This document is Amendment 04 to Solicitation N6274224R1308 for the FY23 MCON P-923 AIRCRAFT PARKING APRON, FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR project at Royal Australian Air Force Base, Darwin, Australia. The work includes constructing an aircraft parking apron, aircraft rinse facility, and helicopter landing pads under P-923, as well as Marine Aviation Logistics Squadron and Marine Wing Support Squadron facilities under P-941, and a Type II aircraft maintenance hangar under P-949. The solicitation includes four priced options - Option 1 for P-941, Option 2 for ESS for P-941, Option 3 for P-949, and Option 4 for ESS for P-949. The contract will be awarded on a design-bid-build basis, and the Government may exercise the options within 365 days of contract award. The Department of the Navy Naval Facilities Engineering Command is the procuring agency.

View the file

Other files

File Type Posted
24R1308_AMD06.pdf PDF
JA.zip ZIP file
24R1308_AMD05.pdf PDF
24R1308 Note 12.pdf PDF
24R1308 Note 11.pdf PDF
24R1308 Note 10.pdf PDF
24R1308 Note 9.pdf PDF
24R1308 Note 8.pdf PDF
24R1308_AMD03.pdf PDF
24R1308 Note 7.pdf PDF
24R1308 Note 6.pdf PDF
24R1308 Note 5.pdf PDF
24R1308_AMD02.pdf PDF
24R1308 Note 4.pdf PDF
24R1308 Note 3.pdf PDF
24R1308_AMD01.pdf PDF
24R1308 Note 2.pdf PDF
P923_P949_P941 SV Sign-In.pdf PDF
24R1308 Note 1.pdf PDF
P923 Drawings_Specs_Part 1.zip ZIP file
P949 Drawings_Specs_Part 1.zip ZIP file
P923 Drawings_Specs_Part 2.zip ZIP file
P941 Drawings_Specs.zip ZIP file
P949 Drawings_Specs_Part 2.zip ZIP file
P923 Drawings_Specs_Part 3.zip ZIP file
RFP_24R1308.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. N6274224R1308 Amendment No. 0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

DOCUMENT 00 70 00, NEGOTIATED CONTRACT CLAUSES

Remove in its entirety, and replace with the attached Document 00 70 00, Negotiated Contract Clauses.

FY23 MCON P-923 AIRCRAFT PARKING APRON, FY25 MCON P-941 MAINTENANCE SUPPORT

FACILITY, AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR CONSOLIDATED DIV 01

SPECIFICATIONS

PROJECT TABLE OF CONTENTS

Delete in its entirety and replace with the attached PROJECT TABLE OF CONTENTS.

SECTION 01 11 00d – SMART INFRASTRUCTURE HANDBOOK

Insert after Section 01 11 00c SECTION 01 11 00d – SMART INFRASTRUCTURE

HANDBOOK

Amendment No. 0004

SECTION 01 31 20 - PROJECT TECHNICAL DATA MANAGEMENT AND VISUALIZATION

Delete Specification Section in its entirety.

SECTION 01 32 17.00 20 - COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

Delete Replace with Page 1 Page 1

SECTION 01 33 29 - SUSTAINABILITY REQUIREMENTS AND REPORTING

Delete Replace with Page 1 Page 1

Pages 6-7 Pages 6-7

SECTION 01 57 19 – TEMPORARY ENVIRONMENTAL CONTROLS

Pages 8-32 Pages 8-32

SECTION 01 57 19a – P-923 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN

Page 22 Page 22

Page 30 Page 30

SECTION 01 57 19b – P-941 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN

Page 24 Page 24

Page 33 Page 33

SECTION 01 57 19c – P-949 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN

Page 24 Page 24

Page 33 Page 33

FY23 MCON P-923 AIRCRAFT PARKING APRON

SPECIFICATIONS

PROJECT TABLE OF CONTENTS

Delete in its entirety and replace with the attached PROJECT TABLE OF CONTENTS. SECTION 02 41 00 – DEMOLITION and SECTION 02 61 13 – EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL accompanies this Amendment.

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY

SECTION 09 06 00a_P941.P949 - ARCHITECTURAL FINISHES AND COMPONENTS SCHEDULE (T-

SHEET)

Delete attachment in its entirety and replace with SECTION 09 06 00a_P941.P949 - ARCHITECTURAL FINISHES AND COMPONENTS SCHEDULE (T-SHEET). The revised attachment accompanies this Amendment.

SECTION 41 22 13.15 - BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING TROLLEY

Delete section in its entirety and replace with SECTION 41 22 13.15 - BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING TROLLEY. The revised section accompanies this Amendment.

SECTION 41 22 23.19 - MONORAIL HOISTS

Delete section in its entirety and replace with CTION 41 22 23.19 - MONORAIL HOISTS. The revised section accompanies this Amendment.

DRAWINGS

The following drawings supersede previously issued drawings bearing the same number and title:

DRAWING

NUMBER

NAVFAC

DRAWING

NUMBER

DRAWING

REVISION

NO.

DRAWING TITLE

A-702 17310451 1 MAINTENANCE SUPPORT FACILITY BUILDING -

SIGNAGE TYPES AND MOUNTING DETAILS - SHEET 2

AA103 17310456 2 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL - OVERALL ROOF PLAN

AA161 17310472 2 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL - ENLARGED ROOF PLAN - SHEET 1

AA162 17310473 2 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL - ENLARGED ROOF PLAN - SHEET 2

AA502 17310488 1 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL DETAILS - TYPICAL WALL TYPES -

SHEET 2

AA503 17310489 2 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL DETAILS - TYPICAL WALL TYPES -

SHEET 3

AA504 17310490 1 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL DETAILS - TYPICAL WALL TYPES -

SHEET 4

AA505 17310491 2 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL DETAILS - TYPICAL WALL TYPES -

SHEET 5

AA514 17310808 1 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL DETAIL WALL SECTIONS - SHEET 4

AA531 17310495 1 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL EXTERNAL SCREEN ENCLOSURE

DETAILS

AA621 17310499 2 MAINTENANCE SUPPORT FACILITY BUILDING -

ARCHITECTURAL - DOOR NOTES

AB125 17310517 1 ARMORY BUILDING - ARCHITECTURAL - WALL SET-

OUT PLAN

AB151 17310519 2 ARMORY BUILDING - ARCHITECTURAL REFLECTED

CEILING PLAN

AB321 17310526 2 ARMORY BUILDING - ARCHITECTURAL DETAIL

SECTIONS - SHEET 1

AB322 17310527 2 ARMORY BUILDING - ARCHITECTURAL DETAIL

SECTIONS - SHEET 2

AB325 17310530 2 ARMORY BUILDING - ARCHITECTURAL DETAIL

SECTIONS - SHEET 5

SA101 17310567 2 MAINTENANCE SUPPORT FACILITY BUILDING -

STRUCTURAL CONCRETE FOUNDATIONS AND SLAB

PLAN - OVERALL

SB201 17310601 1 ARMORY BUILDING - STRUCTURAL - ELEVATIONS -

SHEET 1

SB301 17310602 1 ARMORY BUILDING - STRUCTURAL - SECTIONS -

SHEET 1

FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR

PROJECT TABLE OF CONTENTS

Delete in its entirety and replace with the attached PROJECT TABLE OF CONTENTS. SECTION 41 22 13.55 - BRIDGE CRANES, UNDER RUNNING, AIRCRAFT HANGAR accompanies this Amendment.

SECTION 09 06 00a_P941.P949 - ARCHITECTURAL FINISHES AND COMPONENTS SCHEDULE (T-

SHEET)

Delete section in its entirety and replace with SECTION 09 06 00a_P941.P949 - ARCHITECTURAL FINISHES AND COMPONENTS SCHEDULE (T-SHEET). The revised section accompanies this Amendment.

SECTION 41 22 13.15 - BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING TROLLEY

Delete section in its entirety.

DRAWINGS

The following drawings supersede previously issued drawings bearing the same number and title:

DRAWING

NUMBER

NAVFAC

DRAWING

NUMBER

DRAWING

REVISION

NO.

DRAWING TITLE

A-702 17311006 1 SIGNAGE TYPES AND MOUNTING DETAILS - SHEET 2

AA111 17311014 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ENLARGED FLOOR PLAN - MV22

LAYOUT PLAN

AA112 17311015 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ENLARGED FLOOR PLAN - CH53E

LAYOUT PLAN

AA113 17311016 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ENLARGED FLOOR PLAN - HANGAR

BAY - SHEET 1

AA115 17311018 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ENLARGED FLOOR PLAN - FIRST

FLOOR - SHEET 1

AA116 17311019 2 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ENLARGED FLOOR PLAN - FIRST

FLOOR - SHEET 2

AA124 17311025 2 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - SETOUT PLAN - FIRST FLOOR -

SHEET 2

AA201 17311055 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - BUILDING ELEVATIONS - SHEET 1

AA202 17311056 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - BUILDING ELEVATIONS - SHEET 2

AA204 17311058 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ENLARGED BUILDING ELEVATIONS

- SHEET 1

AA205 17311059 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ENLARGED BUILDING ELEVATIONS

- SHEET 2

AA405 17311070 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - ELEVATOR ENLARGED PLANS AND

SECTIONS

AA502 17311080 2 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAILS - TYPICAL WALL TYPES -

SHEET 2

AA505 17311083 2 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAILS - TYPICAL WALL TYPES -

SHEET 5

AA511 17311084 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL WALL SECTIONS - SHEET 1

AA512 17311085 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL WALL SECTIONS - SHEET 2

AA513 17311086 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL WALL SECTIONS - SHEET 3

AA521 17311088 2 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL SECTIONS - SHEET 1

AA522 17311089 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL SECTIONS - SHEET 2

AA523 17311090 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL SECTIONS - SHEET 3

AA525 17311092 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL SECTIONS - SHEET 5

AA526 17311093 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL SECTIONS - SHEET 6

AA527 17311094 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - DETAIL SECTIONS - SHEET 7

AA701 17311103 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - MISCELLANEOUS DETAILS - SHEET

AA751 17311109 1 AIRCRAFT MAINTENANCE HANGAR -

ARCHITECTURAL - CEILING DETAILS

AB501 17311131 1 AREA DISTRUBUTION NODE BUILDING -

ARCHITECTURAL - DETAIL SECTIONS

AB701 17311138 1 AREA DISTRUBUTION NODE BUILDING -

ARCHITECTURAL - MISCELLANEOUS DETAILS

CW102 17310966 2 CIVIL UTILITIES - WET UTILITIES - SITE PLAN - SHEET

CW103 17310967 2 CIVIL UTILITIES - WET UTILITIES - SITE PLAN - SHEET

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

ROYAL AUSTRALIAN AIR FORCE BASE, DARWIN, AUSTRALIA

RFP N62742-24-R-1308

DOCUMENT 00 70 00 (ADVERTISE)

Amendment No. 0004

DOCUMENT 00 70 00

NEGOTIATED

CONTRACT CLAUSES

01/24

1.1 FAR 52.252-2, CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

FAR: https://www.acquisition.gov/browse/index/far DFARS: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

1.2 FAR 52.202-1, DEFINITIONS (JUN 2020)

1.3 FAR 52.203-3, GRATUITIES (APR 1984)

1.4 FAR 52.203-5, COVENANT AGAINST CONTINGENT FEES (MAY 2014)

1.5 FAR 52.203-6, RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

1.6 FAR 52.203-7, ANTI-KICKBACK PROCEDURES (JUN 2020)

1.7 FAR 52.203-8, CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

1.8 FAR 52.203-10, PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY

2014)

1.9 FAR 52.203-12, LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (JUN 2020)

1.10 FAR 52.203-13, CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)

1.11 FAR 52.203-17, CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

1.12 FAR 52.203-19, PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

1.13 FAR 52.204-2, SECURITY REQUIREMENTS (MAR 2021) ALTERNATE II (APR 1984)

1.14 FAR 52.204-4, PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT

PAPER (MAY 2011)

1.15 FAR 52.204-9, PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

1.16 FAR 52.204-10, REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

1.17 FAR 52.204-13, SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

1.18 FAR 52.204-18, COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(a) Definition. As used in this clause–

Commercial and Government Entity (CAGE) code means–

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

(b) Contractors shall ensure that the CAGE code is maintained throughout the life of the contract for each location of contract, including subcontract, performance. For contractors registered in the System for Award Management (SAM), the DLA Commercial and Government Entity (CAGE) Branch shall only modify data received from SAM in the CAGE master file if the contractor initiates those changes via update of its SAM registration. Contractors undergoing a novation or change-of-name agreement shall notify the contracting officer in accordance with subpart

42.12. The contractor shall communicate any change to the CAGE code to the contracting officer within 30 days after the change, so that a modification can be issued to update the CAGE code on the contract.

(c) Contractors located in the United States or its outlying areas that are not registered in SAM shall submit written change requests to the DLA Commercial and Government Entity (CAGE) Branch. Requests for changes shall be provided at https://cage.dla.mil. Change requests to the CAGE master file are accepted from the entity identified by the code.

(d) Contractors located outside the United States and its outlying areas that are not registered in SAM shall contact the appropriate National Codification Bureau (points of contact available at http://www.nato.int/structur/AC/135/main/links/contacts.htm) or NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx to request CAGE changes.

(e) Additional guidance for maintaining CAGE codes is available at https://cage.dla.mil.

(f) If the contract includes Federal Acquisition Regulation clause 52.204-2, Security Requirements, the contractor shall ensure that subcontractors maintain their CAGE code(s) throughout the life of the contract.

1.19 FAR 52.204-19, INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

The Contractor’s representations and certification, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

1.20 FAR 52.204-21, BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(a) Definitions. As used in this clause—

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

1.21 FAR 52.204-23, PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND

SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)

1.22 FAR 52.204-25, PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

1.23 FAR 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

1.24 FAR 52.204-30, FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-

PROHIBITION (DEC 2023)

1.25 FAR 52.209-6, PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021)

1.26 FAR 52.209-9, UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

1.27 FAR 52.209-10, PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (NOV 2015)

1.28 FAR 52.210-1, MARKET RESEARCH (NOV 2021)

1.29 FAR 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) Commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed,

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use of Project P-923 not later than 970 calendar days after notice to proceed.

If Option No. 1 is awarded, all work for the construction of Project P-941 shall be completed not later than 830 calendar days from the date Option No. 1 is exercised.

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004

If only Option No. 3 is awarded, or both Options No. 1 and 3 are awarded at the same time, the contract completion date for all projects (P-923, P-941, and P-949) will be increased to 1,005 calendar days from the date Option No. 3 is exercised.*

*If Option No. 3 is awarded before Option No. 1, the contract completion date of 1,005 calendar days will be increased by the difference in calendar days between the exercise of Option No. 3 and Option No. 1.

The time stated for completion shall include final cleanup of the premises.

A "Notice to Proceed" is deemed to be given by the Government to the Contractor 21 calendar days after the contract award date. No formal written notice will be issued by the Government. Within 21 calendar days following the contract award date, the Contractor is obligated to submit performance and payment bonds in a form acceptable to the Government. The Government shall notify the Contractor of the acceptability of the performance and payment bonds within 5 working days of receipt of these documents. If these documents are not submitted in their proper form acceptable to the Government within 21 calendar days of contract award, any delays resulting thereby will be at the sole expense of the Contractor. The contract completion date will not be extended due to the Government's review of the acceptability of the Contractor's bonds, except where the Government's review of said documents extends beyond 5 working days.

1.30 FAR 52.211-12, LIQUIDATED DAMAGES—CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government for each calendar day of delay until the work is completed or accepted as follows:

P-923: $23,712.11/day P-941: $5,250.39/day P-949: $8,281.98/day

1.31 FAR 52.211-13, TIME EXTENSIONS (SEP 2000)

1.32 FAR 52.211-15, DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

1.33 FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY (APR 1984)

1.34 FAR 52.215-2, AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

1.35 FAR 52.215-11, PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--

MODIFICATIONS (DEVIATION 2022-O0001) (OCT 2021)

1.36 FAR 52.215-13, SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS

(DEVIATION 2022-O0001) (OCT 2021)

(a) The requirements of paragraphs (b) and (c) of this clause shall—

(1) Become operative only for any modification to this contract involving a pricing adjustment expected to exceed $2 million on the date of execution of the modification; and

(2) Be limited to such modifications.

(b) Before awarding any subcontract expected to exceed $2 million on the date of agreement on price or the date of award, whichever is later; or before pricing any subcontract modification involving a pricing adjustment expected to exceed $2 million, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with FAR 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor's estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004 nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies.

If the $2 million threshold for submission of certified cost or pricing data is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.

(c) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (b) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in each subcontract that exceeds $2 million on the date of agreement on price or the date of award, whichever is later.

1.37 FAR 52.215-15, PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

1.38 FAR 52.215-18, REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS

(PRB) OTHER THAN PENSIONS (JUL 2005)

1.39 FAR 52.215-19, NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

1.40 FAR 52.215-21, REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER

THAN CERTIFIED COST OR PRICING DATA—MODIFICATIONS (NOV 2021)

1.41 FAR 52.217-7, OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options at the time of award or by written notice to the Contractor within 365 calendar days from the date of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

1.42 FAR 52.222-1, NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

1.43 FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

1.44 FAR 52.222-26, EQUAL OPPORTUNITY (SEP 2016)

1.45 FAR 52.222-27, AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION

(APR 2015)

1.46 FAR 52.222-29, NOTIFICATION OF VISA DENIAL (APR 2015)

1.47 FAR 52.222-50, COMBATING TRAFFICKING IN PERSON (NOV 2021)

1.48 FAR 52.223-2, AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (SEP 2013)

1.49 FAR 52.223-3, HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB

2021)

1.50 FAR 52.223-5, POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

1.51 FAR 52.223-6, DRUG-FREE WORKPLACE (MAY 2001)

1.52 FAR 52.223-9, ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-

DESIGNATED ITEMS (MAY 2008)

1.53 FAR 52.223-15, ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (MAY 2020)

1.54 FAR 52.223-17, AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND

CONSTRUCTION CONTRACTS (AUG 2018)

1.55 FAR 52.223-18, ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (JUN 2020)

1.56 FAR 52.224-1, PRIVACY ACT NOTIFICATION (APR 1984)

1.57 FAR 52.224-2, PRIVACY ACT (APR 1984)

1.58 FAR 52.225-13, RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

1.59 FAR 52.227-4, PATENT INDEMNITY -- CONSTRUCTION CONTRACTS (DEC 2007)

1.60 FAR 52.228-1, BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds,

(1) to unsuccessful bidders as soon as practicable after the opening of bids, and

(2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 21 days after award of the contract, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

1.61 FAR 52.228-2, ADDITIONAL BOND SECURITY (OCT 1997)

1.62 FAR 52.228-3, WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT) (JUL 2014)

1.63 FAR 52.228-4, WORKER’S COMPENSATION AND WAR HAZARD INSURANCE OVERSEAS (APR

1984)

1.64 FAR 52.228-5, INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

1.65 FAR 52.228-11, INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)

(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004

(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.

(c) A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3)Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.

(d) The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.

1.66 FAR 52.228-12, PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (DEC 2022)

1.67 FAR 52.228-14, IRREVOCABLE LETTER OF CREDIT (NOV 2014)

1.68 FAR 52.228-15, PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)

(DEVIATION 2020-O0016)

(a) Definitions. As used in this clause-

Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance bonds (Standard Form 25, except that no seal is required). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25A, except that no seal is required). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of the Treasury, Financial Management, Service Surety Bond Branch, 3700 East West Highway, Room 6 F01, Hyattsville, MD 20782.

Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

1.69 FAR 52.229-6, TAXES – FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)

1.70 FAR 52.232-5, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014

1.71 FAR 52.232-17, INTEREST (MAY 2014)

1.72 FAR 52.232-23, ASSIGNMENT OF CLAIMS (MAY 2014)

1.73 FAR 52.232-27, PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)

1.74 FAR 52.232-33, PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

1.75 FAR 52.232-39, UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

1.76 FAR 52.232-40, PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (MAR 2023)

1.77 FAR 52.233-1, DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)

1.78 FAR 52.233-3, PROTEST AFTER AWARD (AUG 1996)

1.79 FAR 52.233-4, APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

1.80 FAR 52.236-1, PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

1.81 FAR 52.236-2, DIFFERING SITE CONDITIONS (APR 1984)

1.82 FAR 52.236-3, SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

1.83 FAR 52.236-4, PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Douglas Partners Geotechnical Investigation Report dated December 2022 (Ref: 212401.00 R.001.Rev0); Douglas Partners Supplementary Report of Contamination Sampling and Testing dated December 2022 (Ref: 212401.00 L.001.Rev0); GHD Site Investigation Report dated September 2022 (ref:12573462); Earl James and Associates Survey Report dated 10 May 2021 (ref: 11809); and Earl James and Associates Survey Report dated 18 November 2022 (ref: 12345).

(b) Weather conditions: Refer to Australian Government Bureau of Meteorology (http://www.bom.gov.au/).

Darwin has a tropical savanna climate with distinct wet and dry seasons, and the average maximum temperature is similar year round. The wet season typically occurs from November to April, featuring heavy rainfall, high humidity, and the risk of tropical cyclones.

(c) Transportation facilities: Contractor to arrange all transportation required. Access to the RAAF Base Darwin is via the Stuart Highway and Billeroy Road Entry Gate.

(d) Other information: Project P-949 is intended to be advertised together with Project P-923 Aircraft Parking Apron and P-941 Maintenance Support Facility. P-923 will be the Base Bid, P-941 and P-949 will be Bid Options.

1.84 FAR 52.236-5, MATERIAL AND WORKMANSHIP (APR 1984)

1.85 FAR 52.236-6, SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

1.86 FAR 52.236-7, PERMITS AND RESPONSIBILITIES (NOV 1991)

1.87 FAR 52.236-8, OTHER CONTRACTS (APR 1984)

1.88 FAR 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS (APR 1984)

1.89 FAR 52.236-10, OPERATIONS AND STORAGE AREAS (APR 1984)

1.90 FAR 52.236-11, USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

1.91 FAR 52.236-12, CLEANING UP (APR 1984)

1.92 FAR 52.236-13, ACCIDENT PREVENTION (NOV 1991) ALTERNATE I (NOV 1991)

1.93 FAR 52.236-14, AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

1.94 FAR 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

1.95 FAR 52.236-16, QUANTITY SURVEYS (APR 1984)

1.96 FAR 52.236-17, LAYOUT OF WORK (APR 1984)

1.97 FAR 52.236-21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

ALTERNATE I (APR 1984)

1.98 FAR 52.236-26, PRECONSTRUCTION CONFERENCE (FEB 1995)

1.99 FAR 52.242-13, BANKRUPTCY (JUL 1995)

1.100 FAR 52.242-14, SUSPENSION OF WORK (APR 1984)

1.101 FAR 52.243-4, CHANGES (JUN 2007)

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004

1.102 FAR 52.243-6, CHANGE ORDER ACCOUNTING (APR 1984)

1.103 FAR 52.244-6, SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(DEC 2023)

1.104 FAR 52.246-12, INSPECTION OF CONSTRUCTION (AUG 1996)

1.105 FAR 52.246-21, WARRANTY OF CONSTRUCTION (MAR 1994) ALTERNATE I (APR 1984)

1.106 FAR 52.248-3, VALUE ENGINEERING -- CONSTRUCTION (OCT 2020)

1.107 FAR 52.249-2, TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED – PRICE)

(APR 2012) ALTERNATE I (SEP 1996)

1.108 FAR 52.249-10, DEFAULT (FIXED - PRICE CONSTRUCTION) (APR 1984)

1.109 FAR 52.251-1, GOVERNMENT SUPPLY SOURCES (APR 2012)

1.110 FAR 52.252-4, ALTERATIONS IN CONTRACT (APR 1984)

Portions of this contract are altered as follows:

FAR 52.211-10, Commencement, Prosecution, and Completion of Work (APR 1984): Supplemental clarification of “Notice to Proceed.”

1.111 FAR 52.253-1, COMPUTER GENERATED FORMS (JAN 1991)

1.112 DFARS 252.201-7000, CONTRACTING OFFICER’S REPRESENTATIVE (DEC 1991)

1.113 DFARS 252.203-7000, REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (SEP 2011)

1.114 DFARS 252.203-7001, PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

1.115 DFARS 252.203-7002, REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC

2022)

1.116 DFARS 252.203-7003, AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)

1.117 DFARS 252.203-7004, DISPLAY OF HOTLINE POSTERS (JAN 2023)

1.118 DFARS 252.204-7000, DISCLOSURE OF INFORMATION (OCT 2016)

1.119 DFARS 252.204-7003, CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

1.120 DFARS 252.204-7004, ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN

2023)

1.121 DFARS 252-204-7009, LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY

CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (JAN 2023)

1.122 DFARS 252.204-7012, SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER

INCIDENT REPORTING (JAN 2023)

1.123 DFARS 252.204-7015, NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR

LITIGATION SUPPORT (JAN 2023)

1.124 DFARS 252.204-7018, PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

1.125 DFARS 252.204-7020, NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(a) Definitions.

Basic Assessment” means a contractor’s self-assessment of the contractor’s implementation of NIST SP 800-171 that—

(1) Is based on the Contractor’s review of their system security plan(s) associated with covered contractor information system(s);

(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004

(3) Results in a confidence level of “Low” in the resulting score, because it is a self-generated score.

“Covered contractor information system” has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

“High Assessment” means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that—

(1) Consists of—

(i) A review of a contractor’s Basic Assessment;

(ii) A thorough document review;

(iii) Verification, examination, and demonstration of a Contractor’s system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor’s system security plan; and

(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of “High” in the resulting score.

“Medium Assessment” means an assessment conducted by the Government that—

(1) Consists of—

(i) A review of a contractor’s Basic Assessment;

(ii) A thorough document review; and

(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of “Medium” in the resulting score.

(b) Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, as described in NIST SP 800-171 DoD Assessment Methodology at https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171 , if necessary.

(d) Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) () to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to for posting to

SPRS.

(i) The email shall include the following information:

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

(A) Version of NIST SP 800-171 against which the assessment was conducted.

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract—

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:

System security plan

CAGE codes supported by this plan

Brief description of the plan architecture

Date of assessment

Total score Date score of 110 will achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No. 0004

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(e) Rebuttals.

(1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User’s Guide https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).

(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.

(f) Accessibility.

(1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User’s Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause. DoD will retain and protect any such documentation as “Controlled Unclassified Information (CUI)” and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

(g) Subcontracts.

(1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services (excluding commercially available off-the-shelf).

(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800-171 security requirements, in accordance with DFARS clause 252.204-7012 of this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800-171 DoD Assessment, as described in https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171 , for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.

(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to mailto:webptsmh@navy.mil for posting to SPRS along with the information required by paragraph (d) of this clause.

1.126 DFARS 252.205-7000, PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT

HOLDERS (JUN 2023)

FY23 MCON P-923 AIRCRAFT PARKING APRON, 1580570

FY25 MCON P-941 MAINTENANCE SUPPORT FACILITY, 1737355

AND FY25 MCON P-949 AIRCRAFT MAINTENANCE HANGAR, 1737356

Amendment No.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .