This document is a Task Group Instruction (TGI) for the USS BLUE RIDGE (LCC-19), specifically focused on cleaning, inspecting, repairing, and preserving Void 7-52-0-V. The TGI details a comprehensive maintenance procedure for a specific void space, including commercial blast cleaning, visual inspection, and structural repairs. Key tasks include welding and repairing up to one linear foot of deteriorated welds, base metal weld buildup of 60 square inches, removing and replacing 10 square feet of deteriorated plate, and installing new stiffeners.

The work is part of a larger ship repair and maintenance project scheduled from January 12, 2026, to May 15, 2027. The instruction includes specific requirements for surface preparation, coating, and nondestructive testing, with particular attention to fire zone boundaries and potential lead hazards. The document is marked FOUO (For Official Use Only) and is part of a broader naval ship repair contract at the Fleet Activities Yokosuka Naval Base in Japan, involving multiple Task Group Instructions for comprehensive ship maintenance and overhaul.

View the file

Other files

File Type Posted
N6264925RA0210004.pdf PDF
TGI_3819P59302T01_c0v0.pdf PDF
TGI_3819P51405A01_c0v0.pdf PDF
TGI_3819P14214A01_c0v0.pdf PDF
TGI_3819P51401A01_c1v2.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P16729A02_c0v1.pdf PDF
TGI_3819P14210A01_c0v2.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P14203_T01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12339A01_c3v2.pdf PDF
TGI_3819P12337A01_c0v0.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12318A01_c2v3.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
BLR_5C1_TYCOM1 CDRL.pdf PDF
2.03 Solicitation N6264925RA0210001.pdf PDF
TGI_3819P59302A01_TGI_c1v1.pdf PDF
TGI_3819P14210A01_c0v2.pdf PDF
TGI_3819P51406A01_c0v0.pdf PDF
TGI_3819P14213A01_c0v0.pdf PDF
TGI_3819P14206T02_c0v0.pdf PDF
TGI_3819P13506T01_c0v0.pdf PDF
TGI_3819P12356_A01_c1v0.pdf PDF
TGI_3819P12317A01_c0v0.pdf PDF
TGI_3819P12344A01_c0v0.pdf PDF
TGI_3819P12337A01_c0v0.pdf PDF
TGI_3819P12311A01_c0v0.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
TGI_3819P59302T01_TGI_c0v0.pdf PDF
TGI_3819P58101A01_c1v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P14203_T02_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12339A01_c2v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12310A01_c3v1.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Price Proposal Form N6264925RA021.xlsx XLSX spreadsheet
2.01 N6264925RA021 Solicitation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: VOID 7-52-0-V AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE VOID (7-52-0-V)

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

KENICHIRO ISHIKAWA 231B. 315-243-2479 27-FEB-2024

APPROVED BY: CODE PHONE DATE

RYOUTA TAKAGI 231B. 315-243-4502 27-FEB-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III

SURFMEPP

This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: VOID 7-52-0-V AY A 0

FOUO

SHIP: LCC-19 CHG/VER: 0/1

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 J1-2 M-1

1. SCOPE/PURPOSE

1.1 Title: Void (7-52-0-V); clean, inspect, repair, and preserve

1.2 Location of Work:

1.2.1 Void (7-52-0-V)

1.2.2 Anti-Roll Tank (7-52-01-W)

1.2.3 Storeroom (6-52-5-A)

1.2.4 Storeroom (6-52-4-A)

1.3 Identification:

1.3.1 Quantity (One EA), Void

Void No.: 7-52-0-V

1.3.2 Quantity (2 EA), Manhole Cover Plate(s) for 7-52-0-V

Manhole No(s).: 7-52-5 and 7-52-6 Size: 15 Inches x 23 Inches Material: Steel

1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate(s) for 7-52-0-V Manhole No(s).: 7-52-5 and 7-52-6 Material: Steel

1.3.4 Quantity (1,610 SF), Entire Interior Surface of Void (7-52-0-V) Remarks: The area includes void side of manhole cover plate(s) and bolting ring

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Critical Coated Area: CCNY-LCC19-013-25 for area listed in 1.3.4.

1.5.2 Potential Lead Hazard

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 5/15/2027

FOUO

SHIP: LCC-19 CHG/VER: 0/1

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-

CJ-STM-

010/CH-075

Fasteners 7 N

4 TM

SYSTEMS &

SPECIFICAT

IONS

SSPC Painting Manual Volume 2 - N

5 DWG 104-

2491048

5th Deck PLTG FR51-1/2 - FR102- 1/4

M Y AL

L

6 DWG 114-

2491156

AGC19 TRANSV BHD FR 52 & 64 G Y AL

7 DWG 103-

2491033

2 PLATF FR 52-98 J Y AL

8 DWG 114-

2491164

ANTI-ROLL TANK BHD C Y 3,4

,5, 9 DWG 114-

2491165

CROSS FLOODING DUCTS E Y 3,4

,6

10 TM T-9630-

AB-MMD-

Corrosion Control Assessment and Maintenance Manual (CCAMM)

3 N

11 TM NAVSEA

4790/14

Tank and Void Structural and Coating Condition Survey (MRC G1N5)

- N

3. APPENDICES:

3.1 Appendix “J” TGI Job Summary Information Sheet

3.2 Appendix "M" TGI Material List

3.3 Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 099-902YO of 2.2 for each void listed in 1.3.1.

5.1.1 Accomplish installation of each manhole cover for each void listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.

5.2 Commercial blast clean each void listed 1.3.1. Accomplish each requirement of Surface Preparation Specification SSPC-SP 6 of 2.4.

5.3 Accomplish a visual inspection of each void listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, each crack, and area of damage or distortion, including each sounding tube, tank vent, overflow, piping, each structural member, and manhole cover, using 2.5 through 2.9 for guidance.

5.3.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.3 to the SUPERVISOR.

FOUO

SHIP: LCC-19 CHG/VER: 0/1

5.4 Repair each void listed in 1.3.1, based on the report 5.3.1 and CCIMS assessment report as designated by the SUPERVISOR, using 2.5 through 2.9 for guidance. See 5.9.5 through 5.9.7.

5.4.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead.

5.4.2 Chip and grind each surface flush in way of each repair.

5.4.3 Base metal weld buildup a total of 60 square inches of each plate defect in the void.

5.4.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.

5.4.3.2 Surface must be ground to sound metal prior to base metal weld buildup.

5.4.3.3 Fill each local pit and groove with weld material prior to application of each principal build up layer.

5.4.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.

5.4.4 Remove existing, fabricate, and install new a total of 10 square feet of deteriorated plate.

5.4.5 Remove existing, fabricate, and install new a total of 4 linear feet of defective stiffener.

5.4.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7.

5.4.6.1 Accomplish nondestructive testing in accordance with Line 11.

5.4.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.

5.5 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 17, for tank (7-52-01-W) side surface of each cover plate listed in 1.3.2.

5.6 Accomplish the requirements of 009-32 of 2.1 for tank (7-52-01-W) side surface of each bolting ring listed in 1.3.3.

5.7 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 24, for each area listed in 1.3.4.

5.7.1 Submit new coating data applied to the SUPERVISOR in accordance with 2.10 and 2.11.

5.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

5.9 Notes:

5.9.1 Planner: Code 231B K. Ishikawa, 243-2479

5.9.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.9.3 2.11 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey

(MRC G1N5).

5.9.4 This TGI meets the intent of DDG CSWT File Nos. 123-111, 123-133, and 123-142.

FOUO

SHIP: LCC-19 CHG/VER: 0/1

5.9.5 CCIMS assessment of each void listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No. 3819P12365I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.

5.9.6 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.

5.9.7 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.

5.9.8 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.9.9 JCNs ER01-ZAQ1, ER01-ZAT5, and ER04-ZA71 are related to this TGI.

5.10 Opening, initial cleaning, and closing of each space listed in 1.2.2 will be covered by TGI No. 3819P12335A01

(KTR TGI).

5.11 Government Furnished Material (GFM): None.

5.12 SRF-JRMC will provide the following service work: (TGI No. 3819P12365S02).

5.12.1 [C740] Crane and crane rigging service.

5.12.2 [X99E] Utility service, electrical.

5.12.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.

5.12.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.12.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.12.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.

5.12.7 [C135] QA inspection for (G) symbol(s).

5.12.8 [C250] Technical support.

FOUO

J-1

SHIP: LCC-19 CHG/VER: 0/1

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

VOID 7-52-0-V AY A 0 1

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE VOID (7-52-0-V)

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

MANHOLE 6-58-1 HA MANHOLE 6-52-2 HA VOID 7-52-0-V VD

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

3819P12365 A01

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI is to clean, inspect, repair, and preserve void (7-52-0-V).

Location of Work:

Void (7-52-0-V) Anti-Roll Tank (7-52-01-W) Storeroom (6-52-5-A) Storeroom (6-52-4-A)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

5.1 LBR HRs 22 KE PC

5.2 PNTR HRs, RGRS HRs, QA HRs 22 KE PC

5.3 SFTR HRs, PNTR HRs, 22 KE PC

5.4 SFTR HRs, WELD HRs, PNTR HRs, CARP HRs, QA HRs 22 KE PC

5.5 PNTR HRs, QA HRs 22 KE PC

5.6 PNTR HRs, QA HRs 22 KE PC

5.7 PNTR HRs, RGRS HRs, QA HRs 22 KE PC

5.8 PNTR HRs, QA HRs 22 KE PC

Dewatering and Cleaning Work CFM for marine chemist, gaskets, fasteners, tank watch cost, and misc.

22 MQ CS

Preservation Work CFM for all paints, thinners, grits, disposal cost, compressor and fuel oil, dryer for compressor, air conditioner, tank watch cost, and MISC such as consumable parts and covering material.

22 MQ CS

FOUO

J-2

SHIP: LCC-19 CHG/VER: 0/1

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

Structural Work CFM for fire watch cost, tank watch cost, MT inspection cost, compressor rental cost and fuel oil cost for air hose test, lead sampling/analysis cost, and misc such as electrode, gases, temporary closure, covering materials, and other consumable.

22 KE PC

Process Funding Document. 10 CT OM

Version-1: add special requirement. C231B R. Takagi, 02/27/2024, -/-/N.

V-01

FOUO

M-1

SHIP: LCC-19 CHG/VER: 0/1

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

VOID 7-52-0-V AY A 0 1

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE VOID (7-52-0-V)

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

3819P12365 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 VOID 7-52-0-V AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

3819P12365 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 VOID 7-52-0-V AY A 0