This solicitation requests proposals for the manufacture, assembly, test and delivery of Vertical Launching System (VLS) Universal Canister Electronics Units and associated cables. The Naval Surface Warfare Center Port Hueneme Division seeks these products in support of the Air Dominance Department. Offerors must submit proposals by November 2, 2020. This requirement adheres to technical data packages furnished by the government. Interested parties may request drawings through written communication with specified Navy contacts. Offerors may submit clarifying questions by the stated deadline. The solicitation instructs offerors to reference product numbers when seeking component quotes from authorized suppliers.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
To provide responses to questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Oct-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6339420R0014
X 9B. DATED (SEE ITEM 11)
24-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Oct-2020
CODE
NSWC PHD 022
4363 MISSILE WAY
PORT HUENEME CA 93043
N63394 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6339420R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
Amendment 1:
Q&A and Revisions
The purpose of this amendment is to add K-227-W001 INSTRUCTIONS FOR OBTAINING EXPORT-
CONTROLLED TECHNICAL DATA (NAVSEA) (OCT 2018) to section K of the RFP and to provide response to questions.
1) Question: May we make internal copies of the CD to permit our locations in PA and FL to both work with the information (we will maintain control over the CD on a separate computer not on the network)?
Response: Yes, internal copies of the TDP CD are allowed as long as the procedures in Section L, Paragraph 2.3, Disposition of Technical Data Package (TDP) and Technical Drawings are followed.
2) Question: Currently we are not able to share with third parties. For material quotes with suppliers, the
TDP, BOMs, drawings etc may need to be shared with suppliers for pricing. With the restrictions, how should this be managed? Do we request permission from you and Nayneet specifically naming the supplier?
Response: To comply with International Traffic in Arms Regulations (ITAR, the TDP cannot be shared with third parties. If a possible third party vendor needs a copy of the TDP, they need to be under the Joint
Certification Program and request a copy of the TDP.
3) Question: Requesting instruction/authorization from the Government for the process to provide the TDP to vendors in order for vendors to quote source assembly support under the Solicitation.
Response: To comply with International Traffic in Arms Regulations (ITAR, the TDP cannot be shared with third parties. If a possible third party vendor needs a copy of the TDP, they need to be under the Joint
Certification Program and request a copy of the TDP.
4) Question: Requesting an additional 30 calendar day extension of time to submit the RFP response (from 25
Sep 2020 until 25 Oct 2020).
Response: The Government does not intend to extend the proposal due date at this time, should the
Government choose to do so, an RFP Amendment would be released.
Amendment 2:
Q&A
1) Question: Have the UCEU been prototype build before? If so have many units were prototyped?
Response: The requested information is not required for industry to respond to this RFP.
2) Question: Have the UCEU been built using any drawings in the provided TDP before with manufacturing redlines collected and incorporated?
Response: The requested information is not required for industry to respond to this RFP.
3) Question: Which CLINs does the Government plan to execute on the first order?
Response: CLINs 0002AA – 0002AD, 0003AA – 0003AD, 0004AA – 004AD
4) Question: Does the Government have and are willing to provide 3D model files of the Mechanical items to the awardee?
Response: Yes, the 3D Model files are available and will be provided to the contract awardee, however, the
UCEU is to be built IAW the approved Government TDP.
5) Question: Please see the list below of missing drawing.
7104325 HOUSEKEEPING P.S.
7104567 ASSEMBLY, SBR LINK
8660232 ENCLOSURE POWER MODULE
8660233 COVER, POWER MODULE
8660235 CENTERCSTRUCTURE, POWER MODULE
8660237 FLANGE, COVER, SUPPORT
8660251 ENCLOSURE, CONTROL MODULE
8660252 COVER, CONTROL MODULE
8660255 RAIL, CABLE TIE-DOWN
8660272 CCA, PMPS/CMPS, DC/DC CONVERTER
8660275 CCA, PM TERMINATION
8660278 CABLE ASSEMBLY, VOLTAGE AND CONTROL, POWER MODULE
8660279 CABLE ASSEMBLY, DC/DC TO EMI 1W30
8660280 CABLE ASSEMBLY, DC/DC TO EMI 2W31
8660281 CABLE ASSEMBLY, EM1 TO TERMINAL BLOCKS W32
8660282 CABLE ASSEMBLY, EM2 TO TERMINAL BLOCKS W33
8660284 CCA, CONTROL MODULE
8660289 ASSEMLBY, CABLE, CM/PM VOLTAGE & CONTROL W9
8660290 ASSEMBLY, CABLE, CM/POWER SUPPLY MODULE W10
8660293 ASSEMBLY, CABLE, CM FAN W24
8660297 CCA, I/O RIDGED FLEX HARNESS W28
8660301 ASSEMBLY, CCA CAGE MEB
8660322 COVER, PROTECTIVE
8660323 BRACKET, HOLD DOWN
8660324 CARTRIDGE DEHYDRATOR
Response: All of the drawings referenced below were included on the UCEU DVD H30ENGWO035.
6) Question: Can you extend the deadline by 30 days?
Response: The Government intends to extend the proposal due date to 26 October 2020.
Amendment 3:
1) Question: Please provide the following drawing:
WS20130
TL130-AD-PLAN-010-VLS
MK 41 VLS STANDING INSTRUCTIONS 94-IF
TL130-AD-PLAN-030-VLS
WS19179
WS35779
WS19176
WS20203
WS 19185
WS19202
Response: All drawings except for WS35779 will be sent via DoD SAFE. WS35779 will be sent via DoD
SAFE at a later date.
2) Question: Will the Government identify preferred dates for exercising Optional CLINs and/or Optional
Quantities for UCEU and W2/W3 Cables per year?
Response: GOVT response: As stated in the RFP, “This option CLIN may be exercised at any time within 5 years of award.”
3) Question: Does the Government intend to exercise the base contract CLINs simultaneously with Option
CLINs or multiple Option CLINs simultaneously?
Response: GOVT response: As stated in the RFP, “This option CLIN may be exercised at any time within 5 years of award.”
4) Question: Will the Government identify preferred Product Data Management (PDM) tools for
Configuration Management?
Response: GOVT response: No, the tool is at the vendors’ discretion, as long as it complies with the CM plan.
5) Question: In Section L, Factor 2: Past Performance, sub‐section (c) it states that "the submission of
Contractor Performance Assessment Reporting System (CPARS) evaluations in lieu of PPQs is acceptable" and in Section L, Factor 2: Past Performance, sub‐section (d) it states "While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror." Will the Government allow the entire CPARS documentation (consisting of multiple pages) to be included as an attachment to the Vol. II Technical (Non‐
Price) Proposal and not included in the volume page count?
Response: The Government will allow for the entire CPARS documentation as long as it is part of the contract(s) mentioned in Factor 2: Past Performance and is meets the criteria mentioned in the RFP. The
CPARS will not be included in volume page count.
6) Question: Section L states "tab and divider pages should be employed". Can this requirement be removed or clarification be provided on how to include these within the electronic submission?
Response: Clear identification of the Factors shall be used instead of tabs and dividers.
7) Question: Please confirm that the Title Page, Table of Contents, List of Figures, List of Tables, Index Pages and Glossary are not included in the page counts.
Response: Please refer to Section L of the RFP. Section L, Paragraph 2.2 states what is and what is not included in the page limit/count.
8) Question: There is no requirement for First Article Testing (FAT) stated in the RFP or SOW, but on page
96 of 108, Section L, paragraph Element 2: Factory Acceptance Testing in accordance with TDP states
"The Offeror shall address personnel, facilities, fixtures, software, and test equipment required to successfully conduct first article testing to objectively verify product compliance to the TDP." Please clarify this discrepancy or will the Government remove this reference to First Article Testing?
Response: First Article Testing will be changed to Factory Acceptance Test in accordance with TDP, Section L, Element 2, has been revised to read Factory Acceptance Test vice First Article Testing.
9) Question: Please provide appropriate acceptance test procedures for the GFP acceptance test equipment
(ATE). Please confirm if the test results from the ATE are automated or manually derived.
Response: Test results will be automated derived from the ATE.
10) Question: For the Government Furnished Property (GFP) listed below, please clarify the components and fixtures that comprise such GFP and if the GFP includes any required cabling and/or ESS fixtures.
1) CM ATE
2) S9100 ATE
3) PM ATE
4) SAVE ATE
Response: All required cabling and fixtures will be provided with the ATEs.
11) Question: CLIN 0002 through CLIN 0004 identify incremental delivery dates and quantities starting with a
9 month ADC lead time. For the Option CLINs 0005 through 0007 and 0011 through 0013, will the
Government allow for incremental delivery dates and quantities with the same the same or similar lead times as provided for CLINs 0002 through 0004?
Response: Yes, when exercised, the delivery dates and lead times will be similar to base year CLINs.
12) Question: If Option CLINs are exercised concurrently, will the Government consider providing a minimum number of monthly deliverables or a minimum delivery rate of UCEU's for such exercised Option deliveries?
Response: Yes, same response as question 11.
13) Question: For any solicitation sections with "Offeror Fill‐ins" or request for other information or data, should Offeror include in the Volume I Price Proposal only the specific RFP page as filled‐in or the complete Section containing such RFP pages as filled in?
Response: The Offeror should include all fill-ins as part of the complete SF-33.
14) Question: Please confirm that for each CLIN delivery, except for CLIN 0001 CDRLs, that the CLIN is
"FOB:Destination" rather than "FOB:Orign".
Response: Each CLIN/SLIN states it is FOB: Destination.
15) Question: Please provide the following test specification documents that were not located in the provided
TDP documentation:
8660262 (applies to 8660231)
8660317 (applies to 8660250)
8660519 (applies to 8660458)
8660520 (applies to 8660462)
Response: The Government will furnish the GFE required to support test requirements associated with
8660262, 8660317, 8660519, and 8660520. All GFI/GFE, including these ATR's, will be provided along with the GFE required to support test.
16) Question: If an offeror chooses to include full page IMS figures as an attachment to the Volume II
Technical, can they be excluded from the page count?
Response: Please refer to Section L of the RFP. Section L, Paragraph 2.2 states which is and what is not included in the page limit/count. The Government does not intend to count figures that are attachments as part of the page limit/count.
17) Question: Automatic Test Equipment - S9100 Automated Test Equipment is identified as GFP, but no associated GFI is identified in Section 3.1. Test Station GFI is needed to properly assess the labor needed to maintain and calibrate the ATE, as well as the time/cost for performing the tests called out in the TDP.
Response: The Government will provide GFE and be responsible for the maintenance of the ATEs.
18) Question: Automatic Test Equipment - S9100 Automated Test Equipment is identified as GFP. Please clarify that the government intends to deliver, set up, verify operation, and instruct the contractor on proper procedures.
Response: The Government will deliver, set up, and provide training on operating the ATEs.
19) Question: Production Environmental Tests - Unclear on scope. Does every UCEU and cable need to be environmentally tested?
Response: WS20130, PET Requirements only apply to assemblies or components which specifically indicate on their drawing, they have to be tested IAW WS20130.
20) Question: Paragraph thet begins with "The Contractor shall hold program reviews commencing after contract award which shall cover progress, schedules and problems." Number/Frequency of program reviews not specified. (Not the same as management meetings discussed in following paragraph)
Response: Program Review will be conducted quarterly.
21) Question: TECHNICAL PROPOSAL – SPECIFIC REQUIREMENTS – SUPERSEDING PART
NUMBERS (NAVSEA) (OCT 2018) - The provision only discusses DMS identified at time of proposal submission. There is no no mention of being able to invoke a DMS clause during execution.
Response: The Government will conduct DMSMS.
22) Question: Item No 2 & 3 of Section B - Is the various 0002 AA, AB, AC, AD expected to be part of a single award, or do they need to be priced assuming no overlap. Likewise on CLIN 0003
Response: CLIN 0002 AA, AB, AC, AD are part of the base year award.
23) Question: Note these items are all noted as FOB Destination - Which means they would be accepted at the receiving facility. Is acceptance at that site just inspection that it arrived safely? What criteria will be used at the destination?
Response: DCMA will sign off before delivery and inspection at destination will ensure that it arrives safely.
24) Question: How are items such as : design changes due to obsolete parts, TDP changes due to issues discovered during production, design changes as a result of field testing etc. expected to be covered. Is that all out of scope of this contract, and would be handled via the change clauses?
Response: The Government will be responsible for any design changes.
25) Question: Is the customer willing to entertain changes to the POP deliveries? We note with concern that the options are all 26 weeks after execution and may be exercised at any time within 5 years of award. For example, delivery of 90 units for CLIN 0011 in 6 months after execution, without proper lead time to procure material if there is a break in production, will be challenging. Are there any adjustments if the government chooses to execute two options at the same time (e.g., simultaneously award options 0008 and
0011 and expect 120 units in 6 months).
Response: The delivery and lead time for options CLINs will be similar to the base year CLINs.
26) Question: Both W2 and W3 cable assembly drawings (8660265 & 8660266) include a "Qualification
Testing Requirements" note that includes multiple destructive testing requirements. Are these qualification tests required by this Build To Print effort, or were the qualification tests already confirmed by the design agent? If the qualification tests are required to be performed by this Build to Print effort, how many total units of each part number are required to complete each test?
Response: No qualification tests are required for the W2 and W3 cables.
27) Question: CLINS 2, 5, 8, 11, 14, 17, and 20 call for the top level UCEU Assembly 8660230. Included in the 8660230 assembly are the W2 and W3 cables as find numbers 3 and 4, 8660265 and 8660266 respectively. These same cables (W2 and W3) are then called out again as deliverable items in CLINS 3, 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21 and 22. Will contractors be required to deliver the W2 and W3 cables within CLINS 2, 5, 8, 11, 14, 17, and 20 or are the cables intended to be removed from the UCEU top level assembly 8660230 as separate deliverables in CLINS 3, 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21 and 22?
Please confirm the intention of the Government to procure the W2 and W3 cables within the top level
UCEU Assembly as well as standalone deliverables.
Response: The Government intends to buy the W2 and W3 cables within the top level UCEU assembly as well as standalone deliverables.
28) Question: The TDP contains DWGs for the HEB CCAs (8660458 & 8660462) but the part numbers do not seem to be referenced in the overall UCEU assembly. These DWGs call out the same parent (8660457) and same end item (8660450). The TDP does not contain the referenced DWGs for either of the parent or end item part nor are any of these part numbers called out in PLs. Please provide clarification on why the HEB
CCAs DWGs (8660458 & 8660462) are included in the TDP. Please provide DWGS for parent (8660457) and end item (8660450).
Response: The HEB CCAs (8660458 HEB Interface and 8660462 HEB Driver) are not part of the UCEU
TDP. The vendors should ignore these drawings.
The following drawings are also not applicable to the UCEU: 8660430 Harness, Ethernet, HEB/MEB
8660431 Assembly, CCA Cage, MEB
8660458 CCA, Interface HEB
8660459 PCB, Interface, HEB
8660460 Schematic Diagram, HEB Interface
8660462 CCA, Driver HEB
8660463 PCB, Driver, HEB
Amendment 4:
1) Question: If the supplier is a DoD Contractor with an active JCP certification, after verifying can we directly provide a copy of the relevant portions of the TDP to the DOD Contractor? Files will be securely transferred to the identified JCP Data Custodian, and proof of the supplier’s DD2345 can be provided directly to the USG. This should be in compliance with Distribution Statement D restriction distribution to
DOD and DOD contractors only.
Response: Yes, as long as the vendor has the JCP certification and proof of DD 2345.
2) Question: Requesting the following drawings:
Drawing No. Govt. Response
7105265 Will be provided via DoD Safe
7105266 Will be provided via DoD Safe
6388239 6388239 does not exist. 6388329 will be provided via DoD Safe
7104520 Will be provided via DoD Safe
8660262 Responses provided in Amendment 3.
The Government will furnish the GFE required to support test requirements associated with 8660262, 8660317, 8660519, and 8660520. All GFI/GFE, including these ATR's, will be provided along with the GFE required to support test.
8660317 Responses provided in Amendment 3.
The Government will furnish the GFE required to support test requirements associated with 8660262, 8660317, 8660519, and 8660520. All GFI/GFE, including these ATR's, will be provided along with the GFE required to support test.
3) Question: Referring to TDP drawings 8660231 and 8660317: Since Government is not providing to
Offerers' the 8660317 Acceptance Test Requirements document referenced on assembly drawing 8660231 during the Proposal process, will the Government provide sufficient description of the types of tests and/or test durations described in the document to allow Offerors to adequately estimate the scope of work to be bid?
Response: The Government does have the ATRs and will provide them.
4) Question: Referring to TDP drawings 8660250 and 8660262: Since Government is not providing to
Offerers' the 8660262 Acceptance Test Requirements document referenced on assembly drawing 8660250 during the Proposal process, will the Government provide sufficient description of the types of tests and/or test durations described in the document to allow Offerors to adequately estimate the scope of work to be bid?
Response: The Government does have the ATRs and will provide them.
5) Question: Can the Government provided the Gerber files for the following PCBs?
7104323 (PRINTED WIRING BOARD, SBR)
7104509 (PRINTED WIRING BOARD, HOUSEKEEPING)
7104539 (PRINTED WIRING BOARD, DRIVER, SBR)
7105567 (PRINTED WIRING BOARD, HOUSEKEEPING)
Response: These Gerbers will be provided via DoD Safe, but note that the PWB files are reference only.
The manufacturer, per the TDP, should be procuring the PWB from TTM as specified in the source control drawings.
6) Question: Please provide DWG 7105266 (THERMALLY CONDUCTIVE SHEET) required to make
7104544-1 (PAD, INSULATOR).
Response: This drawing will be provided via DoD Safe.
7) Question: DWG 8660325 has material as PART NUMBER TBD for Note 3. Is there a NOR that defines the material?
Response: A NOR will be provided which specifies the proper material for 8660325.
8) Question: Can the Government provide PN 0N850180 (KIV-7M) used in 8660250-9 (ASSEMBLY, CONTROL MODULE) as GFE?
Response: KIV7MT will be provided as GFE.
9) Question: Can the Government provide DWG 8252251 for the GFE KIV-7MT Cable? What is the next higher assembly for this cable?
Response: This drawing is not required to fabricate the UCEU and will not be provided.
Amendment 5:
1) Question: The Government will provide KIV7MT as GFE per response to Question 8 of Amendment
4. One (1) PN: 0N850180 (KIV-7M) is required per UCEU. Will the Government be adding this item to form J-3 (Consolidated GFP)?
Response: J-3 GFP form had been updated for KIV-7MT part number 0N850180. See J-3 Rev 1.
2) Question: The current form J-3 (Consolidated GFP) has one (1) KIV cable (PN: 8252251) to be provided as
GFP per UCEU. We cannot find where this cable is used in the TDP. Please advise and provide the next higher assembly to where this cable will be used in the UCEU.
Response: J-3 GFP form had been updated to reflect KIV-7MT part number 0N850180. See J-3 Rev 1.
3) Question: Can the Government please provide the following documents?
8660317 (ATR, POWER MODULE, UCEU)
8660262 (ATR, CONTROL MODULE, UCEU)
Response: ATRs will be provided via DoD Safe.
4) Question: Connector 714253001, FN4 of PN 8660287-9 (ASSEMBLY, CABLE, CM/KIV-7MT W5) is obsolete with low to no stock. Can the Government identify an alternate for this connector?
Response: The connector will be provided as GFP.
5) Question: Will the Government identify when and how the 8660317 and 8660262 Acceptance Test
Requirements (ATR) will be provided?
Response: 8660317 and 8660262 ATR will be provided via DoD Safe.
6) Question: While obtaining material quotes, several vendors have related that specific items are a “custom design owned by a specific end customer” and have requested a Letter of Authorization (LOA) from the
Navy or additional documentation before releasing pricing. Will the Government provide requested
LOAs?
Response: Notify Contracting Officer and Contract Specialist of any LOA request so the Government can work with the vendor to ensure quotes can be provided.
7) Question: The artwork files for the PCB assemblies 8660413‐2 and 8660409‐2 were not found in the
Government released TDP files. Both drawings for these PCB assemblies contain a note 13 stating:
“ARTWORK MASTER FILES LOCATED IN PCB_8660413(409)‐2_REV‐.ZIP.” Will the Government provide and release to Offerors the missing TDP zip files for both PCB_8660413‐2_REV‐.ZIP and
PCB_8660409‐2_REV‐.ZIP?
Response: The drawings will be provided via DoD Safe.
8) Question: To allow Offerors to provide accurate, complete and compliant RFP Proposal (Volumes for technical, past performance and price), for the 8660317 Acceptance Test Requirements, referenced on assembly drawing 8660231, please provide the following information:
a. Description of the required test flow of each test
b. Description of the required technical requirements or procedures of each test
c. Statement of the test cycle time for each test
(Please note: Government has not provided the 8660317 Acceptance Test Requirements document to
Offerors to permit adequate determination of scope, support labor or schedule impacts)
Response: ATR 8660231 will be provided via DoD Safe.
9) Question: To allow Offerors to provide accurate, complete and compliant RFP Proposal (Volumes for technical, past performance and price), for the 8660317 Acceptance Test Requirements, referenced on assembly drawing 8660262, please provide the following information:
a. Description of the required test flow of each test
b. Description of the required technical requirements or procedures of each test
c. Statement of the test cycle time for each test
(Please note: Government has not provided the 8660317 Acceptance Test Requirements document to
Offerors to permit adequate determination of scope, support labor or schedule impacts)
Response: ATR 8660262 will be provided via DoD Safe.
10) Question: We have identified some components with low (inadequate) or no stock available such as MFG
PN: CDLL963B. Factory lead time is 30 weeks. We anticipate another 10 weeks to finish assembling, test, and conformal coat the CCA as well as install the CCA to next higher assembly, build, factory test, and environmental test the final assembly. We request delivery be changed to 1 month past the current delivery dates for CLINs 0002-0004 and 10 weeks past the current delivery dates for option CLINs 0005-
0022.
Response: The Government requirement is required to have the delivery date at 9 months ADC.
Amendment 6:
Q&A
1) Question: Can you Government provide an LOA to Mil Power Source for PN: 8660321-1 and PN: M515-
1? They are asking for one in order to quote the part. The POC is Ryan Cicciu
[Ryan.Cicciu@milpower.com].
Response: PN M515-1: Milpower will provide quotes. When requesting for quotes, solicitation #
N6339420R0014 must be referenced on the request.
2) Question: The approved source of supply Absopulse Electronics Ltd. cannot quote Control Number
8660241-1, MFG PN: BAP800-375/160P6T-T6384 (375VDC TO 160VDC CONVERTER) without written authorization from the designated customer. Can the Government please provide written authorization for the vendor to quote this part? The POC is Tony Szullo [Tony@absopulse.com]
Response: From Absopulse:
BAP 800-375/160P6LT-T6384
Our prices:
Qty 1-4 5-24 25-99 100-249 250-500
USD$ 481 458 436 125 415
Delivery: 7-8 weeks from receipt of PO
3) Question: Drawing 8652315-9 calls out PN: BU-67301B. We have reached out to the Manufacturer (Data
Device Corporation) but they are not willing to supply us a quote on this without an email from the Navy stating that we are allowed to procure this component on the Navy’s behalf. Can you please either provide us with a letter that we can pass along or provide said vendor with an email directly?
Response: Data Device Corporation will provide quotes. Vendors requests for quote have to reference solicitation # N6339420R0014.
4) Question: Offerors received VLS UCEU test procedures via DoDSAFE on Monday, October 5. To allow
Offerors to provide accurate, complete and compliant RFP Proposal (Volumes for technical, past mailto:Tony@absopulse.com performance and price), for the 8660317 Acceptance Test Requirements, will the Government approve an extension to Nov 5, 2020?
Response: The Government has no intention of extending the proposal due date.
Amendment 7:
Q&A
1) Question: Is thermal transfer method for ID marking acceptable? ID marking materials are not clearly specified on the cable drawings.
Response: ID markings in accordance with the TDP.
2) Question: There seems to be an error in the drawing 8660289rev-. Wire running list page 8. Wire number
140 and 142 should use material C M27500-20RC2U00 not D M27500-20RC2S06 in order to adhere to the drawing depiction. There is no M27500-20RC2S06 in the BOM and there is no shield shown between J3 contacts K and J and splice 1 and 2. Wire number 141 and 142 should use material G M27500-20RC2S06 not F M27500-20RC3U00. Can the Government please confirm which part numbers should be used?
Response: The drawing will be updated and forward for Amendment 7.
3) Question: One of the issues currently that we would like clarification on is CCA PN 8660510-9. There are
3 items other than solder and coating that make up this board; 8660513-1 (Adlink Technologies PN:
CM2BT2-E3825-ETT-CC), 8660511-1 (Delkin Devices PN: ME04TFNRB-XN050-D which is obsolete) and 8660512-1 (Transcend Information Inc PN: TS512MSK64W6H*). On the previous solicitation for the
VLS HEB & MEB units, this solicitation required the same board, PN 8660510-9. In the question and answers on that solicitation, it called out a new PN that contains all 3 of these so the vendor would only have to acquire one part number which was CM2-BT2-E3825 NV. Is this the same for this current solicitation? Or does the vendor need to purchase all 3 items and incorporate them? If we do need to incorporate them, we are requesting use of the Delkin Devices replacement PN: ME08TQJAK-3N050-D.
Response: Adlink will provide quote for part number CM2-BT2-E3825 NV. Vendors are to reference
N6339420R0014 when request for quotes.
4) Question: On part number 8660300 find number 1 part number M39012/55-3126 is for a coax connector only. It looks like the intention was for it to be purchased as a complete harness and labeled. The remainder of the BOM is labeling. They do not call out a coax cable part number and the qty of connectors should be
2 but it says 1. Can you please advise how you would like vendors to quote PN 8660300?
Response: The cable part number used on 8660300 is an SMA Male to Male cable with part number:
FLA02-S1S1-S12-AL, cage code: 3SRB4. Note that FLA02-S1S1-S12-AL is the custom part number the manufacturer created including having the drawing specified labels pre-attached on the cable
5) Question: We have identified the following components with low (inadequate) or no stock available and long Factory Lead-Time.
MFG PN Factory Lead-Time
M83536/15-022M 56 weeks
M83536/9-022M 58 weeks
M83536/15-022M 58 weeks
JANTX1N4478US 30 weeks
JANTX1N5619US 30 weeks
CDLL963B 30 weeks
JANTX1N4478US 30 weeks
JANTX1N4148UR-1 40 weeks
C2225C105K5RAL (6388328-87) 47 weeks
JANTX1N5804US 30 weeks
JANTXV1N5806US 30 weeks
Some of these components have up to 58 weeks Factory Lead-Time so making the delivery date at 9 months ADC will be impossible. Will the Government consider a Contractor proposed delivery schedule with our proposal or provide these components as GFP?
Response:
MFG PN Factory Lead-Time
M83536/15-022M 56 weeks (Alternate p/n M83536/16-020M - 17 weeks. ECP will be provided to add alt in next amendment)
M83536/9-022M 58 weeks (Will provide as GFE)
M83536/15-022M 58 weeks (Duplicate P/N)
JANTX1N4478US 30 weeks*
JANTX1N5619US 30 weeks*
CDLL963B 30 weeks*
JANTX1N4478US 30 weeks (Duplicate P/N)
JANTX1N4148UR-1 40 weeks (Alternate p/n JAN1N4148UR-1 - Microsemi has 1316 available with ship date of 3/8/2021. ECP will be provided to alt in next amendment)
C2225C105K5RAL (6388328-87) 47 weeks (Alternate p/n C2225C105K5RAC - 15 weeks. ECP will be provided to add alt in next amendment. Alt part has RoHS tin finish and requires tin-lead pre-tinning prior to installation IAW WS20120.)
JANTX1N5804US 30 weeks*
JANTXV1N5806US 30 weeks*
*To alleviate the impact of the 30-week LT parts, the contract execution will be extended from 9 months to
10 months.
Section F of the RFP has been updated to reflect this.
6) Question: Is the Government going to provide all the test equipment for all ATR's at the CCA level and
LRU level (loads, test cables, power supply, software, etc.)
Response: Yes, ATE will be provided.
7) Question: Is the Government going to provide test fixture for vibration testing?
Response: Yes, vibration fixture will be provided.
8) Question: In RFP Amendment 6, the Government provided pricing from the approved source of supply
Absopulse Electronics Ltd. for MFG PN: BAP800‐375/160P6T‐T6384 as:
Qty 1‐4 5‐24 25‐99 100‐249 250‐500
USD$ 481 458 436 125 415
Please confirm the price quoted for quantity 100‐249 is $125?
The 100‐249 quantity price appears to be mis‐aligned with the other quantity/prices.
Response: It was a typo. It should be $425.00 for 100-249 pcs.
9) Question: See quote_13668610 from Digikey Attached. This correlates to PN CC1210MKX5R7BB476 which is use on BOM 8660284-9. The quote states no bid due to 0 stock and no backorders allowed due to
MFG restrictions. Lead time is also unknown. Can the Government please provide a replacement part number for find number 8 on BOM 8660284?
Response: Alternate Part Number is: CC1210KKX5R7BB476. Updated ECP will provided with
Amendment 7 via DoD Safe.
10) Question: On the same Bill of Materials, 8660284 find number 203, PN N25Q256A13ESF40G is an obsolete part. Can the government please provide a replacement to this component?
Response: Alternate Part Number is: MT25QL256ABA8ESF-0SIT TR. Updated ECP will provided with
Amendment 7 via DoD Safe.
11) Question: Please see Digikey Quote 13694783. Please see line item 4 which is PN CDR33BX104AKUS, find number 7. This is on assembly 7104322-9. There are about 8000 or so of these parts on the open market from authorized suppliers. Although after going back to Digikey, there is not lead time from the
OEM on this component. Without knowing lead time and availability of this component it is hard to confirm that a contractor can provide these items within 9 months from award. Can the government provide an alternate that we can use with this part to secure enough parts for the entire build?
Response: Use Form, Fit, Function alternate Part Number CDR33BX104AKUS7370 from KEMET, as
Digi-Key is showing 8K can ship immediately. No TDP update is required.
12) Question: Please see Digikey quote 13694783, item 8 which is PN XC95144-10TQ100I, Find number
25. This is also on assembly 7104322-9. This component has been determined obsolete by the manufacturer. Can the Government please provide a replacement component for this?
Response: This is already on the GFP list.
Question: Please also see Digikey quote 13694783, item 14, PN R451007 & item 15 PN R451001 are both obsolete as per the manufacturer. Now the RoHS version of both of these parts are readily available. Is the use of RoHS allowed? If not, can the government please provide replacements for these components?
Response: RoHS alternates are already identified, per drawing 7105110 NOR1.
Question: On BOM 7104538-9 find number 14, 6388327-371 calls out Dale PN CRCW1206-
3R01F. This part number is not complete. Can the government please advise the complete part number?
Response: Per 6388327 NOR 32, 6388327-371 is now listed as CRCW12063R01FKT.
Question: On BOM 7104322-9, find number 40, PN 95011-1R00J is an obsolete part number. As per the supplier this part went obsolete as of October of 2019. Can the government pleas advise of a replacement part for this location?
Response: NSWC2-1946, 7104322 NOR35, added alternate part number RM412DTTE1R0J.
13) Question: On BOM 7104322-9, Find number 63, PN 16TTS08PFB is an obsolete part. Can you please provide a replacement for this part?
Response: The GFP list has been updated – see J3 GFP rev 2.
14) Question: On BOM 7104322-9, Find number 78, PN MAX4429ESA is an obsolete part. Can we use the
RoHS version of this component?
Response: Per NSWC2-1521, 7104322 NOR30, lead-free part number MAX4429ESA+ can be used.
Amendment 8:
1) Question: On BOM 7105566-9, Item 4, PN: IXGA12N100 please see attached quote from Mouser
Electronics stating this item is obsolete. Can the government please provide a replacement for this item?
Response: Per 7105566 NOR 20, ECP NSWC2-1891, alternate part number: IXGA30N120B3 from
Littelfuse.
2) Question: The Texas Instrument Digital signal processor in the Governments BOM, PN:
TMS320F2808PQA has been identified as obsolete from Arrow Electronics and they have identified a recommended replacement part of TMS320F2808PZQ. This is a significant part in the Governments design and we need to know if the alternate is acceptable to the Government and the firmware the
Government will provide will run on the suggested replacement. Can you please confirm?
Response: The Government cannot find the drawing or find number associated with TMS320F2808PQA.
3) Question: Our team has identified a list of what we expected to receive per the amendment 0007 Q&As and it was not part of the TDP dropped last night.
8660289 per question 2
8660510 per question 3 (Did not state dwg would be updated but response suggests update required)
8660300 per question 4 (Did not state dwg would be updated but response suggests update required)
8660284 per questions 9 and 10
Response: These are being answered again from Amendment 7:
Question 2 from A7: Question: There seems to be an error in the drawing 8660289rev-. Wire running list page 8. Wire number 140 and 142 should use material C M27500-20RC2U00 not D M27500-20RC2S06 in order to adhere to the drawing depiction. There is no M27500-20RC2S06 in the BOM and there is no shield shown between J3 contacts K and J and splice 1 and 2. Wire number 141 and 142 should use material G M27500-20RC2S06 not F M27500-20RC3U00. Can the Government please confirm which part numbers should be used?
Updated Response: The drawing will be updated and forward for Amendment 7. Address in NSWC2-2014 sent in Amendment 7.
Question 3 from A7: Question: One of the issues currently that we would like clarification on is CCA PN
8660510-9. There are 3 items other than solder and coating that make up this board; 8660513-1 (Adlink
Technologies PN: CM2BT2-E3825-ETT-CC), 8660511-1 (Delkin Devices PN: ME04TFNRB-XN050-D which is obsolete) and 8660512-1 (Transcend Information Inc PN: TS512MSK64W6H*). On the previous solicitation for the VLS HEB & MEB units, this solicitation required the same board, PN 8660510-9. In the question and answers on that solicitation, it called out a new PN that contains all 3 of these so the vendor would only have to acquire one part number which was CM2-BT2-E3825 NV. Is this the same for this current solicitation? Or does the vendor need to purchase all 3 items and incorporate them? If we do need to incorporate them, we are requesting use of the Delkin Devices replacement PN: ME08TQJAK-
3N050-D.
Updated Response: Adlink will provide quote for part number CM2-BT2-E3825 NV. Vendors are to reference N6339420R0014 when request for quotes. The updated ECP is not complete. The part number to order is CM2-BT2-E3825 NV.
Question 4 from A7: Question: On part number 8660300 find number 1 part number M39012/55-3126 is for a coax connector only. It looks like the intention was for it to be purchased as a complete harness and labeled. The remainder of the BOM is labeling. They do not call out a coax cable part number and the qty of connectors should be 2 but it says 1. Can you please advise how you would like vendors to quote PN
8660300?
Updated Response: The cable part number used on 8660300 is an SMA Male to Male cable with part number: FLA02-S1S1-S12-AL, cage code: 3SRB4. Note that FLA02-S1S1-S12-AL is the custom part number the manufacturer created including having the drawing specified labels pre-attached on the cable.
Address in NSWC2-2014 sent in Amendment 7.
Question 9 from A7: Question: See quote_13668610 from Digikey Attached. This correlates to PN
CC1210MKX5R7BB476 which is use on BOM 8660284-9. The quote states no bid due to 0 stock and no backorders allowed due to MFG restrictions. Lead time is also unknown. Can the Government please provide a replacement part number for find number 8 on BOM 8660284?
Updated Response: Alternate Part Number is: CC1210KKX5R7BB476. Updated ECP will provided with
Amendment 7 via DoD Safe. Address in Amendment 8 NSWC2-2014R2 6388121_NOR 019
Question 10 from A7: Question: On the same Bill of Materials, 8660284 find number 203, PN
N25Q256A13ESF40G is an obsolete part. Can the government please provide a replacement to this component?
Updated Response: Alternate Part Number is: MT25QL256ABA8ESF-0SIT TR. Updated ECP will provided with Amendment 7 via DoD Safe. Address in NSWC2-2014 sent in Amendment 7
4) Question: Regarding the subject line RFP N6339420R0014 for the UCEU, I had a question regarding
Volume I for Price:
It indicates that it is expected that the resulting contract will be award based upon adequate price competition, and therefore the offeror is not required to submit or certify cost and/or pricing data with their proposal
However later on it indicates that:
o Volume I of the proposal shall include pricing spreadsheets for all CLINs, for all items (with options) as described in Section B. Spreadsheets shall be in Microsoft Excel format with cells containing working formulas that are visible for Government examination of price buildup and methodology. *All pricing shall be proposed in whole dollars*
Could you define price buildup and methodology further? Do the spreadsheets only have to show the unit price multiplied by the quantity, or is the USG requiring detailed information such as total material costs, total labor costs, overhead rates, and profit % as part of the “price buildup and methodology”?
If the latter, is that necessary given the presumption of adequate price competition and the Section M evaluation criteria (pg. 119) that price will not be characterized as acceptable or unacceptable?
Response: Price will not be rated as “Acceptable” or “Unacceptable” per Section M of the RFP and it is the
Government’s intention that there will be adequate price competition; thus submission of certified cost and pricing data will not be necessary. If you choose to submit an excel sheet, they should be Microsoft Excel sheets with working formulas and proposed in whole dollars. As this is Firm Fixed Price, what information you share in the excel sheet is Offeror’s discretion.
5) An updated ECP will be sent via DoD Safe.
6) The due date for this solicitation is being updated to 11/02/2020.
Amendment 9:
1) Question: Can the Government please provide an ALT for JANTXM19500/469-03 used on 7105566-9 which has a 40 week lead time?
Response: No alternate for JANTXM19500.
2) Question: We cannot find a source for 8551401PX used on 7105566-9. Does the Government have an
ALT for this component?
Response: 8551401PX is available from Analogue Devices, per authorized distributor Mouser.com.
3) Question: Capacitor (ControlNO: 6388328-70; MFGPN: SK05CC944KHA350) used on 7104322-9, 7104322-19, and 7105566-9 has been quoted at $2000 each from Mouser. Does the Government have an
ALT capacitor that is less expensive?
Response: No alternate part SK05CC944KHA350.
(End of Summary of Changes)