This document contains a sample submittal register and details for a federal contract opportunity for road paving projects. The sample submittal register outlines 15 required submittals prior to or at the start of construction such as quality control plans, safety plans, schedules of prices, designs, and certificates of insurance. It also lists 7 submittals required prior to final payment like operation and maintenance information and licenses.
The federal contract opportunity is a solicitation from the Naval Facilities Engineering Command Southwest for an indefinite quantity contract to perform road paving repair, removal and replacement projects at various government facilities within the Naval Base Point Loma, Naval Base San Diego, Naval Base Coronado and Marine Corps Air Station Miramar areas. The contractor will furnish all labor, materials, tools, equipment and supervision to fulfill task order requirements. Most task orders will include pre-negotiated categorized services in addition to negotiated incidental items, all with pre-negotiated prices inclusive of labor, materials, overhead, profit and bonds. The agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247320R0029 Paving IDIQ RFI Answers 033120.pdf | ||
| N62473-20-R-0029 Road Paving Amendment 0001.pdf | ||
| Exhibit F Surety Form.docx | DOCX document | |
| N62473-20-R-0029 RFP.pdf | ||
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| CalTrans Std A87B - HOT MIX ASPHALT DIKES - USE FOR ALL PAVING IDIQS.pdf | ||
| Exhibit C - PPQ.docx | DOCX document | |
| CalTrans Std A87A - CURB AND DRIVEWAYS - USE FOR ALL PAVING IDIQS.pdf | ||
| Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| SAN DIEGO COUNTY WD 122719.pdf | ||
| Exhibit D Safety Data 123019.docx | DOCX document | |
| FINAL REVISED PAVING ELINS FOR RFP.xlsx | XLSX spreadsheet | |
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| Exhibit G Revised RFI Form.docx | DOCX document | |
| Exhibit X Post-Award-Limitations-on-Subcontracting-Report.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMPLE SUBMITTAL REGISTER
| SUBMITTAL/BENCHMARK |
| DURATION |
| BENCHMARK |
| REQUIRED |
| STATUS |
| 1 |
| Quality Control Plan |
| Prior to |
| Start of Construction |
| 2 |
| Material Safety Data Sheets |
| Prior to |
| Start of Construction |
| 3 |
| Planning/Construction Schedule |
| Within 15 days |
| After Award |
| 4 |
| Waste Management Plan |
| Prior to |
| Start of Construction |
| 5 |
| Safety and Health Plan or Accident Prevention Plan |
| Prior to |
| Start of Construction |
| 6 |
| Utility Outage Plan |
| Prior to |
| Start of Construction |
| 7 |
| Schedule of Prices |
| Within 21 days |
| After Award |
| 8 |
| Operation and Maintenance Information |
| Prior to |
| Final Payment |
| 9 |
| Licenses and Permits |
| Prior to |
| Start of Construction |
| 10 |
| Badge Requests, DBIDS requests |
| Prior to |
| Any work on Government Property |
| 11 |
| Statement of Acknowledgement SF 1413 |
| Prior to |
| Any work on Government Property |
| 12 |
| Demolition and Work Plan |
| Prior to |
| Start of Construction |
| 13 |
| Design Development Docs (HVAC preliminary drawings of equipment and air distribution layout, structural cals and drawings, preliminary electrical single line drawings) |
| Prior to |
| Start of Construction |
| 14 |
| Final Design Docs (HVAC shop drawings of equipment and air distribution layout, structural shop drawings, electrical single line shop drawings) |
| Prior to |
| Start of Construction |
| 15 |
| Submittal Register |
| Prior to |
| Start of Construction |
| 16 |
| Performance/Payment Bonds |
| Within 15 days |
| After Award |
| 17 |
| Environmental Protection Plan |
| Prior to |
| Start of Construction |
| 18 |
| Certificates of Insurance |
| Prior to |
| Start of Construction |
| 19 |
| Door Details / Drawings |
| Prior to |
| Start of Construction |
| 20 |
| Manufacturer Material Cut Sheets and Specifications |
| Prior to |
| Start of Construction |
| 21 |
| eOMSI |
| Prior to |
| BOD |
| 22 |
| Operating and Maintenance Support Hazard Analysis |
| Prior to |
| Start of Construction |