AA 1.00 2.00

OPTION MTP - STP-ST OBRP CMPNTS

FFP

Option Year 3: Manufacture, assemble, test and deliver MTP OBRP Components

CMPNTS 6 Units

3300 1.00 2.00

3300AA 6 Set

OPTION MTP - STP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - STP-ST OBRP CMPNTS

FFP

Option Year 4: Manufacture, assemble, test and deliver MTP OBRP Components

CMPNTS 6 Units

3400 1.00 2.00

3400AA 6 Set

OPTION MTP - STP-ST OBRP CMPNTS

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

MTP - STP INCO Spares

FFP

Manufacture, assemble, test and deliver MTP Installation and Checkout (INCO)

Spares Kits in accordance with the SOW and TDP. Refer to CDRLs for item and data requirements.

4000AA 1 Set USN FFG, MTP-ST INCO Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4000AB 1 Set FMS Australia, MTP-ST INCO Spare

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4000AC 1 Set FMS SPAIN, MTP-ST INCO Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4000AD 1 Set Korea KDX III, MTP-ST INCO Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4000AE 1 Set Finland SQ2020, MTP-ST INCO Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4000AF 1 Set Germany Saschen, MTP-ST INCO Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

MTP - STP-ST Depot Spares

FFP

Manufacture, assemble, test and deliver MTP Depot Spares Kits in accordance with the SOW and TDP. Refer to CDRLs for item and data requirements

5000AA 1 Set FMS Australia, MTP-ST Depot Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

5000AB 1 Set FMS Spain, MTP-ST Depot Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

5000AC 1 Set Korea KDX III, MTP-ST Depot Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

5000AD 1 Set Finland SQ2020, MTP-ST Depot Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

5000AE 1 Set Germany Saschen, MTP Depot Spares

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - STP LRU Set

FFP

Option Year 1: Manufacture, assemble, test and deliver MTP LRU Sets in

MTP - STP LRU Set 6 Units 6100 1.00 2.00

6100AA 6 Set OPTION MTP - STP LRU Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - STP LRU Set

FFP

Option Year 2: Manufacture, assemble, test and deliver MTP LRU Sets in

MTP - STP LRU Set 6 Units 6200 1.00 2.00

6200AA 6 Set OPTION MTP - STP LRU Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - STP LRU Set

FFP

Option Year 3: Manufacture, assemble, test and deliver MTP LRU Sets in

MTP - STP LRU Set 6 Units 6300 1.00 2.00

6300AA 6 Set OPTION MTP - STP LRU Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION MTP - STP LRU Sets

FFP

Option Year 4: Manufacture, assemble, test and deliver MTP LRU Sets in

MTP - STP LRU Set 6 Units 6400 1.00 2.00

6400AA 6 Set OPTION MTP - STP LRU Set

FFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

7000 4 Quarter

(Time)

Production Readiness/Program Review

FFP

The Production Readiness Review will take place 3 months after contract award and will continue quarterly.

7100 4 Quarter

OPTION Production Readiness/Program Review

Option Year 1: The Production Readiness Review will take place 3 months after contract award and will continue quarterly.

7200 4 Quarter

Option Year 2: The Production Readiness Review will take place 3 months after

7300 4 Quarter

Option Year 3: The Production Readiness Review will take place 3 months after

7400 4 Quarter

Option Year 4: The Production Readiness Review will take place 3 months after

8000 1 Each Physical Configuration Audit

FFP

This option will be exercised when the Government decides to perform the

Physical Configuration Audit (PCA).

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

CDRLs - Not Separately Priced (NSP)

FFP

Prepare, maintain and deliver data in accordance with CDRLs A001 through A007 and Data Item Delivery (DID) schedule requirements. The Government shall have unlimited rights to all data generated under this contract in accordance with

DFARS 252.227-7013 unless an assertion is provided and accepted by the

Government with the offer in accordance with DFARS 252.227-7017. The price for all data generated by the contractor directly or indirectly in its performance of this procurement effort is included in the price paid by the Government under the other CLINs in this contract.

CLAUSES INCORPORATED BY FULL TEXT

B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)

(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.

(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:

(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.

(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR

52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.

(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.

(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.

(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor.

Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid.

If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the

Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).

(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the

Contracting Officer.

(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.

(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the

Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.

(End of text)

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

VERTICAL LAUNCHING SYSTEM

MODULE TRANSFORMER PLATFORM N63394-22-R-0001

1.0 SCOPE

The Contractor shall be responsible for the satisfactory and timely performance of all tasks defined in the Statement of Work (SOW). This SOW, with its supporting attachments and referenced documentation, describes the total requirement for the manufacture, assembly, test and delivery of Vertical Launching System (VLS) Module

Transformer Platform (MTP), Onboard Repair Part (OBRP) kit, Installation and Checkout (INCO) spares kit, Depot spares kit, and Lowest Replaceable Unit (LRU) kit.

2.0 PROGRAM AUTHORITY

Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD) is the program authority for this contract.

3.0 APPLICABLE DOCUMENTS

The following documents, of the issue indicated, form a part of this SOW, including all applicable terms, conditions, clauses, attachments and exhibits. The exact revisions of the documents are not cited in the text of this SOW. The

Contractor shall apply the latest version of the documents in effect at the time of award of the contract. In the event of a conflict between the documents referenced herein and the contents of this SOW, the SOW shall be considered the superseding requirement.

3.1 Government Documents

Document Number Document Title

MIL-STD-109C Quality Assurance Terms and Definitions

MIL-STD-1686C Electrostatic Discharge Control Program for Protection of

Electrical and Electronic Parts, I Assemblies and Equipment

(Excluding

Electrically Initiated Explosive Devices)

WS 20130 Production Environmental Test Requirements for VLS

TL130-AD-PLN-010-VLS Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware) Configuration Management

MK 41 VLS Standing Instruction 94-1F, Attachment 6

Marking for technical data

TL130-AD-PLN-030-VLS, Firmware Configuration Management

NAVSEA Drawing Motor Transformer Platform (MTP)

3.2 Industry Documents

Document Number Document Title

ANSI/ISO/ASQC Q9001 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

ANSI/EIA-649 2011 National Consensus Standard for Configuration Management

ANSI/ASQC Q9004 Quality System Elements

ISO 9001 Quality Program Requirements

SAE Aerospace Standard

AS9102 Rev A

Aerospace First Article Inspection

ISO 14000 Environmental Management Systems Standards

SAE AS5553 & AS6174 Counterfeit Prevention Plan

4.0 REQUIREMENTS

The Government requires manufacturing of VLS Launch Sequencer, MAM, OBRP, INCO, Depot and LRU kits in accordance with the documents specified in SOW and the technical data package (TDP). All MTP and associated components kits shall meet all requirements in accordance with the TDP and associated specifications.

The OBRP kit contains the following:

Nomenclature Part Number Quantity

Transformer, Power 440/115V AC 60HZ 7103922-1 1

Transformer, Power Assy 5598314-9 1

Transformer, Power Assy T5 8666059-1 1

Power Transfer Assy 115V 60HZ PDP 5223737-19 1

Circuit Breaker 5498220-3 1

Transformer, Power Assy 5598215-9 1

Resistor Assy, PDP 5223818-9 1

The INCO spares kit contains the following:

Transformer, Power 440/115V AC 60HZ 7103922-1 1

Transformer, Power Assy 5598314-9 1

Transformer, Power Assy T5 8666059-1 2

Circuit Breaker 5498220-3 2

The Depot spares kit contains the following:

Transformer, Power 440/115V AC 60HZ 7103922-1 1

Transformer, Power Assy 5598314-9 2

Transformer, Power Assy T5 8666059-1 2

Circuit Breaker 5498220-3 4

The LRU spares kit contains the following:

Transformer, Power 440/115V AC 60HZ 7103922-1 18

Plate Assy, Platform No. 1 8660381-9 18

Circuit Breaker 5498220-3 1

Power Transfer Assy 115V 60HZ PDP 5223737-19 1

4.1 Automatic Test Equipment

The Government will provide all necessary test equipment to test the LRUs and MTPs.

The Government has certified the MTP and associated equipment ATEs, along with test program sets for use.

The Contractor shall be responsible for maintaining and calibrating the necessary test capability including ATE, associated interface cables, test tools and calibration tools.

Changes to certified ATE shall be submitted to the Government for approval and certification.

4.2 First Article Inspection

The Contractor shall perform First Article Inspection (FAI) of all assemblies, subassemblies, components and detail parts including castings and forgings in accordance with SAE Aerospace Standard AS9102 Rev A. The purpose of

FAI is to provide objective evidence that all TDP and specification requirements are correctly understood, accounted for, verified, and recorded. An FAI is not required for standard catalog items, commercial-off-the-shelf items, raw materials or items procured in accordance with source control drawings.

The Contractor shall submit all FAI requirement waivers to the NSWC PHD for approval. The waiver shall identify, at a minimum, the part description, part number, manufacturer, date last built, location last built, FAI report summary (if applicable), FAI discrepancies and corrective actions (if applicable), and waiver justification.

The Government reserves the right to witness all FAI activities. The Contractor shall submit a comprehensive schedule of FAI events prior to the first event in accordance with CDRL A001. The schedule shall include date, time, expected duration and location.

The Contractor shall generate FAI reports in accordance with AS9102 Rev A. The Contractor shall retain the FAI reports for at least seven years. The Government reserves the right to examine all FAI reports. The Contractor shall submit a report copy via digital means in accordance with CDRL A002.

All deficiencies discovered during the FAIs shall be corrected at Contractor’s expense prior to unit delivery to the

Government.

5.0 TECHNICAL DATA REVIEWS, QUALITY AUDITS

During the performance of the contract, the Government shall have the right to perform technical data reviews and quality audits consisting of evaluation of records, processes and products to verify the Contractor's compliance with the respective quality programs. The Government audits may include evaluation of effectiveness in implementing the Contractor's and Subcontractors' or suppliers' audit programs to promote prevention of defects, which includes schedule of audits, evaluation of operations, notification of required corrective action with follow-up and means of notification to top management concerning audit results.

6.0 FOLLOW-ON PHYSICAL CONFIGURATION AUDIT

During the performance of the contract, the Government shall have the right to perform a Physical Configuration

Audit (PCA). The PCA may include an evaluation of the effectiveness of the Contractor, Subcontractor and/or supplier audit programs to promote prevention of defects. This includes scheduling of audit, evaluation of operations, and notification of required corrective action with follow-up and means of notification to top management concerning audit results. The PCA will be conducted in accordance with Section 7 of TL130-AD-

PLN-010-VLS, Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware)

Configuration Management.

One (1) PCA shall be conducted over the course of the contract on the MTP. The MTPs shall be selected by the

Government and the Contractor from the initial production run.

The Contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for the PCA. The Contractor shall provide all tools, measuring devices and other equipment required for equipment disassembly, dimensional and tolerance verification and performance verification. The

Contractor shall provide an area to conduct PCA that is well illuminated, temperate and low noise level. The PCA work area shall contain worktables, print copies of all pertinent drawings, telephone and easy access to a copy machine.

During the PCA, the Contractor shall provide, at a minimum, individual parts that make up the configuration item, completed assemblies, an as-built list delineating all Engineering Change Proposal (ECP) (either requested or approved), deviations and waivers, hardcopies of production specifications and technical drawings, complete shortage list, manufacturing instructions, acceptance test procedures and data, purchase order documents and associated certificates of conformance from suppliers or appropriate documents indicating compliance with material or drawing requirements in accordance with CDRL A003.

The PCA will be conducted at the Contractor's, Subcontractors' and suppliers' facilities by the Government team.

The Government will notify the Contractor seven (7) to 14 business days prior to performance of the PCA. This notice will include identification of assemblies, subassemblies and/or piece parts to be audited. The PCA will be approximately one to two weeks in duration.

Following conduct of the PCA, the Contractor shall generate the necessary documentation to resolve all audit findings and provide these to the Government audit team within the timeframe specified by the Government in accordance with CDRL A004. The Government audit team will evaluate the documentation to assess corrective action(s) taken to close any and all audit finding(s). Necessary documentation may include, but not be limited to, revised manufacturing processes, ECPs, notice of revisions, SCN and revised TDP drawings.

Government and Contractor pre- and post-PCA activities are described in Sections 7.4 through 7.7 of the VLS

Configuration Management Plan TL130-AD-PLN-010-VLS.

7.0 GOVERNMENT INSPECTION

The Contractor shall provide technical, administrative, and management support for Government source inspection for purposes of inspection and acceptance of supplies and services provided by the Contractor, Subcontractor and suppliers. Government source inspection will be conducted at the convenience of the Government.

8.0 PRODUCTION ENVIRONMENTAL TESTS

The Contractor shall perform production environmental testing as specified by the TDP or production environmental test requirements for VLS Specification WS 20130.

9.0 TECHNICAL DATA RIGHTS

The Government will maintain the Government-owned TDP. The Contractor shall submit proposed changes to the

TDP to the Government. The Government shall retain unlimited rights to all versions of and changes to all drawings, specifications and other documents for the VLS components produced under this contract.

10.0 MARKING FOR TECHNICAL DATA

The Contractor shall mark all technical data in accordance with MK 41 VLS Standing Instruction 94-1F, Attachment

6. This instruction is applicable to new documents, revised documents or documents from file in response to a request for copy.

11.0 MANUFACTURING PROCESSES

The Contractor shall maintain and control manufacturing processes to fabricate, assemble, inspect, test, and deliver

VLS MTP as described in the SOW. The processes shall cover all phases from the ordering of raw materials to

Government acceptance of the finished product. All hardware components shall be manufactured in accordance with the drawings and specifications referenced in the TDP and this SOW.

12.0 CONFIGURATION MANAGEMENT

The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the MTP produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-

649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration

Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

12.1 Configuration Identification

The Contractor shall maintain identification of the product baselines throughout fabrication, testing, and delivery.

The Contractor shall ensure that equipment is assigned identifying numbers, designators, and serial numbers in accordance with the TDP.

Serialized items shall be traceable to source of manufacture and production contract year. This information may be incorporated as a formal part of the Contractor's serialization system or otherwise be annotated on the affected item.

Serial number assignments shall be requested in writing from the COR. The request for serial number assignment shall contain the following minimum information:

(a) Officially assigned item name

(b) Officially assigned type designation

(c) Officially assigned model number

(d) Top drawing number and list of drawings or parts list

(e) Exact quantity to be delivered under the contract including pre-production samples and spares required by the contract.

(f) Contract number

(g) National Stock Number

(h) NAVSEA cognizant office code

The Contractor shall submit a configuration definition data package describing the detailed configuration of each end item as delivered to the designated destination in accordance with CDRL A004. The Contractor shall maintain a system to monitor engineering release and correlation of manufactured products.

12.2 Military Specifications and Standards:

The Government shall maintain the Government owned Technical Data Package(s) (TDP). Proposed changes to the

TDP shall be submitted by the Contractor to the Government. The Government shall retain unlimited rights to all versions of and changes to all drawings, specifications and other documents for the MTP and associated parts produced under this contract.

The Contractor shall prepare the updated drawings, specifications and all related documents with revisions, including the Request for Variance.

12.3 Qualification of Substitute Sources of Supply

The TDP contains source control or vendor item drawings that specify approved or suggested sources of supply.

The Contractor may qualify other sources for these items. Qualification of new sources selected by the Contractor shall be at the Contractor’s expense.

The Contractor shall submit all proposed changes to approved or suggested sources of supply as indicated in the source control or vendor item drawings in accordance with SOW. The package of information that is submitted for

Government review shall contain all applicable drawings, test plans, procedures and qualification reports. An extended Government review period of 20 business days applies to all proposed changes to approved or suggested sources of supply.

12.4 Configuration Status Accounting

The Contractor’s configuration status accounting shall be in accordance with ANSI/EIA-649, the Configuration

Management Plan for the VLS, Volume 1, Equipment (Hardware) Configuration Management, TL130-AD-PLN-

010-VLS, and the Configuration Management Plan for the VLS, Volume 3, Firmware Configuration Management, TL130-AD-PLN-030-VLS.

The Contractor shall provide a system that documents the exact delivered configuration of each unit. The

Contractor, or Subcontractor at the appropriate tier, shall identify the "as-built" production configuration of each

NAVSEA nomenclatured item by means of permanent markings on the appropriate ORDALT/ Ship Change

Installation Procedure (SCIP) label plate on the equipment to identify the specific ORDALTs/SCIPs installed in the equipment being delivered. For Class I ECPs, which are not assigned an ORDALT number, the ORDALT label plate shall be marked with the applicable Class I ECP number as assigned by the Government. For purposes of this requirement, markings may be etched, steel stamped or affixed by other suitable means which results in the permanent identification of the equipment configuration. Ink stamping is not permitted.

12.5 Failure/Defect Reporting and Corrective Action System (FACAR)

The Contractor shall have a FACAR system established and maintained for both manufacturing and test processes.

Level of assembly for failure reporting shall be consistent with the requirement for recording defect history.

FACAR system information required to be recorded or reported by this SOW paragraph shall be submitted in accordance with CDRL A005.

The Contractor shall implement an effective system for evaluation and disposition of supplies and services that exhibit nonconformance, including those furnished by suppliers (Subcontractors and vendors). The Contractor shall ensure that the personnel staffing the FACAR system have the authority to coordinate and implement the necessary failure and problem reporting, analysis, and related corrective action. The Contractor shall ensure that nonconformance data is adequately analyzed, distributed to appropriate organizations and personnel, and that appropriate management decisions are based on this data. Analysis must target root cause corrective action. The

Contractor shall take appropriate actions to improve or change processes that do not meet requirements. All use-as-is and repair dispositions shall include a determination of whether or not a change is required to the product database

(drawing, specifications, work instructions, tooling, etc.). Determination that such a change is not required shall be recorded and shall be available to the Government for review. Acceptance of the nonconformance corrective action and disposition is the prerogative of the Government and can be revoked whenever the Contractor’s system fails to demonstrate effective root cause corrective action or when repeated nonconformance indicate an overall quality system degradation.

12.6 Configuration Control

Minor Deviations:

(1) The Contractor shall submit the deviation to NSWC DD via NSWC PHD for review and approval.

(2) If NSWC DD concurs in classification, the deviation will be boarded at NSWC DD CCB for approval or disapproval.

(3) If NSWC DD does not concur in classification, the Contractor shall cancel the minor deviation.

The Contractor shall submit for review and approval all specification changes to NSWC PHD for review and approval.

13.0 TESTING, INSPECTION AND ACCEPTANCE

Testing and inspection of the VLS MTP shall be performed at the Contractor's facility in accordance with the applicable drawings, standards and specifications and factory test and inspection plans. The Contractor shall prepare specific written inspection and test procedures for each inspection and test operation to be performed by the

Contractor. These inspection and test procedures shall be reviewed by the quality assurance organization and maintained current in accordance with the change control system requirements. The inspection and test procedures shall clearly identify the item through part number with revision and nomenclature, and include detail instructions and/or operations to be performed.

The Contractor shall maintain records of inspection results and quantitative test data for each deliverable end item and make them available to the Government upon request.

Although preliminary inspections will occur at the contractor’s facility, the final Inspection and Acceptance will take place at Port Hueneme, CA and will be performed by the Government. The Contractor is responsible for delivering items to the destination in Port Hueneme.

14.0 Parts Re-Screening

The Contractor is not required to implement the TDP requirements to conduct re-screening of electrical components.

Remarking of parts to the re-screened part number will not be required and the existing base part number shall remain intact. Programmable parts shall require re-identification.

15.0 Counterfeit Parts and Materials

The following minimum processes shall be implemented and flowed down by the Contractor to all Subcontractors in order to minimize the risk of use of counterfeit parts in VLS components.

The Contractor shall establish processes to minimize the risk of procuring and using counterfeit parts and materials.

The Contractor shall document these processes and provide those documented processes to Government upon request. These processes shall include:

At a minimum, these processes shall ensure that all components for MTP assemblies and subassemblies are purchased from Original Equipment Manufacturers (OEM), Original Component

Manufacturers (OCM) authorized suppliers or franchised distributors. The term OEM, OCM, authorized supplier and franchised distributor are each defined in SAE AS5553.

At a minimum, the contractor shall ensure procurement practices and processes to purchase and install components from OEM, OCM, authorized suppliers and franchised distributors are flowed down to subcontractors and suppliers at all tiers.

The Counterfeit Prevention Plan, SAE AS5553 and SAE AS6174 requirements shall be flowed down to all subcontractors and suppliers.

The Contractor shall maximize the use of authentic, originally designed and/or qualified parts.

The Contractor shall assess potential sources of supply to minimize the risk of receiving counterfeit parts or materials.

The Contractor shall have purchasing procedures, which confirm whether a selected supplier is authorized, as defined in SAE AS5553 and SAE AS6174, for each purchase.

The Contractor shall define minimum inspection and test requirements for parts being procured and shall ensure that in-house, third-party, and/or supplier inspection and test procedures and facilities comply with these requirements. These minimum inspection and test requirements shall specify appropriate test methods to detect potential counterfeit parts and materials.

The Contractor shall require a certificate of compliance and supply chain traceability for all electronic part purchases.

The Contractor shall require a Certificate of Conformance, as defined in SAE AS5553 and SAE

AS6174, and supply chain traceability for all electronic part purchases.

The Contractor shall use government or industry services such as the Government-Industry Data

Exchange Program (GIDEP) and other commercially available services to identify part or supplier quality or authenticity problems.

The Contractor shall notify the Government of the occurrence of a confirmed counterfeit part or material and the actions taken to identify, contain, and impound all product from the lot, within seven (7) business days of confirmation of the counterfeit status. The Contractor shall flow down a requirement for similar notification from

Subcontractors to the Contractor. The Contractor shall initiate and submit an alert to the GIDEP within 30 calendar days of knowledge of the counterfeit part or material.

Counterfeit parts and material are defined by SAE AS5553 and SAE AS6174 may be electronic or mechanical in nature. Counterfeit electronic parts may typically be used parts, which have been refurbished and represented as new. Commonly counterfeited electronic parts include parts such as microcontrollers or specially screened devices, or common parts, which have several pin-compatible versions from multiple manufacturers, such as memory devices and operational amplifiers. Counterfeit mechanical parts are typically improperly made, marked, or treated products. Examples are improper anodization or heat treatments, falsified data, mismarked parts sold as a higher-grade steel, or used/fake parts such as valves or circuit breakers.

An authorized supplier is a supplier authorized by the original component manufacturer to buy parts or materials directly from the manufacturer. Parts provided from authorized suppliers typically have never left the manufacturer’s authorized supply chain, and are accompanied by full manufacturer support and warranty.

16.0 REVIEWS

16.1 Program/Production Reviews

The Production Readiness Review (PRR) will be conducted by the Government to ensure the Contractor has accomplished adequate production planning and preparations to produce MTP and associated cables that meet performance requirements in accordance with the contract schedules and without unacceptable risks.