KC-130J_RFP+IDIQ_Attachment_(4)_Safety_Provisions_(2019-04-10)_v1.docx

DOCX document 23 KB Posted

Attached to
KC-130J Scheduled and Unscheduled Maintenance, Repair and Overhaul - OCONUS
Solicitation number
N6264919R0167
Issued by

About this file

This attachment to a solicitation provides safety provisions for scheduled and unscheduled maintenance, repair and overhaul services for U.S. Marine Corps KC-130J aircraft forward deployed to the Western Pacific region. The contractor must comply with the Navy's industrial safety, health and environmental requirements and develop a detailed safety program. This includes hazard control plans for various operations like lifting, fueling, cleaning and hazards like foreign object damage. The contractor must report any incidents within an hour and investigate all incidents, submitting a report within 24 hours. The contractor's safety council must meet regularly to promote safety and address trends.

SAFETY PROVISIONS N6264919R0167 AMD 0001

View the file

Other files

File Type Posted
N6264919R0167 AMD 0007.docx DOCX document
N6264919R0167 AMD 0007 CONFORMED.docx DOCX document
Attachment_01_KC-130J_PWS_(2019-11-27_AMD_0007.docx DOCX document
N6264919R0167 Amendment 06.docx DOCX document
N6264919R0167 Amendment 06 Conformed Copy.docx DOCX document
N6264919R0167_AMD_0005.docx DOCX document
N6264919R0167_AMD_0005_CONFORMED.docx DOCX document
CDRL_A008_SITUATION_SUMMARY_REPORT_C-130_v1.pdf PDF
CDRL_A007_SCHEDULED_REMOVAL_CARDS_C-130_v1.pdf PDF
CDRL_A013_NON-DESTRUCTIVE_INSPECTION_(NDI)_REPORT_C-130_v1.pdf PDF
Attachment_01_KC-130J_PWS_(2019-10-25)_AMD_0004.docx DOCX document
CDRL_A012_Maintenance_History_Summary_(MHS)_Report_C-130_v1.pdf PDF
CDRL_A009_AIRCRAFT_CONDITION_EVALUATION_REPORT_C-130_v1.pdf PDF
N6264919R0167_AMD_0004_CONFORMED.docx DOCX document
CDRL_A005_PRODUCTION_PLAN_C-130_v1.pdf PDF
CDRL_A011_WEIGHT_AND_BALANCE_REPORTS_C-130_v1.pdf PDF
Attachment_14_Price_Summary_Spreadsheet_(2019-10-31)_AMD_0004.xlsx XLSX spreadsheet
CDRL_A014_CORROSION_INSPECTION_(CI)_REPORT_C-130_v1.pdf PDF
N6264919R0167_AMD_0004.docx DOCX document
N6264919R0167_AMD_0003.docx DOCX document
Attachment_14_Price_Summary_Spreadsheet_(2019-10-16).xlsx XLSX spreadsheet
N6264919R0167_AMD_0003_CONFORMED.docx DOCX document
Attachment_01_KC-130J_PWS_AMD_0003.docx DOCX document
RFP_N6264919R0167_MOD_0002_CORRECTED.docx DOCX document
Attachment_13_Past_Performance_Questionnaire.docx DOCX document
RFP_N6264919R0167_AMD_0002.docx DOCX document
RFP_N6264919R0167_AMD_0002_CONFORMED.docx DOCX document
Attachment_14_Price_Summary_Spreadsheet.xlsx XLSX spreadsheet
KC-130J_RFP+IDIQ_Attachment_(6)_TEI_Process_at_Contarctor_Facilities_(2019-08-09)_v1.docx DOCX document
N6264919R0167_AMD_0001_CONFORMED.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(12)_Projected_Induction_Schedule_(2019-07-03)_v2.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(7)_PEMA_Specifications_(2019-03-15)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(9)_Facility_Requirements_(2019-03-15)_v1.docx DOCX document
RFP_N6264919R0167_AMD_0001.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(10)_Repairable_Items_(2019-07-02)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(8)_Airfield_Requirements_(2019-03-15)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(3)_QASP_(2019-08-28)_v2.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(5)_LMR_Process_at_Contractor_Facilities_(2019-08-09)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(2)_Government_Responsibilities_(2019-04-10)_v1.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(11)_Support_Equipment_(2019-06-05)_v2.docx DOCX document
KC-130J_RFP+IDIQ_Attachment_(1)_PMI_PWS_(2019-08-22).docx DOCX document
CDRL_A001_TECHNICAL_DIRECTIVES_REQUIREMENTS_10_DAY_REPORT_C-130 PDF
CDRL_A002_TECHNICAL_DIRECTIVES_REPORT_C-130.pdf PDF
CDRL_A014_CORROSION_INSPECTION_(CI)_REPORT_C-130.pdf PDF
KC-130J_RFP+IDIQ_Attachment_(1)_PMI_PWS_(2019-08-08).docx DOCX document
CDRL_C001_MEETING_MINUTES_C-130.pdf PDF
CDRL_D001_PHASE-IN_TRANSITION_PLAN_C-130.pdf PDF
CDRL_A008_SITUATION_SUMMARY_REPORT_C-130.pdf PDF
CDRL_A007_SCHEDULED_REMOVAL_CARDS_C-130.pdf PDF
KC-130J_RFP+IDIQ_Attachment_(5)_LMR_(Final_3-8-19).docx DOCX document
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264918R0167 Attachment (4) 10 April 2019

Attachment (4): Occupational Safety, Health and Environmental Provisions For

KC-130J

Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI)

SECTION I - GENERAL SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS

1. The Contractor, and its sub-contractors, shall comply with the provisions as set forth in the instructions of the U.S. Government in the performance of this contract as specified within the SOW, its attachments, and its references.

1.1 The Contractor shall be responsible for developing and maintaining a detailed Industrial Safety, Health, and Environmental Program that includes:

1.1.1. Policy, organization, responsibilities, surveillance, enforcement, and training.

1.1.2. Fire protection/prevention and emergency response. The contractor shall identify specific plans for fire protection/prevention along with coordination of external activities that support these requirements for response to emergencies to include fire, chemical spill, accident, terrorist threat, adverse weather, natural disaster, etc. This item includes joint participation with external agencies in emergency response drills and training exercises.

1.1.3. Specific methods of compliance with the requirements of this section.

1.1.4. Compliance with applicable technical manual for each type, model, series aircraft.

2. The Contractor shall submit to the Administrative Contracting Officer (ACO), Government Flight Representative (GFR), and Contracting Officer’s Representative (COR) a copy of his Industrial Safety, Health and Environmental (ISHE) plan for review prior to execution, when changed and annually thereafter as part of this contract. The plan submitted shall be in English and provide a detailed description of the Contractor’s ISHE program.

3. In addition to the Mishap/Incident Reporting and Investigation requirements of DCMA INST 8210.1, Contractor's Flight and Ground Procedures, the Contractor shall comply with the following:

3.1. The Contractor shall report, to the GFR and PMTR Government representative by telephone, any hazardous material spill, occupational injury and/or illness(es) to contractor personnel, and/or damage to Government property as well as aircraft and/or explosive-related incidents within one (1) hour of its identification/occurrence.

3.2. The contractor shall submit a written investigation report detailing all available facts relating to each case of material spill, personnel injury or damage to Government property to the GFR and PMTR within 24 hours of the incident.

4. The contractor’s Aviation Safety Council shall promote a program of accident prevention, accept action items, provide safety expertise, implement changes as required, and address company mishaps for trend analysis and recommendations and operate as a focal point for ISHE within the company. These meetings shall be held on a regular basis (minimum 10 times per contract year).

SECTION II - INDUSTRIAL SAFETY REQUIREMENTS

1. The contractor shall document program specific plans for hazard control that ensures for compliance identified by specific standards within the following operations:

1.1. Lifting Devices

1.2. Aircraft Jacking Operations

1.3. Handling, Storing, and Transporting Compressed Gas Cylinders

1.4. Parked Aircraft

1.5. Moving or Tie-Down of Aircraft

1.6. Emergency Procedures to Safeguard Parked Aircraft During Severe Weather Conditions

1.7. Storage of Work Stands, Loose Aircraft Parts and Materials not Required for In-Progress Work

1.8. Aircraft Towing, Parking, Mooring

1.9. Fuel/Defuel, Fuel Tank/Cell Repair Operations

1.10. Removal of Hangared Fueled Aircraft

1.11. Aircraft Cleaning/Paint Removal/Painting

1.12. Handling, Storage and Use of Flammable Liquids

1.13. Housekeeping

1.14. Foreign Object Damage (FOD) Prevention

1.15. Welding

1.16. Fire Protection/Prevention

1.17. Personal Protective Equipment

1.18. Respiratory Protection

1.19. Lockout/Tagout (Energy Control)

1.20. Storage and Disposal of Hazardous Waste

1.21. Material Spills and Spill Response Procedures

1.22. Fall Protection

SECTION III - ADDITIONAL REQUIREMENTS –

None

BIBLIOGRAPHY

The Contractor shall be responsible for compliance with all applicable portions of the documents listed below:

NUMBER TITLE

DCMA 8210.1C Change 1 Contractor’s Flight and Ground Operations /NAVAIRINST 3710.1 (Series)

NAS 3306 version 3 (current) Facility Requirements for Aircraft Operations

NAVAIR 01-75GAJ-00JG-00-1 General Maintenance Manual

NAVAIR 01-1A-35Aircraft Fuel Cells and Tanks
NAVAIR 17-1-114Inspection and Proofload Testing of Lifting Slings for Aircraft and Related Components
NAVAIR 19-70-521Operation and Intermediate Maintenance with Illustrated Parts Breakdown, Aircraft Jacks
NAVAIR 19-600-135-6-1Preoperational Checklist Aircraft Hydraulic Jacks, All Types GLCA
NAVAIR 19-600-135-6-2Periodic Maintenance Requirements Manuals Hydraulic Aircraft Jacks
NAVSUPINST 4440.128 (Series)Storage and Handling of Liquefied and Gaseous
Compressed Gasses and Their Full and Empty
Cylinders

DOD 4145.19 (Series) Storage and Material Handling

NFPA 407 (Series) Standard for Aircraft Fuel Servicing