38KA186502A01_c0v0TGI.pdf

PDF 141 KB Posted

Attached to
Solicitation N6264925RA019: USS MILIUS (DDG 69) FY25 5J1 Surface Incremental Availability (Yokosuka, Japan)
Solicitation number
N6264925RA019
Issued by

About this file

This Task Group Instruction (TGI) details crane and rigging services required for the USS MILIUS (DDG-69) FY25 Surface Incremental Availability (SIA) at Yokosuka Naval Base, Japan. The work involves providing crane services with a 1,500 lb weight limitation and rigging services consisting of four riggers and one supervisor, to be performed over 18 days (Wednesdays and Saturdays across 9 weeks) between 08:00-17:00. The period of performance runs from May 14, 2025 to July 12, 2025.

The TGI is part of a larger solicitation (N6264925RA019) managed by NAVSUP Fleet Logistics Center Yokosuka for SRF-JRMC. Work will be conducted throughout the ship and pier side, with no government furnished materials required. The document identifies key personnel including planner M. Namegaya (Code 231B) and Work Integration Manager T. Yaginuma (Code 333). Proposals for the overall solicitation are due February 12, 2024, at 10:00 AM, and must be submitted to specified Navy personnel via email.

View the file

Other files

File Type Posted
Attachment II Price Proposal Form N6264925RA019.xlsx XLSX spreadsheet
N6264925RA019-0001.pdf PDF
Attachment IV Contract Data Sheet 25RA019.pdf PDF
38KA112301A01_c0v0TGI.pdf PDF
Attachment II Price Proposal Form N6264925RA019.xlsx XLSX spreadsheet
38KA116802A01_c0v0TGI.pdf PDF
38KA186501A01_c0v0TGI.pdf PDF
38KA163401A01_c0v0TGI.pdf PDF
38KA175301A01_c0v0TGI.pdf PDF
N6264925RA019.pdf PDF
38KA112302A01_c0v0TGI.pdf PDF
38KA165402A01_c0v0TGI.pdf PDF
38KA165403A01_c1v1TGI.pdf PDF
Attachment III Request for Information Form.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

18-JAN-2025 1614

20.14.15.2.9020 (September 2024) ICN: 38KA186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: F/O CRANE & RIG SVCE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: F/O - PROVIDE FY25 SIA CRANE, CRANE RGNG, AND RGNG SERVICE FOR SHIP’S FORCE WORK

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

EXSYL082

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NAMEGAYA, MASAHARU 231B 3152434489 18-JAN-2025

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 18-JAN-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSY-L082

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

865A3102

1. SCOPE/PURPOSE:

1.1 Title: FY25 SIA Crane, Crane Rigging, and Rigging Service for Ship’s Force Work; provide

1.2 Location of Work:

1.2.1 Throughout the Ship

1.2.2 Pier Side

1.3 Identification:

1.3.1 Quantity (One Lot), Crane and Crane Rigging Service for Ship’s Force Work

Remarks: Weight Limitation; No greater than 1,500 LBs Work Time Performance Period; 18 Days (Wednesday and Saturday in 9 Weeks) Work Time; From 08:00 to 17:00

TGI Short Form

18-JAN-2025 1614

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: F/O CRANE & RIG SVCE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: F/O - PROVIDE FY25 SIA CRANE, CRANE RGNG, AND RGNG SERVICE FOR SHIP’S FORCE WORK

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

1.3.2 Quantity (One Lot), Rigging Service for Ship’s Force Work

Remarks: Weight Limitation; No greater than 1,500 LBs Work Time Performance Period; 18 Days (Wednesday and Saturday in 9 Weeks) Work Time; From 08:00 to 17:00 Rigging team must consist of Four (4) riggers and One (1) supervisor proficient.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 14 May 2025

1.7 Contractor work completion date: 12 July 2025

2. PROCEDURE:

2.1 Provide crane, crane rigging, and rigging service listed in 1.3.1 and 1.3.2 during throughout FY25 SIA (KA1) period as per Ship’s Force request.

2.2 Notes:

2.2.1 Planner: Code 231B M. Namegaya, 243-4489

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN EXSY-L082 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC service work: None.

18-JAN-2025 1614

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: F/O CRANE & RIG SVCE AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: F/O - PROVIDE FY25 SIA CRANE, CRANE RGNG, AND RGNG SERVICE FOR SHIP’S FORCE WORK

FOUO Pg 3 of 3

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KA186502 KEY OP: A01

File details come from the government source that posted it. Updated .