P3105_Note5.pdf
PDF 111 KB Posted
- Solicitation number
- N62742-20-R-1324
About this file
This document provides notice no. 5 for request for proposal no. N62742-20-R-1324 issued by the Department of the Navy Naval Facilities Engineering Command Pacific. The notice includes deferred responses to pre-proposal questions from offerors as well as responses to additional questions. The solicitation is for the Asia Pacific Stability Initiative munitions storage igloos phase 3 project at Andersen Air Force Base in Guam, involving construction of new igloos for munitions storage. Services required include site work, utilities, buildings, and electrical systems. Offerors were asked to clarify specifications for materials, equipment locations and ratings. The government deferred many responses indicating they are still being developed and will provide answers as soon as possible, and issued an amendment extending the proposal due date by one week.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P3105_Note6.pdf | ||
| P3105_AMD4.pdf | ||
| P3105_Note4.pdf | ||
| P3105_Note3.pdf | ||
| P3105_SiteVisit_SignIn.pdf | ||
| P3105_Note2.pdf | ||
| P3105_Note1.pdf | ||
| N6274220R1324-.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC
258 MAKALAPA DR., STE. 100
PEARL HARBOR, HI 96860-3134
RFP N62742-20-R-1324
Notice No. 5
Notice No. 5 March 18, 2020
PRE-PROPOSAL QUESTIONS & ANSWERS
N62742-20-R-1324
FY20 MCAF PROJECT P-3105/AJJY073105P3 ASIA PACIFIC STABILITY INITIATIVE
(APSI) – MUNITION STORAGE IGLOOS PHASE 3, ANDERSEN AIR FORCE BASE,
GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The solicitation remains unchanged unless it is amended in writing on a Standard Form 30.
The Government will not respond to questions received on or after the date of this notice.
DEFERRED RESPONSES FROM NOTICE NO. 4 ISSUED ON MARCH 16, 2020
27. Reference DWG# M-500, note #6 requiring the ventilators’ pipe to be made out of ASTM A 312/A 312M, grade TP 316L Stainless Steel, Sch. 40, Seamless. All suppliers have indicated that they are unable to source domestic US seamless pipe in 12” Sch. 40, 316L SS per the note.
Please advise if ERW (or other) welded pipe would be acceptable as an alternate, or if imported seamless product from a FAR 52 acceptable country would be allowed for this project.
ANSWER: Pipe requirement remains as specified in Note #6 of Drawing M-500, alternative ERW (or other) will not be accepted. Comply with current note provided in drawings as well as FAR 52.225-11 Buy American -- Construction Materials Under Trade Agreements provided in Document 00700.
28. Reference drawing E-602. Please confirm items below relating to the circuit breakers, transformers and panelboards shown on E-602.
a. ECB-M – Please confirm circuit breaker location on the compound. Please confirm if this is contractor furnished.
b. 4MDP – Please confirm panelboard location on the compound. Please confirm if this is contractor furnished.
c. 2G – Please confirm this panelboard is located at the Generator building.
d. 2FP – Please confirm this panelboard is located at the Switchgear building.
e. TR-G – Please confirm this transformer is located at the Generator building.
f. TR-FP – Please confirm this transformer is located at the Switchgear building.
ANSWER: (continued on next page)
RFP N62742-20-R-1324
Notice No. 5
a. ECB-M – Unless otherwise noted, all items shown on E-602 are contractor furnished contractor installed. ECB-M must be located inside the generator building.
b. 4MDP – Unless otherwise noted, all items shown on E-602 are contractor furnished contractor installed. 4MDP must be located inside the generator building.
c. 2G – Unless otherwise noted, all items shown on E-602 are contractor furnished contractor installed. 2G must be located inside the generator building.
d. 2FP – Unless otherwise noted, all items shown on E-602 are contractor furnished contractor installed. 2FP must be located inside the generator building.
e. TR-G – Unless otherwise noted, all items shown on E-602 are contractor furnished contractor installed. TR-G must be located inside the generator building.
f. TR-FP – Unless otherwise noted, all items shown on E-602 are contractor furnished contractor installed. TR-FP must be located inside the generator building.
An amendment will be issued clarifying the above.
29. Reference to Part 3 Project Program G401003 requires the entire Pad Mounted Switchgear to be fabricated of "ASTM" A167 Type 316L stainless steel". Manufacturer are only manufacturing stainless type 304 for pad mounted switchgear. Please consider using type 304 stainless steel.
Note that under G401002, Pad Mounted Transformer can be allowed to be fabricated of stainless steel 304 and under G401003 states, "all exterior switch and control enclosures must be 304 stainless steel."
ANSWER: Pad Mounted Switchgear and Transformer equipment enclosures must be 304L stainless steel. An amendment will be issued clarifying the above.
30. For the past contracts MEC procedures in RFP and SOW for projects have stated to follow ESS Amendment 6 and/or current ESS series. If the current ESS series has now changed, contractors will need a copy at time of Bidding to provide an accurate proposal and avoid delay cost and REAs.
Will the new ESS Amendment 7 be applied to this project? If this new ESS Amendment 7 is going to apply to this project, please provide a copy for bidding purposes.
ANSWER: The latest version of the JRM ESS must be used. The current JRM ESS Amendment 7 dated 24 January 2020 is provided for your reference as an attachment to this Notice.
31. Can the Design analysis and supporting calculations for Phase 3 be shared with the Bidders?
It will be beneficial for all parties to understand the capacity required for the Generator.
ANSWER: Response deferred.
32. Reference Drawing S-704. Thrust Bearing Detail shows the munition bunker doors call for "Oil sintered brass" as a component of the door hinge assembly. Please provide the specifications for this material.
ANSWER: Response deferred.
33. Reference RFP Part 3, Chapter 2. Confirm that all site utilities are existing and have been designed where we are routing the communication and distribution duct banks. Please provide utility as-builts drawings.
ANSWER: Response deferred.
34. RFP documents are showing the igloos are a non-hazardous area. Please confirm if hazardous.
ANSWER: Response deferred.
35. Confirm a fire suppression system is not required in the generator building?
ANSWER: Response deferred.
36. Confirm fire hydrants are not required to provide fire flow per UFC 3-600-01, Section 9-2.1 for the Telecom and Generator facilities?
37. Reference Section 01 57 19.01 20, Para 3.2.1.
a. Is the Biologist work full time required to happen every day for the entire duration of the project and to be part of the construction crew?
b. Is the biologist provided by NAVFAC?
38. Reference Drawing S-502/B2. Detail B2 on S-502 shows the typical door jamb connection.
This detail will be difficult to achieve in the field, as there is no tolerance between the prefabricated blast door frame, precast panel, and cast in place wing wall. If any of these items are off by even 1/8” of an inch the welding as shown will not be possible. Please consider revising this detail to allow for standard construction tolerances.
ANSWER: Response deferred.
41. Is there a location on Andersen AFB where the green waste created from vegetation removal can be disposed of? Is there a limit to the length/diameter of the green waste or does it need to be chipped?
42. According to the JRM MRESS Amendment 7, this site is located in Area 3 of Andersen AFB. Table 6-1 (Historical Exclusion Zones) of Appendix B of the JRM MRESS Amendment 7 states that munition with the greatest fragmentation distance (MGFD) is the 500-lb M64A1 Bomb, which has a K18 distance of 123 ft. However, the Request for Proposal (RFP) references the JRM MRESS Amendment 6 and states that the minimum K18 distance for all earth-moving equipment with front or rear mounted buckets or blades is 13 feet, after the 60mm. Since 01 57 19.03, Section 1.1 of the RFP states that the latest version of the publications must be used (i.e., JRM MRESS Amendment 7) should contractors assume that the MGFD is the 500-lb M64A1 Bomb (Composition B filled)? Or should contractors assume the MGFD is the 60mm, as referenced in the RFP?
ANSWER: Response deferred.
43. Was this location a battlefield or disposal site?
ANSWER: Response deferred.
44. Reference Drawings E-601 & E-602. Please confirm that the rating of the pad mount transformer, generator, and MDP is per the RFP as shown on Sheets E-601 and E-602. However, If the rating shall serve future MSMs (48 Total), please provide rating.
ANSWER: Response deferred.
45. Reference Drawing M-101/Section D209092. Drawing M-101 indicates that the Fuel day tank has 100-gallon capacity. Section D209092 requires a 100-gallon fuel tank Minimum capacity. However, Part 3 Chapter 1 Page 3 states that “generator must be sized to support a total of 48 MSMs.” Please advice what the fuel tank capacity should be.
ANSWER: Response deferred.
46. Reference Section D501002. Room requirements and Engineering system requirements specify Type 316 Stainless steel equipment enclosures. However, Electrical Equipment Manufacturers are advising that only Type 304 Stainless steel is available. Please advise how to proceed.
NOTICE NO. 5
48. We have received Note 4. All answered were deferred, does that mean you do not intend to answer them or they will be answered at a later date? Since the Gov’t is not allowing us to submit electronically, can you please extend the due date a week so that we can get the proposal delivered on time?
ANSWER: We are currently working on the deferred responses and will provide responses as soon as they are available. Regarding request for extension, see Amendment 0005.
File details come from the government source that posted it. Updated .