Enclosure 4 Blank BoQ - 25R6503.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
D/B Construct Fixed Ground Stations, Kota Samarahan and Labuan, Malaysia
Solicitation number
N6274225R6503
Issued by

About this file

This document is a Bill of Quantities (BoQ) for a Design-Build construction contract (N6274225R6503) for two Fixed Ground Stations located in Kota Samarahan and Labuan, Malaysia, issued by the Department of the Navy Naval Facilities Engineering Command. The BoQ details two primary Contract Line Items (CLINs), one for each location, with comprehensive cost breakdown categories including superstructure, exterior enclosure, electrical systems, site preparation, and overhead costs. Key construction elements include anchor bolts, steel structural members, base plates, exterior painting, aviation obstruction lighting, lightning protection systems, and electrical infrastructure.

The solicitation includes a pre-solicitation site visit scheduled for 23 June 2025 at the Royal Malaysian Air Force Base in Kota Samarahan and 25 June 2025 at the Labuan base, with strict access requirements for contractors. The proposal submission deadline is 11 July 2025 at 11:00 AM Thailand time. The project involves constructing fixed ground stations with detailed specifications for site preparation, electrical systems, structural components, and special construction elements, with separate cost estimations for material, labor, and overall project expenses.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BILL OF QUANTITIES DATE PREPARED

ACTIVITY AND LOCATION:CONSTRUCTION CONTRACT NO.ID NO.
Kota Samarahan and Labuan, MalaysiaN6274225R6503
ESTIMATED BYCATEGORY CODE
PROJECT TITLE:NO
D/B Construct Fixed Ground StationsSTATUS OF DESIGNJOB ORDER NO.
CLIN 001 Construct Fixed Ground Station Kota SamarahanQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
B10SUPERSTRUCTURE
Anchor boltsbolt
Base platesunit
Steel structural members including platformkg
Connectionskg
B20EXTERIOR ENCLOSURE
B201009Exterior Painting and Coating
Antirust paintLiter
D50ELECTRICAL
D5010Electrical Service and Distributionls
D5020Lighting and Branch Wiringls
D502002Aviation obstruction lightingpcs
D503001Conduit for fiber optic cablesm
D509004Lightning protection systemls
F10SPECIAL CONSTRUCTION
Project plaquels
XOFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 001 Construct Fixed Ground Station Kota SamarahanQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingls
G1030Mobilizationls
De-mobilizationls
Design and drawingls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Electricity connection
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 001
CLIN 002 Construct Fixed Ground Station LabuanQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
B10SUPERSTRUCTURE
Anchor boltsbolt
Base platesunit
Steel structural members including platformkg
Connectionskg
B20EXTERIOR ENCLOSURE
B201009Exterior Painting and Coating
Antirust paintLiter
D50ELECTRICAL
D5010Electrical Service and Distributionls
D5020Lighting and Branch Wiringls
D502002Aviation obstruction lightingpcs
D503001Conduit for ethernet cablesm
D509004Lightning protection systemls
F10SPECIAL CONSTRUCTION
Project plaquels
XOFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 002 Construct Fixed Ground Station LabuanQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingls
G1030Mobilizationls
De-mobilizationls
Design and drawingls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Electricity connection
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 002

TOTAL CLIN 001 and CLIN 002

N6274225R6503 Enclosure 4. Blank BOQ

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

Sheet2

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

Sheet3

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

File details come from the government source that posted it. Updated .