About this file

This solicitation requests proposals for natural resource management services predominantly in Hawaii, Guam, the Commonwealth of the Northern Mariana Islands, and other locations within the Naval Facilities Engineering Systems Command area of responsibility worldwide as needed. The Naval Facilities Engineering Systems Command, Pacific intends to award firm-fixed price indefinite delivery indefinite quantity multiple award contracts to no more than six offerors whose proposals represent the best value to the government, with price and technical factors considered. The scope of work includes tasks associated with monitoring, managing, and protecting biological resources such as coordination meetings, fauna and flora surveys, wetlands work, habitat restoration, biosecurity, integrated natural resource management plans, environmental planning and studies, educational outreach, fire management, aerial and GIS mapping, diving and marine resource surveys, and miscellaneous natural resource services. The aggregate value of task orders awarded is not to exceed $49 million over the one base year and four option years of the contracts. The estimated workload is $23 million for the unrestricted division and $26 million for the partial small business set aside division.

View the file

Other files

File Type Posted
N6274221R1800_Amd 0005_FINAL.pdf PDF
SECTION L - 21R1800 final_Amd 0005.pdf PDF
N6274221R1800_AMD 0004_FINAL.pdf PDF
J-16 Sample Project PWS_AMD 0003.pdf PDF
QAs 17-18_AMD 0003 final.pdf PDF
N6274221R1800_Amd 0003_FINAL.pdf PDF
N6274221R1800_AMD 0001_FINAL.pdf PDF
J-17 Sample Project Key Personnel Assignments_AMD 0002.pdf PDF
QAs 4-16_AMD 0002.pdf PDF
J-16 Sample Project PWS_AMD 0002.pdf PDF
SECTION M _Am 0002.pdf PDF
N6274221R1800_AMD 0002_FINAL.pdf PDF
QAs 1-3_AMD 0001.pdf PDF
N6274221R1800_AMD 0001.pdf PDF
J-2 Minimum Professional Qualifications 24Oct2019.pdf PDF
J-5 Guidelines for Reports Graphics and Other Deliverables_July2021.pdf PDF
J-8 ACOE Hi Pac Wetland Delineation.pdf PDF
J-12 WD No 2015-5691 Rev. 13 (Hawaii - Kauai).pdf PDF
J-6 HACCP Manual 2014 FINAL. 080314.pdf PDF
J-11 WD No 2015-5689 Rev. 14 (Hawaii - Oahu).pdf PDF
J-9 SECREQS FOR CIA CNIA NWA_REV AUG2013.pdf PDF
J-17 Sample Project Key Personnel Assignments.rtf RTF text file
J-15 Key Personnel Experience.docx DOCX document
J-16 Sample Project PWS_2021 05 24.pdf PDF
J-10 WD No 2015-5693 Rev. 13 (Guam).pdf PDF
J-13 SB Subcontracting Plan.doc DOC document
J-18 Small Business Participation Commitment Document.docx DOCX document
N6274221R1800.pdf PDF
J-4 Navy GIS deliverable specifications_2021 04 19.pdf PDF
J-1 Laws and Regs_25may2021.pdf PDF
J-7 ESA Section 7 handbook March 1998.pdf PDF
J-20 Sample Project Price Sheet.docx DOCX document
J-3 DoD INRMP Manual 2018.pdf PDF
J-14 Contract Experience Form.docx DOCX document
J-19 PPQ Form.doc DOC document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62742-21-R-1800

SOLICITATION NO. N62742-21-R-1800, NATURAL RESOURCE MANAGEMENT SERVICES PREDOMINATELY IN HAWAII, GUAM, THE COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS (CNMI), AND OTHER LOCATIONS WITHIN

THE NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (NAVFAC) AREA OF RESPONSIBILITY WORLDWIDE AS NEEDED

QUESTIONS AND ANSWERS

Question # Reference/Section (Page, #, etc.) Question Government Response

19 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section

3.3 Rodent Control

Are all traps required to be monitored during the 1 to 6 weeks span or can the area be divided into sections/ plots allowing one plot to be thoroughly monitored every 1 to 6 weeks?

Please refer to section 3.3.2.c

20 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section

3.3 Rodent Control

How has the counts of the two species of rodents within the 50-acre forest restoration area been identified? Via surveying of the full 50-acre area, surveying of a particular area and then extrapolating the counts for 50-acres, or through other methods?

Please refer to section 1.1, paragraph 4 for the information available. Methodology should be developed on the information the government has provided.

21 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section 3.3 Rodent Control

Can the government provide a map of the 50-acre forest restoration area?

A map will not be provided. The information needed is provided in section 1.1, paragraph 3 and 4.

22 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section

3.3 Rodent Control

Does the Government expect the Contractor to kill the rodent species with the traps to be utilized or to keep the rodents alive?

The Government would like rodents to be dispatched.

23 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section 3.3 Rodent Control

Is there a particular placement the Government would like the Contractor to place the traps within the 50-acre footprint?

Placement of traps should be based on the contractor's technical approach.

24 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section 3.3 Rodent Control

Is there a minimum or maximum number of wildlife cameras that need to be deployed within a particular size of the footprint?

The minimum or maximum number of cameras that need to be deployed is based on the contractor’s technical approach.

25 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section 3.3 Rodent Control

Is there a minimum or maximum number of wildlife cameras that need to be deployed within a particular size of the footprint?

Please see response to question 24.

26 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section 3.3 Rodent Control

Are there any repercussions for non-targets (in particular ESA listed species) accidentally caught with the types of traps deployed?

There are no Endangered Species Act non-targets, therefore the are no repercussions.

27 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section 3.3 Rodent Control

What procedures are allowed by the Contractor to kill any live rodent species caught within the traps?

Any live rodents should be dispatched, the contractor should develop a procedure in accordance with industry standards.

28 SF33, Section J, Attachment J-16 Sample Project Performance Work Statement, page 8, Section 3.3 Rodent Control

Is there a designated area that the Government will provide to the Contractor to dispose of the dead rodent? If the Contractor will need to provide a location, are there any specifications to the locations and procedures for properly disposing of the dead rodents?

There is no designated area.

29 SF33, Section M8, Factor 1, Experience, Solicitation Submittal Requirements

Can all resumes be attached in an appendix? No, please include resumes in Factor 1.