KC-130J_RFP+IDIQ_Attachment_(8)_Airfield_Requirements_(2019-03-15)_v1.docx

DOCX document 17 KB Posted

Attached to
KC-130J Scheduled and Unscheduled Maintenance, Repair and Overhaul - OCONUS
Solicitation number
N6264919R0167
Issued by

About this file

This solicitation requests proposals for scheduled and unscheduled maintenance, repair, and overhaul services for U.S. Marine Corps KC-130J aircraft forward deployed to the Western Pacific region. Fleet Logistics Center Yokosuka and Fleet Readiness Center Western Pacific, in support of Program Manager Aviation 207, seek contractors with significant KC-130J experience to provide MRO services. The solicitation includes Attachments 1 through 12, a past performance questionnaire, and CDRLs A0001 through L001. Offerors are to have experience maintaining the KC-130J aircraft and must comply with requirements for airfield category 4 under National Aerospace Standard 3306, as well as DCMA 8210.c standards for compass roses and ARFF capabilities.

AIRFIELD REQUIREMENTS N6264919R0167 AMD 0001

View the file

Other files

File Type Posted
N6264919R0167 AMD 0007.docx DOCX document
N6264919R0167 AMD 0007 CONFORMED.docx DOCX document
Attachment_01_KC-130J_PWS_(2019-11-27_AMD_0007.docx DOCX document
N6264919R0167 Amendment 06.docx DOCX document
N6264919R0167 Amendment 06 Conformed Copy.docx DOCX document
N6264919R0167_AMD_0005.docx DOCX document
N6264919R0167_AMD_0005_CONFORMED.docx DOCX document
CDRL_A008_SITUATION_SUMMARY_REPORT_C-130_v1.pdf PDF
CDRL_A007_SCHEDULED_REMOVAL_CARDS_C-130_v1.pdf PDF
CDRL_A013_NON-DESTRUCTIVE_INSPECTION_(NDI)_REPORT_C-130_v1.pdf PDF
Attachment_01_KC-130J_PWS_(2019-10-25)_AMD_0004.docx DOCX document
CDRL_A012_Maintenance_History_Summary_(MHS)_Report_C-130_v1.pdf PDF
CDRL_A009_AIRCRAFT_CONDITION_EVALUATION_REPORT_C-130_v1.pdf PDF
N6264919R0167_AMD_0004_CONFORMED.docx DOCX document
CDRL_A005_PRODUCTION_PLAN_C-130_v1.pdf PDF
CDRL_A011_WEIGHT_AND_BALANCE_REPORTS_C-130_v1.pdf PDF
Attachment_14_Price_Summary_Spreadsheet_(2019-10-31)_AMD_0004.xlsx XLSX spreadsheet
CDRL_A014_CORROSION_INSPECTION_(CI)_REPORT_C-130_v1.pdf PDF
N6264919R0167_AMD_0004.docx DOCX document
N6264919R0167_AMD_0003.docx DOCX document
Attachment_14_Price_Summary_Spreadsheet_(2019-10-16).xlsx XLSX spreadsheet
N6264919R0167_AMD_0003_CONFORMED.docx DOCX document
Attachment_01_KC-130J_PWS_AMD_0003.docx DOCX document
RFP_N6264919R0167_MOD_0002_CORRECTED.docx DOCX document
Attachment_13_Past_Performance_Questionnaire.docx DOCX document
RFP_N6264919R0167_AMD_0002.docx DOCX document
RFP_N6264919R0167_AMD_0002_CONFORMED.docx DOCX document
Attachment_14_Price_Summary_Spreadsheet.xlsx XLSX spreadsheet
KC-130J_RFP+IDIQ_Attachment_(6)_TEI_Process_at_Contarctor_Facilities_(2019-08-09)_v1.docx DOCX document
N6264919R0167_AMD_0001_CONFORMED.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(12)_Projected_Induction_Schedule_(2019-07-03)_v2.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(7)_PEMA_Specifications_(2019-03-15)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(9)_Facility_Requirements_(2019-03-15)_v1.docx DOCX document
RFP_N6264919R0167_AMD_0001.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(10)_Repairable_Items_(2019-07-02)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(3)_QASP_(2019-08-28)_v2.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(5)_LMR_Process_at_Contractor_Facilities_(2019-08-09)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(2)_Government_Responsibilities_(2019-04-10)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(11)_Support_Equipment_(2019-06-05)_v2.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(1)_PMI_PWS_(2019-08-22).docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(4)_Safety_Provisions_(2019-04-10)_v1.docx DOCX document
CDRL_A001_TECHNICAL_DIRECTIVES_REQUIREMENTS_10_DAY_REPORT_C-130 PDF
CDRL_A002_TECHNICAL_DIRECTIVES_REPORT_C-130.pdf PDF
CDRL_A014_CORROSION_INSPECTION_(CI)_REPORT_C-130.pdf PDF
KC-130J_RFP+IDIQ_Attachment_(1)_PMI_PWS_(2019-08-08).docx DOCX document
CDRL_C001_MEETING_MINUTES_C-130.pdf PDF
CDRL_D001_PHASE-IN_TRANSITION_PLAN_C-130.pdf PDF
CDRL_A008_SITUATION_SUMMARY_REPORT_C-130.pdf PDF
CDRL_A007_SCHEDULED_REMOVAL_CARDS_C-130.pdf PDF
KC-130J_RFP+IDIQ_Attachment_(5)_LMR_(Final_3-8-19).docx DOCX document
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264919R0167 Attachment (8) 15 March 2019

Attachment (8): Airfield Requirement For

KC-130J

Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI)

C-130 Reference for Airfield requirements.

NAS 3306 - Airfield Category 4: Wingspans of 118ft (36m) up to but not including 171 ft (52m) and 1.3 VS of less than 141 knots.

External Dimensions

Wing Span132.6 ft/ 40.41 m
Wing Aspect Ratio10.1
Length (Overall)97.75 ft/ 29.79 m
Height (Overall)38.8 ft/ 11.84 m
Tailplane Span52.7 ft/ 16.05 m
Wheel Track14.25 ft / 4.34 m
Propeller Diameter13.5ft/4.11 m
Wing Area (gross)1,745 sq. ft/ 162.12 sq. m

Internal Dimensions

Cabin Length (excluding ramp)40 ft I 12.19 m
Cabin Length (including ramp)50.7ft/15.44m
Max. Width10.25 ft/ 3.12 m
Max. Height9 ft/2.74 m
Total useable volume4,551 cubic ft/ 128.9 cubic m

Weights

Operating Empty Weight75,562 lbs/ 34,274 kg
Takeoff Run to 15 m4,700 ft/ 1,433 m
Takeoff Run using max. effort procedures1,800ft/549m
Landing from 15 mat 58,967 kg AI.JW2,550 ft / 777 m
Landing Run at 58,967 kg AI.JW1 ,400 ft / 427 m
Runway LCN: asphalt37
Runway LCN: concrete42

Range with 18,144 kg payload and MIL-STD-3013 reserves 2,835 nm / 5,250 km

In tandem with C-130 characteristics above; must comply with DCMA 8210.c (or latest revision)

Compass Rose Must be compliant to USN/USMC requirements.

ARFF

Must comply with DCMA 8210.c and National Aerospace Standard (NAS) 3306. (latest revisions shall be used)

File details come from the government source that posted it. Updated .