This document is a Bill of Quantities (BOQ) for a Design-Build contract to construct fixed ground stations in two locations in Malaysia: Kota Samarahan and Labuan. The solicitation (N6274225R6503) is issued by the Department of the Navy Naval Facilities Engineering Command and involves two Contract Line Items (CLINs): CLIN 0001 for the Kota Samarahan ground station (base bid) and CLIN 0002 for the Labuan ground station (option bid).
The BOQ details specific construction elements across multiple categories including superstructure (anchor bolts, steel structural members), exterior enclosure (painting), electrical systems (service distribution, lighting, aviation obstruction lighting, conduit for cables), and site preparation activities. The procurement timeline has been amended multiple times, with the most recent extension setting the proposal submission date to 20 August 2025 at 11:00 AM Thailand time. Pre-solicitation site visits are scheduled for 8 July 2025 at Kota Samarahan and 10 July 2025 at Labuan, with strict requirements for base access request submission. The contract involves constructing fixed ground stations at Royal Malaysian Air Force (RMAF) bases, with specific geographical coordinates provided for each location.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
BILL OF QUANTITIES DATE PREPARED
| ACTIVITY AND LOCATION: | CONSTRUCTION CONTRACT NO. | ID NO. | |||||||
| Kota Samarahan and Labuan, Malaysia | N6274225R6503 | ||||||||
| ESTIMATED BY | CATEGORY CODE | ||||||||
| PROJECT TITLE: | NO | ||||||||
| D/B Construct Fixed Ground Stations | STATUS OF DESIGN | JOB ORDER NO. | |||||||
| CLIN 0001: Base Bid Item 0001 | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| Construct Fixed Ground Station Kota Samarahan | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | |
| B10 | SUPERSTRUCTURE | ||||||||
| Anchor bolts | bolt | ||||||||
| Base plates | unit | ||||||||
| Steel structural members including platform | kg | ||||||||
| Connections | kg | ||||||||
| Steel plate cover | unit | ||||||||
| B20 | EXTERIOR ENCLOSURE | ||||||||
| B201009 | Exterior Painting and Coating | ||||||||
| Antirust paint | Liter | ||||||||
| D50 | ELECTRICAL | ||||||||
| D5010 | Electrical Service and Distribution | ls | |||||||
| D5020 | Lighting and Branch Wiring | ls | |||||||
| D502002 | Aviation obstruction lighting | pcs | |||||||
| D503001 | Conduit for fiber optic cables | m | |||||||
| D509004 | Lightning protection system | ls | |||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 0001: Base Bid Item 0001 | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| Construct Fixed Ground Station Kota Samarahan | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | |
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | ls | |||||||
| G1030 | Mobilization | ls | |||||||
| De-mobilization | ls | ||||||||
| Design and drawing | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Electricity connection | |||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 001 |
| CLIN 002: Option Bid Item 0001 | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| Construct Fixed Ground Station in Labuan | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | |
| B10 | SUPERSTRUCTURE | ||||||||
| Anchor bolts | bolt | ||||||||
| Base plates | unit | ||||||||
| Steel structural members including platform | kg | ||||||||
| Connections | kg | ||||||||
| B20 | EXTERIOR ENCLOSURE | ||||||||
| B201009 | Exterior Painting and Coating | ||||||||
| Antirust paint | Liter | ||||||||
| D50 | ELECTRICAL | ||||||||
| D5010 | Electrical Service and Distribution | ls | |||||||
| D5020 | Lighting and Branch Wiring | ls | |||||||
| D502002 | Aviation obstruction lighting | pcs | |||||||
| D503001 | Conduit for ethernet cables | m | |||||||
| D509004 | Lightning protection system | ls | |||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 002: Option Bid Item 0001 | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| Construct Fixed Ground Station in Labuan | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | |
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | ls | |||||||
| G1030 | Mobilization | ls | |||||||
| De-mobilization | ls | ||||||||
| Design and drawing | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Electricity connection | |||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 002 |
TOTAL CLIN 001 and CLIN 002
N6274225R6503_0004 Enclosure 4. BOQ rev.
&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS
Sheet2
&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS
Sheet3
&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS
File details come from the government source that posted it. Updated .