Exhibit X Post-Award-Limitations-on-Subcontracting-Report.docx
DOCX document 20 KB Posted
- Attached to
- Naval Facilities Engineering Command Southwest Metro San Diego HubZone Set Aside NAICS 237310 Road Paving
- Solicitation number
- N62473-20-R-0029
About this file
This document outlines reporting requirements for a contractor on a Navy contract to monitor limitations on subcontracting. It requires the prime contractor to submit semi-annual reports including labor costs for both prime and subcontractor personnel for each task order. The reports must demonstrate the prime contractor has performed at least 50% of the personnel costs on services contracts, 50% of manufacturing costs on supply contracts, 15% of costs on general construction, and 25% of costs on special trade construction using its own employees. The contractor certification confirms compliance with these limitations on subcontracting under the Federal Acquisition Regulation and SBA regulations.
A separate but related solicitation is for an indefinite delivery, indefinite quantity contract from the Naval Facilities Engineering Command Southwest for road paving projects at Navy and Marine Corps bases in the San Diego area. The HubZone set-aside contract involves task orders for repair, removal and replacement of road paving along with all required labor, materials, equipment and overhead. Pre-priced line items will include all costs to complete categories of work from start to finish. Task order overheads incorporated into pricing may include various costs of doing business such as travel, supplies, engineering, and site facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247320R0029 Paving IDIQ RFI Answers 033120.pdf | ||
| N62473-20-R-0029 Road Paving Amendment 0001.pdf | ||
| Exhibit F Surety Form.docx | DOCX document | |
| N62473-20-R-0029 RFP.pdf | ||
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx | DOCX document | |
| CalTrans Std A87B - HOT MIX ASPHALT DIKES - USE FOR ALL PAVING IDIQS.pdf | ||
| Exhibit C - PPQ.docx | DOCX document | |
| CalTrans Std A87A - CURB AND DRIVEWAYS - USE FOR ALL PAVING IDIQS.pdf | ||
| Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| SAN DIEGO COUNTY WD 122719.pdf | ||
| Exhibit D Safety Data 123019.docx | DOCX document | |
| FINAL REVISED PAVING ELINS FOR RFP.xlsx | XLSX spreadsheet | |
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| Exhibit G Revised RFI Form.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT J
POST-AWARD CONTRACTOR’S LIMITATIONS
ON SUBCONTRACTING CERTIFICATION
From: Contractor Name, Street Address, City, State, Zip
To: Contracting Officer, Naval Facilities Engineering Command, Southwest
Subj: Contract No. N62473-XX-D-XXXX
1. Prime contractor is to complete and submit the following for each reporting period (6 months) for each performance period (Base Year and Options)
Block 1
Period of Performance
Block 2
Task Order # (list TO#) Block 3
Prime Labor Cost Block 4
Subcontractor Labor Cost Block 5
Total FFP or Task Order Labor Cost Block 6
% Cost Performed by Prime Block 7
% Cost Performed by Subcontractor
Base Period
(Insert reporting period dates)
TO # 0001
TO # 0002
TO # 0003
** add rows here
TOTAL FOR REPORTING PERIOD
Base Period
(Insert reporting period dates)
TO XXXX
TO XXXX
Etc.
** add rows here
TOTAL FOR REPORTING PERIOD
TOTAL PERFORMANCE PERIOD (Base Year)
2. Furthermore, in accordance with the provisions of FAR 52.219-14, Limitations on Subcontracting (Nov 2011), 13 CFR 124.510 and 13 CFR 125.6, in the performance of this contract, |_| In the case of a contract for services (except construction), your Company Name has performed at least 50 percent of the cost of the contract incurred for personnel with its own employees.
|_| In the case of a contract for supplies or products (other than procurement from a non-manufacturer in such supplies or products your Company Name has performed at least 50 percent of the cost of manufacturing the supplies or products (not including the costs of materials).
|_| In the case of a contract for general construction, your Company Name has performed at least 15 percent of the cost of the contract with its own employees (not including the costs of materials).
|_| In the case of a contract for construction by special trade contractors, your Company Name has performed at least 25 percent of the cost of the contract with its own employees (not including the cost of materials).
|_| I certify that to the best of its knowledge and belief, the information provided in this report is accurate, complete, and current as of the date of report.
CONTRACTOR:
SIGNATURE NAME AND TITLE DATE
File details come from the government source that posted it. Updated .