38KA112302A01_c0v0TGI.pdf

PDF 570 KB Posted

Attached to
Solicitation N6264925RA019: USS MILIUS (DDG 69) FY25 5J1 Surface Incremental Availability (Yokosuka, Japan)
Solicitation number
N6264925RA019
Issued by

About this file

This is a Task Group Instruction (TGI) detailing preservation work to be performed on the USS MILIUS (DDG-69) in passage 01-118-4-L. The work involves preserving bulkhead plating (2,400 SF and 100 SF areas) and replacing nonskid systems on the 01 Level deck plating (610 SF). Specific tasks include preserving 18 foundation lights and 2 corroded brackets, power tool cleaning to bare metal, and applying nonskid system conforming to MIL-PRF-24667 specifications.

The work is to be performed between May 12, 2025 and July 4, 2025 at Yokosuka Naval Base, Japan. The TGI includes detailed location specifications for all work areas, including frame numbers and port-side designations. SRF-JRMC will provide support services including crane operations, utility services, safety inspections, and QA inspections. No Government Furnished Material is specified. The file includes three sketch sheets showing detailed plan views of the passage and foundation lighting fixture details.

View the file

Other files

File Type Posted
Attachment II Price Proposal Form N6264925RA019.xlsx XLSX spreadsheet
38KA186502A01_c0v0TGI.pdf PDF
N6264925RA019-0001.pdf PDF
Attachment IV Contract Data Sheet 25RA019.pdf PDF
38KA112301A01_c0v0TGI.pdf PDF
Attachment II Price Proposal Form N6264925RA019.xlsx XLSX spreadsheet
38KA116802A01_c0v0TGI.pdf PDF
38KA186501A01_c0v0TGI.pdf PDF
38KA163401A01_c0v0TGI.pdf PDF
38KA175301A01_c0v0TGI.pdf PDF
N6264925RA019.pdf PDF
38KA165402A01_c0v0TGI.pdf PDF
38KA165403A01_c1v1TGI.pdf PDF
Attachment III Request for Information Form.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

25-SEP-2024 0843

20.14.15.2.9020 (September 2024) ICN: 38KA112302 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - PRESERVE BULKHEAD PLATING AND REPLACE NONSKID SYS IN PASSAGE (01-118-4-L)

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

ES01L136

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

HAGA, MASAMICHI 231B 3152432513 09-SEP-2024

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 09-SEP-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-L136

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A4302

1 SCOPE/PURPOSE:

1.1 Title: Bulkhead Plating and Nonskid System in Passage (01-118-4-L); preserve and replace

1.2 Location of Work:

1.2.1 Passage (01-118-4-L)

1.2.2 01 Level Weather, Frames between 202 and 209, Port

1.3 Identification:

1.3.1 Quantity (2,400 SF), Bulkhead Plating in 01-118-4-L, Frames between 118 and 197, including longitudinal bulkhead plating, house side bulkhead plating, sloping house front bulkhead plating, stiffener, foundation, piping, piping hanger, and passage side surface of door panel of watertight cargo door 01-121-2, Port

Remarks:

TGI Short Form

25-SEP-2024 0843

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA112302 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - PRESERVE BULKHEAD PLATING AND REPLACE NONSKID SYS IN PASSAGE (01-118-4-L)

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

The area is accessible area only.

The area excludes where compartment insulation is installed, and passage side surface of door panel of watertight door

01-121-4, 01-124-2, 01-172-2, and 01-176-2.

1.3.2 Quantity (18 EA), Foundation of Incandescent Lighting Fixture on 02 Level Deck Plating in 01-118-4-L, Frames between 128 and 194, Port

Remarks:

See Sheets One through 3 of Sketch Enclosure-01 for location and details.

The area excludes where compartment insulation is installed.

1.3.3 Quantity (2 EA), Corroded Bracket on 02 Level Deck Plating in 01-118-4-L, Frames between 187 and 194, Port

Remarks:

See Sheet 2 of Sketch Enclosure-01 for location and details.

The area excludes where compartment insulation is installed.

1.3.4 Quantity (100 SF), Bulkhead Plating in 01-118-4-L, Frames between 197 and 209, including longitudinal bulkhead plating, house side bulkhead plating, house side sloping bulkhead plating, stiffener, foundation, piping, piping hanger, curtain plate, light shield, and collar plate, Port

Remarks: The area excludes where rubber tile and compartment insulation are installed.

1.3.5 Quantity (610 SF), 01 Level Deck Plating in 01-118-4-L, Frames between 118 and 209, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Port

Remarks: The area excludes where rubber tile is installed, and vertical surface of longitudinal bulkhead plating, house side bulkhead plating, sloping house front bulkhead plating, house side sloping bulkhead plating, and vertical stiffener on bulkhead plating listed in 1.3.1 and 1.3.4.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 12 May 2025

1.7 Contractor work completion date: 04 Jul 2025

2. PROCEDURE:

2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) One, for each area and equipment listed in 1.3.1 through 1.3.3, and Table 3, Line(s) 8, for each area listed in 1.3.4.

2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 21, for each area listed in 1.3.5.

Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.

2.2.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of Ref. No. 3.

25-SEP-2024 0843

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA112302 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - PRESERVE BULKHEAD PLATING AND REPLACE NONSKID SYS IN PASSAGE (01-118-4-L)

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.3 Notes:

2.3.1 Planner: Code 231B M. Haga, 243-2513

Planner: Code 233 M. Yamaguchi, 080-9350-1450

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 JCN ES01-L136 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38KA112302S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including water supply and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

25-SEP-2024 0843

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA112302 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-69 USS MILIUS KA1

CU PHASE TITLE: *F/O - PRESERVE BULKHEAD PLATING AND REPLACE NONSKID SYS IN PASSAGE (01-118-4-L)

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

3 TM SYSTEMS &

SPECIFICATIONS

SSPC Painting Manual Volume

- N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38KA112302A01-Sketch.pdf 09-SEP-2024 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KA112302 KEY OP: A01

Sketch 38KA112302A01 ENCLOSURE-01 Sheet 1 of 3

PLAN VIEW

PASSAGE (01-118-4-L)

Frames between 125-175

1.3.2 Quantity (18 EA), Foundation of Incandescent Lighting Fixture on 02 Level Deck Plating in 01-118-4-L, Frames between 128 and 194, Port

Detail Photo Detail 3-A

38KA112302A01 ENCLOSURE-01 Sheet 2 of 3

PLAN VIEW

PASSAGE (01-118-4-L)

Frames between 175-209

1.3.3 Quantity (2 EA), Corroded Bracket on 02 Level Deck Plating in 01-118-4-L, Frames between 187 and 194, Port

Detail Photo

Foundation of Incandescent Lighting Fixture

38KA112302A01 ENCLOSURE-01 Sheet 3 of 3

DETAIL 3-A

Foundation of Incandescent Lighting Fixture

Preservation Area

02 Level Deck Plating