AMD01 22R1317.pdf
PDF 236 KB Posted
- Solicitation number
- N6274222R1317
About this file
This solicitation requests proposals for an indefinite delivery, indefinite quantity multiple award construction contract to provide facilities and infrastructure services for U.S. military construction projects in Guam and other areas under the Naval Facilities Engineering Command, Pacific. Contractors will perform a wide variety of construction tasks on projects such as barracks, administrative facilities, communications facilities, hospitals, dining facilities, warehouses, operational facilities, roads, bridges, site utilities, aviation facilities, and other base development facilities. The majority of work will be in Guam, but other areas under the NAVFAC Pacific cognizance may be included. The contract will have a 60-month period of performance with a minimum $25,000 guaranteed for each awardee. Task order value will typically range from $25 million to $250 million. This is a two-phase solicitation, evaluating technical approach, experience, past performance, safety, and small business participation. Proposals are due by 25 April 2022. The Naval Facilities Engineering Command, Pacific intends to award to at least three contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22R1317 Note 7-Final.pdf | ||
| 22R1317 Note 6.pdf | ||
| AMD 04 22R1317.pdf | ||
| 22R1317 Note 5.pdf | ||
| 22R1317 Note 4.pdf | ||
| AMD 03 22R1317.pdf | ||
| 22R1317 Note 3-Final.pdf | ||
| AMD 02 22R1317.pdf | ||
| 22R1317 Note 2-Final.pdf | ||
| Attch A Exp-rev.doc | DOC document | |
| 22R1317 Note 1.pdf | ||
| N62742-22-R-1317 PH I.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62742-22-R-1317, FACILITIES AND INFRASTRUCTURE MULTIPLE AWARD CONSTRUCTION CONTRACTS FOR U.S. MILITARY CONSTRUCTION PROJECTS IN GUAM AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC
See Next Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274222R1317
X 9B. DATED (SEE ITEM 11)
25-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-May-2022
CODE
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (CODE ACQ33)
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274222R1317
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
This amendment is issued to revise the following:
1. Document 00 22 00, page 2, title is revised from “Document 00202” to “Document 00 22 00.”
2. Document 00 22 00, page 3, PHASE ONE, Factor 1 – Technical Approach: (a) Solicitation Submittal requirements, 2nd line, “Document 00100” is revised to “Document 00 21 16.”
3. Document 00 22 00, Attachment A is deleted in its entirety and replaced with the attached Attachment A-REV 1.
4. All other terms and conditions remain unchanged.
End of Amendment
RFP N62742-22-R-1317
Document 00 22 00
ATTACHMENT A-REV 1
ATTACHMENT A-REV 1
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5
CON #6
DESIGN #1 DESIGN #2 DESIGN #3 DESIGN #4 DESIGN #5
DESIGN #6
1. Name of Firm that Performed Project*: ____________________________________________ Address: __________________________________________________ Unique Entity Identifier: ___________________ Phone Number: _____________ DUNS #: ________________________________ Point of Contact: _____________________________ Contact Phone Number: ____________________
a. If the firm that performed the project has been acquired by the Offeror and is no longer a separate legal entity, the Offeror shall provide an explanation of the acquisition sufficient to demonstrate that the predecessor firm is now part of the Offeror.
b. Name of Firm Experience is Claimed for* (i.e.; if the project was performed by a J/V and Offeror is claiming experience of one of the J/V members, state the exact legal name of the JV member Offeror claims experience for):
Address: ___________________________________ Unique Entity Identifier: ___________________ Phone Number: _____________ DUNS #: _______________________________ Point of Contact: _____________________________ Contact Phone Number: ____________________
2. Work Performed as*: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Construction Completion Date (mm/dd/yy):
5. Type of work:
New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
RFP N62742-22-R-1317
Document 00 22 00
ATTACHMENT A-REV 1
Complete Block 7 for Construction Projects.
7. Construction Project:
Total Award Amount: $_____________________ Final Price: $__________________________
Type of Contract/Task Order: (Check ALL that apply)
Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
Complete Block 8 for Design Projects.
8. Design Project:
A/E Design Fee: $________________ Total Construction Value: $_______________
Type of Contract/Task Order: (Check ALL that apply)
Design-Build RFP Development Designer of Record Engineering Services Full Plans & Specs
Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
Primary Function of Facility: ______________________________________
File details come from the government source that posted it. Updated .