View the file

Other files

File Type Posted
20R1801_SECTION L_AMD4.pdf PDF
J.7 _7A - 20R1801_AMD4.xlsx XLSX spreadsheet
SBRAC QA_AMD4.pdf PDF
20R1801_SECTION M_AMD4.pdf PDF
N6274220R1801_AMD4.pdf PDF
J.10 - 20R1801_AMD3.docx DOCX document
Sec L- 20R1801_AMD3.pdf PDF
Sec M- 20R1801_AMD3.pdf PDF
J.8 - 20R1801_AMD3.docx DOCX document
Sec F - 20R1801_AMD3.pdf PDF
TOC J - 201801_AMD3.pdf PDF
Sec C- 20R1801_AMD3.pdf PDF
J.9 - 20R1801_AMD3.docx DOCX document
N6274220R1801_AMD3.pdf PDF
J.7 _7A - 20R1801_AMD3.xlsx XLSX spreadsheet
SBRAC QA 1-39 AMD3.pdf PDF
N6274221R1801_AMD2.pdf PDF
N6274220R1801_AMD1.pdf PDF
Sec L_AMD1.pdf PDF
J.6 Proposed, Historical, and Year-To-Date Indirect Rates (AMD1).xlsx XLSX spreadsheet
Attach J.1 & J.1A_Direct Labor Bid Bill & Escalation (AMD1).xlsx XLSX spreadsheet
Sec J TOC_AMD1.pdf PDF
J.1A Direct Labor Rate Escalation Submission.xls XLS spreadsheet
J.5, SCA & DBA Ceiling Labor Rates.doc DOC document
J.11 Form PPQ_20-R-1801_v2.doc DOC document
J.10 Key Personnel Experience_20R1801_EVedit.docx DOCX document
J.8 Special Recent Proj Exp_20R1801_EVedit.docx DOCX document
J.1 Direct Labor Bid and Billing Rate Submission.xlsx XLSX spreadsheet
J.6 Proposed, Historical, and Year-To-Date Indirect Rates.doc DOC document
J.2 Identification of Uncompensated Overtime Ratios.doc DOC document
RFP N62742-20-R-1801.pdf PDF
J.9 Workload Form_Am 0001_20R1801_EVeditv1.docx DOCX document
J.4 Indirect Ceiling Rate Forms.doc DOC document
J.7 _7A 20-R-1801_Cost_Model Attachments.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES FOR COMPLETING J.3

1. Only use the base indirect rates, as applicable and in accordance with disclosed accounting practices, for the base year and each option year. The listed indirect rate categories may be adjusted to reflect the offeror’s accounting system. See Section L, Paragraph L1, 2.b., Section II, Tab 1, Paragraph b, INDIRECT RATES SUBMITTAL – ATTACHMENTS J.3, J.4 AND J.6).

2. A separate rate sheet shall be submitted for the prime, each joint venture member, and each team subcontractor that may perform cost reimbursable work. If the prime or subcontractor has more than one cost center that will perform work under this contract, information shall be provided for each cost center.

3. Any variance between base indirect rates and historical rates, applicable forward pricing rates, DCAA approved rates, and/or approved CAS practices should be clearly documented in the supporting narrative.

4. Attachment J.3 is provided in Microsoft Word. Complete in Microsoft Word format, as provided. Additionally, offerors shall provide J.3 in Microsoft Excel format on CDs to show how the multiplier was calculated.

5. Award Fee shall not be applied to travel, Contractor – Acquired Property, Facilities Capital Cost of Money, and award fee on cost reimbursable subcontractor’s cost at any tier.

6. The offeror may adjust the columns or rows to be consistent with its cost accounting system.

ATTACHMENT J.3, N62742-20-R-1801

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

BASE INDIRECT RATES USED TO DERIVE CEILING RATES

BASE YEAR

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

BASE INDIRECT RATES USED TO DERIVE CEILING RATES

OPTION YEAR 1

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 2

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 3

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 4

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

Proposed Distribution of Work.

Offerors shall include the percentage of work expected to be performed by each proposed cost reimbursable subcontractor.

Prime

Joint Venture

Company A

_______% (if applicable)

Company B

_______% (if applicable)

Cost Reimbursable Subcontractor

_______% (if applicable)

Cost Reimbursable Subcontractor

_______% (if applicable)

Total

100 %

File details come from the government source that posted it. Updated .