N6339420R0014 UCEU RFP Amendment 2 - Conformed Copy.pdf

PDF 1 MB Posted

Attached to
Vertical Launching System (VLS) Universal Canister Electronic Unit (ECEU)
Solicitation number
N6339420R0014
Issued by

About this file

This solicitation requests proposals for the manufacture, assembly, test and delivery of Vertical Launching System Universal Canister Electronics Units and associated cables. The Naval Surface Warfare Center Port Hueneme Division seeks these products in accordance with technical data package drawings for the Air Dominance Department. Offerors may submit questions by email through April 2020, with proposals due on October 26, 2020. The solicitation is full and open competition requiring build-to-print of restricted drawings available to DoD contractors through written process. The government will furnish automated test equipment and manage technical data rights. The statement of work specifies production, quality assurance, configuration management and other requirements. Options exist to order additional units over five years.

View the file

Other files

File Type Posted
N6339420R0014 UCEU RFP Amendment 13 -Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 13 - Conformed Copy.pdf PDF
J-3 N6339420R0014 GFP Rev. 3.xlsx XLSX spreadsheet
N6339420R0014 UCEU RFP Amendment 12 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 12 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 11 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 11 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 10 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 10 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 10 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 9 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 9 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 8 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 8 - Summary of Changes.pdf PDF
J-3 N6339420R0014 GFP Rev. 2.xlsx XLSX spreadsheet
N6339420R0014 UCEU RFP Amendment 7 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 7 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 6 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 6 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 5 - Summary of Changes.pdf PDF
J-3 N6339420R0014 GFP Rev. 1.xlsx XLSX spreadsheet
N6339420R0014 UCEU RFP Amendment 5 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 4 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 4 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 3 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 3 - Conformed Copy.pdf PDF
N6339420R0014 UCEU RFP Amendment 2 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 1 - Summary of Changes.pdf PDF
N6339420R0014 UCEU RFP Amendment 1 - Conformed Copy.pdf PDF
J-S-1 - Past Performance Questionnaire.pdf PDF
J-3 N6339420R0014 GFP.xlsx XLSX spreadsheet
J-2 DD-1432 CDRLs and DIDs.pdf PDF
N6339420R0014_RFP.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local time 26 Oct 2020

X

A

X B

X C X D

EX

X

G

F 85 - 90

91 - 106

X H 107

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

D0A5 1 112

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N63394 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Section L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3

4 - 21

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

22 - 44

45 - 47

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

48 - 52

53 - 56 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 57 - 65 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 66 - 67 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

68 - 83

PART II - CO NTRACT CLAUSES

NAVAL SURFACE WARFARE CENTER

4363 MISSILE WAY

PORT HUENEME CA 93043-4307

(805) 228-8287

805-228-6299FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

24 Aug 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6339420R0014

Section SF 30 - BLOCK 14 CONTINUATION PAGE

Amendment 1:

Q&A and Revisions

The purpose of this amendment is to add K-227-W001 INSTRUCTIONS FOR OBTAINING EXPORT-

CONTROLLED TECHNICAL DATA (NAVSEA) (OCT 2018) to section K of the RFP and to provide response to questions.

1) Question: May we make internal copies of the CD to permit our locations in PA and FL to both work with the information (we will maintain control over the CD on a separate computer not on the network)?

Response: Yes, internal copies of the TDP CD are allowed as long as the procedures in Section L, Paragraph 2.3, Disposition of Technical Data Package (TDP) and Technical Drawings are followed.

2) Question: Currently we are not able to share with third parties. For material quotes with suppliers, the

TDP, BOMs, drawings etc may need to be shared with suppliers for pricing. With the restrictions, how should this be managed? Do we request permission from you and Nayneet specifically naming the supplier?

Response: To comply with International Traffic in Arms Regulations (ITAR, the TDP cannot be shared with third parties. If a possible third party vendor needs a copy of the TDP, they need to be under the Joint

Certification Program and request a copy of the TDP.

3) Question: Requesting instruction/authorization from the Government for the process to provide the TDP to vendors in order for vendors to quote source assembly support under the Solicitation.

Response: To comply with International Traffic in Arms Regulations (ITAR, the TDP cannot be shared with third parties. If a possible third party vendor needs a copy of the TDP, they need to be under the Joint

Certification Program and request a copy of the TDP.

4) Question: Requesting an additional 30 calendar day extension of time to submit the RFP response (from 25

Sep 2020 until 25 Oct 2020).

Response: The Government does not intend to extend the proposal due date at this time, should the

Government choose to do so, an RFP Amendment would be released.

Amendment 2:

Q&A

1) Question: Have the UCEU been prototype build before? If so have many units were prototyped?

Response: The requested information is not required for industry to respond to this RFP.

2) Question: Have the UCEU been built using any drawings in the provided TDP before with manufacturing redlines collected and incorporated?

Response: The requested information is not required for industry to respond to this RFP.

3) Question: Which CLINs does the Government plan to execute on the first order?

Response: CLINs 0002AA – 0002AD, 0003AA – 0003AD, 0004AA – 004AD

4) Question: Does the Government have and are willing to provide 3D model files of the Mechanical items to the awardee?

Response: Yes, the 3D Model files are available and will be provided to the contract awardee, however, the

UCEU is to be built IAW the approved Government TDP.

5) Question: Please see the list below of missing drawing.

7104325 HOUSEKEEPING P.S.

7104567 ASSEMBLY, SBR LINK

8660232 ENCLOSURE POWER MODULE

8660233 COVER, POWER MODULE

8660235 CENTERCSTRUCTURE, POWER MODULE

8660237 FLANGE, COVER, SUPPORT

8660251 ENCLOSURE, CONTROL MODULE

8660252 COVER, CONTROL MODULE

8660255 RAIL, CABLE TIE-DOWN

8660272 CCA, PMPS/CMPS, DC/DC CONVERTER

8660275 CCA, PM TERMINATION

8660278 CABLE ASSEMBLY, VOLTAGE AND CONTROL, POWER MODULE

8660279 CABLE ASSEMBLY, DC/DC TO EMI 1W30

8660280 CABLE ASSEMBLY, DC/DC TO EMI 2W31

8660281 CABLE ASSEMBLY, EM1 TO TERMINAL BLOCKS W32

8660282 CABLE ASSEMBLY, EM2 TO TERMINAL BLOCKS W33

8660284 CCA, CONTROL MODULE

8660289 ASSEMLBY, CABLE, CM/PM VOLTAGE & CONTROL W9

8660290 ASSEMBLY, CABLE, CM/POWER SUPPLY MODULE W10

8660293 ASSEMBLY, CABLE, CM FAN W24

8660297 CCA, I/O RIDGED FLEX HARNESS W28

8660301 ASSEMBLY, CCA CAGE MEB

8660322 COVER, PROTECTIVE

8660323 BRACKET, HOLD DOWN

8660324 CARTRIDGE DEHYDRATOR

Response: All of the drawings referenced below were included on the UCEU DVD H30ENGWO035.

6) Question: Can you extend the deadline by 30 days?

Response: The Government intends to extend the proposal due date to 26 October 2020.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CDRLs - Not Separately Priced (NSP)

FFP

Prepare, maintain and deliver data in accordance with (IAW) Contract Data

Requirement List (CDRLs) A001 through A007 and Data Item Delivery (DID) schedule requirements. The Government shall have unlimited rights to all data generated under this contract IAW DFARS 252.227-7013 unless an assertion is provided and accepted by the Government with the offer IAW DFARS 252.227-

7017.The price for all data generated by the contractor directly or indirectly in its performance of this procurement effort is included in the price paid by the

Government under other CLINs in the contract.

NET AMT

Universal Canister Electronics Unit

FFP

NAVSEA part number 8660230. Manufacture, assemble, test and deliver Universal

Canister Electronics Unit (UCEU) IAW the Statement of Work (SOW) and

Technical Data Package (TDP). Refer to CDRLs for item and data requirements.

0002AA 25 Each

UCEU

FFP

NAVSEA part number 8660230.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: 5963

0002AB 25 Each

UCEU

FFP

NAVSEA part number 8660230.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0002AC 25 Each

UCEU

FFP

NAVSEA part number 8660230.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0002AD 15 Each

UCEU

FFP

NAVSEA part number 8660230.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Cable W2

FFP

NAVSEA part number 8660265. Manufacture, assemble, test and deliver UCEU

Cable W2 IAW the SOW and TDP. Refer to CDRLs for item and data requirements.

0003AA 30 Each Cable W2

FFP

NAVSEA part number 8660265.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0003AB 30 Each Cable W2

FFP

NAVSEA part number 8660265.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0003AC 30 Each Cable W2

FFP

NAVSEA part number 8660265.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0003AD 18 Each Cable W2

FFP

NAVSEA part number 8660265.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Cable W3

FFP

NAVSEA part number 8660266. Manufacture, assemble, test and deliver UCEU

Cable W3 IAW the SOW and TDP. Refer to CDRLs for item and data requirements.

0004AA 30 Each Cable W3

FFP

NAVSEA part number 8660266.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0004AB 30 Each Cable W3

FFP

NAVSEA part number 8660266.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0004AC 30 Each Cable W3

FFP

NAVSEA part number 8660266.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0004AD 18 Each Cable W3

FFP

NAVSEA part number 8660266.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0005 90 Each

OPTION UCEU

FFP

NAVSEA part number 8660230. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0006 108 Each OPTION Cable W2

FFP

NAVSEA part number 8660265. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0007 108 Each OPTION Cable W3

FFP

NAVSEA part number 8660266. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0008 30 Each

OPTION UCEU

FFP

NAVSEA part number 8660230. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0009 36 Each OPTION Cable W2

FFP

NAVSEA part number 8660265. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0010 36 Each OPTION Cable W3

FFP

NAVSEA part number 8660266. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0011 90 Each

OPTION UCEU

FFP

NAVSEA part number 8660230. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0012 108 Each OPTION Cable W2

FFP

NAVSEA part number 8660265. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0013 108 Each OPTION Cable W3

FFP

NAVSEA part number 8660266. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0014 30 Each

OPTION UCEU

FFP

NAVSEA part number 8660230. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0015 36 Each OPTION Cable W2

FFP

NAVSEA part number 8660265. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0016 36 Each OPTION Cable W3

FFP

NAVSEA part number 8660266. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0017 30 Each

OPTION UCEU

FFP

NAVSEA part number 8660230. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0018 36 Each OPTION Cable W2

FFP

NAVSEA part number 8660265. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0019 36 Each OPTION Cable W3

FFP

NAVSEA part number 8660266. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0020 30 Each

OPTION UCEU

FFP

NAVSEA part number 8660230. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0021 36 Each OPTION Cable W2

FFP

NAVSEA part number 8660265. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0022 36 Each OPTION Cable W3

FFP

NAVSEA part number 8660266. This option CLIN may be exercised at any time within 5 years of award.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

CLAUSES INCORPORATED BY FULL TEXT

B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)

(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.

(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:

(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.

(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR

52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.

(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.

(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.

(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor.

Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid.

If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the

Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).

(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the

Contracting Officer.

(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.

(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the

Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.

(End of text)

Section C - Descriptions and Specifications

STATEMENT OF WORK

VERTICAL LAUNCHING SYSTEM

UNIVERSAL CANISTER ELECTRONICS UNIT N63394-20-R-0014

1.0 SCOPE

The Contractor is responsible for the satisfactory and timely performance of all tasks defined in the Statement of

Work (SOW). This SOW, with its supporting attachments and referenced documentation, describes the requirement for the manufacture, assembly, test and delivery of Vertical Launching System (VLS) Universal Canister Electronics

Unit (UCEU) NAVSEA part number (p/n) 8660230 and associated cables W2 NAVSEA p/n 8660265 and W3

NAVSEA p/n 8660266.

2.0 PROGRAM AUTHORITY

Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD) is the program authority for this contract.

3.0 APPLICABLE DOCUMENTS

The following documents, of the issue indicated, form a part of this SOW, including all applicable terms, conditions, clauses, attachments and exhibits. The exact revisions of the documents are not cited in the text of this SOW. The

Contractor shall apply the latest version of the documents in effect at the time of award of the contract. In the event of a conflict between the documents referenced herein and the contents of this SOW, the SOW shall be considered the superseding requirement.

3.1 Government Documents

Document Number Document Title

MIL-STD-109C Quality Assurance Terms and Definitions

MIL-STD-1686C

Electrostatic Discharge Control Program for Protection of

Electrical and Electronic Parts, I Assemblies and Equipment

(Excluding Electrically Initiated Explosive Devices)

WS 20130 Production Environmental Test Requirements for VLS

TL130-AD-PLN-010-VLS

Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware) Configuration Management

MK 41 VLS Standing Instruction 94-1F, Attachment 6

Marking for technical data

TL130-AD-PLN-030-VLS Firmware Configuration Management

NAVSEA Drawing 8660230 UCEU

NAVSEA Drawing 8660265 W2 – Cable Assy, PM/CM 1

NAVSEA Drawing 8660266 W3 – Cable Assy, PM-CM 2

3.2 Industry Documents

Document Number Document Title

ANSI/ISO/ASQC Q9001 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

ANSI/EIA-649 2011 National Consensus Standard for Configuration Management

ANSI/ASQC Q9004 Quality System Elements

ISO 9001 Quality Program Requirements

SAE Aerospace Standard

AS9102 Rev A

Aerospace First Article Inspection

ISO 14000 Environmental Management Systems Standards

SAE AS5553 & AS6174 Counterfeit Prevention Plan

4.0 REQUIREMENTS

The Government requires manufacturing of VLS UCEU and associated cables in accordance with the documents specified in SOW and the technical data package (TDP). All UCEU and associated cables shall meet all requirements in accordance with the TDP and associated specifications.

4.1 Automatic Test Equipment

Control Module Automated Test Equipment (ATE), S9100, Power Module ATE, and SBR ATE, associated interface cables, software, operator manual, test tools and calibration tools will be provided as Government-

Furnished Property (GFP). The UCEU assembly electrical and digital data acceptance tests that are required by TDP require use of this GDP.

The Government has certified the test equipment, along with test program sets for use.

The Contractor shall be responsible for maintaining and calibrating the necessary test capability including ATE, associated interface cables, test tools and calibration tools.

Changes to certified ATEs shall be submitted to the Government for approval and certification.

4.2 First Article Inspection

The Contractor shall perform First Article Inspection (FAI) on the first article of all assemblies, subassemblies, components and detail parts including castings and forgings in accordance with SAE Aerospace Standard AS9102

Rev A. The purpose of FAI is to provide objective evidence that all TDP and specification requirements are correctly understood, accounted for, verified, and recorded. An FAI is not required for standard catalog items, commercial-off-the-shelf items, raw materials or items procured in accordance with source control drawings.

The Contractor shall submit all FAI requirement waivers to the NSWC PHD for approval. The waiver shall identify, at a minimum, the part description, part number, manufacturer, date last built, location last built, FAI report summary (if applicable), FAI discrepancies and corrective actions (if applicable), and waiver justification.

The Government reserves the right to witness all FAI activities. The Contractor shall submit a comprehensive schedule of FAI events prior to the first event in accordance with CDRL A001. The schedule shall include date, time, expected duration and location.

The Contractor shall generate FAI reports in accordance with AS9102 Rev A. The Contractor shall retain the FAI reports for at least seven years. The Government reserves the right to examine all FAI reports. The Contractor shall submit a report copy via digital means in accordance with CDRL A002.

All deficiencies discovered during the FAIs shall be corrected at Contractor’s expense prior to unit delivery to the

Government.

5.0 TECHNICAL DATA REVIEWS, QUALITY AUDITS

During the performance of the contract, the Government shall have the right to perform technical data reviews and quality audits consisting of evaluation of records, processes and products to verify the Contractor's compliance with the respective quality programs. The Government audits may include evaluation of effectiveness in implementing the Contractor's and Subcontractors' or suppliers' audit programs to promote prevention of defects, which includes schedule of audits, evaluation of operations, notification of required corrective action with follow-up and means of notification to top management concerning audit results.

6.0 FOLLOW-ON PHYSICAL CONFIGURATION AUDIT

During the performance of the contract, the Government shall have the right to perform a Physical Configuration

Audit (PCA). The PCA may include an evaluation of the effectiveness of the Contractor, Subcontractor and/or supplier audit programs to promote prevention of defects. This includes scheduling of audit, evaluation of operations, and notification of required corrective action with follow-up and means of notification to top management concerning audit results. The PCA will be conducted in accordance with Section 7 of TL130-AD-PLN-

010-VLS, Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware)

Configuration Management.

One (1) PCA shall be conducted over the course of the contract on the UCEU. The UCEU shall be selected by the

Government and the Contractor from the production run.

The Contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for the PCA. The Contractor shall provide all tools, measuring devices and other equipment required for equipment disassembly, dimensional and tolerance verification and performance verification. The

Contractor shall provide an area to conduct PCA that is well illuminated, temperate and low noise level. The PCA work area shall contain worktables, print copies of all pertinent drawings, telephone and easy access to a copy machine.

During the PCA, the Contractor shall provide, at a minimum, individual parts that make up the configuration item, completed assemblies, an as-built list delineating all Engineering Change Proposal (ECP) (either requested or approved), deviations and waivers, hardcopies of production specifications and technical drawings, complete shortage list, manufacturing instructions, acceptance test procedures and data, purchase order documents and associated certificates of conformance from suppliers or appropriate documents indicating compliance with material or drawing requirements in accordance with CDRL A003.

The PCA will be conducted at the Contractor's, Subcontractors' and suppliers' facilities by the Government team.

The Government will notify the Contractor seven (7) to 14 business days prior to performance of the PCA. This notice will include identification of assemblies, subassemblies and/or piece parts to be audited. The PCA will be approximately one to two weeks in duration.

Following conduct of the PCA, the Contractor shall generate the necessary documentation to resolve all audit findings and provide these to the Government audit team within the timeframe specified by the Government in accordance with CDRL A004. The Government audit team will evaluate the documentation to assess corrective action(s) taken to close any and all audit finding(s). Necessary documentation may include, but not be limited to, revised manufacturing processes, ECPs, notice of revisions, SCN and revised TDP drawings.

Government and Contractor pre-and post-PCA activities are described in Sections 7.4 through 7.7 of the VLS

Configuration Management Plan TL130-AD-PLN-010-VLS.

7.0 GOVERNMENT INSPECTION

The Contractor shall provide technical, administrative, and management support for Government source inspection for purposes of inspection and acceptance of supplies and services provided by the Contractor, Subcontractor and suppliers. Government source inspection will be conducted at the convenience of the Government.

8.0 PRODUCTION ENVIRONMENTAL TESTS

The Contractor shall perform production environmental testing as specified by the TDP or production environmental test requirements for VLS Specification WS 20130.

9.0 TECHNICAL DATA RIGHTS

The Government will maintain the Government-owned TDP. The Contractor shall submit proposed changes to the

TDP to the Government. The Government shall retain unlimited rights to all technical data, versions of and changes to all drawings, specifications and other documents for the VLS components produced under this contract.

10.0 MARKING FOR TECHNICAL DATA

The Contractor shall mark all technical data in accordance with MK 41 VLS Standing Instruction 94-1F, Attachment

6. This instruction is applicable to new documents, revised documents or documents from file in response to a request for copy.

11.0 MANUFACTURING PROCESSES

The Contractor shall maintain and control manufacturing processes to fabricate, assemble, inspect, test, and deliver

VLS UCEU and associated cables as described in the SOW. The processes shall cover all phases from the ordering of raw materials to Government acceptance of the finished product. All hardware components shall be manufactured in accordance with the drawings and specifications referenced in the TDP and this SOW.

12.0 CONFIGURATION MANAGEMENT

The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011.

Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the

VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

12.1 Configuration Identification

The Contractor shall maintain identification of the product baselines throughout fabrication, testing, and delivery.

The Contractor shall ensure that equipment is assigned identifying numbers, designators, and serial numbers in accordance with the TDP.

Serialized items shall be traceable to source of manufacture and production contract year. This information may be incorporated as a formal part of the Contractor's serialization system or otherwise be annotated on the affected item.

Serial number assignments shall be requested in writing from the COR. The request for serial number assignment shall contain the following minimum information:

(a) Officially assigned item name

(b) Officially assigned type designation

(c) Officially assigned model number

(d) Top drawing number and list of drawings or parts list

(e) Exact quantity to be delivered under the contract including pre-production samples and spares required by the contract.

(f) Contract number

(g) National Stock Number

(h) NAVSEA cognizant office code

The Contractor shall submit a configuration definition data package describing the detailed configuration of each end item as delivered to the designated destination in accordance with CDRL A004. The Contractor shall maintain a system to monitor engineering release and correlation of manufactured products.

12.2 Military Specifications and Standards:

The Government shall maintain the Government owned Technical Data Package(s) (TDP). Proposed changes to the

TDP shall be submitted by the Contractor to the Government. The Government shall retain unlimited rights to all versions of and changes to all drawings, specifications and other documents for the UCEU and associated parts and cables produced under this contract.

The Contractor shall prepare the updated drawings, specifications and all related documents with revisions, including the Request for Variance.

12.3 Qualification of Substitute Sources of Supply

The TDP contains source control or vendor item drawings that specify approved, or suggested sources of supply.

The Contractor may qualify other sources for these items. Qualification of new sources selected by the Contractor shall be at the Contractor’s expense.

The Contractor shall submit all proposed changes to approved, or suggested sources of supply as indicated in the source control or vendor item drawings in accordance with SOW. The package of information that is submitted for

Government review shall contain all applicable drawings, test plans, procedures and qualification reports. An extended Government review period of 20 business days applies to all proposed changes to approved or suggested sources of supply.

12.4 Configuration Status Accounting

The Contractor’s configuration status accounting shall be in accordance with ANSI/EIA-649, the Configuration

Management Plan for the VLS, Volume 1, Equipment (Hardware) Configuration Management, TL130-AD-PLN-

010-VLS, and the Configuration Management Plan for the VLS, Volume 3, Firmware Configuration Management, and TL130-AD-PLN-030-VLS.

The Contractor shall provide a system that documents the exact delivered configuration of each unit. The

Contractor, or Subcontractor at the appropriate tier, shall identify the "as-built" production configuration of each

NAVSEA nomenclature item by means of permanent markings on the appropriate ORDALT/ Ship Change

Installation Procedure (SCIP) label plate on the equipment to identify the specific ORDALTs/SCIPs installed in the equipment being delivered. For Class I ECPs, which are not assigned an ORDALT number, the ORDALT label plate shall be marked with the applicable Class I ECP number as assigned by the Government. For purposes of this requirement, markings may be etched, steel stamped or affixed by other suitable means which results in the permanent identification of the equipment configuration. Ink stamping is not permitted.

12.5 Failure/Defect Reporting and Corrective Action System (FACAR)

The Contractor shall have a FACAR system established and maintained for both manufacturing and test processes.

Level of assembly for failure reporting shall be consistent with the requirement for recording defect history.

FACAR system information required to be recorded or reported by this SOW paragraph shall be submitted in accordance with CDRL A005.

The Contractor shall implement an effective system for evaluation and disposition of supplies and services that exhibit nonconformance, including those furnished by suppliers (Subcontractors and vendors). The Contractor shall ensure that the personnel staffing the FACAR system have the authority to coordinate and implement the necessary failure and problem reporting, analysis, and related corrective action. The Contractor shall ensure that nonconformance data is adequately analyzed, distributed to appropriate organizations and personnel, and that appropriate management decisions are based on this data. Analysis must target root cause corrective action. The

Contractor shall take appropriate actions to improve or change processes that do not meet requirements. All use-as-is and repair dispositions shall include a determination of whether or not a change is required to the product database

(drawing, specifications, work instructions, tooling, etc.). Determination that such a change is not required shall be recorded and shall be available to the Government for review. Acceptance of the nonconformance corrective action and disposition is the prerogative of the Government and can be revoked whenever the Contractor’s system fails to demonstrate effective root cause corrective action or when repeated nonconformance indicate an overall quality system degradation.

12.6 Configuration Control

Minor Deviations:

(1) The contractor shall submit the deviation to NSWC DD for review & approval.

(2) If NSWC DD concurs in classification, the deviation will be boarded at NSWC DD CCB for approval or disapproval.

(3) If NSWC DD does not concur in classification, the Contractor shall cancel the minor deviation

The Contractor shall submit for review and approval all specification changes to NSWC DD for review and approval.

13.0 TESTING, INSPECTION AND ACCEPTANCE

Testing and inspection of all VLS UCEU units and associated cables shall be performed at the Contractor's facility in accordance with the applicable drawings, standards and specifications and factory test and inspection plans. The

Contractor shall prepare specific written inspection and test procedures for each inspection and test operation to be performed by the Contractor. These inspection and test procedures shall be reviewed by the quality assurance organization and maintained current in accordance with the change control system requirements. The inspection and test procedures shall clearly identify the item through part number with revision and nomenclature, and include detail instructions and/or operations to be performed.

The Contractor shall maintain records of inspection results and quantitative test data for each deliverable end item and make them available to the Government upon request.

14.0 PARTS RE-SCREENING

The Contractor is not required to implement the TDP requirements to conduct re-screening of electrical components.

Remarking of parts to the re-screened part number will not be required and the existing base part number shall remain intact. Programmable parts shall require re-identification.

15.0 COUNTERFEIT PARTS AND MATERIALS

The following minimum processes shall be implemented and flowed down by the Contractor to all Subcontractors in order to minimize the risk of use of counterfeit parts in VLS components.

The Contractor shall establish processes to minimize the risk of procuring and using counterfeit parts and materials.

The Contractor shall document these processes and provide those documented processes to Government upon request. These processes shall include:

At a minimum, these processes shall ensure that all components for UCEU assemblies and subassemblies are purchased from Original Equipment Manufacturers (OEM), Original Component

Manufacturers (OCM) authorized suppliers or franchised distributors. The term OEM, OCM, authorized supplier and franchised distributor are each defined in SAE AS5553).

At a minimum, the contractor shall ensure procurement practices and processes to purchase and install components from OEM, OCM, authorized suppliers and franchised distributors are flowed down to subcontractors and suppliers at all tiers.

The Counterfeit Prevention Plan, SAE AS5553 and SAE AS6174 requirements shall be flowed down to all subcontractors and suppliers.

The Contractor shall maximize the use of authentic, originally designed and/or qualified parts.

The Contractor shall assess potential sources of supply to minimize the risk of receiving counterfeit parts or materials.

The Contractor shall have purchasing procedures which confirm whether a selected supplier is authorized, as defined in SAE AS5553 and SAE AS6174, for each purchase.

The Contractor shall define minimum inspection and test requirements for parts being procured and shall ensure that in-house, third-party, and/or supplier inspection and test procedures and facilities comply with these requirements. These minimum inspection and test requirements shall specify appropriate test methods to detect potential counterfeit parts and materials.

The Contractor shall require a certificate of compliance and supply chain traceability for all electronic part purchases.

The Contractor shall require a Certificate of Conformance, as defined in SAE AS5553 and SAE

AS6174, and supply chain traceability for all electronic part purchases.

The Contractor shall use government or industry services such as the Government-Industry Data

Exchange Program (GIDEP) and other commercially available services to identify part or supplier quality or authenticity problems.

The Contractor shall notify the Government of the occurrence of a confirmed counterfeit part or material and the actions taken to identify, contain, and impound all product from the lot, within seven (7) business days of confirmation of the counterfeit status. The Contractor shall flow down a requirement for similar notification from

Subcontractors to the Contractor. The Contractor shall initiate and submit an alert to the GIDEP within 30 calendar days of knowledge of the counterfeit part or material.

Counterfeit parts and material are defined by SAE AS5553 and SAE AS6174 may be electronic or mechanical in nature. Counterfeit electronic parts may typically be used parts which have been refurbished and represented as new.

Commonly counterfeited electronic parts include parts such as microcontrollers or specially screened devices, or common parts, which have several pin-compatible versions from multiple manufacturers, such as memory devices and operational amplifiers. Counterfeit mechanical parts are typically improperly made, marked, or treated products.

Examples are improper anodization or heat treatments, falsified data, mismarked parts sold as a higher grade steel, or used/fake parts such as valves or circuit breakers.

An authorized supplier is a supplier authorized by the original component manufacturer to buy parts or materials directly from the manufacturer. Parts provided from authorized suppliers typically have never left the manufacturer’s authorized supply chain, and are accompanied by full manufacturer support and warranty.

16.0 REVIEWS

16.1 Program/Production Readiness Reviews

The Production Readiness Review (PRR) will be conducted by the Government to ensure the Contractor has accomplished adequate production planning and preparations to produce UCEU and associated cables that meet performance requirements in accordance with the contract schedules and without unacceptable risks. During PRR, the Contractor shall provide, at a minimum, overall comprehensive status of:

Producibility;

Manufacturing Planning;

Manufacturing Schedules;

Configuration Management;

Quality Assurance;

Material Procurement & Supplier Control;

Facility and Equipment;

Production Processing & Fabrication;

Calibration, Tool and Test Equipment;

Non-Conforming Material Control;

Completed Item Inspection and Test;

Handling, Storage and Delivery

The Contractor shall demonstrate the ability to manufacture and test the UCEU and associated cables by providing various documents to include, but not be limited to, Manufacturing, Testing, Quality Assurance, Configuration

Management, Calibration, and Supplier Management Plans. Policies, procedures, processes & plans demonstrating production processing & fabrication capability, facilities & equipment capacity, production scheduling, manpower resources & training, supplier management, parts & material procurement and shop loading will also be required.

On-Site examination of the plans/documents described above, as well as examination of the manufacturing equipment and facility, review of support functions/groups, and interviews with project personnel, are all integral parts of the PRR. Processes must be able to produce repeatable conforming hardware within time constraints of the contract. During the PRR, the Contractor shall be prepared to discuss manufacturing & procurement planning status, issues, problems, risks and schedules associated with the production program, and provide requested supporting objective evidence.

A successful review is predicated on the Government’s determination that there are no unacceptable risks, performance & quality requirements are fully met in the production configuration, and production capability demonstrates a satisfactory basis for proceeding into production. The Government in its sole discretion will determine whether the PRRs are successful.

The Government will provide a report summarizing the proceedings and identifying deficiencies and issues, as applicable. The Contractor shall provide a written response within 30 working days that addresses all identified deficiencies and issues and provides corrective actions.

The Contractor shall hold program reviews commencing after contract award which shall cover progress, schedules and problems. These reviews will be used to assess the Contractor’s progress, risk in meeting contractual requirements and status. During these reviews, the Contractor shall provide, at a minimum, overall comprehensive status of:

Production, Procurement and Material Issues

Subcontractor and Vendor Procurement

Integrated Master Schedule including the Critical Path

Make-or-Buy Program Changes

Risk Analysis Activities

Quality Program Status

Defect Reduction Program Status

Safety Program Status

Configuration Management Activities

Government Furnished Equipment/Property Status and Issues

Component Procurement Status and Expected delivery schedule

Equipment and Data Item Delivery Schedule

Final System Test(s)

Cost Saving Initiatives

Other Issues Identified by the Technical POC

For planning purposes, the program review location will be at the Contractor’s facility.

The Contractor shall also conduct management meetings regarding delivery on a regular basis (to be mutually agreed upon between the Government and Contractor) between the program reviews. The meetings will be conducted via teleconference or at the Contractor’s facility.

Meetings may be held bi-weekly via teleconference

Meeting materials shall be made available 24 hours prior to meeting start and distributed via email

Bi-weekly review shall include updated to schedules for UCEU and associated cables production status with actual start and completion dates for each major step and updated projections with detailed explanation if schedule slips

Bi-weekly review shall include any special topics as mutually agreed upon between the Government and Contractor

The Contractor shall provide presentation material in accordance with CDRL A006. The Government shall reserve and exercise the right to hold additional informal reviews at mutually convenient times to follow progress and problems, which may exist. Attendance at program reviews may include Government personnel, Government support service Contractor personnel, and other Government representatives as appropriate (Contractor personnel are not permitted for all reviews addressing matters pertaining to competitive contracting and actual pricing).

16.2 Defect Reduction

The Contractor shall establish a statistically-based process control and defect reduction program to control and improve product quality. The Contractor shall present the progress of the process control and defect reduction program at the program reviews and/or periodic production reviews of SOW paragraph 16.1.

17.0 GENERAL REQUIREMENTS

17.1 Program Management

The Contractor shall follow its internal Program Management Plan in the production of VLS UCEU and associated cables, and shall submit Progress, Status and Management Reports in accordance with CDRL A005.

17.2 Manufacturing Planning

The Contractor shall update their Manufacturing Plan to include VLS UCEU…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .