Base Year
| Attachment J.7, Cost Model |
| N62742-20-R-1801 Amendment 0004 |
| BASE YEAR |
| Direct Labor Cost |
| | Labor Hours | | | | Labor Cost | | | |
| Labor Category | Rate | Home | Field | DBA | SCA | Home | Field | DBA | SCA |
| ( $/hr ) | ( hr) | ( hr) | ( hr) | ( hr) | ( $ ) | ( $ ) | ( $ ) | ( $ ) |
| Key Personnel -- Program Manager | x | 820 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Senior Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Contract Administration Manager | x | 1,900 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Quality Assurance Manager | x | 160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel - Health and Safety Manager | x | 390 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Superintendent | x | 14,480 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Scientist/Geologist | x | 4,800 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Industrial Hygenist, Certified | x | 80 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Engineer | x | 1,030 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Engineer | x | 180 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Engineer | x | 120 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Scientist/Geologist | x | 1,270 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Health and Safety Officer | x | 7,200 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project QC Manager | x | 3,240 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Scientist/Geologist | x | 500 | 0 | 0 | 0 | $ | $ | $ | $ |
| CADD/GIS Operator | x | 290 | 0 | 0 | 0 | $ | $ | $ | $ |
| Word Processor | x | 260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Administrative Assistant | x | 320 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Controls Administrator | x | 1,220 | 0 | 0 | 0 | $ | $ | $ | $ |
| Estimator | x | 70 | 0 | 0 | 0 | $ | $ | $ | $ |
| Billing/Invoice Clerk | x | 1,440 | 0 | 0 | 0 | $ | $ | $ | $ |
| Subcontract Administrator | x | 1,410 | 0 | 0 | 0 | $ | $ | $ | $ |
| Cost/Schedule Analyst | x | 1,210 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Chemist | x | 1,160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior UXO Supervisor (SUXOS) | x | - 0 | 790 | 0 | 0 | $ | $ | $ | $ |
| UXO Quality Control Specialist (UXO QCS) | x | - 0 | 640 | 0 | 0 | $ | $ | $ | $ |
| UXO Safety Officer (UXO SO) | x | - 0 | 80 | 0 | 0 | $ | $ | $ | $ |
| SCA 30491 - Unexploded Ordnance (UXO) Technician I | x | - 0 | 0 | 0 | 250 | $ | $ | $ | $ |
| SCA 30492 - Unexploded Ordnance (UXO) Technician II | x | - 0 | 0 | 0 | 2130 | $ | $ | $ | $ |
| SCA 30493 - Unexploded Ordnance (UXO) Technician III | x | - 0 | 0 | 0 | 630 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 8 | x | - 0 | 0 | 620 | 0 | $ | $ | $ | $ |
| DBA Truck Driver, Group 13B | x | - 0 | 0 | 6300 | 0 | $ | $ | $ | $ |
| DBA Laborer, Laborer 1 | x | - 0 | 0 | 7300 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 1 | x | - 0 | 0 | 2770 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 2 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 3 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 6, Loader | x | - 0 | 0 | 6510 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 12A | x | - 0 | 0 | 2270 | 0 | $ | $ | $ | $ |
| DBAEquipment Operator, Group 13, Truck Driver | x | - 0 | 0 | 2370 | 0 | $ | $ | $ | $ |
| Total (Home) | | | | | | | | |
| Total (Field) | | | | | | | | |
| Total (Craft SCA/DBA) | | | | | | | | |
| Total Hours (Home, Field, DBA, and SCA) | 52,070 | 1,510 | 35,840 | 3,010 | $ | $ | $ | $ |
| Rate | Labor | Cost |
| ( % ) | ( hr ) | ( $ ) |
| Direct Labor Cost | Home | 52,070 | $ |
| Field | 1,510 | $ |
| DBA | 35,840 | $ |
| SCA | 3,010 | $ |
| Fringe | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Overhead | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Low Value Equipment | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
Other Direct Costs $ 16,384,828
Travel $ 2,521,311
Fixed Price Subcontracts $ 9,902,960
| G&A | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| ODC's | % | x | $ | $ |
| Travel | % | x | $ | $ |
| Subs | % | x | $ | $ |
| Facilities Capital Cost of Money (FCCOM) | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| G&A | % | x | $ | $ |
| Dir. Equip. | % | x | $ | $ |
| Maximum Award Fee (not to exceed 10%) | % | x | Labor | $ | $ | ERROR:#VALUE! |
| | | ODCs | $ | $ | ERROR:#VALUE! |
| | | Subcontractor | $ | $ | ERROR:#VALUE! |
TOTAL COST $
Notes:
| 1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS J.7 FORM. |
| 2. The Offeror shall not add or delete labor categories, make structural changes, or change the hours on this form. |
| 3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontracts on this form. |
| 4. If applicable, Offeror should add direct cost applied to the labor base (e.g. Health and Safety charge, low value equipment). Must correspond to the breakdown provided on Attachments J.3 and J.4. |
| 5. Offeror should add or delete additional indirect costs in accordance with established account system (must use appropriate base and explain). |
| 6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract. |
| 7. Offeror shall utilize the indirect rate ceilings on Attachment JL.4 as their indirect rates. If an offeror (prime/JV, cost reimbursable subs) proposes multiple mark-up rates for other directs costs and subcontracts (e.g. G&A), the highest mark-up rate shall be utilized on the cost model worksheet (J.7). |
| 8. For professional labor, the ceiling rates listed on Attachment J.1 under Maximum Ceiling Rate for Billing Purposes shall be utilized. |
| 9. The proposed rates for DBA labor, shall be equal to the General Decision Number: General Decision No. HI20210001 dated 05/07/2021 (J.13). These rates will be used for evaluation purposes only. |
| 10. The proposed rates for SCA labor, shall be equal to the rates provided in Wage Determination No. 2015-5693, Revision No. 12, Date of Revision 12/21/2020 (J.14). These rates will be used for evaluation purposes only. |
| 11. Do not include hazard pay for the SCA labor categories. |
| 12. This form shall be submitted by the Prime, each member of a Joint Venture (JV) entity (see note below), each cost reimbursable subcontractor and (if necessary) each cost center that will be utilized |
| in performance of the contract. If the JV entity has an established separate cost center with an adequate accounting system for a cost reimbursement contract, one form may be submitted for the JV entity. |
| 13. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost. |
| 14. Per Section H of the solicitation, the acquisition and use of Information Technology Equipment or Systems shall not be considered a direct charge under this contract. |
| 15. For SCA and DBA labor, if it is the offeror’s normal accounting practice to charge health and welfare/fringe benefits as a direct charge, then the offeror shall explain the basis of the base rate, including calculation in Microsoft Excel format on a CD to clearly show the base rate and markups applied. For example, showing the SCA rate plus SCA health and welfare or DBA plus WD fringe and any other direct charges added to the direct labor rate such as FUTA, SUTA and FICA. The offeror shall use their indirect ceiling rates on Attachment J.4 in any offset or differential calculations to account for the payment of health and welfare/fringes in the base labor rate. |
| 16. Offerors should add the award fee as proposed on Attachment J.4. Award fee shall not be applied to travel, Contractor-Acquired Property, Facilities Capital Cost of Money, and award fee on cost reimbursable subcontractor's cost at any tier. |
| 17. SEE ADDITIONAL INSRUCTIONS IN SECTION L |
Option Year 1
| Attachment J.7, Cost Model |
| N62742-20-R-1801 Amendment 0004 |
| OPTION YEAR 1 |
| Direct Labor Cost |
| | Labor Hours | | | | Labor Cost | | | |
| Labor Category | Rate | Home | Field | DBA | SCA | Home | Field | DBA | SCA |
| ( $/hr ) | ( hr) | ( hr) | ( hr) | ( hr) | ( $ ) | ( $ ) | ( $ ) | ( $ ) |
| Key Personnel -- Program Manager | x | 820 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Senior Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Contract Administration Manager | x | 1,900 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Quality Assurance Manager | x | 160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel - Health and Safety Manager | x | 390 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Superintendent | x | 14,480 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Scientist/Geologist | x | 4,800 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Industrial Hygenist, Certified | x | 80 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Engineer | x | 1,030 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Engineer | x | 180 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Engineer | x | 120 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Scientist/Geologist | x | 1,270 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Health and Safety Officer | x | 7,200 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project QC Manager | x | 3,240 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Scientist/Geologist | x | 500 | 0 | 0 | 0 | $ | $ | $ | $ |
| CADD/GIS Operator | x | 290 | 0 | 0 | 0 | $ | $ | $ | $ |
| Word Processor | x | 260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Administrative Assistant | x | 320 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Controls Administrator | x | 1,220 | 0 | 0 | 0 | $ | $ | $ | $ |
| Estimator | x | 70 | 0 | 0 | 0 | $ | $ | $ | $ |
| Billing/Invoice Clerk | x | 1,440 | 0 | 0 | 0 | $ | $ | $ | $ |
| Subcontract Administrator | x | 1,410 | 0 | 0 | 0 | $ | $ | $ | $ |
| Cost/Schedule Analyst | x | 1,210 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Chemist | x | 1,160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior UXO Supervisor (SUXOS) | x | - 0 | 790 | 0 | 0 | $ | $ | $ | $ |
| UXO Quality Control Specialist (UXO QCS) | x | - 0 | 640 | 0 | 0 | $ | $ | $ | $ |
| UXO Safety Officer (UXO SO) | x | - 0 | 80 | 0 | 0 | $ | $ | $ | $ |
| SCA 30491 - Unexploded Ordnance (UXO) Technician I | x | - 0 | 0 | 0 | 250 | $ | $ | $ | $ |
| SCA 30492 - Unexploded Ordnance (UXO) Technician II | x | - 0 | 0 | 0 | 2130 | $ | $ | $ | $ |
| SCA 30493 - Unexploded Ordnance (UXO) Technician III | x | - 0 | 0 | 0 | 630 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 8 | x | - 0 | 0 | 620 | 0 | $ | $ | $ | $ |
| DBA Truck Driver, Group 13B | x | - 0 | 0 | 6300 | 0 | $ | $ | $ | $ |
| DBA Laborer, Laborer 1 | x | - 0 | 0 | 7300 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 1 | x | - 0 | 0 | 2770 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 2 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 3 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 6, Loader | x | - 0 | 0 | 6510 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 12A | x | - 0 | 0 | 2270 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 13, Truck Driver | x | - 0 | 0 | 2370 | 0 | $ | $ | $ | $ |
| Total (Home) | | | | | | | | |
| Total (Field) | | | | | | | | |
| Total (Craft SCA/DBA) | | | | | | | | |
| Total Hours (Home, Field, DBA, and SCA) | 52,070 | 1,510 | 35,840 | 3,010 | $ | $ | $ | $ |
| OPTION YEAR 1 |
| Indirect Costs |
| Rate | Labor | Cost |
| ( % ) | ( hr ) | ( $ ) |
| Direct Labor Cost | Home | 52,070 | $ |
| Field | 1,510 | $ |
| DBA | 35,840 | $ |
| SCA | 3,010 | $ |
| Fringe | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Overhead | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Low Value Equipment | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
Other Direct Costs $16,774,787
Travel $2,581,319
Fixed Price Subcontracts $10,138,651
| G&A | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| ODC's | % | x | $ | $ |
| Travel | % | x | $ | $ |
| Subs | % | x | $ | $ |
| Facilities Capital Cost of Money (FCCOM) | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| G&A | % | x | $ | $ |
| Dir. Equip. | % | x | $ | $ |
| Maximum Award Fee (not to exceed 10%) | % | x | Labor | $ | $ |
| | | ODCs | $ | $ |
| | | Subcontractor | $ | $ |
TOTAL COST $
Notes:
| 1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS J.7 FORM. |
| 2. The Offeror shall not add or delete labor categories, make structural changes, or change the hours on this form. |
| 3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontracts on this form. |
| 4. If applicable, Offeror should add direct cost applied to the labor base (e.g. Health and Safety charge, low value equipment). Must correspond to the breakdown provided on Attachments J.3 and J.4. |
| 5. Offeror should add or delete additional indirect costs in accordance with established account system (must use appropriate base and explain). |
| 6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract. |
| 7. Offeror shall utilize the indirect rate ceilings on Attachment JL.4 as their indirect rates. If an offeror (prime/JV, cost reimbursable subs) proposes multiple mark-up rates for other directs costs and subcontracts (e.g. G&A), the highest mark-up rate shall be utilized on the cost model worksheet (J.7). |
| 8. For professional labor, the ceiling rates listed on Attachment J.1 under Maximum Ceiling Rate for Billing Purposes shall be utilized. |
| 9. The proposed rates for DBA labor, shall be equal to the General Decision Number: General Decision No. HI20210001 dated 05/07/2021 (J.13). These rates will be used for evaluation purposes only. |
| 10. The proposed rates for SCA labor, shall be equal to the rates provided in Wage Determination No. 2015-5693, Revision No. 12, Date of Revision 12/21/2020 (J.14). These rates will be used for evaluation purposes only. |
| 11. Do not include hazard pay for the SCA labor categories. |
| 12. This form shall be submitted by the Prime, each member of a Joint Venture (JV) entity (see note below), each cost reimbursable subcontractor and (if necessary) each cost center that will be utilized |
| in performance of the contract. If the JV entity has an established separate cost center with an adequate accounting system for a cost reimbursement contract, one form may be submitted for the JV entity. |
| 13. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost. |
| 14. Per Section H of the solicitation, the acquisition and use of Information Technology Equipment or Systems shall not be considered a direct charge under this contract. |
| 15. For SCA and DBA labor, if it is the offeror’s normal accounting practice to charge health and welfare/fringe benefits as a direct charge, then the offeror shall explain the basis of the base rate, including calculation in Microsoft Excel format on a CD to clearly show the base rate and markups applied. For example, showing the SCA rate plus SCA health and welfare or DBA plus WD fringe and any other direct charges added to the direct labor rate such as FUTA, SUTA and FICA. The offeror shall use their indirect ceiling rates on Attachment J.4 in any offset or differential calculations to account for the payment of health and welfare/fringes in the base labor rate. |
| 16. Offerors should add the award fee as proposed on Attachment J.4. Award fee shall not be applied to travel, Contractor-Acquired Property, Facilities Capital Cost of Money, and award fee on cost reimbursable subcontractor's cost at any tier. |
| 17. SEE ADDITIONAL INSRUCTIONS IN SECTION L |
Option Year 2
| Attachment J.7, Cost Model |
| N62742-20-R-1801 Amendment 0004 |
| OPTION YEAR 2 |
| Direct Labor Cost |
| | Labor Hours | | | | Labor Cost | | | |
| Labor Category | Rate | Home | Field | DBA | SCA | Home | Field | DBA | SCA |
| ( $/hr ) | ( hr) | ( hr) | ( hr) | ( hr) | ( $ ) | ( $ ) | ( $ ) | ( $ ) |
| Key Personnel -- Program Manager | x | 820 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Senior Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Contract Administration Manager | x | 1,900 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Quality Assurance Manager | x | 160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel - Health and Safety Manager | x | 390 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Superintendent | x | 14,480 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Scientist/Geologist | x | 4,800 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Industrial Hygenist, Certified | x | 80 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Engineer | x | 1,030 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Engineer | x | 180 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Engineer | x | 120 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Scientist/Geologist | x | 1,270 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Health and Safety Officer | x | 7,200 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project QC Manager | x | 3,240 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Scientist/Geologist | x | 500 | 0 | 0 | 0 | $ | $ | $ | $ |
| CADD/GIS Operator | x | 290 | 0 | 0 | 0 | $ | $ | $ | $ |
| Word Processor | x | 260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Administrative Assistant | x | 320 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Controls Administrator | x | 1,220 | 0 | 0 | 0 | $ | $ | $ | $ |
| Estimator | x | 70 | 0 | 0 | 0 | $ | $ | $ | $ |
| Billing/Invoice Clerk | x | 1,440 | 0 | 0 | 0 | $ | $ | $ | $ |
| Subcontract Administrator | x | 1,410 | 0 | 0 | 0 | $ | $ | $ | $ |
| Cost/Schedule Analyst | x | 1,210 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Chemist | x | 1,160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior UXO Supervisor (SUXOS) | x | - 0 | 790 | 0 | 0 | $ | $ | $ | $ |
| UXO Quality Control Specialist (UXO QCS) | x | - 0 | 640 | 0 | 0 | $ | $ | $ | $ |
| UXO Safety Officer (UXO SO) | x | - 0 | 80 | 0 | 0 | $ | $ | $ | $ |
| SCA 30491 - Unexploded Ordnance (UXO) Technician I | x | - 0 | 0 | 0 | 250 | $ | $ | $ | $ |
| SCA 30492 - Unexploded Ordnance (UXO) Technician II | x | - 0 | 0 | 0 | 2130 | $ | $ | $ | $ |
| SCA 30493 - Unexploded Ordnance (UXO) Technician III | x | - 0 | 0 | 0 | 630 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 8 | x | - 0 | 0 | 620 | 0 | $ | $ | $ | $ |
| DBA Truck Driver, Group 13B | x | - 0 | 0 | 6300 | 0 | $ | $ | $ | $ |
| DBA Laborer, Laborer 1 | x | - 0 | 0 | 7300 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 1 | x | - 0 | 0 | 2770 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 2 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 3 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 6, Loader | x | - 0 | 0 | 6510 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 12A | x | - 0 | 0 | 2270 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 13, Truck Driver | x | - 0 | 0 | 2370 | 0 | $ | $ | $ | $ |
| Total (Home) | | | | | | | | |
| Total (Field) | | | | | | | | |
| Total (Craft SCA/DBA) | | | | | | | | |
| Total Hours (Home, Field, DBA, and SCA) | 52,070 | 1,510 | 35,840 | 3,010 | $ | $ | $ | $ |
| OPTION YEAR 2 |
| Indirect Costs |
| Rate | Labor | Cost |
| ( % ) | ( hr ) | ( $ ) |
| Direct Labor Cost | Home | 52,070 | $ |
| Field | 1,510 | $ |
| DBA | 35,840 | $ |
| SCA | 3,010 | $ |
| Fringe | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Overhead | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Low Value Equipment | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Other Direct Costs | % | $ 17,192,479 |
| % | |
| Travel | % | $ 2,645,594 |
Fixed Price Subcontracts % $ 10,391,103
| G&A | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| ODC's | % | x | $ | $ |
| Travel | % | x | $ | $ |
| Subs | % | x | $ | $ |
| Facilities Capital Cost of Money (FCCOM) | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| G&A | % | x | $ | $ |
| Dir. Equip. | % | x | $ | $ |
| Maximum Award Fee (not to exceed 10%) | % | x | Labor | $ | $ |
| | | ODCs | $ | $ |
| | | Subcontractor | $ | $ |
TOTAL COST $
Notes:
| 1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS J.7 FORM. |
| 2. The Offeror shall not add or delete labor categories, make structural changes, or change the hours on this form. |
| 3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontracts on this form. |
| 4. If applicable, Offeror should add direct cost applied to the labor base (e.g. Health and Safety charge, low value equipment). Must correspond to the breakdown provided on Attachments J.3 and J.4. |
| 5. Offeror should add or delete additional indirect costs in accordance with established account system (must use appropriate base and explain). |
| 6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract. |
| 7. Offeror shall utilize the indirect rate ceilings on Attachment JL.4 as their indirect rates. If an offeror (prime/JV, cost reimbursable subs) proposes multiple mark-up rates for other directs costs and subcontracts (e.g. G&A), the highest mark-up rate shall be utilized on the cost model worksheet (J.7). |
| 8. For professional labor, the ceiling rates listed on Attachment J.1 under Maximum Ceiling Rate for Billing Purposes shall be utilized. |
| 9. The proposed rates for DBA labor, shall be equal to the General Decision Number: General Decision No. HI20210001 dated 05/07/2021 (J.13). These rates will be used for evaluation purposes only. |
| 10. The proposed rates for SCA labor, shall be equal to the rates provided in Wage Determination No. 2015-5693, Revision No. 12, Date of Revision 12/21/2020 (J.14). These rates will be used for evaluation purposes only. |
| 11. Do not include hazard pay for the SCA labor categories. |
| 12. This form shall be submitted by the Prime, each member of a Joint Venture (JV) entity (see note below), each cost reimbursable subcontractor and (if necessary) each cost center that will be utilized |
| in performance of the contract. If the JV entity has an established separate cost center with an adequate accounting system for a cost reimbursement contract, one form may be submitted for the JV entity. |
| 13. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost. |
| 14. Per Section H of the solicitation, the acquisition and use of Information Technology Equipment or Systems shall not be considered a direct charge under this contract. |
| 15. For SCA and DBA labor, if it is the offeror’s normal accounting practice to charge health and welfare/fringe benefits as a direct charge, then the offeror shall explain the basis of the base rate, including calculation in Microsoft Excel format on a CD to clearly show the base rate and markups applied. For example, showing the SCA rate plus SCA health and welfare or DBA plus WD fringe and any other direct charges added to the direct labor rate such as FUTA, SUTA and FICA. The offeror shall use their indirect ceiling rates on Attachment J.4 in any offset or differential calculations to account for the payment of health and welfare/fringes in the base labor rate. |
| 16. Offerors should add the award fee as proposed on Attachment J.4. Award fee shall not be applied to travel, Contractor-Acquired Property, Facilities Capital Cost of Money, and award fee on cost reimbursable subcontractor's cost at any tier. |
| 17. SEE ADDITIONAL INSRUCTIONS IN SECTION L |
Option Year 3
| Attachment J.7, Cost Model |
| N62742-20-R-1801 Amendment 0004 |
| OPTION YEAR 3 |
| Direct Labor Cost |
| | Labor Hours | | | | Labor Cost | | | |
| Labor Category | Rate | Home | Field | DBA | SCA | Home | Field | DBA | SCA |
| ( $/hr ) | ( hr) | ( hr) | ( hr) | ( hr) | ( $ ) | ( $ ) | ( $ ) | ( $ ) |
| Key Personnel -- Program Manager | x | 820 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Senior Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Contract Administration Manager | x | 1,900 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Quality Assurance Manager | x | 160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel - Health and Safety Manager | x | 390 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Superintendent | x | 14,480 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Scientist/Geologist | x | 4,800 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Manager | | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Industrial Hygenist, Certified | x | 80 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Engineer | x | 1,030 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Engineer | x | 180 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Engineer | x | 120 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Scientist/Geologist | x | 1,270 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Health and Safety Officer | x | 7,200 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project QC Manager | x | 3,240 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Scientist/Geologist | x | 500 | 0 | 0 | 0 | $ | $ | $ | $ |
| CADD/GIS Operator | x | 290 | 0 | 0 | 0 | $ | $ | $ | $ |
| Word Processor | x | 260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Administrative Assistant | x | 320 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Controls Administrator | x | 1,220 | 0 | 0 | 0 | $ | $ | $ | $ |
| Estimator | x | 70 | 0 | 0 | 0 | $ | $ | $ | $ |
| Billing/Invoice Clerk | x | 1,440 | 0 | 0 | 0 | $ | $ | $ | $ |
| Subcontract Administrator | x | 1,410 | 0 | 0 | 0 | $ | $ | $ | $ |
| Cost/Schedule Analyst | x | 1,210 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Chemist | x | 1,160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior UXO Supervisor (SUXOS) | x | - 0 | 790 | 0 | 0 | $ | $ | $ | $ |
| UXO Quality Control Specialist (UXO QCS) | x | - 0 | 640 | 0 | 0 | $ | $ | $ | $ |
| UXO Safety Officer (UXO SO) | x | - 0 | 80 | 0 | 0 | $ | $ | $ | $ |
| SCA 30491 - Unexploded Ordnance (UXO) Technician I | x | - 0 | 0 | 0 | 250 | $ | $ | $ | $ |
| SCA 30492 - Unexploded Ordnance (UXO) Technician II | x | - 0 | 0 | 0 | 2130 | $ | $ | $ | $ |
| SCA 30493 - Unexploded Ordnance (UXO) Technician III | x | - 0 | 0 | 0 | 630 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 8 | x | - 0 | 0 | 620 | 0 | $ | $ | $ | $ |
| DBA Truck Driver, Group 13B | x | - 0 | 0 | 6300 | 0 | $ | $ | $ | $ |
| DBA Laborer, Laborer 1 | x | - 0 | 0 | 7300 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 1 | x | - 0 | 0 | 2770 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 2 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 3 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 6, Loader | x | - 0 | 0 | 6510 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 12A | x | - 0 | 0 | 2270 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 13, Truck Driver | x | - 0 | 0 | 2370 | 0 | $ | $ | $ | $ |
| Total (Home) | | | | | | | | |
| Total (Field) | | | | | | | | |
| Total (Craft SCA/DBA) | | | | | | | | |
| Total Hours (Home, Field, DBA, and SCA) | 52,070 | 1,510 | 35,840 | 3,010 | $ | $ | $ | $ |
| OPTION YEAR 3 |
| Indirect Costs |
| Rate | Labor | Cost |
| ( % ) | ( hr ) | ( $ ) |
| Direct Labor Cost | Home | 52,070 | $ |
| Field | 1,510 | $ |
| DBA | 35,840 | $ |
| SCA | 3,010 | $ |
| Fringe | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Overhead | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Low Value Equipment | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Other Direct Costs | % | $ 17,625,730 |
| % | |
| Travel | % | $ 2,712,262 |
Fixed Price Subcontracts % $ 10,652,959
| G&A | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| ODC's | % | x | $ | $ |
| Travel | % | x | $ | $ |
| Subs | % | x | $ | $ |
| Facilities Capital Cost of Money (FCCOM) | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| G&A | % | x | $ | $ |
| Dir. Equip. | % | x | $ | $ |
| Maximum Awrd Fee (not to exceed 10%) | % | x | Labor | $ | $ |
| | | ODCs | $ | $ |
| | | Subcontractor | $ | $ |
TOTAL COST $
Notes:
| 1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS J.7 FORM. |
| 2. The Offeror shall not add or delete labor categories, make structural changes, or change the hours on this form. |
| 3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontracts on this form. |
| 4. If applicable, Offeror should add direct cost applied to the labor base (e.g. Health and Safety charge, low value equipment). Must correspond to the breakdown provided on Attachments J.3 and J.4. |
| 5. Offeror should add or delete additional indirect costs in accordance with established account system (must use appropriate base and explain). |
| 6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract. |
| 7. Offeror shall utilize the indirect rate ceilings on Attachment JL.4 as their indirect rates. If an offeror (prime/JV, cost reimbursable subs) proposes multiple mark-up rates for other directs costs and subcontracts (e.g. G&A), the highest mark-up rate shall be utilized on the cost model worksheet (J.7). |
| 8. For professional labor, the ceiling rates listed on Attachment J.1 under Maximum Ceiling Rate for Billing Purposes shall be utilized. |
| 9. The proposed rates for DBA labor, shall be equal to the General Decision Number: General Decision No. HI20210001 dated 05/07/2021 (J.13). These rates will be used for evaluation purposes only. |
| 10. The proposed rates for SCA labor, shall be equal to the rates provided in Wage Determination No. 2015-5693, Revision No. 12, Date of Revision 12/21/2020 (J.14). These rates will be used for evaluation purposes only. |
| 11. Do not include hazard pay for the SCA labor categories. |
| 12. This form shall be submitted by the Prime, each member of a Joint Venture (JV) entity (see note below), each cost reimbursable subcontractor and (if necessary) each cost center that will be utilized |
| in performance of the contract. If the JV entity has an established separate cost center with an adequate accounting system for a cost reimbursement contract, one form may be submitted for the JV entity. |
| 13. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost. |
| 14. Per Section H of the solicitation, the acquisition and use of Information Technology Equipment or Systems shall not be considered a direct charge under this contract. |
| 15. For SCA and DBA labor, if it is the offeror’s normal accounting practice to charge health and welfare/fringe benefits as a direct charge, then the offeror shall explain the basis of the base rate, including calculation in Microsoft Excel format on a CD to clearly show the base rate and markups applied. For example, showing the SCA rate plus SCA health and welfare or DBA plus WD fringe and any other direct charges added to the direct labor rate such as FUTA, SUTA and FICA. The offeror shall use their indirect ceiling rates on Attachment J.4 in any offset or differential calculations to account for the payment of health and welfare/fringes in the base labor rate. |
| 16. Offerors should add the award fee as proposed on Attachment J.4. Award fee shall not be applied to travel, Contractor-Acquired Property, Facilities Capital Cost of Money, and award fee on cost reimbursable subcontractor's cost at any tier. |
| 17. SEE ADDITIONAL INSRUCTIONS IN SECTION L |
Option Year 4
| Attachment J.7, Cost Model |
| N62742-20-R-1801 Amendment 0004 |
| OPTION YEAR 4 |
| Direct Labor Cost |
| | Labor Hours | | | | Labor Cost | | | |
| Labor Category | Rate | Home | Field | DBA | SCA | Home | Field | DBA | SCA |
| ( $/hr ) | ( hr) | ( hr) | ( hr) | ( hr) | ( $ ) | ( $ ) | ( $ ) | ( $ ) |
| Key Personnel -- Program Manager | x | 820 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Senior Project Manager | x | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Contract Administration Manager | x | 1,900 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel -- Quality Assurance Manager | x | 160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Key Personnel - Health and Safety Manager | x | 390 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Superintendent | x | 14,480 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Scientist/Geologist | x | 4,800 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Manager | | 4,260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Industrial Hygenist, Certified | x | 80 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior Project Engineer | x | 1,030 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Engineer | x | 180 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Engineer | x | 120 | 0 | 0 | 0 | $ | $ | $ | $ |
| Staff Scientist/Geologist | x | 1,270 | 0 | 0 | 0 | $ | $ | $ | $ |
| Site Health and Safety Officer | x | 7,200 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project QC Manager | x | 3,240 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Scientist/Geologist | x | 500 | 0 | 0 | 0 | $ | $ | $ | $ |
| CADD/GIS Operator | x | 290 | 0 | 0 | 0 | $ | $ | $ | $ |
| Word Processor | x | 260 | 0 | 0 | 0 | $ | $ | $ | $ |
| Administrative Assistant | x | 320 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Controls Administrator | x | 1,220 | 0 | 0 | 0 | $ | $ | $ | $ |
| Estimator | x | 70 | 0 | 0 | 0 | $ | $ | $ | $ |
| Billing/Invoice Clerk | x | 1,440 | 0 | 0 | 0 | $ | $ | $ | $ |
| Subcontract Administrator | x | 1,410 | 0 | 0 | 0 | $ | $ | $ | $ |
| Cost/Schedule Analyst | x | 1,210 | 0 | 0 | 0 | $ | $ | $ | $ |
| Project Chemist | x | 1,160 | 0 | 0 | 0 | $ | $ | $ | $ |
| Senior UXO Supervisor (SUXOS) | x | - 0 | 790 | 0 | 0 | $ | $ | $ | $ |
| UXO Quality Control Specialist (UXO QCS) | x | - 0 | 640 | 0 | 0 | $ | $ | $ | $ |
| UXO Safety Officer (UXO SO) | x | - 0 | 80 | 0 | 0 | $ | $ | $ | $ |
| SCA 30491 - Unexploded Ordnance (UXO) Technician I | x | - 0 | 0 | 0 | 250 | $ | $ | $ | $ |
| SCA 30492 - Unexploded Ordnance (UXO) Technician II | x | - 0 | 0 | 0 | 2130 | $ | $ | $ | $ |
| SCA 30493 - Unexploded Ordnance (UXO) Technician III | x | - 0 | 0 | 0 | 630 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 8 | x | - 0 | 0 | 620 | 0 | $ | $ | $ | $ |
| DBA Truck Driver, Group 13B | x | - 0 | 0 | 6300 | 0 | $ | $ | $ | $ |
| DBA Laborer, Laborer 1 | x | - 0 | 0 | 7300 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 1 | x | - 0 | 0 | 2770 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 2 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 3 | x | - 0 | 0 | 3850 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 6, Loader | x | - 0 | 0 | 6510 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 12A | x | - 0 | 0 | 2270 | 0 | $ | $ | $ | $ |
| DBA Equipment Operator, Group 13, Truck Driver | x | - 0 | 0 | 2370 | 0 | $ | $ | $ | $ |
| Total (Home) | | | | | | | | |
| Total (Field) | | | | | | | | |
| Total (Craft SCA/DBA) | | | | | | | | |
| Total Hours (Home, Field, DBA, and SCA) | 52,070 | 1,510 | 35,840 | 3,010 | $ | $ | $ | $ |
| OPTION YEAR 4 |
| Indirect Costs |
| Rate | Labor | Cost |
| ( % ) | ( hr ) | ( $ ) |
| Direct Labor Cost | Home | 52,070 | $ |
| Field | 1,510 | $ |
| DBA | 35,840 | $ |
| SCA | 3,010 | $ |
| Fringe | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Overhead | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| Low Value Equipment | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
Other Direct Costs % $ 18,054,035
Travel % $ 2,778,170
Fixed Price Subcontracts % $ 10,911,826
| G&A | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| DBA | % | x | $ | $ |
| SCA | % | x | $ | $ |
| ODC's | % | x | $ | $ |
| Travel | % | x | $ | $ |
| Subs | % | x | $ | $ |
| Facilities Capital Cost of Money (FCCOM) | Home | % | x | $ | $ |
| Field | % | x | $ | $ |
| G&A | % | x | $ | $ |
| Dir. Equip. | % | x | $ | $ |
| Maximum Award Fee (not to exceed 10%) | % | x | Labor | $ | $ |
| | | ODCs | $ | $ |
| | | Subcontractor | $ | $ |
TOTAL COST $
Notes:
| 1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS J.7 FORM. |
| 2. The Offeror shall not add or delete labor categories, make structural changes, or change the hours on this form. |
| 3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontracts on this form. |
| 4. If applicable, Offeror should add direct cost applied to the labor base (e.g. Health and Safety charge, low value equipment). Must correspond to the breakdown provided on Attachments J.3 and J.4. |
| 5. Offeror should add or delete additional indirect costs in accordance with established account system (must use appropriate base and explain). |
| 6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract. |
| 7. Offeror shall utilize the indirect rate ceilings on Attachment JL.4 as their indirect rates. If an offeror (prime/JV, cost reimbursable subs) proposes multiple mark-up rates for other directs costs and subcontracts (e.g. G&A), the highest mark-up rate shall be utilized on the cost model worksheet (J.7). |
| 8. For professional labor, the ceiling rates listed on Attachment J.1 under Maximum Ceiling Rate for Billing Purposes shall be utilized. |
| 9. The proposed rates for DBA labor, shall be equal to the General Decision Number: General Decision No. HI20210001 dated 05/07/2021 (J.13). These rates will be used for evaluation purposes only. |
| 10. The proposed rates for SCA labor, shall be equal to the rates provided in Wage Determination No. 2015-5693, Revision No. 12, Date of Revision 12/21/2020 (J.14). These rates will be used for evaluation purposes only. |
| 11. Do not include hazard pay for the SCA labor categories. |
| 12. This form shall be submitted by the Prime, each member of a Joint Venture (JV) entity (see note below), each cost reimbursable subcontractor and (if necessary) each cost center that will be utilized |
| in performance of the contract. If the JV entity has an established separate cost center with an adequate accounting system for a cost reimbursement contract, one form may be submitted for the JV entity. |
| 13. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost. |
| 14. Per Section H of the solicitation, the acquisition and use of Information Technology Equipment or Systems shall not be considered a direct charge under this contract. |
| 15. For SCA and DBA labor, if it is the offeror’s normal accounting practice to charge health and welfare/fringe benefits as a direct charge, then the offeror shall explain the basis of the base rate, including calculation in Microsoft Excel format on a CD to clearly show the base rate and markups applied. For example, showing the SCA rate plus SCA health and welfare or DBA plus WD fringe and any other direct charges added to the direct labor rate such as FUTA, SUTA and FICA. The offeror shall use their indirect ceiling rates on Attachment J.4 in any offset or differential calculations to account for the payment of health and welfare/fringes in the base labor rate. |
| 16. Offerors should add the award fee as proposed on Attachment J.4. Award fee shall not be applied to travel, Contractor-Acquired Property, Facilities Capital Cost of Money, and award fee on cost reimbursable subcontractor's cost at any tier. |
| 17. SEE ADDITIONAL INSRUCTIONS IN SECTION L |
Sum Cost Model for Multiple Off
| COST MODEL SUMMARY SHEET J.7A | | | |
| N62742-20-R-1801 | | | |
| THIS FORM TO BE SUBMITTED BY PRIME CONTRACTOR/JV ENTITY ONLY | | | |
| Base Year | Total Cost Model Value for Base Year | % of work (J.3) | Total Value of Base Year based on % of Work |
| Prime/JV member | $0.00 | | $0.00 |
| Prime/JV member | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| | 100% | $0.00 |
| Cost Sub Total | % Mark-up | Cost Sub Mark-up |
| Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors,i.e. G&A, as provided on J.4 | $0.00 | | $0.00 |
| TOTAL VALUE OF COST MODEL FOR BASE YEAR | | | $0.00 |
| Option Year 1 | Total Cost Model Value for First Option Year | % of work | Total Value of First Option Year based on % of Work |
| Prime/JV member | $0.00 | | $0.00 |
| Prime/JV member | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| | 100% | $0.00 |
| Cost Sub Total | % Mark-up | Cost Sub Mark-up |
| Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors,i.e. G&A, as provided on J.4 | $0.00 | | $0.00 |
| TOTAL VALUE OF COST MODEL FOR OPTION YEAR 1 | | | $0.00 |
| Option Year 2 | Total Cost Model Value for Second Option Year | % of work | Total Value of Second Option Year based on % of Work |
| Prime/JV member | $0.00 | | $0.00 |
| Prime/JV member | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| | 100% | $0.00 |
| Cost Sub Total | % Mark-up | Cost Sub Mark-up |
| Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on J.4 | $0.00 | | $0.00 |
| TOTAL VALUE OF COST MODEL FOR OPTION YEAR 2 | | | $0.00 |
| Option Year 3 | Total Cost Model Value for Third Option Year | % of work | Total Value of Third Option Year based on % of Work |
| Prime/JV member | $0.00 | | $0.00 |
| Prime/JV member | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| | 100% | $0.00 |
| Cost Sub Total | % Mark-up | Cost Sub Mark-up |
| Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on J.4 | $0.00 | | $0.00 |
| TOTAL VALUE OF COST MODEL FOR OPTION YEAR 3 | | | $0.00 |
| Option Year 4 | Total Cost Model Value for Fourth Option Year | % of work | Total Value of Fourth Option Year based on % of Work |
| Prime/JV member | $0.00 | | $0.00 |
| Prime/JV member | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| Cost Reimbursable Contractor | $0.00 | | $0.00 |
| | 100% | $0.00 |
| Cost Sub Total | % Mark-up | Cost Sub Mark-up |
| Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on J.4 | $0.00 | | $0.00 |
| TOTAL VALUE OF COST MODEL FOR OPTION YEAR 4 | | | $0.00 |
| 1. For evaluation purposes, the Government will utilize the percentages listed on Attachment J.3 (Proposed Distribution of Work) |
| (this will be performed for the base and each option year) to arrive at a TOTAL COST MODEL VALUE (PER YEAR) |
| 2. In the event an offeror utilizes multiple cost centers, the cost model will be filled out for each cost center expected to be utilized in the performance of this contract. For evaluation purposes, the cost center with the highest "Total" price for the cost model will be utilized. |
| 3. Cost Subcontractor mark-up : If the prime contractor is a JV, the rate for the JV member with the highest ceiling rate will be used. |
| In addittion to hard copy, offerors shall submit this form in Microsoft Excel format on CD. |
| SEE ADDITIONAL INSTRUCTIONS IN SECTION L. |
| SAMPLE | | | |
| Total Cost Model Value for Base Year | % of work (J.3) | Total Value of Base Year based on % of Work |
| Prime/JV member | $490,000.00 | 30% | $147,000.00 |
| Prime/JV member | $505,000.00 | 25% | $126,250.00 |
| Cost Reimbursable Contractor | $479,000.00 | 20% | $95,800.00 |
| Cost Reimbursable Contractor | $515,000.00 | 25% | $128,750.00 |
| | 100% | $497,800.00 |
| Cost Sub Total | % Mark-up | Cost Sub Mark-up |
| Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors,i.e. G&A, as provided on J.4 | $224,550.00 | 7.5% | $16,841.25 |
| TOTAL VALUE OF COST MODEL FOR BASE YEAR | | | $514,641.25 |