J-2_GFI_Attachment.pdf
PDF 1 MB Posted
- Attached to
- Vertical Launching System (VLS) Module Transformer Platform (MTP) Federal contract opportunity
- Solicitation number
- N6339422R0001
About this file
This document outlines the requirements for a federal solicitation seeking proposals for the manufacture, assembly, test, and delivery of Vertical Launching System Module Transformer Platform components.
The Naval Surface Warfare Center Port Hueneme Division is soliciting proposals to provide Vertical Launching System Module Transformer Platforms, Maintenance Assistance Modules, Onboard Repair Part kits, Installation and Checkout spares kits, Depot spares kits, and Lowest Replaceable Unit kits. Offerors may access specification and drawing packages through FedEx or DoD Safe upon written request to the specified contracting personnel. Comments on solicitation requirements must also be submitted to the Contracting Specialist and Contracting Officer by email no later than two weeks before the closing date. The specifications/drawing package will aid offerors in preparing proposals, which are due on November 10, 2021 as indicated in the solicitation number N6339422R0001. The Naval Sea Systems Command is the contracting agency for this requirement.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of
GOVERNMENT FURNISHED INFORMATION
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: J-2 |
| TextField2: N6339422R0001 |
| TextField7: MK 41 Vertical Launching System |
| TextField8: TBD |
| DateField1: 10 November, 2021 |
| TextField3: A107 |
| DateField3: 30 DAC |
| DateField3: 30DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField2: |
| TextField6: 8660382-9 |
| TextField6: TL130-AD-PLN-030-VLS |
| TextField6: MK 41 VLS Standing Instruction 94-1F |
| TextField6: TL130-AD-PLN-010-VLS |
| TextField6: WS 20130 |
| TextField6: 5497369-19 |
| TextField6: 8660384-9 |
| TextField5: Module Transformer Drawings #1 |
| TextField5: Firmware Configuration Management |
| TextField5: Marking for technical data |
| TextField5: Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware) Configuration Management |
| TextField5: Production Environmental Test Requirements for VLS |
| TextField5: System Transformer |
| TextField5: Module Transformer Drawings #2 |
| TextField4: 1 |
| TextField4: 7 |
| TextField4: 6 |
| TextField4: 5 |
| TextField4: 4 |
| TextField4: 3 |
| TextField4: 2 |
File details come from the government source that posted it. Updated .