This federal solicitation seeks design-build proposals for an Undersea Operational Training Facility project located at Joint Base Pearl Harbor-Hickam in Hawaii. Key details include:

  • The project scope involves constructing a new approximately 54,380 square foot facility housing specialized training spaces such as a combat training tank, classrooms, laboratories, and administrative offices. Supporting site work and utilities are also required.

  • Proposals are due by December 9, 2019 with contract award anticipated shortly after. The estimated value ranges from $25-100 million.

  • Evaluation criteria are experience, safety, and past performance. Large businesses must submit subcontracting plans.

  • The soliciting agency is the Naval Facilities Engineering Command. The primary NAICS code is 236220 for commercial and institutional building construction.

  • Electronic proposal submissions are required and can be accessed on the Federal Business Opportunities website using the provided link. Paper copies will not be distributed. Firms must register with SAM to be eligible for award.

Am-0001 to N62478-19-R-1518.

View the file

Other files

File Type Posted
Am7.pdf PDF
Am6.pdf PDF
Am5.pdf PDF
Am4.pdf PDF
Am3.pdf PDF
Am2.pdf PDF
P-463_JA_19-06.pdf PDF
P-463_JA_170727.pdf PDF
RFP_Part_1.pdf PDF
P-463_JA_19-09.pdf PDF
FedBizOps_Notice_1_use.pdf PDF
P-463_JA_19-10.pdf PDF
P-463_JA_19-11.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Am-0001 11/6/19

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

NAVFAC Hawaii Construction Acquisition Division (OPHA2) 400 Marshall Road See Item 6 JBPHH, Hawaii 96860-3139

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

N62478-19-R-1518

X 9B. DATED (SEE ITEM 11)

16 Oct 19

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [x ] is extended, [ ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) NA

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR CLAUSE 52.243-4, CHANGES

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N62478-19-R-1518, FY20 MILCON P-463 SOF Undersea Operational Training Facility, Pearl City Peniunsula, Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii

See page 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0001 Standard Form 30 Item No. 14 (Continued) Page 2 of 3

1. CHANGES TO THE SOLICITATION. Attached hereto are new and revised pages to the solicitation. The revision mark “(Am-0001)” is shown on each page.

a. REVISED SECTIONS/PROVISIONS/CLAUSES/PAGES/PARAGRAPHS/ITEMS. The following are revised pages to the solicitation. Changes are indicated in bold print. Although the entire documents are being re-issued under Am-0001, only the following pages/paragraphs/items changed in the following document.

Document 00010

SF 1442, Item No. 13A Proposal Schedule, Page 3

Document 00110

Paragraph 2.2a1(a)(1) Paragraph 2.2a1(b)(1)

Document 00700

52.211-10, Commencement, Prosecution, and Completion of Work (Apr 1984)

52.211-12, Liquidated Damages-Construction (Sep 2000) 252.203-7003, Agency Office of the Inspector General (Aug 2019)

b. REVISED PARAGRAPHS/SECTIONS/PAGES. Following are revisions to the solicitation. Revised technical specification pages are not being issued with this amendment.

(1) Part 5 – Section 13 11 00, 1.6.1 CTT Designer Qualifications

Revise the first sentence of paragraph to read: “The CTT designer….at least three (3) constructed training CTT or recreational pool projects of similar or greater size and complexity.” vs. “The CTT designer….at least three (3) constructed training or recreational CTT projects of similar or greater size and complexity.”

c. DELETED PARAGRAPHS/PAGES/PROVISIONS/CLAUSES. The following item is deleted from the solicitation.

Document 00830

Construction Wage Rate Requirements Statute Wage Decision (dated 10/4/19)

d. DELETED PARAGRAPHS/PAGES/PROVISIONS/CLAUSES. The following items are deleted from the solicitation.

Technical Specifications

(1) Part 2 - Section 01 32 17.00 20 Cost-Loaded Network Analysis Scheduled (NAS)

(2) Part 3 - Chapter 6, Section D209007 - Breathable Compressed Air and O2 Systems

e. NEW PAGES/PROVISIONS/CLAUSES/PARAGRAPHS/ITEMS. The following items are added to the solicitation.

Document 00830

Construction Wage Rate Requirements Statute Wage Decision (dated 10/25/19)

Am-0001 Standard Form 30 Item No. 14 (Continued) Page 3 of 3

Document 00900

Appendix D, Page A.1

f. NEW PAGES/PROVISIONS/CLAUSES/PARAGRAPHS/ITEMS. The following items are added to the solicitation.

Technical Specifications

(1) Part 2 - Section 01 32 17.00 20 Cost-Loaded Network Analysis Scheduled (NAS)

(2) Part 3, Chapter 6 – Building Interface Requirements Document for Hyperbaric Facilities

2. The proposal due date of December 5, 2019, 2:00 P.M., Hawaiian Standard Time, is hereby extended to December 9, 2019, 2:00 P.M., Hawaiian Standard Time.

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATIED (RFP)

3. DATE ISSUED

10/16/19

PAGE OF

PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO 6. PROJECT NO.

7. ISSUED BY CODE N62478 8. ADDRESS OFFER TO

NAVFAC Hawaii Construction Acquisition Division (OPHA2) 400 Marshall Road

JBPHH, HI 96860-3139

Mail: See Block 7 or

Hand carry proposals to:

NAVFAC Hawaii 400 Marshall Road, Building A13

JBPHH, HI 96860-3139

Depository hours between 7:30 AM and 2:00 PM, Monday Through Friday except Holidays. Please call 471-0318 or 474-3783 or 471-9197 for access to A13.

9. FOR INFORMATION

CALL:

A. NAME

Jody Muraoka

B. TELEPHONE NO. (Include area code) (NO COLLECT

CALLS)

(808)471-0318, FAX: (808)474-1543

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Request for Proposals No. N62478-19-R-1518, FY20 MILCON P-463 SOF Undersea Operational Training Facility Pearl City Peninsula, Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

This procurement is solicited on an unrestricted basis.

SYSTEM FOR AWARD MANAGEMENT (SAM): Offerors shall comply with FAR 52.204-7, System for Award Management (Oct 2018) to receive an award. Lack of registration in the SAM database will make an Offeror ineligible for award

11. The Contractor shall begin performance within 15 calendar days and complete it within * calendar days after receiving *See Document 00700, Clause 52.211-10 award, notice to proceed. This performance period is X mandatory, negotiable. (See Section 00700 FAR 52.211-10) 12.a THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES”, indicate within how many calendar days after award in Item 12B.)

YES NO

12.B CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and (See Document 00100) copy to perform the work required are due at the place specified in Item 8 by 2:00 PM HST, 12/9/19 (or as amended via SF30). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-102 (Am-0001) STANDARD FORM 1442 (REV. 4-85) Prescribed by GSA

FAR (48 CFR) 53.236-1(d)

OFFER (Must be fully completed by offeror) N62478-19-R-1518

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO./FACSIMILE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

DUNS NO. CAGE CODE

TIN NO.

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within ____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

SEE ATTACHED PROPOSAL SCHEDULE

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZATION TO SIGN OFFER

(Type or print )

20B. SIGNATURE 20C. OFFER

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified) (See Section 00700 252.232-7006).

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C.253(c) ( )

26. ADMINISTERED BY CODE N62478 27. PAYMENT WILL BE MADE BY N68732

NAVFAC HAWAII

NAVFAC HI FEAD PRJ22

90 G St., Bldg 1200

JBPHH, HI 96853-5230

Defense Finance & Accounting Service - Cleveland Norfolk Accounts Payable

PO BOX 998022

Cleveland OH 44199

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form an any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD

GPO : 1995 O - 469-79

STANDARD FORM 1442 BACK

(REV. 4-8)

(Am-0001)

PROPOSAL SCHEDULE

FY20 MILCON P-463 SOF Undersea Operational Training Facility, Pearl City Peninsula, Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii

ITEM NO. DESCRIPTION QUANTITY UNIT AMOUNT___

0001 Design and Construction 1 LS $__________

(The basis for Line Item No. 0001 is the price for design and construction of all work complete in accordance with the drawings and specifications associated with FY20 MILCON P-463 SOF Undersea Operational Training Facility, Pearl City Peninsula, Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii, but not including Line Item Nos. 0002, 0003, 0005, 0006, 0008, and 0009.)

0002 Furniture Fixtures & Equipment (FF&E) 1 LS $1,632,868.00 (Planned Mod) All Furniture & Audio Visual for Line Item No. 0001

Handling and Administrative Rate (HAR) ______% $__________ (contractor to enter HAR not to exceed 5% and extended HAR amount)

Total FF&E Amount for project (estimated) $__________ (Contractor to enter total amount for FF&E (FF&E budget + HAR)

0003 Physical Security Equipment (PSE) 1 LS $__________

(Option 1 - All PSE for Line Item No. 0001)

TOTAL BASE $__________

(Line Items 0001 through 0003)

0004 Deductive No. 1 1 LS $__________

Remove from the project all of the TRADET3 rooms and associated spaces, reconfigure remaining areas for optimal area design: First Floor - one of the three Dive Drying Cages; Male TRADET3 Personnel Support Cages Area - all TRADET3 designated Cage ‘A’ and Cage ‘B’ types and the associated walkway space for the removed cages; Female Cages, Toilet, and Shower Area- (1) Cage ‘A’ and (1) – Cage ‘B’ types and the associated walkway space for the removed cages.

Second Floor - TRADET3 Administrative Office Spaces;

TRADET3 Duty Crew Workstation Offices; TRADET3 Classroom 01 & 02; TRADET3 Personnel Support Space; one exterior stairway; and the associated portion of the Main Corridor connecting the above rooms.

0005 Furniture Fixtures & Equipment (FF&E) 1 LS $401,747.00_ (Planned Mod) All Furniture & Audio Visual for Line Item No. 0004, Deductive No. 1

Handling and Administrative Rate (HAR) ______% $__________ (contractor to enter HAR not to exceed 5% and extended HAR amount)

Total FF&E Amount for project (estimated) $__________ (Contractor to enter total amount for FF&E (FF&E budget + HAR)

0006 Physical Security Equipment (PSE) 1 LS $__________

(Option 2 - All PSE for Line Item No. 0004, Deductive No. 1)

TOTAL FOR DEDUCTIVE No. 1 $__________ (Line Item Nos. 0004 through 0006)

0007 Deductive No. 2 1 LS $____________

Remove from the project the following rooms: the Mechanic / Maintenance Bay, the Fabrication and Fiberglass / ABS Repair Area; the Electronic Technician (ET) Computer Laboratory; and the ET Computer Laboratory Server Room.

0008 Furniture Fixtures & Equipment (FF&E) 1 LS $153,792.00_ ( Planned Mod) All Furniture & Audio Visual for Line Item No. 0007, Deductive No. 2

Handling and Administrative Rate (HAR) ______% $__________ (contractor to enter HAR not to exceed 5% and extended HAR amount)

Total FF&E Amount for project (estimated) $__________ (Contractor to enter total amount for FF&E (FF&E budget + HAR)

0009 Physical Security Equipment (PSE) 1 LS $__________

(Option 3- All PSE for Line Item No. 0007, Deductive No. 2)

TOTAL FOR DEDUCTIVE No. 2 $__________ (Line Item Nos. 0007 through 0009)

0010 Deductive No. 3 1 LS $__________

In the Submersible Operator Workspace, remove the laydown the laydown area for the SDV Mark VIII and its trailer from the room.

0011 Deductive No. 4 1 LS $__________

Reduce the laydown area from 2 SDVs adjacent to the Combat T raining Tank side-by-side down to 1 SDV by removing a 15’-0” wide X full length of the High Bay from the High Bay; reconfigure the Male ATC Staff Cages Area and the Female Cages, Toilet, and Shower Area as required to accommodate the relocation of one roll-up door from the south face of the building to be moved to the north face of the building, allowing for a vehicle and trailer to drive through the building.

THE FOLLOWING WILL BE COMPLETED BY THE CONTRACTING OFFICER UPON

AWARD:

TOTAL AWARD AMOUNT $________________

NOTES:

1. The Government’s objective is to obtain all work complete in accordance with the drawings and specifications associated with FY20 MILCON P-463 SOF Undersea Operational Training Facility, Pearl City Peninsula, Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii for Line Item Nos. 0001, 0002, and 0003 within the budgeted amount. In the event the Offeror is not able to provide all the above described work within the budgeted amount for Line Item Nos. 0001, 0002, and 0003, the proposed amount for Line Item Nos. 0001, 0002, and 0003 may be reduced by utilizing deductive Line Item Nos. 0004 through 0011 in the deductive order listed on the proposal schedule .

a. The prices proposed will be evaluated as follows:

(1) The total price proposed for Line Item Nos. 0001, 0002, and 0003 will be evaluated to determine if it is within the budgeted amount. If the total price proposed is within the budgeted amount for Line Item Nos. 0001, 0002, and 0003, the price proposed for Line Item Nos. 0004 through 0011 will not be applied and the total price for Line Item Nos. 0001, 0002, and 0003 will form the basis for the evaluation noted in paragraph 3 below.

(2) If the total price proposed for Line Item Nos. 0001, 0002, and 0003 exceed the budgeted amount, Line Items Nos. 0004 through 0011 will be applied by first deducting the total Line Item Nos. 0004, 0005, and 0006 from the total of Line Item Nos. 0001, 0002, and 0003. Prices will then be evaluated to determine if it is within the budgeted amount. If none of the prices are within the budgeted amount, the total of Line Item Nos.

0007, 0008, and 0009 will be deducted from the total of Line Item Nos. 0001, 0002, and 0003 less the total of Line Item Nos. 0004, 0005, and 0006. Prices will then be evaluated to determine if they are within the budgeted amount. If none of the prices are within the budgeted amount, Line Item No. 0010 will be deducted from the total of Line

Item Nos. 0001, 0002, and 0003 less the total of Line Item Nos. 0004 through 0009. If none of the prices are within the budgeted amount, line Item No. 0011 will be deducted from the total of Line Item Nos. 0001, 0002, and 0003 less the total of Line Item Nos.

0004 through 0010. Prices will then be evaluated to determine if it is within the budgeted amount. Proposals will then be evaluated as noted in paragraph 3 below.

(3) If applicable, the total of the all applicable Line Item Nos., will be evaluated in accordance with FAR 52.219-4, Notice of price evaluation preference for HUBZone small business concerns.

2. Failure to provide an offer on all items in the Proposal Schedule may cause the offeror to be considered non-responsive.

3. See Document 00110, paragraph 2.2b for the price evaluation.

4. Line Item No. 0002, Furniture Fixtures & Equipment (FF&E), shall be awarded as a modification at least six months prior to the contract completion date.

5. See FAR Provision 52.217-5, Evaluation of Options. By submission of an offer under the OPTIONS, Offeror agrees that the Government may exercise the OPTION as follows:

Option Line Item No. 0003, Physical Security Equipment (PSE), shall be awarded as a modification at least six months prior to the contract completion date.

6. The total estimated budget amount for FF&E has been identified to provide offeror's with the projected magnitude of effort for FF&E. The total estimated budget amount for the FF&E Furniture, Fixtures, and Equipment includes the actual cost of the FF&E including freight and installation charges and the Prime Contractor's proposed Handling and Administration Rate (HAR). The FF&E Budget Amount is only an estimated amount. The contractor will be given the final budget amount to design the FF&E package to during the design phase for the FF&E.

7. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5%. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract/task order award and will not be adjusted regardless of fluctuations from the estimated budget amount for FF&E. The proposed HAR is a fixed rate.

8. If awarded, this line item will be funded separately after completion of FF&E design review, acceptance of FF&E package, and receipt of appropriate funding. The design for the FF&E itself is performed under the Base Item or other applicable option item. See section E20 for details on FF&E.

9. The Government is not obligated to award the FF&E line item. Should the Government choose to award the FF&E, the line item will be awarded as a negotiated modification to the contract/task order. The contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.

10. The FF&E modification shall be awarded at least six months prior to the contract completion date. A minimum of six months is required for the contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project.

The contractor’s schedule should assume the award of the FF&E as a modification. No schedule extensions shall be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contract completion date, the contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the prime contractor demonstrates that sufficient lead time for the FF&E is not available and the Government’s award of the modification is in the last six months of the contract.

Document 00110

DOCUMENT 00110

EVALUATION FACTORS FOR AWARD

DOCUMENT 00110

EVALUATION FACTORS

TABLE OF CONTENTS

PART I. GENERAL

1.1 PROJECT SCOPE

1.2 PROPOSAL EVALUATION

1.3 ENFORCEABILITY OF THE PROPOSAL

PART II. EVALUATION CRITERIA

2.1 BASIS OF AWARD

2.2 EVALUATION FACTORS

ATTACHMENTS

(A) – CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

(B) – PAST PERFORMANCE QUESTIONNAIRE

EVALUATION FACTORS

PART I – GENERAL

1.1 PROJECT SCOPE

The Undersea Operations Training Center (UOTC) will support a variety of functions including Operator and Undersea Vehicle training via the use of a Combat Training Tank, and applied instruction in topic-dedicated classrooms, laboratories, and computer laboratories. Also included in the UOTC are Diver support spaces, administrative spaces, maintenance and repair spaces, operator’s gear storage lockers, maintenance and support spaces.

a. Provide a new building of approximately 54,380 GSF which equates to approximately 41,685 GSF on the first floor, and approximately 12,695 GSF on the second floor.

b. Provide on the first floor: Submersible Operator Workspace and Electronic Technician (ET) Workspace; Hull Maintenance and Equipment (HM & E) Laboratory, Computer Laboratory, and Computer Laboratory Server Room; ET Laboratory, Storage, Computer Laboratory, and Computer Laboratory Server Room; Battery Laboratory Suite consisting of the Charging Room, Battery Laboratory, and Battery Storage Room; Mechanic / Maintenance Bay, Fabrication, and Fiberglass / ABS Repair Room; Diver Suite consisting of the Dive Locker and Diver Workstation Room, MK 16 Laboratory / O2 Safe Room, Dive Setup and O2 / OC Charging Room, Dive Storage Room, Dive Medical Exam Office, Compressor Room, and Dive Drying Cages; Operator Cages and Locker Rooms for Transient Operators, and Staff / Instructors, separated for male and female users, with associated toilets and showers; and the High Bay open area housing the Combat Training Tank and a bridge crane.

c. Provide on the second floor: separate Classrooms for Advanced Training Command (ATC) and TRADET3 use; separate offices for both ATC and Training Detachment THREE (TRADET3) use (with ancillary kitchenette spaces as required); VTC Conference Room, SIPR Cafe, Break Room, and Unisex Toilet Rooms.

d. Provide on each floor, as required, various ancillary and other required support areas including, but not limited to: mechanical, electrical, fire protection, telecommunication, stairs, entry lobbies, stairs wells, elevator and machine rooms, janitor closets, outdoor showers (ground floor only), and circulation areas.

e. Built-in equipment part of the basic scope includes but not limited to built-in operator cages, operator lockers, casework and cabinet work.

f. Supporting equipment for the Combat Training Tank including water and sewer connections, circulation pumps, pool filtration, water treatment, electrical power, lighting and other required items.

g. Supporting utilities include sewer, water, electrical, telecommunication, compressed air and oxygen lines, fire protection lines, a new small package lift station with a force main

(Am-0001) connecting to the existing peninsula sewer system. Site work includes excavation, backfilling, grading, paving, and exterior lighting. Stormwater collection and discharge shall conform to all storm water code requirements and Best Management Practices (BMPs).

h. The overall site is constrained by other existing buildings, infrastructure, and other improvements, some of which may not be able to be modified nor relocated.

1.2 PROPOSAL EVALUATION

a. The Government intends to award without discussions to the Offeror with the Lowest Price Technically Acceptable (LPTA) proposal, in accordance with the provisions of this solicitation and applicable acquisition regulations. The Government will evaluate offers in accordance with the non-cost/price evaluation factors described in Paragraph 2.2 and the Offeror’s proposal schedule.

b. Proposals are evaluated for technical acceptability but not ranked using the non-cost/price factors. Tradeoffs are not permitted.

c. The number of proposals to be evaluated for technical acceptability may be limited to the lowest priced offer at the discretion of the contracting officer. If the number of proposals to be evaluated is limited, the technical proposal shall be provided to the evaluator(s) without any identification of price. If the lowest priced proposal is not found to be technically acceptable then the next lowest price proposal shall be evaluated. If that proposal is also not found to be technically acceptable, then the process described will be conducted again as many times as necessary, until such time as the Government identifies a technically acceptable proposal. If the contracting officer later determines that discussions are necessary, the procedures in FAR 15.306 shall be followed.

d. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract.

e. The distinction between experience and past performance is experience pertains to the type of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

1.3 ENFORCEABILITY OF THE PROPOSAL

The proposals must set forth full, accurate and complete information as required by this solicitation. The Government will rely on such information in the award of the contracts. By submission of the offer, the Offeror agrees that all items proposed (e.g., key personnel, designers, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions will be equal or better than as proposed and accepted for contract award and shall require prior Contracting Officer's approval.

PART II – EVALUATION CRITERIA

2.1 BASIS OF AWARD

a. The Government intends to award a contract resulting from this solicitation to that responsive responsible Offeror with the LPTA proposal based on the evaluation factors in the solicitation.

b. An overall non-price factor rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factor rating of ‘UNACCEPTABLE” makes a proposal ineligible for award.

c. Since the LPTA methodology prohibits trade-offs, all evaluation factors are equally important. Proposals are evaluated for acceptability but not ranked using the non-cost and/or price factors.

2.2 EVALUATION FACTORS

The non-cost/price factors that will be evaluated as acceptable or unacceptable shall be as follows:

Factor 1 – Experience Factor 2 – Safety

Factor 3 – Past Performance

Price

a. NON-COST/PRICE EVALUATION FACTORS

Factor 1 – Experience:

1. Solicitation Submittal Requirements:

The Offeror shall submit the following information:

(a) Construction Experience:

(1) Submit a maximum of five (5) relevant construction projects, completed and performed by the Prime or Subcontractor(s) that are similar in size, scope and complexity to the RFP. Out of the maximum of five (5) construction projects, two (2) shall be construction of training Combat Training Tanks (CTT) or recreational pool, one (1) shall be construction of a building with deep concrete pile foundations, one (1) shall be construction of a minimum 9.75 ton overhead bridge crane, and one (1) shall be construction of a building with a steel superstructure system or a combination of concrete and steel superstructure system that includes one or more of the following structural framing systems: cast-in-place or precast

(Am-0001) concrete, concrete masonry walls, steel columns, steel beams, steel joist girders, or pre-engineered metal buildings. Each project shall be completed within the past twenty (20) years of the date of issuance of this RFP. The projects must demonstrate having experience in all four (4) types of work as stated above, but the experience does not have to be all in one project. Project value shall be as follows: 1) training or recreational CTT projects shall be valued at $3,000,000 or more; 2) construction of a building with deep concrete pile foundation shall be valued at $4,000,000 or more; 3) construction of a minimum 9.75 ton overhead bridge crane shall be valued at $750,000 or more; 4) construction of a building with a steel superstructure system or a combination of concrete and steel superstructure system that includes one or more of the following structural framing systems: cast-in-place or precast concrete, concrete masonry walls, steel columns, steel beams, steel joist girders, or pre-engineered metal buildings shall be valued at $10,000,000 or more; 5) single construction project that includes multiple relevant types of work (up to 3) shall be valued at the total sum of the types of relevant work. For example, a project that includes both a building with deep concrete pile foundation and a minimum 9.75 tons overhead bridge crane shall be valued at $4,750,000 or more; and 6) projects that include all four

(4) types of relevant work in a single project shall be valued at $20,000,000 or more. At least one (1) relevant construction project must be completed by the Offeror as the Prime Contractor.

(2) The Offeror must provide signed letters of commitment from the

Subcontractor(s), listed in Document 00110, Attachment A, that will perform the work. The letter must explain the involvement the subcontractor will have in performance of this contract. Identify the types of work that each subcontractor will be responsible for.

(3) A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

(4) The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Construction and Design Project Data Sheets for construction and for design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Do not alter the Construction & Design Experience Project Data Sheet (Attachment A) with the exception of expanding the individual blocks on this form; however, total length for each project data sheet shall not exceed one (1) double-sided 8.5” x 11” page (or two (2) single-sided 8.5” x 11” pages) and shall be Arial 10 font (minimum).

(5) For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e. unique features, area, complexities, construction methods).

(6) If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the JV entity as the prime contractor. If the JV does not have shared experience, relevant projects shall be submitted for each JV partner for which they were prime contractors. Offerors are still limited to a total of five (5) projects combined.

(b) Design Experience:

(1) The Architect-Engineer firm (AE) or Designer responsible for the CTT design shall:

a) Submit three (3) completed training CTT or recreational pool projects, designed and completed by the A-E team or Designer, that are of similar or greater size and complexity to the RFP. Projects submitted shall be completed within the past twenty (20) years of the date of issuance of this RFP. A-E design experience is based on construction projects valued as stated in paragraph 2.2a, Factor 1-Experience, 1(a)(1) above.

b) Include a licensed architect(s) and/or engineer(s) who has at least ten

(10) years of experience in training or recreational CTT design. Submit a copy of his/her current professional registration(s).

c) Submit a certified letter or documentation attesting that his/her or the company’s previous experience reflects compliance with this RFP’s experience requirements for training or recreational CTT designs.

(2) Submit one (1) completed design of a building with deep concrete pile foundations that are of similar or greater size and complexity to the RFP. The project submitted shall be completed within the past twenty (20) years of the date of issuance of this RFP. A-E design experience is based on construction projects valued as stated in paragraph 2.2a, Factor 1- Experience, 1(a)(1) above. The AE Designer(s) for this project shall be a licensed engineer(s) with at least ten (10) years of experience in designing buildings with deep concrete pile foundations and SHALL submit a copy of his/her current professional registration(s).

(3) Submit one (1) completed design of a minimum 9.75 ton overhead bridge crane project that are of similar or greater size and complexity to the RFP. The project submitted shall be completed within the past twenty (20) years of the date of issuance of this RFP. A-E design experience is based on construction projects valued as stated in paragraph 2.2a, Factor 1- Experience, 1(a)(1) above. The AE Designer(s) for this project shall be a licensed engineer(s) with at least ten (10) years of experience in designing overhead bridge cranes and SHALL submit a copy of his/her current professional registration(s).

(4) Submit one (1) completed design of a building with a steel superstructure system or a combination of concrete and steel superstructure system that includes one or more of the following structural framing systems: cast-in-place or precast concrete, concrete masonry walls, steel columns, steel beams, steel joist girders, or pre-engineered metal buildings that are of similar or greater size and complexity to the RFP. The project submitted shall be completed within the past twenty (20) years of the date of issuance of this RFP. A-E design experience is based on construction projects valued as stated in paragraph 2.2a, Factor 1-Experience, 1(a)(1) above. The AE Designer(s) for this project shall be a licensed architect(s) and/or engineer(s) with at least ten (10) years of experience in designing a steel superstructure system or a combination of concrete and steel superstructure system that includes one or more of the

(Am-0001) following structural framing systems: cast-in-place or precast concrete, concrete masonry walls, steel columns, steel beams, steel joist girders, or pre-engineered metal buildings and SHALL submit a copy of his/her current professional registration(s).

(5) The Offeror must provide signed letters of commitment from each subcontractor, listed in Document 00110, Attachment A, that will perform the work. The letter must explain the involvement the each Designer will have in performance of this contract.

(6) A project is defined as a complete design effort performed under a single task order or contract. For multiple award and IDIQ type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a single task order as a project.

(7) The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Construction and Design Project Data Sheets for construction and for design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Do not alter the Construction & Design Experience Project Data Sheet (Attachment A) with the exception of expanding the individual blocks on this form; however, total length for each project data sheet shall not exceed one (1) double-sided 8.5” x 11” page (or two (2) single-sided 8.5” x 11” pages) and shall be Arial 10 font (minimum).

(8) For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.

unique features, area, complexities, construction methods).

2. Basis of Evaluation:

The requirement for acceptability will be based upon the projects submitted by the Offeror in its proposal. The Offeror must demonstrate experience in performing relevant construction and design projects as defined in the solicitation submittal requirements in Paragraph 2.2a, Factor 1 above. The Government will only review the first five (5) projects for construction and the first six (6) projects for design, in the order they were submitted in the proposal. Any projects submitted in excess of the first five (5) for Construction Experience and the first six (6) for Design Experience will not be considered. Proposals that do not contain any relevant projects that demonstrate the required experience for the Offeror and its Designer will not be considered.

Factor 2 – Safety

(a) Submittal Requirements: The Offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and sub-contractor performed work and the Offeror’s method for qualifying, evaluating, selecting all tiers of sub-contractors. The narrative shall include:

(Am-0001)

(1) Experience Modification Rate (EMR): Include five previous complete calendar years’ (January 2014 through December 2018) worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the factor submission.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Case (TRC) Rates: Submit five previous complete calendar years’ (January 2014 through December 2018) worth of OSHA DART and TRC data. If an offeror cannot submit OSHA DART and TRC rates for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART and TRC rate data negatively must be addressed as part of this factor submission.

(3) Technical Approach for Safety: Technical Approach for Safety should describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. Fully describe the safety management system that will be used to oversee safety compliance and performance of self-performed and sub-contractor performed work. Also describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels. Additionally, describe the methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. The technical approach to safety narrative shall be limited to one (1) double-sided 8.5” x 11” page or two (2) single-sided 8.5” x 11” pages, Arial 10 font (minimum).

NOTE: For a partnership or JV, the EMR, OSHA DART, and TRC rates are required for each contractor who is part of the partnership or JV; however, only one safety narrative is required.

Safety narratives for a partnership or JV may be up to one (1) double-sided 8.5” x 11” pages or two (2) single-sided 8.5” x 11” pages in length, Arial 10 font (minimum).

(b) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for its self-performed work and the work of its subcontractors. The Government will evaluate the EMR, OSHA DART and TRC Rates to determine if the offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. The Government will not calculate the EMR, DART and TRC Rates. Offerors that do not submit EMR, DART, and TRC rates and do not explain why it did not submit the rates will be rated unacceptable for that element. If extenuating circumstances that affect the rates and negative trends are not clearly addressed, the element will be rated unacceptable. The Government will evaluate the Offeror’s overall safety performance record, safety management system, and the methodology of qualifying, evaluating, selecting and overseeing its subcontractors. The Government may also consider other sources of information for evaluating safety that may include, but not limited to: OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS) database, NAVFAC’s Contractor

(Am-0001)

Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project and the specific management practices that will be in place for providing deliberate safety program management and mishap prevention support.

Offeror’s EMR will be evaluated against the following Navy standards:

Risk EMR Very Low Risk Less than 0.6 Low Risk From 0.6 to less than 0.8 Moderate Risk From 0.8 to 1.0 High Risk Greater than 1.0 to 1.1 Extremely High Risk Greater than 1.1 Offeror’s DART and TRC rates will be evaluated against the following Navy standards:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

Risk TRC Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater Than 6.0

Factor 3 – Past Performance:

(a) Solicitation Submittal Requirements:

(1) If a completed Construction Contractor Appraisal Support System (CCASS)/Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for construction experience. If a completed AE Contractor Appraisal Support System (ACASS)/CPARS evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for design experience. If a completed CCASS, ACASS, or CPARS evaluation is not available for a project that was submitted under Factor 1, the Offeror shall submit Past Performance Questionnaire (Attachment B) for that project. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Evidence of

(Am-0001) customer satisfaction shall be from the owner and/or their representative responsible for the construction contract administration of construction projects or design administration of design projects. For construction contractors, it shall not be from the designer on a design-build project nor shall it be from a prime construction contractor for a subcontractor. For design firms, it shall not be from the construction contractor on a design-build project nor shall it be from prime consultant to a subconsultant or from a subconsultant to a prime consultant. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

However, previously completed PPQs in full text submitted for other RFPs will be accepted. All previously completed PPQs shall include all information requested in Attachment B, NAVFAC/USACE Past Performance Questionnaire (form PPQ-0) located at the end of Document 00110. All PPQs shall be complete, contain clients’ signature, and include all information requested in Attachment B located at the end of Document 00110. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Ms. Jody Muraoka, jody.muraoka@navy.mil.

(2) Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues. Explanations shall be Arial 10 font (minimum) and shall not exceed one (1) double-sided 8.5” x 11” pages (or two (2) single-sided 8.5” x 11” pages) in total.

(3) The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past or current performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

(4) Performance award or additional information submitted will not be considered.

(b) Basis of Evaluation:

(1) This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1– Experience and may also consider an Offeror’s past and/or current performance on other projects, interim and/or final, documented in known sources.

Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.

(Am-0001)

(2) The Government may consider the recency and relevance of the information, the source of the information, context of the data, and general trends, interim and/or final, in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.

(3) In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability a neutral rating shall be considered “acceptable.”.

b. PRICE EVALUATION

Price Proposal:

1. Solicitation Submittal Requirements:

Offerors shall complete the Proposal Schedule.

2. Basis of Evaluation:

(a) The price proposal will be evaluated to determine the reasonableness of the Offeror’s proposal. One or more of the following techniques will be used to ensure a fair and reasonable price:

Comparison of proposed prices received in response to the solicitation, against one another.

Comparison of proposed prices received with the independent Government estimate.

Comparison of proposed prices received with available historical information.

Comparison of information reports obtained from Defense Contract Audit Agency (DCAA) or other outside agencies as required.

(b) A price that is found to be either unreasonably high or unrealistically low in relation to the proposed work may be indicative of an inherent lack of understanding of the solicitation requirements and may result in the overall proposal not being considered for award.

(c) It is the Government’s intent to award Line Item Nos. 0001, 0002 and 0003 within the budgeted amount.