10341223_Bid_Schedule_Revised_04022014.xlsx
XLSX spreadsheet 148 KB Posted
- Solicitation number
- N6247314R2205
About this file
Revised Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10341223_Annex_0200000_HVAC_BASE_WIDE_Revised_04022014.doc | DOC document | |
| Amendment_02.pdf | ||
| 10341223_Annex_1502000_HVAC_BASE_WIDE_Revised_04022014.docx | DOCX document | |
| 10341223_Annex_0200000_HVAC_BASE_WIDE_Revised_04022014.doc | DOC document | |
| 10341223_Mechanical_Inventory_r1.xlsx | XLSX spreadsheet | |
| Belts_and_Filters_41014.xlsx | XLSX spreadsheet | |
| Exhibits_in_Word_Format.doc | DOC document | |
| 10341223_Attachment_J_BASEWIDE_Mechanical.docx | DOCX document | |
| AMD_001_(2).pdf | ||
| N62473-14-R-2205_HVAC_RFP_Package.pdf | ||
| N6247314R2205_PreSolicitation_Notice_-HVAC.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
SUMMARY
| BASE YEAR | |
| Total FFP | $0.00 |
| Total IDIQ | $0.00 |
| Total Base Year Value | $0.00 |
| Total FFP | $0.00 |
| Total IDIQ | $0.00 |
| Total 1st Opt Year Value | $0.00 |
| Total FFP | $ - 0 |
| Total IDIQ | $ - 0 |
| Total 2nd Opt Year Value | $0.00 |
| Total FFP | $ - 0 |
| Total IDIQ | $ - 0 |
| Total 3rd Opt Year Value | $0.00 |
| Total FFP | $ - 0 |
| Total IDIQ | $ - 0 |
| Total 4th Opt Year Value | $0.00 |
Total $ 5,912.54 $0.00
Base Year 12 Month
| EXHIBIT A | ||||||
| CLIN 0001 - BASE YEAR- FIRM FIXED PRICE | ||||||
| Est Annual | Unitof | Unit | ||||
| ELIN No. | DESCRIPTION | Qty | ISSUE | Price | TOTAL AMOUNT | |
| A001 | Contract Management and Administration | |||||
| A001AA | Contract Administration | 12 | Month | $ - 0 | ||
| A001AB | Program Manager: Contract Management and Administration | 12 | Month | $ - 0 | ||
| A001AC | Field Operations Managers x3: Preventative Maintenance Program Management | 12 | Month | $ - 0 | ||
| A001AD | Site Safety and Health Officer: Safety Management and Enforcement | 12 | Month | $ - 0 | ||
| A001AE | Quality Control Managers x3: Quality Control and Quality Assurance Management | 12 | Month | $ - 0 | ||
| A001AF | Data Entry: USMC Maximo x2 | 12 | Month | $ - 0 | ||
| A001AG | Computerized Maintenance Management System Supervisor: USMC Maximo | 12 | Month | $ - 0 | ||
| Total BASE YEAR FFP ELIN A001 | $ - 0 | |||||
| ANNEX - 1502000 FACILITY INVESTMENT | ||||||
| A002 | Perform Preventative Maintenance and Repairs under the Repair Liability Limit in accordance with the Contract Performance Work Statement. | |||||
| A002AA | HVAC Systems | 12 | Month | $ - 0 | ||
| A002AB | Chiller Systems | 12 | Month | $ - 0 | ||
| A002AC | Boiler and Hot Water Systems | 12 | Month | $ - 0 | ||
| A002AD | DDC Systems | 12 | Month | $ - 0 | ||
| Total BASE YEAR FFP ELIN A002 | $ - 0 | |||||
| A003 | Perform Inspection Testing and Certification in accordance with the Contract Performance Work Statement. | |||||
| A003AA | Boiler Systems | 12 | Month | $ - 0 | ||
| Total BASE YEAR FFP ELIN A003 | $ - 0 | |||||
| A004 | Perform Recurring Maintenance in accordance with the Contract Performance Work Statement. | |||||
| A004AA | HVAC Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | ||
| A004AB | Boiler Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | ||
| A004AC | Water Testing and Treatment Services Program | 12 | Month | $ - 0 | ||
| Total BASE YEAR FFP ELIN A004 | $ - 0 | |||||
| Total CLIN 0001 (BASE YEAR FFP ELINS A001 THROUGH A004) | $ - 0 | |||||
| CLIN 0002 - BASE YEAR - INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) WORK | ||||||
| The IDIQ ELINs are for use throughout MCB Camp Pendleton and are not subject to just the locations as specified in the inventory found in Attachment J. All unit prices shall be fully burdened to include all indirect and direct costs, and profit. Daily Reports are required for IDIQ work. Daily Reports shall be submitted for each day of work on the following work day by 10:00 AM to the FSC PAR. | ||||||
| ELIN | FULL DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT | ||
| PRICE | TOTAL |
AMOUNT
| A005 | ROUTINE TROUBLE CALLS Perform routine trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| ROUTINE TROUBLE CALL RESPONSE TIME The Contractor shall respond to routine trouble calls within 30-minutes of the notification. If called before 12:30 PM during normal working hours, the Contractor must be on site to correct deficiencies within 2-hours after receipt of notification. If after 12:30 PM, be on site to correct deficiencies by 8:00 AM the following work day. | ||||
| A005AA | Level I ($0 - $400) | 20 | Each | $ - 0 |
| A005AB | Level II ($400.01 - $600) | 20 | Each | $ - 0 |
| A005AC | Level III ($600.01 - $800) | 20 | Each | $ - 0 |
| A005AD | Level IV (800.01 - $1000) | 15 | Each | $ - 0 |
| A005AE | Level V ($1000.01 - $1200) | 15 | Each | $ - 0 |
| A005AF | Level VI ($1200.01 - $1600) | 15 | Each | $ - 0 |
| A005AG | Level VII ($1600.01 - $2000) | 10 | Each | $ - 0 |
| A005AH | Level VIII (2000.01 - $2500) | 10 | Each | $ - 0 |
| Total of ELINS A005AA Through A005AH | $ - 0 | |||
| A006 | EMERGENCY TROUBLE CALL Perform emergency trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| EMERGENCY TROUBLE CALL RESPONSE TIME The Contractor shall respond to an emergency notification within 30-minutes of the notification and be on site to correct deficiencies within 2-hours after the time of receipt of notification. An emergency notification is defined as a notification received from the PAR any time after 12:30 PM during a normal work day to 7:00 AM of the following normal work day, or at any time during a weekend or Government holiday. | ||||
| A006AA | Level I ($0 - $400) | 12 | Each | $ - 0 |
| A006AB | Level II ($400.01 - $600) | 12 | Each | $ - 0 |
| A006AC | Level III ($600.01 - $800) | 12 | Each | $ - 0 |
| A006AD | Level IV (800.01 - $1000) | 12 | Each | $ - 0 |
| A006AE | Level V ($1000.01 - $1200) | 6 | Each | $ - 0 |
| A006AF | Level VI ($1200.01 - $1600) | 6 | Each | $ - 0 |
| A006AG | Level VII ($1600.01 - $2000) | 6 | Each | $ - 0 |
| A006AH | Level VIII (2000.01 - $2500) | 6 | Each | $ - 0 |
| Total of ELINS A006AA Through A006AH | $ - 0 | |||
| Total of ELINS A005 Through A006 | $ - 0 |
| A007 | Unit Priced Labor | The Unit Price Labor Rate shall include all direct and indirect costs associated with performing an hour of work. The rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin-materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up, time tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, ect. The Government will not reimburse the contractor for any restocking fees or material returned for cancelled work. | |||
| A007AA | Heating, Air Conditioning, and Refrigeration Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 320 | HR | $ - 0 |
| A007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 320 | HR | $ - 0 |
| A007AC | Boiler Technician | The Technician must perform troubleshooting, repair and replacement, and testing on various types of boiler systems, equipment and components. The Technician shall be qualified to work on boiler systems. | 320 | HR | $ - 0 |
| A007AD | Plumber/ Pipefitter | The Plumber/ Pipefitter must perform plumbing and minor pipefitting work in support of sustainment, restoration, and modernization of mechanical systems. | 320 | HR | $ - 0 |
| A007AE | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of mechanical systems. The electrician shall have a California Electrician's certification. | 320 | HR | $ - 0 |
| A007AF | Sheet Metal Mechanic | The Sheet Metal Mechanic must perform sheet metal work in support of sustainment, restoration, and modernization of mechanical systems. | 240 | HR | $ - 0 |
| A007AG | Welder | The Welder must perform metal work in support of sustainment, restoration, and modernization of mechanical systems. | 160 | HR | $ - 0 |
| A007AH | Filter Technician | The Filter Technician shall perform filter replacement and cleaning of non-disposable filters. | 320 | HR | $ - 0 |
| A007AJ | Laborer | The Laborer must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| A007AK | Chiller Technician | The Chiller Technician must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| Total of ELINS A007AA Through A007AJ | $ - 0 |
| A008 | UNIT PRICED LABOR - OVERTIME | ||||
| A008AA | Heating, Air Conditioning, and Refrigeration Technician | 80 | HR | $0.00 | $ - 0 |
| A008AB | DDC Technician | 80 | HR | $0.00 | $ - 0 |
| A008AC | Boiler Technician | 80 | HR | $0.00 | $ - 0 |
| A008AD | Plumber/ Pipefitter | 70 | HR | $0.00 | $ - 0 |
| A008AE | Electrician | 60 | HR | $0.00 | $ - 0 |
| A008AF | Sheet Metal Mechanic | 60 | HR | $0.00 | $ - 0 |
| A008AG | Welder | 60 | HR | $0.00 | $ - 0 |
| A008AH | Filter Technician | 70 | HR | $0.00 | $ - 0 |
| A008AJ | Laborer | 70 | HR | $0.00 | $ - 0 |
| A008AK | Chiller Technician | 80 | HR | $0.00 | $ - 0 |
| Total of ELINS A008AA Through A008AJ | $ - 0 |
| A009 | Unit Price Labor, Equipment and Material (Negotiated) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment, and provide the purchase/rental receipts upon completing any ordered work. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. ***See Annex 020000, spec item 2.17.2.1.2 for additional information.*** Solicited Bid Schedule Only: The Contractor shall apply the Governments "Estimated Quantity" on the Bid Schedule and multiply it by their proposed "FBR" and populate the "Total Amount". The "Total Amount" shall include the Governments "Estimated Quantity". | $300 | 0.00% | $0 |
| TOTAL CLIN 0002 (BASE YEAR FOR IDIQ ELINS A005 THROUGH A009) | $ - 0 |
Page &P
Opt 1
| EXHIBIT B | ||||||
| CLIN 0001 - 1st OPTIOIN YEAR- FIRM FIXED PRICE | ||||||
| Est Annual | Unitof | Unit | ||||
| ELIN No. | DESCRIPTION | Qty | ISSUE | Price | TOTAL AMOUNT | |
| B001 | Contract Management and Administration | |||||
| B001AA | Contract Administration | 12 | Month | $ - 0 | $ - 0 | |
| B001AB | Program Manager: Contract Management and Administration | 12 | Month | $ - 0 | $ - 0 | |
| B001AC | Field Operations Managers x3: Preventative Maintenance Program Management | 12 | Month | $ - 0 | $ - 0 | |
| B001AD | Site Safety and Health Officer: Safety Management and Enforcement | 12 | Month | $ - 0 | $ - 0 | |
| B001AE | Quality Control Managers x3: Quality Control and Quality Assurance Management | 12 | Month | $ - 0 | $ - 0 | |
| B001AF | Data Entry: USMC Maximo x2 | 12 | Month | $ - 0 | $ - 0 | |
| B001AG | Computerized Maintenance Management System Supervisor: USMC Maximo | 12 | Month | $ - 0 | $ - 0 | |
| Total 1st OPTION YEAR FFP ELIN B001 | $ - 0 | |||||
| ANNEX - 1502000 FACILITY INVESTMENT | ||||||
| B002 | Perform Preventative Maintenance and Repairs under the Repair Liability Limit in accordance with the Contract Performance Work Statement. | |||||
| B002AA | HVAC Systems | 12 | Month | $ - 0 | $ - 0 | |
| B002AB | Chiller Systems | 12 | Month | $ - 0 | $ - 0 | |
| B002AC | Boiler and Hot Water Systems | 12 | Month | $ - 0 | $ - 0 | |
| B002AD | DDC Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 1st OPTION YEAR FFP ELIN B002 | $ - 0 | |||||
| B003 | Perform Inspection Testing and Certification in accordance with the Contract Performance Work Statement. | |||||
| B003AA | Boiler Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 1st OPTION YEAR FFP ELIN B003 | $ - 0 | |||||
| B004 | Perform Recurring Maintenance in accordance with the Contract Performance Work Statement. | |||||
| B004AA | HVAC Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| B004AB | Boiler Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| B004AC | Water Testing and Treatment Services Program | 12 | Month | $ - 0 | $ - 0 | |
| Total 1st OPTION YEAR FFP ELIN B004 | $ - 0 | |||||
| Total CLIN 0001 (1st OPTION YEAR FFP ELINS B001 THROUGH B004) | $ - 0 | |||||
| CLIN 0002 - 1st OPTION YEAR - INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) WORK | ||||||
| The IDIQ ELINs are for use throughout MCB Camp Pendleton and are not subject to just the locations as specified in the inventory found in Attachment J. All unit prices shall be fully burdened to include all indirect and direct costs, and profit. Daily Reports are required for IDIQ work. Daily Reports shall be submitted for each day of work on the following work day by 10:00 AM to the FSC PAR. | ||||||
| ELIN | FULL DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT | ||
| PRICE | TOTAL |
AMOUNT
| B005 | ROUTINE TROUBLE CALLS Perform routine trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| ROUTINE TROUBLE CALL RESPONSE TIME The Contractor shall respond to routine trouble calls within 30-minutes of the notification. If called before 12:30 PM during normal working hours, the Contractor must be on site to correct deficiencies within 2-hours after receipt of notification. If after 12:30 PM, be on site to correct deficiencies by 8:00 AM the following work day. | ||||
| B005AA | Level I ($0 - $400) | 20 | Each | $ - 0 |
| B005AB | Level II ($400.01 - $600) | 20 | Each | $ - 0 |
| B005AC | Level III ($600.01 - $800) | 20 | Each | $ - 0 |
| B005AD | Level IV (800.01 - $1000) | 15 | Each | $ - 0 |
| B005AE | Level V ($1000.01 - $1200) | 15 | Each | $ - 0 |
| B005AF | Level VI ($1200.01 - $1600) | 15 | Each | $ - 0 |
| B005AG | Level VII ($1600.01 - $2000) | 10 | Each | $ - 0 |
| B005AH | Level VIII (2000.01 - $2500) | 10 | Each | $ - 0 |
| Total of ELINS B005AA Through B005AH | $ - 0 | |||
| B006 | EMERGENCY TROUBLE CALL Perform emergency trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| EMERGENCY TROUBLE CALL RESPONSE TIME The Contractor shall respond to an emergency notification within 30-minutes of the notification and be on site to correct deficiencies within 2-hours after the time of receipt of notification. An emergency notification is defined as a notification received from the PAR any time after 12:30 PM during a normal work day to 7:00 AM of the following normal work day, or at any time during a weekend or Government holiday. | ||||
| B006AA | Level I ($0 - $400) | 12 | Each | $ - 0 |
| B006AB | Level II ($400.01 - $600) | 12 | Each | $ - 0 |
| B006AC | Level III ($600.01 - $800) | 12 | Each | $ - 0 |
| B006AD | Level IV (800.01 - $1000) | 12 | Each | $ - 0 |
| B006AE | Level V ($1000.01 - $1200) | 6 | Each | $ - 0 |
| B006AF | Level VI ($1200.01 - $1600) | 6 | Each | $ - 0 |
| B006AG | Level VII ($1600.01 - $2000) | 6 | Each | $ - 0 |
| B006AH | Level VIII (2000.01 - $2500) | 6 | Each | $ - 0 |
| Total of ELINS B006AA Through B006AH | $ - 0 | |||
| Total of ELINS B005 Through B006 | $ - 0 |
| B007 | Unit Priced Labor | The Unit Price Labor Rate shall include all direct and indirect costs associated with performing an hour of work. The rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin-materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up, time tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, ect. The Government will not reimburse the contractor for any restocking fees or material returned for cancelled work. | |||
| B007AA | Heating, Air Conditioning, and Refrigeration Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 320 | HR | $ - 0 |
| B007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 320 | HR | $ - 0 |
| B007AC | Boiler Technician | The Technician must perform troubleshooting, repair and replacement, and testing on various types of boiler systems, equipment and components. The Technician shall be qualified to work on boiler systems. | 320 | HR | $ - 0 |
| B007AD | Plumber/ Pipefitter | The Plumber/ Pipefitter must perform plumbing and minor pipefitting work in support of sustainment, restoration, and modernization of mechanical systems. | 320 | HR | $ - 0 |
| B007AE | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of mechanical systems. The electrician shall have a California Electrician's certification. | 320 | HR | $ - 0 |
| B007AF | Sheet Metal Mechanic | The Sheet Metal Mechanic must perform sheet metal work in support of sustainment, restoration, and modernization of mechanical systems. | 240 | HR | |
| B007AG | Welder | The Welder must perform metal work in support of sustainment, restoration, and modernization of mechanical systems. | 160 | HR | $ - 0 |
| B007AH | Filter Technician | The Filter Technician shall perform filter replacement and cleaning of non-disposable filters. | 320 | HR | $ - 0 |
| B007AJ | Laborer | The Laborer must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| B007AK | Chiller Technician | The Chiller Technician must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| Total of ELINS B007AA Through B007AJ | $ - 0 |
| B008 | UNIT PRICED LABOR - OVERTIME | |||
| B008AA | Heating, Air Conditioning, and Refrigeration Technician | 80 | HR | $ - 0 |
| B008AB | DDC Technician | 80 | HR | $ - 0 |
| B008AC | Boiler Technician | 80 | HR | $ - 0 |
| B008AD | Plumber/ Pipefitter | 70 | HR | $ - 0 |
| B008AE | Electrician | 60 | HR | $ - 0 |
| B008AF | Sheet Metal Mechanic | 60 | HR | $ - 0 |
| B008AG | Welder | 60 | HR | $ - 0 |
| B008AH | Filter Technician | 70 | HR | $ - 0 |
| B008AJ | Laborer | 70 | HR | $ - 0 |
| B008AK | Chiller Technician | 80 | HR | $ - 0 |
| Total of ELINS B008AA Through B008AJ | $ - 0 |
| B009 | Unit Price Labor, Equipment and Material (Negotiated) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment, and provide the purchase/rental receipts upon completing any ordered work. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. ***See Annex 020000, spec item 2.17.2.1.2 for additional information.*** Solicited Bid Schedule Only: The Contractor shall apply the Governments "Estimated Quantity" on the Bid Schedule and multiply it by their proposed "FBR" and populate the "Total Amount". The "Total Amount" shall include the Governments "Estimated Quantity". | $300 | 0.00% | $0 |
| TOTAL CLIN 0002 (1st OPTION YEAY FOR IDIQ ELINS A005 THROUGH A009) | $ - 0 |
Page &P
Opt 2
| EXHIBIT B | ||||||
| CLIN 0001 - 2nd OPTION YEAR- FIRM FIXED PRICE | ||||||
| Est Annual | Unitof | Unit | ||||
| ELIN No. | DESCRIPTION | Qty | ISSUE | Price | TOTAL AMOUNT | |
| C001 | Contract Management and Administration | |||||
| C001AA | Contract Administration | 12 | Month | $ - 0 | $ - 0 | |
| C001AB | Program Manager: Contract Management and Administration | 12 | Month | $ - 0 | $ - 0 | |
| C001AC | Field Operations Managers x3: Preventative Maintenance Program Management | 12 | Month | $ - 0 | $ - 0 | |
| C001AD | Site Safety and Health Officer: Safety Management and Enforcement | 12 | Month | $ - 0 | $ - 0 | |
| C001AE | Quality Control Managers x3: Quality Control and Quality Assurance Management | 12 | Month | $ - 0 | $ - 0 | |
| C001AF | Data Entry: USMC Maximo x2 | 12 | Month | $ - 0 | $ - 0 | |
| C001AG | Computerized Maintenance Management System Supervisor: USMC Maximo | 12 | Month | $ - 0 | $ - 0 | |
| Total 2nd OPTION YEAR FFP ELIN C001 | $ - 0 | |||||
| ANNEX - 1502000 FACILITY INVESTMENT | ||||||
| C002 | Perform Preventative Maintenance and Repairs under the Repair Liability Limit in accordance with the Contract Performance Work Statement. | |||||
| C002AA | HVAC Systems | 12 | Month | $ - 0 | $ - 0 | |
| C002AB | Chiller Systems | 12 | Month | $ - 0 | $ - 0 | |
| C002AC | Boiler and Hot Water Systems | 12 | Month | $ - 0 | $ - 0 | |
| C002AD | DDC Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 2nd OPTION YEAR YEAR FFP ELIN C002 | $ - 0 | |||||
| C003 | Perform Inspection Testing and Certification in accordance with the Contract Performance Work Statement. | |||||
| C003AA | Boiler Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 2nd OPTION YEAR YEAR FFP ELIN C003 | $ - 0 | |||||
| C004 | Perform Recurring Maintenance in accordance with the Contract Performance Work Statement. | |||||
| C004AA | HVAC Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| C004AB | Boiler Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| C004AC | Water Testing and Treatment Services Program | 12 | Month | $ - 0 | $ - 0 | |
| Total 2nd OPTION YEAR FFP ELIN A004 | $ - 0 | |||||
| Total CLIN 0001 (2nd OPTION YEAR FFP ELINS A001 THROUGH A004) | $ - 0 | |||||
| CLIN 0002 - 2nd OPTION YEAR - INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) WORK | ||||||
| The IDIQ ELINs are for use throughout MCB Camp Pendleton and are not subject to just the locations as specified in the inventory found in Attachment J. All unit prices shall be fully burdened to include all indirect and direct costs, and profit. Daily Reports are required for IDIQ work. Daily Reports shall be submitted for each day of work on the following work day by 10:00 AM to the FSC PAR. | ||||||
| ELIN | FULL DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT | ||
| PRICE | TOTAL |
AMOUNT
| C005 | ROUTINE TROUBLE CALLS Perform routine trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| ROUTINE TROUBLE CALL RESPONSE TIME The Contractor shall respond to routine trouble calls within 30-minutes of the notification. If called before 12:30 PM during normal working hours, the Contractor must be on site to correct deficiencies within 2-hours after receipt of notification. If after 12:30 PM, be on site to correct deficiencies by 8:00 AM the following work day. | ||||
| C005AA | Level I ($0 - $400) | 20 | Each | $ - 0 |
| C005AB | Level II ($400.01 - $600) | 20 | Each | $ - 0 |
| C005AC | Level III ($600.01 - $800) | 20 | Each | $ - 0 |
| C005AD | Level IV (800.01 - $1000) | 15 | Each | $ - 0 |
| C005AE | Level V ($1000.01 - $1200) | 15 | Each | $ - 0 |
| C005AF | Level VI ($1200.01 - $1600) | 15 | Each | $ - 0 |
| C005AG | Level VII ($1600.01 - $2000) | 10 | Each | $ - 0 |
| C005AH | Level VIII (2000.01 - $2500) | 10 | Each | $ - 0 |
| Total of ELINS C005AA Through C005AH | $ - 0 | |||
| C006 | EMERGENCY TROUBLE CALL Perform emergency trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| EMERGENCY TROUBLE CALL RESPONSE TIME The Contractor shall respond to an emergency notification within 30-minutes of the notification and be on site to correct deficiencies within 2-hours after the time of receipt of notification. An emergency notification is defined as a notification received from the PAR any time after 12:30 PM during a normal work day to 7:00 AM of the following normal work day, or at any time during a weekend or Government holiday. | ||||
| C006AA | Level I ($0 - $400) | 12 | Each | $ - 0 |
| C006AB | Level II ($400.01 - $600) | 12 | Each | $ - 0 |
| C006AC | Level III ($600.01 - $800) | 12 | Each | $ - 0 |
| C006AD | Level IV (800.01 - $1000) | 12 | Each | $ - 0 |
| C006AE | Level V ($1000.01 - $1200) | 6 | Each | $ - 0 |
| C006AF | Level VI ($1200.01 - $1600) | 6 | Each | $ - 0 |
| C006AG | Level VII ($1600.01 - $2000) | 6 | Each | $ - 0 |
| C006AH | Level VIII (2000.01 - $2500) | 6 | Each | $ - 0 |
| Total of ELINS C006AA Through C006AH | $ - 0 | |||
| Total of ELINS C005 Through C006 | $ - 0 |
| C007 | Unit Priced Labor | The Unit Price Labor Rate shall include all direct and indirect costs associated with performing an hour of work. The rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin-materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up, time tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, ect. The Government will not reimburse the contractor for any restocking fees or material returned for cancelled work. | |||
| C007AA | Heating, Air Conditioning, and Refrigeration Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 320 | HR | $ - 0 |
| C007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 320 | HR | $ - 0 |
| C007AC | Boiler Technician | The Technician must perform troubleshooting, repair and replacement, and testing on various types of boiler systems, equipment and components. The Technician shall be qualified to work on boiler systems. | 320 | HR | $ - 0 |
| C007AD | Plumber/ Pipefitter | The Plumber/ Pipefitter must perform plumbing and minor pipefitting work in support of sustainment, restoration, and modernization of mechanical systems. | 320 | HR | $ - 0 |
| C007AE | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of mechanical systems. The electrician shall have a California Electrician's certification. | 320 | HR | $ - 0 |
| C007AF | Sheet Metal Mechanic | The Sheet Metal Mechanic must perform sheet metal work in support of sustainment, restoration, and modernization of mechanical systems. | 240 | HR | |
| C007AG | Welder | The Welder must perform metal work in support of sustainment, restoration, and modernization of mechanical systems. | 160 | HR | $ - 0 |
| C007AH | Filter Technician | The Filter Technician shall perform filter replacement and cleaning of non-disposable filters. | 320 | HR | $ - 0 |
| C007AJ | Laborer | The Laborer must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| C007AK | Chiller Technician | The Chiller Technician must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| Total of ELINS C007AA Through C007AJ | $ - 0 |
| C008 | UNIT PRICED LABOR - OVERTIME | ||||
| C008AA | Heating, Air Conditioning, and Refrigeration Technician | 80 | HR | $0.00 | $ - 0 |
| C008AB | DDC Technician | 80 | HR | $0.00 | $ - 0 |
| C008AC | Boiler Technician | 80 | HR | $0.00 | $ - 0 |
| C008AD | Plumber/ Pipefitter | 70 | HR | $0.00 | $ - 0 |
| C008AE | Electrician | 60 | HR | $0.00 | $ - 0 |
| C008AF | Sheet Metal Mechanic | 60 | HR | $0.00 | $ - 0 |
| C008AG | Welder | 60 | HR | $0.00 | $ - 0 |
| C008AH | Filter Technician | 70 | HR | $0.00 | $ - 0 |
| C008AJ | Laborer | 70 | HR | $0.00 | $ - 0 |
| C008AK | Chiller Technician | 80 | HR | $0.00 | $ - 0 |
| Total of ELINS C008AA Through C008AJ | $ - 0 |
| C009 | Unit Price Labor, Equipment and Material (Negotiated) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment, and provide the purchase/rental receipts upon completing any ordered work. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. ***See Annex 020000, spec item 2.17.2.1.2 for additional information.*** Solicited Bid Schedule Only: The Contractor shall apply the Governments "Estimated Quantity" on the Bid Schedule and multiply it by their proposed "FBR" and populate the "Total Amount". The "Total Amount" shall include the Governments "Estimated Quantity". | $300 | 0.00% | $0 |
| TOTAL CLIN 0002 (2nd OPTION YEAR FOR IDIQ ELINS C005 THROUGH C009) | $ - 0 |
Page &P
Opt 3
| EXHIBIT B | ||||||
| CLIN 0001 - 3rd OPTION YEAR - FIRM FIXED PRICE | ||||||
| Est Annual | Unitof | Unit | ||||
| ELIN No. | DESCRIPTION | Qty | ISSUE | Price | TOTAL AMOUNT | |
| D001 | Contract Management and Administration | |||||
| D001AA | Contract Administration | 12 | Month | $ - 0 | $ - 0 | |
| D001AB | Program Manager: Contract Management and Administration | 12 | Month | $ - 0 | $ - 0 | |
| D001AC | Field Operations Managers x3: Preventative Maintenance Program Management | 12 | Month | $ - 0 | $ - 0 | |
| D001AD | Site Safety and Health Officer: Safety Management and Enforcement | 12 | Month | $ - 0 | $ - 0 | |
| D001AE | Quality Control Managers x3: Quality Control and Quality Assurance Management | 12 | Month | $ - 0 | $ - 0 | |
| D001AF | Data Entry: USMC Maximo x2 | 12 | Month | $ - 0 | $ - 0 | |
| D001AG | Computerized Maintenance Management System Supervisor: USMC Maximo | 12 | Month | $ - 0 | $ - 0 | |
| Total 3rd OPTION YEAR FFP ELIN A001 | $ - 0 | |||||
| ANNEX - 1502000 FACILITY INVESTMENT | ||||||
| D002 | Perform Preventative Maintenance and Repairs under the Repair Liability Limit in accordance with the Contract Performance Work Statement. | |||||
| D002AA | HVAC Systems | 12 | Month | $ - 0 | $ - 0 | |
| D002AB | Chiller Systems | 12 | Month | $ - 0 | $ - 0 | |
| D002AC | Boiler and Hot Water Systems | 12 | Month | $ - 0 | $ - 0 | |
| D002AD | DDC Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 3rd OPTION YEAR FFP ELIN A002 | $ - 0 | |||||
| D003 | Perform Inspection Testing and Certification in accordance with the Contract Performance Work Statement. | |||||
| D003AA | Boiler Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 3rd OPTION YEAR FFP ELIN A003 | $ - 0 | |||||
| D004 | Perform Recurring Maintenance in accordance with the Contract Performance Work Statement. | |||||
| D004AA | HVAC Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| D004AB | Boiler Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| D004AC | Water Testing and Treatment Services Program | 12 | Month | $ - 0 | $ - 0 | |
| Total 3rd OPTION YEAR FFP ELIN A004 | $ - 0 | |||||
| Total CLIN 0001 (3rd OPTION YEAR FFP ELINS D001 THROUGH D004) | $ - 0 | |||||
| CLIN 0002 - 3rd OPTION YEAR - INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) WORK | ||||||
| The IDIQ ELINs are for use throughout MCB Camp Pendleton and are not subject to just the locations as specified in the inventory found in Attachment J. All unit prices shall be fully burdened to include all indirect and direct costs, and profit. Daily Reports are required for IDIQ work. Daily Reports shall be submitted for each day of work on the following work day by 10:00 AM to the FSC PAR. | ||||||
| ELIN | FULL DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT | ||
| PRICE | TOTAL |
AMOUNT
| D005 | ROUTINE TROUBLE CALLS Perform routine trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| ROUTINE TROUBLE CALL RESPONSE TIME The Contractor shall respond to routine trouble calls within 30-minutes of the notification. If called before 12:30 PM during normal working hours, the Contractor must be on site to correct deficiencies within 2-hours after receipt of notification. If after 12:30 PM, be on site to correct deficiencies by 8:00 AM the following work day. | ||||
| D005AA | Level I ($0 - $400) | 20 | Each | $ - 0 |
| D005AB | Level II ($400.01 - $600) | 20 | Each | $ - 0 |
| D005AC | Level III ($600.01 - $800) | 20 | Each | $ - 0 |
| D005AD | Level IV (800.01 - $1000) | 15 | Each | $ - 0 |
| D005AE | Level V ($1000.01 - $1200) | 15 | Each | $ - 0 |
| D005AF | Level VI ($1200.01 - $1600) | 15 | Each | $ - 0 |
| D005AG | Level VII ($1600.01 - $2000) | 10 | Each | $ - 0 |
| D005AH | Level VIII (2000.01 - $2500) | 10 | Each | $ - 0 |
| Total of ELINS A005AA Through A005AH | $ - 0 | |||
| D006 | EMERGENCY TROUBLE CALL Perform emergency trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| EMERGENCY TROUBLE CALL RESPONSE TIME The Contractor shall respond to an emergency notification within 30-minutes of the notification and be on site to correct deficiencies within 2-hours after the time of receipt of notification. An emergency notification is defined as a notification received from the PAR any time after 12:30 PM during a normal work day to 7:00 AM of the following normal work day, or at any time during a weekend or Government holiday. | ||||
| D006AA | Level I ($0 - $400) | 12 | Each | $ - 0 |
| D006AB | Level II ($400.01 - $600) | 12 | Each | $ - 0 |
| D006AC | Level III ($600.01 - $800) | 12 | Each | $ - 0 |
| D006AD | Level IV (800.01 - $1000) | 12 | Each | $ - 0 |
| D006AE | Level V ($1000.01 - $1200) | 6 | Each | $ - 0 |
| D006AF | Level VI ($1200.01 - $1600) | 6 | Each | $ - 0 |
| D006AG | Level VII ($1600.01 - $2000) | 6 | Each | $ - 0 |
| D006AH | Level VIII (2000.01 - $2500) | 6 | Each | $ - 0 |
| Total of ELINS D006AA Through D006AH | $ - 0 | |||
| Total of ELINS D005 Through D006 | $ - 0 |
| D007 | Unit Priced Labor | The Unit Price Labor Rate shall include all direct and indirect costs associated with performing an hour of work. The rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin-materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up, time tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, ect. The Government will not reimburse the contractor for any restocking fees or material returned for cancelled work. | |||
| D007AA | Heating, Air Conditioning, and Refrigeration Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 320 | HR | $ - 0 |
| D007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 320 | HR | $ - 0 |
| D007AC | Boiler Technician | The Technician must perform troubleshooting, repair and replacement, and testing on various types of boiler systems, equipment and components. The Technician shall be qualified to work on boiler systems. | 320 | HR | $ - 0 |
| D007AD | Plumber/ Pipefitter | The Plumber/ Pipefitter must perform plumbing and minor pipefitting work in support of sustainment, restoration, and modernization of mechanical systems. | 320 | HR | $ - 0 |
| D007AE | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of mechanical systems. The electrician shall have a California Electrician's certification. | 320 | HR | $ - 0 |
| D007AF | Sheet Metal Mechanic | The Sheet Metal Mechanic must perform sheet metal work in support of sustainment, restoration, and modernization of mechanical systems. | 240 | HR | |
| D007AG | Welder | The Welder must perform metal work in support of sustainment, restoration, and modernization of mechanical systems. | 160 | HR | $ - 0 |
| D007AH | Filter Technician | The Filter Technician shall perform filter replacement and cleaning of non-disposable filters. | 320 | HR | $ - 0 |
| D007AJ | Laborer | The Laborer must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| D007AK | Chiller Technician | The Chiller Technician must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| Total of ELINS D007AA Through D007AJ | $ - 0 |
| D008 | UNIT PRICED LABOR - OVERTIME | ||||
| D008AA | Heating, Air Conditioning, and Refrigeration Technician | 80 | HR | $0.00 | $ - 0 |
| D008AB | DDC Technician | 80 | HR | $0.00 | $ - 0 |
| D008AC | Boiler Technician | 80 | HR | $0.00 | $ - 0 |
| D008AD | Plumber/ Pipefitter | 70 | HR | $0.00 | $ - 0 |
| D008AE | Electrician | 60 | HR | $0.00 | $ - 0 |
| D008AF | Sheet Metal Mechanic | 60 | HR | $0.00 | $ - 0 |
| D008AG | Welder | 60 | HR | $0.00 | $ - 0 |
| D008AH | Filter Technician | 70 | HR | $0.00 | $ - 0 |
| D008AJ | Laborer | 70 | HR | $0.00 | $ - 0 |
| D008AK | Chiller Technician | 80 | HR | $0.00 | $ - 0 |
| Total of ELINS D008AA Through D008AJ | $ - 0 |
| D009 | Unit Price Labor, Equipment and Material (Negotiated) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment, and provide the purchase/rental receipts upon completing any ordered work. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. ***See Annex 020000, spec item 2.17.2.1.2 for additional information.*** Solicited Bid Schedule Only: The Contractor shall apply the Governments "Estimated Quantity" on the Bid Schedule and multiply it by their proposed "FBR" and populate the "Total Amount". The "Total Amount" shall include the Governments "Estimated Quantity". | $300 | 0.00% | $0 |
| TOTAL CLIN 0002 (3rd OPTION YEAR FOR IDIQ ELINS A005 THROUGH A009) | $ - 0 |
Page &P
Opt 4
| EXHIBIT B | ||||||
| CLIN 0001 - 4th OPTION YEAR- FIRM FIXED PRICE | ||||||
| Est Annual | Unitof | Unit | ||||
| ELIN No. | DESCRIPTION | Qty | ISSUE | Price | TOTAL AMOUNT | |
| E001 | Contract Management and Administration | |||||
| E001AA | Contract Administration | 12 | Month | $ - 0 | $ - 0 | |
| E001AB | Program Manager: Contract Management and Administration | 12 | Month | $ - 0 | $ - 0 | |
| E001AC | Field Operations Managers x3: Preventative Maintenance Program Management | 12 | Month | $ - 0 | $ - 0 | |
| E001AD | Site Safety and Health Officer: Safety Management and Enforcement | 12 | Month | $ - 0 | $ - 0 | |
| E001AE | Quality Control Managers x3: Quality Control and Quality Assurance Management | 12 | Month | $ - 0 | $ - 0 | |
| E001AF | Data Entry: USMC Maximo x2 | 12 | Month | $ - 0 | $ - 0 | |
| E001AG | Computerized Maintenance Management System Supervisor: USMC Maximo | 12 | Month | $ - 0 | $ - 0 | |
| Total 4th OPTION YEAR FFP ELIN A001 | $ - 0 | |||||
| ANNEX - 1502000 FACILITY INVESTMENT | ||||||
| E002 | Perform Preventative Maintenance and Repairs under the Repair Liability Limit in accordance with the Contract Performance Work Statement. | |||||
| E002AA | HVAC Systems | 12 | Month | $ - 0 | $ - 0 | |
| E002AB | Chiller Systems | 12 | Month | $ - 0 | $ - 0 | |
| E002AC | Boiler and Hot Water Systems | 12 | Month | $ - 0 | $ - 0 | |
| E002AD | DDC Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 4th OPTION YEARFFP ELIN A002 | $ - 0 | |||||
| E003 | Perform Inspection Testing and Certification in accordance with the Contract Performance Work Statement. | |||||
| E003AA | Boiler Systems | 12 | Month | $ - 0 | $ - 0 | |
| Total 4th OPTION YEARFFP ELIN A003 | $ - 0 | |||||
| E004 | Perform Recurring Maintenance in accordance with the Contract Performance Work Statement. | |||||
| E004AA | HVAC Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| E004AB | Boiler Seasonal Start-up and Shutdown | 2 | EA | $ - 0 | $ - 0 | |
| E004AC | Water Testing and Treatment Services Program | 12 | Month | $ - 0 | $ - 0 | |
| Total 4th OPTION YEAR FFP ELIN A004 | $ - 0 | |||||
| Total CLIN 0001 (4th OPTION YEAR FFP ELINS A001 THROUGH A004) | $ - 0 | |||||
| CLIN 0002 - 4th OPTION YEAR - INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) WORK | ||||||
| The IDIQ ELINs are for use throughout MCB Camp Pendleton and are not subject to just the locations as specified in the inventory found in Attachment J. All unit prices shall be fully burdened to include all indirect and direct costs, and profit. Daily Reports are required for IDIQ work. Daily Reports shall be submitted for each day of work on the following work day by 10:00 AM to the FSC PAR. | ||||||
| ELIN | FULL DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT | ||
| PRICE | TOTAL |
AMOUNT
| E005 | ROUTINE TROUBLE CALLS Perform routine trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| ROUTINE TROUBLE CALL RESPONSE TIME The Contractor shall respond to routine trouble calls within 30-minutes of the notification. If called before 12:30 PM during normal working hours, the Contractor must be on site to correct deficiencies within 2-hours after receipt of notification. If after 12:30 PM, be on site to correct deficiencies by 8:00 AM the following work day. | ||||
| E005AA | Level I ($0 - $400) | 20 | Each | $ - 0 |
| E005AB | Level II ($400.01 - $600) | 20 | Each | $ - 0 |
| E005AC | Level III ($600.01 - $800) | 20 | Each | $ - 0 |
| E005AD | Level IV (800.01 - $1000) | 15 | Each | $ - 0 |
| E005AE | Level V ($1000.01 - $1200) | 15 | Each | $ - 0 |
| E005AF | Level VI ($1200.01 - $1600) | 15 | Each | $ - 0 |
| E005AG | Level VII ($1600.01 - $2000) | 10 | Each | $ - 0 |
| E005AH | Level VIII (2000.01 - $2500) | 10 | Each | $ - 0 |
| Total of ELINS E005AA Through E005AH | $ - 0 | |||
| E006 | EMERGENCY TROUBLE CALL Perform emergency trouble calls. The unit price bid by the Contractor shall be the accepted price to be paid in full for the trouble call rendered. The Contractor shall use the applicable IDIQ tradesman wage rate plus the FBR applied to the material and equipment costs to determine the trouble call liability limit. The Contractor shall submit supporting documentation for the labor and associated costs of material and equipment used to the KO. An issued service callmay be reduced or increased as predicated by the supporting documentation. | |||
| EMERGENCY TROUBLE CALL RESPONSE TIME The Contractor shall respond to an emergency notification within 30-minutes of the notification and be on site to correct deficiencies within 2-hours after the time of receipt of notification. An emergency notification is defined as a notification received from the PAR any time after 12:30 PM during a normal work day to 7:00 AM of the following normal work day, or at any time during a weekend or Government holiday. | ||||
| E006AA | Level I ($0 - $400) | 12 | Each | $ - 0 |
| E006AB | Level II ($400.01 - $600) | 12 | Each | $ - 0 |
| E006AC | Level III ($600.01 - $800) | 12 | Each | $ - 0 |
| E006AD | Level IV (800.01 - $1000) | 12 | Each | $ - 0 |
| E006AE | Level V ($1000.01 - $1200) | 6 | Each | $ - 0 |
| E006AF | Level VI ($1200.01 - $1600) | 6 | Each | $ - 0 |
| E006AG | Level VII ($1600.01 - $2000) | 6 | Each | $ - 0 |
| E006AH | Level VIII (2000.01 - $2500) | 6 | Each | $ - 0 |
| Total of ELINS E006AA Through E006AH | $ - 0 | |||
| Total of ELINS E005 Through E006 | $ - 0 |
| E007 | Unit Priced Labor | The Unit Price Labor Rate shall include all direct and indirect costs associated with performing an hour of work. The rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin-materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up, time tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, ect. The Government will not reimburse the contractor for any restocking fees or material returned for cancelled work. | |||
| E007AA | Heating, Air Conditioning, and Refrigeration Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 320 | HR | $ - 0 |
| E007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 320 | HR | $ - 0 |
| E007AC | Boiler Technician | The Technician must perform troubleshooting, repair and replacement, and testing on various types of boiler systems, equipment and components. The Technician shall be qualified to work on boiler systems. | 320 | HR | $ - 0 |
| E007AD | Plumber/ Pipefitter | The Plumber/ Pipefitter must perform plumbing and minor pipefitting work in support of sustainment, restoration, and modernization of mechanical systems. | 320 | HR | $ - 0 |
| E007AE | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of mechanical systems. The electrician shall have a California Electrician's certification. | 320 | HR | $ - 0 |
| E007AF | Sheet Metal Mechanic | The Sheet Metal Mechanic must perform sheet metal work in support of sustainment, restoration, and modernization of mechanical systems. | 240 | HR | |
| E007AG | Welder | The Welder must perform metal work in support of sustainment, restoration, and modernization of mechanical systems. | 160 | HR | $ - 0 |
| E007AH | Filter Technician | The Filter Technician shall perform filter replacement and cleaning of non-disposable filters. | 320 | HR | $ - 0 |
| E007AJ | Laborer | The Laborer must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| E007AK | Chiller Technician | The Chiller Technician must perform general labor work in support of sustainment, restoration, and modernization of mechanical systems. A Laborer may operate a forklift but must be licensed. | 320 | HR | $ - 0 |
| Total of ELINS E007AA Through E007AJ | $ - 0 |
| E008 | UNIT PRICED LABOR - OVERTIME | ||||
| E008AA | Heating, Air Conditioning, and Refrigeration Technician | 80 | HR | $0.00 | $ - 0 |
| E008AB | DDC Technician | 80 | HR | $0.00 | $ - 0 |
| E008AC | Boiler Technician | 80 | HR | $0.00 | $ - 0 |
| E008AD | Plumber/ Pipefitter | 70 | HR | $0.00 | $ - 0 |
| E008AE | Electrician | 60 | HR | $0.00 | $ - 0 |
| E008AF | Sheet Metal Mechanic | 60 | HR | $0.00 | $ - 0 |
| E008AG | Welder | 60 | HR | $0.00 | $ - 0 |
| E008AH | Filter Technician | 70 | HR | $0.00 | $ - 0 |
| E008AJ | Laborer | 70 | HR | $0.00 | $ - 0 |
| E008AK | Chiller Technician | 80 | HR | $0.00 | $ - 0 |
| Total of ELINS E008AA Through E008AJ | $ - 0 |
| E009 | Unit Price Labor, Equipment and Material (Negotiated) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment, and provide the purchase/rental receipts upon completing any ordered work. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. ***See Annex 020000, spec item 2.17.2.1.2 for additional information.*** Solicited Bid Schedule Only: The Contractor shall apply the Governments "Estimated Quantity" on the Bid Schedule and multiply it by their proposed "FBR" and populate the "Total Amount". The "Total Amount" shall include the Governments "Estimated Quantity". | $300,000 | % Mark Up | 0.00% | $0 |
| TOTAL CLIN 0002 (4th OPTION YEAR FOR IDIQ ELINS A005 THROUGH A009) | $ - 0 |
Page &P
File details come from the government source that posted it. Updated .