View the file

Other files

File Type Posted
20R1801_SECTION L_AMD4.pdf PDF
J.7 _7A - 20R1801_AMD4.xlsx XLSX spreadsheet
SBRAC QA_AMD4.pdf PDF
20R1801_SECTION M_AMD4.pdf PDF
N6274220R1801_AMD4.pdf PDF
Sec L- 20R1801_AMD3.pdf PDF
Sec M- 20R1801_AMD3.pdf PDF
J.8 - 20R1801_AMD3.docx DOCX document
Sec F - 20R1801_AMD3.pdf PDF
TOC J - 201801_AMD3.pdf PDF
Sec C- 20R1801_AMD3.pdf PDF
J.9 - 20R1801_AMD3.docx DOCX document
N6274220R1801_AMD3.pdf PDF
J.7 _7A - 20R1801_AMD3.xlsx XLSX spreadsheet
SBRAC QA 1-39 AMD3.pdf PDF
N6274221R1801_AMD2.pdf PDF
N6274220R1801_AMD1.pdf PDF
Sec L_AMD1.pdf PDF
J.6 Proposed, Historical, and Year-To-Date Indirect Rates (AMD1).xlsx XLSX spreadsheet
Attach J.1 & J.1A_Direct Labor Bid Bill & Escalation (AMD1).xlsx XLSX spreadsheet
Sec J TOC_AMD1.pdf PDF
J.1A Direct Labor Rate Escalation Submission.xls XLS spreadsheet
J.5, SCA & DBA Ceiling Labor Rates.doc DOC document
J.11 Form PPQ_20-R-1801_v2.doc DOC document
J.10 Key Personnel Experience_20R1801_EVedit.docx DOCX document
J.8 Special Recent Proj Exp_20R1801_EVedit.docx DOCX document
J.1 Direct Labor Bid and Billing Rate Submission.xlsx XLSX spreadsheet
J.6 Proposed, Historical, and Year-To-Date Indirect Rates.doc DOC document
J.2 Identification of Uncompensated Overtime Ratios.doc DOC document
RFP N62742-20-R-1801.pdf PDF
J.3 Indirect Ceiling Rates Build-Up Form.doc DOC document
J.9 Workload Form_Am 0001_20R1801_EVeditv1.docx DOCX document
J.4 Indirect Ceiling Rate Forms.doc DOC document
J.7 _7A 20-R-1801_Cost_Model Attachments.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62742-20-R-1801 Amendment 0003

ATTACHMENT J.10: OFFEROR’S KEY PERSONNEL EXPERIENCE/QUALIFICATIONS

Provide the following information, on separate sheets, to demonstrate the key personnel’s (Program Manager, Senior Project Manager, Contract Administration Manger, Quality Assurance Manager, Health and Safety Manager) qualifications and experience. Please see Section M, Paragraph M5.(3), for the definition of recent, relevant projects and Section C, Paragraph 1.3.3 for the key personnel qualification requirements. With exception to vertical cell height and paragraph indentation, do not modify this form (i.e. horizontal cell width, font type and size, etc.). Do not delete this instructional paragraph. Italicized text may be deleted from the form prior to submittal. The Offeror shall not submit more than four (4) pages single-sided per person for each Key Personnel position.

Name:

Proposed assignment on this contract (Program Manager, Senior Project Manager, Contract Administration Manager, Quality Assurance Manager, Health and Safety Manager):

Assigned tasks in Section C

Dates/titles/duties of each position held at current firm:

Dates/titles/duties of each position held at other firms, names of other firms. (Please list by date of employment, e.g., March 2001 – April 2005, ABC Corp, QC Manager)

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training courses completed that pertain to this contract:

Familiar with the COE EM-385-1-1 and Hazard Identification and Safety Compliance

Provide information on a maximum of four (4) recent, relevant projects that were completed by the key personnel that would demonstrate their project experience with the assigned Section C tasks. Information may be provided on Basic IDIQ contracts for the Program Manager, Contract Administration Manager, Quality Assurance Manager, and Health and Safety Manager key personnel positions, but not the Senior Project Manager key personnel position. Provide the following for each project/contract:

Project #1

a. Contract number/task order number

b. Title and location of the project

c. Start and Completion date of the project

d. Dollar value of the project

e. Clear description of the contract/task order scope of work

f. Key personnel’s role in project, (i.e. Project Manager, H&S Specialist, etc.)

g. Clear description of the duties performed by the key personnel for the project.

Project #2

a. Contract number/task order number

b. Title and location of the project

c. Start and Completion date of the project

d. Dollar value of the project

e. Clear description of the contract/task order scope of work

f. Key personnel’s role in project, (i.e. Project Manager, H&S Specialist, etc.)

g. Clear description of the duties performed by the key personnel for the project.

Project #3

a. Contract number/task order number

b. Title and location of the project

c. Start and Completion date of the project

d. Dollar value of the project

e. Clear description of the contract/task order scope of work

f. Key personnel’s role in project, (i.e. Project Manager, H&S Specialist, etc.)

g. Clear description of the duties performed by the key personnel for the project.

Project #4

a. Contract number/task order number

b. Title and location of the project

c. Start and Completion date of the project

d. Dollar value of the project

e. Clear description of the contract/task order scope of work

f. Key personnel’s role in project, (i.e. Project Manager, H&S Specialist, etc.)

g. Clear description of the duties performed by the key personnel for the project.