This document contains a standard plan and revised standard plan from the California Department of Transportation for hot mix asphalt dikes of various types and dimensions, along with construction notes. It also includes details for a solicitation from the Naval Facilities Engineering Command Southwest for an indefinite quantity contract to provide road paving repair and replacement services at facilities in the San Diego area. The contract will utilize pre-negotiated labor, material, equipment, overhead, and profit rates for categorized task order line items. Task orders will include any necessary incidental items and overheads for travel, temporary facilities, tools, and other supporting equipment.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Var 4:1

ES ES

Var

ES

Var Var

R=1"

R=1" R=1"

R=1"

3"

2"

Var

2" 2"

ES

5%

5%

ES

FL

FL

FLFL FL

ES

3"

ES

TYPE A

ES

TYPE C TYPE D TYPE E TYPE F

See Note 5

CASE C-1 CASE C-2

Cut Slope Cut Slope

CASE R

See Note 2

DIKES

TYPE D AND E BACKFILL DETAILS

CASE F

3’-0"

5"

6"

4"

3’-0"

1’-8"

6"

2’-2"

1’-0"

1’-4"

4"

4"

4:1

SEE NOTE 1

LEVEL LINE

SEE NOTE 1

LEVEL LINE

SEE NOTE 1

LEVEL LINE

SEE NOTE 1

Var CUT SLOPE

SEE NOTE 1

SEE NOTE 4

LEVEL LINE

LEVEL LINE

SEE NOTE 4

SLOPE T

O DRAIN

NO SCALE

NOTES:

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

HOT MIX ASPHALT DIKES

COUNTY ROUTE

POST MILES

TOTAL PROJECT

SHEET TOTAL

SHEETS

PLANS APPROVAL DATE

No.

Exp.

R E

G I

S T

E R

E

D

P

ROFESSIONA

L

E

N G I

N E

E R

S

T A

TE OF CALIF

ORN

IA

REGISTERED CIVIL ENGINEER

Michael Janzen

44788

CIVIL

Dist No.

THE STATE OF CALIFORNIA OR ITS OFFICERS

OR AGENTS SHALL NOT BE RESPONSIBLE FOR

COPIES OF THIS PLAN SHEET.

THE ACCURACY OR COMPLETENESS OF SCANNED

REVISED STANDARD PLAN RSP A87B

TO ACCOMPANY PLANS DATED

cross slope.

Quantities based on 5%

5.

4.

3.

2.

1.

R

V I S

D

S T

A N

D A

D

P L

A N

S

P

B

4"

ES

LINE

LEVEL

:1

:1

5’-0" FOR TYPE D

3’-0" FOR TYPE E

F

E

D

C

TYPE

QUANTITIES

DIKE

0.0066

0.0130

0.0293

0.0038

0.0135

PER LINEAR FOOT

CUBIC YARDS

STANDARD PLAN A87B DATED MAY 20, 2011 - PAGE 120 OF THE STANDARD PLANS BOOK DATED 2010.

RSP A87B DATED JANUARY 15, 2016 SUPERSEDES RSP A87B DATED JULY 19, 2013 AND

11-17-15

See Notes 3 and 5

Standard Plan RSP A77N3 for hinge point offsets with guardrail.

See Revised Standard Plan RSP A77N4 for dike positioning details. See Revised

Use Type A or F dike, where dike is required with guardrail installations.

Fill and compact with excavated material to top of dike.

enough width to use Type D or Type E dike.

Type A dike only to be used where restrictive slope conditions do not provide provide enough width for Case F backfill.

Case R applies to retrofit only projects where restrictive conditions do not

OGFC under dike. See project plans for modified dike detail.

dike with no joint at the ES. For projects with OGFC shoulders, do not extend

For HMA shoulders only, extend top layer of HMA placed on the shoulder under