This is a Task Group Instruction (TGI) for installing and removing scaffolding at various locations aboard the USS MILIUS (DDG-69) to support Ship's Force maintenance work. The document details scaffolding requirements at multiple locations including weather decks, yardarm, and pole mast positions between frames 125-202, spanning multiple deck levels. The work will enable preservation of bulkheads and maintenance of various antenna systems including antenna numbers 6-4, 3-30B, 3-12, 3-4, 3-3, and 4-1.
The contractor work period is scheduled from May 12, 2025 through July 4, 2025. The work will be performed in 10 separate lots of scaffolding assemblies, each supporting specific maintenance tasks to be completed by Ship's Force. SRF-JRMC will provide crane and rigging services, safety inspections, and QA inspections under TGI No. 38KA186501S02. The work requires compliance with NAVSEA Standard Items, Local Standard Items, and scaffolding regulations under 29 CFR PART 1915.71. No government furnished materials are provided for this task.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment II Price Proposal Form N6264925RA019.xlsx | XLSX spreadsheet | |
| 38KA186502A01_c0v0TGI.pdf | ||
| N6264925RA019-0001.pdf | ||
| Attachment IV Contract Data Sheet 25RA019.pdf | ||
| 38KA112301A01_c0v0TGI.pdf | ||
| Attachment II Price Proposal Form N6264925RA019.xlsx | XLSX spreadsheet | |
| 38KA116802A01_c0v0TGI.pdf | ||
| 38KA163401A01_c0v0TGI.pdf | ||
| 38KA175301A01_c0v0TGI.pdf | ||
| N6264925RA019.pdf | ||
| 38KA112302A01_c0v0TGI.pdf | ||
| 38KA165402A01_c0v0TGI.pdf | ||
| 38KA165403A01_c1v1TGI.pdf | ||
| Attachment III Request for Information Form.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
17-OCT-2024 1315
20.14.15.2.9020 (September 2024) ICN: 38KA186501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
ES01L150
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAKEISHI, TAKAYUKI 231B 3152436704 12-OCT-2024
APPROVED BY: CODE: PHONE: DATE:
NAMEGAYA, MASAHARU 231B 3152434489 12-OCT-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-L150
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
865A1201
1. SCOPE/PURPOSE:
1.1 Title: Scaffolding for Ship’s Force Work; install and remove
1.2 Location of work:
1.2.1 Between 04 Level and 05 Level Weather, Frames between 125 and 135, Port and Starboard (Stbd)
1.2.2 01 Level Weather, Frames between 142 and 150, Port and Stbd
1.2.3 01 Level Weather, Frames between 197 and 202, Port and Stbd
1.2.4 04 Level Weather, Frames between 160 and 170, Port and Stbd
1.2.5 Lower yardarm, Frames between 170 and 175, Port and Stbd
1.2.6 Pole Mast, Frame 181, Ship’s Center Line
TGI Short Form
17-OCT-2024 1315
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA186501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
1.3 Identification:
1.3.1 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.1 Remarks: Preservation work of bulkhead and antenna pedestal will be accomplished by Ship's Force.
1.3.2 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.2 Remarks: Maintenance work of antenna number 6-4(P6) will be accomplished by Ship's Force.
1.3.3 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.2 Remarks: Maintenance work of antenna number 6-4(S5) will be accomplished by Ship's Force.
1.3.4 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.3 Remarks: Maintenance work of antenna number 6-4(P8) will be accomplished by Ship's Force.
1.3.5 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.3 Remarks: Maintenance work of antenna number 6-4(S7) will be accomplished by Ship's Force.
1.3.6 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.4 Remarks: Preservation work of antenna number 3-30B platform will be accomplished by Ship's Force.
1.3.7 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.4 Remarks: Preservation work of antenna number 3-12 platform will be accomplished by Ship's Force.
1.3.8 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.5 Remarks: Maintenance work of antenna number 3-4 will be accomplished by Ship's Force.
1.3.9 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.5 Remarks: Maintenance work of antenna number 3-3 will be accomplished by Ship's Force.
1.3.10 Quantity (One Lot), Scaffolding Assembly
17-OCT-2024 1315
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA186501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
Location: 1.2.6 Remarks: Maintenance work of antenna number 4-1 will be accomplished by Ship's Force.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 12 May 2025
1.7 Contractor work completion date: 04 Jul 2025
2. PROCEDURE:
2.1 Erect/hang scaffolding listed in 1.3.1 through 1.3.10 in accordance with Ref. No. 3.
2.2 Remove scaffolding listed in 1.3.1 through 1.3.10 upon completion of the work in accordance with Ref. No. 3 when requested by Ship’s Force via Code 333.
2.3 Notes:
2.3.1 Planner: Code 231B T. Takeishi, 243-6704
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 JCN ES01-L150 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38KA186501S02)
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.3 [C133] QA inspection for (G) symbol(s).
17-OCT-2024 1315
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA186501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KA186501 KEY OP: A01
File details come from the government source that posted it. Updated .