This is a Task Group Instruction (TGI) for replacing deck covering in Director Equipment Room No. One (05-131-0-Q) aboard the USS MILIUS (DDG-69). The work involves removing 374 SF of existing electrical grade sheet deck covering system and installing new electrical grade sheet conforming to MIL-DTL-15562, Type One in blue marbleized color, plus treating 385 SF of deck plating and vertical surfaces.
The work is to be performed between May 12, 2025 and July 4, 2025 at SRF-JRMC in Yokosuka, Japan. There is a potential asbestos hazard noted. The government will provide various support services including crane/rigging, utilities (electrical, air, water, steam), safety inspections, gas free inspections, and QA inspections. Materials include government-furnished floor matting. The contractor must comply with requirements of documents 009-26 and 009-32 regarding removal, installation and surface preparation specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment II Price Proposal Form N6264925RA019.xlsx | XLSX spreadsheet | |
| 38KA186502A01_c0v0TGI.pdf | ||
| N6264925RA019-0001.pdf | ||
| Attachment IV Contract Data Sheet 25RA019.pdf | ||
| 38KA112301A01_c0v0TGI.pdf | ||
| Attachment II Price Proposal Form N6264925RA019.xlsx | XLSX spreadsheet | |
| 38KA116802A01_c0v0TGI.pdf | ||
| 38KA186501A01_c0v0TGI.pdf | ||
| 38KA163401A01_c0v0TGI.pdf | ||
| 38KA175301A01_c0v0TGI.pdf | ||
| N6264925RA019.pdf | ||
| 38KA112302A01_c0v0TGI.pdf | ||
| 38KA165403A01_c1v1TGI.pdf | ||
| Attachment III Request for Information Form.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
25-SEP-2024 0928
20.14.15.2.9020 (September 2024) ICN: 38KA165402 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 05-131-0-Q DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1 66311
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 05-131-0-Q
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
CF023013
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HAYASHI, MOTONORI 231B 3152436145 24-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 24-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CF02-3013
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 05-131-0-Q 05 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
654A1102
1 SCOPE/PURPOSE:
1.1 Title: Deck Covering in 05-131-0-Q; replace
1.2 Location of Work:
1.2.1 Director Equipment Room No. One (05-131-0-Q)
1.3 Identification:
1.3.1 Quantity (374 SF), Entire Electrical Grade Sheet Deck Covering System [Existing]
1.3.2 Quantity (374 SF), Entire, Electrical Grade Sheet
Specification: MIL-DTL-15562, Type One Color: Blue Mableized
TGI Short Form
25-SEP-2024 0928
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA165402 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 05-131-0-Q DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1 66311
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 05-131-0-Q
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.3.3 Quantity (385 SF in Total), Deck Plating, including vertical structural surface up to height of One inch from complete electrical grade sheet deck covering system level
Remarks: The area excepts where insulation is installed.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor Work start date: 12 May 2025
1.7 Contractor Work completion date: 04 Jul 2025
2 PROCEDURE:
2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment D, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.
2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.2 Notes:
2.2.1 Planner: Code 231B M. Hayashi, 243-6145
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN CF02-3013 is related to this TGI.
2.3 Government Furnished Material (GFM):
2.3.1 SRF-JRMC will provide GFM listed in the Material List.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38KA165402S02)
2.4.1 [C740] Crane and crane rigger service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
25-SEP-2024 0928
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KA165402 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 05-131-0-Q DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-69 USS MILIUS KA1 66311
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 05-131-0-Q
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M MATTING,FLOOR, ORIG: C-
231B M.HAYASHI 243-6145
ORDERED FOR KTR
9Q 7220 010249040 NA 4 N 42375173 2/RO