This is a Task Group Instruction (TGI) for replacing and preserving peel and stick nonskid deck covering on the USS MILIUS (DDG-69). The work involves installing new nonskid covering on 290 square feet of the 06 Level Deck Weather area between frames 131-165 (port and starboard), including vertical surfaces up to 4 inches, and on 12 shroud plates of the Director Mounting Ring between frames 147-153. The material is steel and excludes areas where rubber tile is installed.
The work is scheduled for May 12, 2025 through July 4, 2025. The contractor must follow requirements of specification 009-32 for surface preparation and 009-26 for installation of peel and stick nonskid covering conforming to MIL-PRF-24667, Type XI, Composition PS. SRF-JRMC will provide government furnished materials, crane services, utility services (electrical, air, water, steam), safety inspections, gas free inspections, and QA inspections. The TGI includes one material item requiring 48 cap screws.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment II Price Proposal Form N6264925RA019.xlsx | XLSX spreadsheet | |
| 38KA186502A01_c0v0TGI.pdf | ||
| N6264925RA019-0001.pdf | ||
| Attachment IV Contract Data Sheet 25RA019.pdf | ||
| 38KA112301A01_c0v0TGI.pdf | ||
| Attachment II Price Proposal Form N6264925RA019.xlsx | XLSX spreadsheet | |
| 38KA116802A01_c0v0TGI.pdf | ||
| 38KA186501A01_c0v0TGI.pdf | ||
| 38KA175301A01_c0v0TGI.pdf | ||
| N6264925RA019.pdf | ||
| 38KA112302A01_c0v0TGI.pdf | ||
| 38KA165402A01_c0v0TGI.pdf | ||
| 38KA165403A01_c1v1TGI.pdf | ||
| Attachment III Request for Information Form.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
25-SEP-2024 0923
20.14.15.2.9020 (September 2024) ICN: 38KA163401 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1
CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
ES01L155
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
MAEDA, MITSUO 231B 3152436101 19-SEP-2024
APPROVED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 19-SEP-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-L155
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
634A1101
1. SCOPE/PURPOSE:
1.1 Title: Peel and Stick Nonskid System 06 Level Deck and Shroud; replace and preserve
1.2 Location of Work:
1.2.1 06 Level Deck Weather, Frames between 131 and 165, Port and Starboard (Stbd)
1.3 Identification:
1.3.1 Quantity (290 SF in Total), 06 Level Deck Plating, Frames between 131 and 165, including vertical surface up to height of 4 inches from deck in and around peel and stick nonskid deck covering area, Port and Stbd
Remarks: The area excepts where rubber tile is installed.
1.3.2 Quantity (12 EA), Shroud Plate of Director Mounting Ring on 06 Level Deck Plating, Frames between 147 and 153, Port and Stbd
TGI Short Form
25-SEP-2024 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA163401 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1
CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 12 May 2025
1.7 Contractor work completion date: 04 Jul 2025
2. PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 25, for each area listed in 1.3.1.
2.1.1 Accomplish the requirements of 009-26 of Ref No. One, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.
2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) One, for each equipment listed in 1.3.2.
2.3 Notes:
2.3.1 Planner: Code 231B M. Maeda, 243-6101
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 JCN ES01-L155 is related to this TGI.
2.4 Government Furnished Material (GFM):
2.4.1 SRF-JRMC will provide GFM listed in Material List.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38KA163401S02)
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbols.
25-SEP-2024 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA163401 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1
CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
25-SEP-2024 0923
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA163401 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1
CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M SCREW,CA, ORDER FOR KTR
ORIG C231B M. MAEDA, 243-
9B 5305 016759570 NA 4 N 48/EA
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KA163401 KEY OP: A01
File details come from the government source that posted it. Updated .