38KA163401A01_c0v0TGI.pdf

PDF 205 KB Posted

Attached to
Solicitation N6264925RA019: USS MILIUS (DDG 69) FY25 5J1 Surface Incremental Availability (Yokosuka, Japan)
Solicitation number
N6264925RA019
Issued by

About this file

This is a Task Group Instruction (TGI) for replacing and preserving peel and stick nonskid deck covering on the USS MILIUS (DDG-69). The work involves installing new nonskid covering on 290 square feet of the 06 Level Deck Weather area between frames 131-165 (port and starboard), including vertical surfaces up to 4 inches, and on 12 shroud plates of the Director Mounting Ring between frames 147-153. The material is steel and excludes areas where rubber tile is installed.

The work is scheduled for May 12, 2025 through July 4, 2025. The contractor must follow requirements of specification 009-32 for surface preparation and 009-26 for installation of peel and stick nonskid covering conforming to MIL-PRF-24667, Type XI, Composition PS. SRF-JRMC will provide government furnished materials, crane services, utility services (electrical, air, water, steam), safety inspections, gas free inspections, and QA inspections. The TGI includes one material item requiring 48 cap screws.

View the file

Other files

File Type Posted
Attachment II Price Proposal Form N6264925RA019.xlsx XLSX spreadsheet
38KA186502A01_c0v0TGI.pdf PDF
N6264925RA019-0001.pdf PDF
Attachment IV Contract Data Sheet 25RA019.pdf PDF
38KA112301A01_c0v0TGI.pdf PDF
Attachment II Price Proposal Form N6264925RA019.xlsx XLSX spreadsheet
38KA116802A01_c0v0TGI.pdf PDF
38KA186501A01_c0v0TGI.pdf PDF
38KA175301A01_c0v0TGI.pdf PDF
N6264925RA019.pdf PDF
38KA112302A01_c0v0TGI.pdf PDF
38KA165402A01_c0v0TGI.pdf PDF
38KA165403A01_c1v1TGI.pdf PDF
Attachment III Request for Information Form.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

25-SEP-2024 0923

20.14.15.2.9020 (September 2024) ICN: 38KA163401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

ES01L155

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

MAEDA, MITSUO 231B 3152436101 19-SEP-2024

APPROVED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 19-SEP-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-L155

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

634A1101

1. SCOPE/PURPOSE:

1.1 Title: Peel and Stick Nonskid System 06 Level Deck and Shroud; replace and preserve

1.2 Location of Work:

1.2.1 06 Level Deck Weather, Frames between 131 and 165, Port and Starboard (Stbd)

1.3 Identification:

1.3.1 Quantity (290 SF in Total), 06 Level Deck Plating, Frames between 131 and 165, including vertical surface up to height of 4 inches from deck in and around peel and stick nonskid deck covering area, Port and Stbd

Remarks: The area excepts where rubber tile is installed.

1.3.2 Quantity (12 EA), Shroud Plate of Director Mounting Ring on 06 Level Deck Plating, Frames between 147 and 153, Port and Stbd

TGI Short Form

25-SEP-2024 0923

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA163401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

Material: Steel

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 12 May 2025

1.7 Contractor work completion date: 04 Jul 2025

2. PROCEDURE:

2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 25, for each area listed in 1.3.1.

2.1.1 Accomplish the requirements of 009-26 of Ref No. One, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.

2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) One, for each equipment listed in 1.3.2.

2.3 Notes:

2.3.1 Planner: Code 231B M. Maeda, 243-6101

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 JCN ES01-L155 is related to this TGI.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38KA163401S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbols.

25-SEP-2024 0923

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA163401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

25-SEP-2024 0923

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA163401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 06 NONSKID AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - RPL PEEL AND STICK NONSKID SYS 06 LEVEL DECK AND PSV SHROUD

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M SCREW,CA, ORDER FOR KTR

ORIG C231B M. MAEDA, 243-

9B 5305 016759570 NA 4 N 48/EA

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KA163401 KEY OP: A01