N6247024R0053 Amendment 0002.pdf
PDF 329 KB Posted
- Solicitation number
- N62470-24-R-0053
About this file
This document is an Amendment (Amendment 0002) to a federal solicitation for professional utility systems management services for Naval Facilities Engineering Systems Command (NAVFAC). The amendment revises Section C of the original solicitation, providing detailed requirements for professional services to assist NAVFAC in managing electric, civil, and mechanical utility systems across Department of Navy installations worldwide. Key service areas include utility management, operations and maintenance, asset management, energy conservation, utility privatization, cyber security, control systems, and technical training.
The amendment outlines specific personnel requirements, with labor categories ranging from Junior Consultant to Principal/Program Manager, each requiring relevant degrees and extensive experience in utility systems. The contract will use firm fixed-price task orders, with a total contract not-to-exceed amount of $90,000,000. Offerors must demonstrate corporate experience in utility system risk assessments, rate analysis, management assessments, privatization programs, and technical training. The solicitation emphasizes small business participation, with a minimum 20% small business participation requirement, and includes detailed evaluation factors for corporate experience, technical approach, safety, small business utilization, and past performance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6247024R0053 Amendment 0002 is issued to provide revisions to section C.
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Mar-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247024R0053
X 9B. DATED (SEE ITEM 11)
17-Jan-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Mar-2025
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247024R0053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to disseminate the information below:
1. Section C is revised. See note below.
NOTE: Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SECTION C
1 Introduction
This effort is to obtain professional services throughout Naval Facilities Engineering Systems Command (NAVFAC) area of operations (AO) to assist in the management of the Navy’s electric, civil, and mechanical utility systems.
NAVFAC’s AO includes Department of the Navy (DON) installations worldwide. The selected firms will provide the required services through the issuance of individual Task Orders. The workload may fluctuate with changes in the number and types of projects in various stages of implementation and in response to Navy decisions to expand various programs. The Contractors must be flexible and able to surge in response to any workload challenges.
1.1 Mission
NAVFAC is an integral element of the shore infrastructure for the Navy and Marine Corps worldwide. NAVFAC plans, builds and maintains sustainable facilities, expertly delivers utilities and services, and strengthens the linkage between the Shore Enterprise and the Fleet.
1.2 Background
NAVFAC manages utilities infrastructure programs for Naval Installations worldwide. These programs include utility management; utility operation and maintenance; utility inventory and asset management; electric and steam production; electric and steam distribution; natural gas distribution; water and wastewater treatment; water distribution; wastewater and storm water collection; utility privatization and out-sourcing; cyber security and control systems; advanced metering; energy management; energy security; energy and water conservation; project financing; utility regulation; utility rate making and analysis; commodity and service pricing and procurement;
supply and demand practices; market design; and fuel sourcing.
1.3 Scope
The Contractor shall provide professional knowledge, skills, and experience in electrical, mechanical, and civil utility systems. Services provided will require the Contractor to have extensive experience in the following areas:
utility management; utility operation and maintenance; electric power production and distribution; steam production and distribution to include combined heat and power (CHP); natural gas distribution; water, wastewater, and industrial wastewater treatment; water distribution (potable and non-potable systems); wastewater and storm water collection; environmental permitting and asset management; utility privatization and out-sourcing; cyber security and control systems; advanced metering; energy management; energy security; energy and water conservation;
project financing; utility regulation; utility rate making and analysis; commodity and service pricing and procurement; supply and demand practices; market design; and fuel sourcing.
The Contractor shall advise the Navy and conduct necessary research and analysis to present decision makers with accurate and relevant information. The contractor shall not participate in source selection actions. The contractor may be required to produce or provide training on industry best practices related to items within this statement of work and facilitate adoption of best practices by the Navy.
Tasks related to electrical, mechanical, and civil utility systems will include, but are not limited to those shown in Table 1.
Table 1: Utilities Professional Services Tasks
a. Evaluate, analyze, and recommend improvements regarding utility management, including the implementation of strategic asset management
b. Evaluate, analyze, and recommend improvements to staffing and organizational Efficiency of utility systems
c. Assist the Navy in the development of strategic plans, business plans, capital plans, and program plans
d. Assist the Navy in the development of utility system master plans and energy master plans, including evaluations of conservation, reuse, and renewable energy
e. Assist the Navy in the development of standard operating and maintenance procedures, manuals, and provide field training
f. Assist the Navy in the development of and documentation of energy management analysis techniques and processes and provide field training
g. Assist the Navy in the development and application of metrics and key performance indicators
h. Benchmark Navy utility performance against public and private organizations
i. Evaluate and recommend improvements to utility and energy data collection/reporting systems
j. Evaluate, maintain, enhance, and further develop Utilities Inventory Condition Assessment
Program (UICAP) documentation, processes, and the Utilities Risk Tool
k. Perform utility system asset collection (field inventory) and database management for UICAP and environmental permitting needs
l. Assist the Navy in the development, documentation, execution, and training of processes and tools to successfully privatize or outsource utilities
m. Advise and provide support to the Navy during privatization and outsourcing contract development, evaluation, negotiation, and execution
n. Advise and provide support on technical and economic aspects of privatization and outsourcing
o. Perform economic analysis
p. Assist the Navy in the development, documentation, execution, and training of processes and tools to successfully deploy and sustain utility control systems and advanced metering
q. Evaluate, analyze, and recommend improvements to utility control systems and advanced metering infrastructure, processes, and programs including cyber security and accreditation requirements
r. Perform utility rate analysis and make recommendations
s. Perform electrical buy versus generate and fuel-alternatives analyses
t. Assist the Navy in the development, documentation, execution, and training of the processes and tools to successfully deploy and sustain advanced commodity procurement strategies and techniques
u. Evaluate, analyze, and recommend improvements to utility budget formulation implementation
v. Create and conduct utility system safety training and document editing services
Examples of applicable tasks the contract will be asked to perform include:
1. Perform a utilities management assessment. For a particular Facilities Engineering Systems Command, Public Works Department, or the entire Product Line, document the current organization, its’ processes, staffing, skills, education, and training along with associated costs and priorities. Assess the organization’s performance against internal and industry benchmarks and best practices. Recommend improvements to improve performance.
2. Strategic plan for the Product Line built upon an assessment of current strengths, weakness, opportunities, and threats, with an eye toward aligning levels of effort across different focus areas to future needs of our customers and larger industry direction. Training instruction to support strategic planning and organizational transformation.
3. Evaluate current operation and maintenance practices and develop documentation, tools, and supply training to implement reliability centered maintenance for a particular Facilities Engineering Systems Command, Public Works Department, or the entire Product Line.
4. Perform a utility system assessment and produce recommendations that include operational, maintenance, and capital improvements to meet stated Product Line goals. Perform alternatives analysis, economic analysis, energy Return on Investment analysis, and risk assessment. Produce project documentation for recommendations to include: Military Construction (DD 1391), Capital Investment Program, Energy Conservation Investment Program, Major Maintenance and Repair Program, and energy return on investment programs.
5. Utility system master plan for long term solutions to issues of staffing, energy conservation and efficiency, water reuse, recycling, alternative fuels, best management practices for operation and maintenance, long term trends in utility markets, utility system right-sizing, utilities systems risk analysis, technological advances, DoE energy goals.
6. Perform technical and financial analysis of utility improvements, including renewable options such as solar, wind, biomass, and evaluate alternative funding methods available, such as Enhanced Use Lease, Purchase Power Agreements, and financed energy projects (e.g. ESPC, UESC).
7. Update UICAP tools and documentation to ensure they are current with industry best practices for asset management and Product Line objectives. Provide classroom and web-based training to Product Line personnel. Collect and manage utility system asset data to update UICAP or environmental permitting efforts.
8. Assist the Navy in the development of a utilities privatization program that combines best practices from the US Air Force, US Army, US Navy, and public and private utilities to meet Product Line objectives, such as lower cost, improved reliability and safety. Provide necessary documentation, tools, training, analysis, and negotiation support to privatize one or more utilities at one or more Public Works Departments.
9. Provide technical and economic support during privatization post-award activities, such as price redetermination.
10. Assist the Navy in the development and implementation of utility control systems, advanced meter, and smart grid programs that complies with current cyber security and mission assurance requirements.
Evaluate and recommend improvements to the use and management of control system assets and their information (e.g. SCADA, DDC, AMI). Evaluate and recommend improvements to integration of control systems with business information systems (e.g. Maximo, GIS, DUERS, CIRCUITS, URT) under a central operations center concept and using secure networks.
11. Assist the Navy in the development, implementation, and training of government personnel to sustain a commodity management program for electricity and natural gas that leverages market assessment, competitive procurement, purchase timing, rate analysis, and demand response.
12. Perform cost of service rate analysis in support of water and wastewater rate negotiations with public and private service providers.
13. Assist the Navy in the development of models of purchased commodity costs (e.g. electric power purchased at different rates) and provide benchmarking metrics to measure the effectiveness of commodity purchase decisions against Product Line goals. Develop and deliver comprehensive summary reports to illustrate commodity purchase methodology historic effectiveness and forecasts of future results.
14. Provide training on topics related to the safe operation and maintenance of 51 V through 69 kV electrical systems and equipment. Services are intended to assist in the education of utility electricians, engineers and other personnel that need to implement safe procedures and perform proper operation and maintenance of electrical utility equipment. Services may also include updating and revising safety documents, references, Standard Operating Procedures (SOPs), and Business Process Management System (BPMS) documents.
2 General Requirements
This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.
2.2 Business Relations
Contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
2.3 Contract Administration and Management
The following subsections specify requirements for contract, management, and personnel administration.
2.3.1 Contract Management
The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at all locations and the contractor's corporate offices.
2.3.2 Contract Administration
The contractor shall establish processes and assign appropriate resources to effectively administer the requirement.
The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support task orders.
The contractor shall assign work effort and maintain proper and accurate time keeping records of personnel assigned to work on the requirement.
2.3.3 Certificate of Insurance
Within 15 calendar days after award, the Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION.
This insurance must be maintained during the performance period.
2.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Procuring Contracting Officer (PCO) or Contracting Officer Representative (COR). However, subcontractors must possess the same level of expertise.
2.5 Specific Personnel Requirement
The Contractor shall provide sufficient technical, supervisory, and administrative personnel to ensure timely execution of the work, for each project (task order). At a minimum, the contractor shall have the below personnel with the following qualifications. If, during the performance of this contract, the contractor must utilize personnel other than those identified in the technical proposal, such substitution shall not be made without written approval of the KO. For all positions for which qualifications are outlined below, the KO shall have the right to request documentation sufficient to verify compliance with the qualification requirements at any time during the course of the contract.
Table 2: Labor Categories
Labor Category Description Principal or Program Manager
Each position shall be filled by someone with a graduate degree in engineering, economics, or business. This position shall be filled by a senior subject matter expert with over 20 years of relevant experience in the utility industry to include: operations and maintenance of utility systems; process improvements relating to equipment and system efficiency and management; long range planning, redesign, and right-sizing; commodity markets and forecasting; smart energy; and federal government project financing. This person shall also demonstrate the ability to run larger, complex projects.
Project Manager Each position shall be filled by someone with a degree in engineering, economics, or business. This position shall be filled with an individual with over 15 10 years of relevant experience in the areas of utility systems to include: utilities operations and maintenance; process improvements relating to equipment and system efficiency and management; long range planning, redesign, and right-sizing;
commodity markets and forecasting; smart energy; and federal government project financing. This person shall demonstrate the ability to run larger, complex projects.
Senior Consultant Each position shall be filled by someone with a degree in engineering, economics, or business. This position shall be filled by someone with 5- 15 over 10 years of relevant experience in the areas of utility systems to include: utilities operations and maintenance; process improvements relating to equipment and system efficiency and management; long range planning, redesign, and right-sizing; commodity markets and forecasting; smart energy; and federal government project financing.
Journeyman Consultant: Each position shall be filled by someone with a degree in engineering, economics, or business. This position shall be filled by someone with 2- 5 5-10 years of relevant experience in the areas of utility systems to include: utilities operations and maintenance; process improvements relating to equipment and system efficiency and management; long range planning, redesign, and right-sizing; commodity markets and forecasting; smart energy; and federal government project financing.
Junior Consultant Each position shall be filled by someone with a degree in engineering, economics, or Business with 0-3 0-5 years of relevant experience in the areas of utility systems to include: utilities operations and maintenance;
process improvements relating to equipment and system efficiency and management; long range planning, redesign, and right-sizing;
commodity markets and forecasting; smart energy; and federal government project financing. The position is responsible for assisting positions that are more senior and/or performing functional duties under the oversight of more senior positions.
GIS Analyst Each position shall be filled by someone with a BA/BS or MA/MS degree. Each position shall be filled by someone with 3-10 years of relevant experience in the areas of utility systems to collect, analyze, and interpret geographic information provided by geodetic surveys, aerial photographs, and satellite data. Research, study, and prepare maps and other spatial data in digital or graphic form for legal, social, political, educational, and design purposes. Work with Geographic Information Systems (GIS). May design and evaluate algorithms, data structures, and user interfaces for GIS and mapping systems.
Financial Analyst Each position shall be filled by someone with a BA/BS or MA/MS degree. This position shall be filled by someone with 3-10 years of relevant experience in the areas of utility systems to conduct quantitative analyses and Life Cycle Costing of information affecting utilities investment programs.
Cost Estimator Each position shall be filled by someone with a BA/BS or MA/MS degree. This position shall be filled by someone with 3-10 years of relevant experience in the areas of utility systems to prepare cost estimates for construction projects or services to aid management in bidding on or determining price of product or service.
Technical Safety Course Developer This position requires someone with a minimum of an Associate’s degree, a current licensed master electrician (any US State or territory), and other professional certifications typically recognized for proficiency in the subject considered for provided training. Experience should indicate at least 10 years in utility system operations, 5 years as a trainer, and 5 years of maintenance experience on High Voltage equipment.
Technical Instructor This position requires someone with a minimum of an Associate’s degree, a current licensed master electrician (any US State or territory), and other professional certifications typically recognized for proficiency in the subject considered for provided training. Experience should indicate at least 10 years in utility system operations, 5 years as a trainer or training assistant, and 2 years of maintenance experience on High Voltage equipment.
2.6 Travel
Performance under this contract may require travel by contractor personnel. The Government will negotiate a firm fixed price with the Contractor on each individual task order for all allowable, allocable, and reasonable travel costs incurred by the contractor in performance of the task order in accordance with FAR Subpart 31.2 and the rules and definitions set forth for relocation, temporary duty and local travel in the Joint Travel Regulations (JTR), but not to exceed the amounts authorized in the JTR. If travel is required, the contractor is responsible for making all needed arrangements for personnel.
3 Performance Requirements
This section specifies the requirements for this effort.
3.1 Safety
Contractor Compliance: The contractor and its subcontractors shall comply with Public Law 91-596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E) and pertinent sections of the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual EM 385-1-1. These requirements shall be incorporated into the contractor’s safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation shall participate in the local VPP activities where applicable. Information on VPP is available at https://www.osha.gov/dcsp/vpp/index.html. The Contractor shall develop and implement an overarching Accident Prevention Plan (APP). The APP shall follow the format and include all elements addressed in Appendix A of EM 385-1-1. The Contractor shall submit an APP for acceptance per Section F. The Contractor shall not commence work until the APP has been accepted and no activity shall be started on site until the applicable Activity Hazard Analyses (AHAs) (if applicable and on a per task order basis) have been accepted. Once accepted, the APP and attachments will be enforced as part of the contract.
Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly notify and provide an investigation report following USACE EM 385-1-1 criteria to record pertinent facts regarding mishaps involving contractor employees, government property damage or injury to Government personnel that occur on Navy property which is associated with contract execution and to cooperate in any resulting DoD safety investigation. The contractor shall notify (via telephone) the appropriate contracting officer, the contracting officer’s representative (COR), and/or other applicable members within four (4) hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety office.
Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the appropriate contracting officer, the contracting officer’s representative, and/or the appropriate program manager the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government also investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.
3.2 Government Furnished Materials
Government furnished materials may be provided on individual task orders.
3.3 Quality
This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.
3.3.1 Quality Control
The Contractor shall develop an overarching Contract Quality Control Plan (QCP) and submit it to the COR for review/approval within 15 calendar days from date of contract award. As necessary, Task/Delivery Order QCPs shall be developed to ensure that the Contractor maintains an effective quality control program to ensure services are performed in accordance with the IDIQ contract and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which they assure that there work complies with the requirement of the contract.
The finalized QCP will be accepted by the Government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."
3.3.2 Quality Assurance Surveillance Plan (QASP)
The Government shall monitor the Contractors performance under Task/Delivery Orders in accordance with the Government’s QASP
4. Deliverables
Refer to Section F for a list of deliverables concerning the IDIQ contract. The contractor shall also provide deliverables as described in subsequent task orders. Deliverables shall be specified by the government.
Format and delivery schedule for deliverables shall be specified in the individual task orders.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
L.1 SUBMITTING YOUR PROPOSAL
Offerors shall utilize the Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE) when submitting proposals.
The signature of the Offeror provided in Box 17 of the SF33 agrees, if this offer is accepted within 180 calendar days from the date of receipt of offers specified as the due date in Box 9 of the SF33 or any extended due date, to furnish any or all items upon which the prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
Proposals must be received within the PIEE Solicitation Module no later than the date and time identified in block 9 on the SF33.
L.2 PRE-AWARD INQUIRIES/REQUEST FOR PROPOSALS (RFP) INFORMATION /
CLARIFICATIONS / QUESTIONS
Submit all questions via one document using Attachment J-4, Pre-award Inquiry Form, by email to Jamie Oyelowo, jamie.l.oyelowo.civ@us.navy.mil, no later than 2:00 p.m. EST on 31 January 2025. The Government will not accept pre-proposal inquiries submitted after 2:00 p.m. EST on 31 January 2025.
The Government is under no obligation to respond to pre-proposal inquiries. As such, submission of pre-proposal inquiries as outlined in section L.2 does not guarantee that the pre-proposal inquiries will be answered.
Contractors are required to review the entire solicitation package before submitting questions. Contractors should ensure that any pre-proposal inquiries are necessary for proposal development in accordance with the solicitation.
L.3 REQUEST FOR PROPOSAL (RFP) FILES
Solicitation N6247024R0053 will be posted to the Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE) website. By necessity, these files are protected to prevent unauthorized editing. It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from the Solicitation Module in the PIEE Website.
L.4 GENERAL PROPOSAL REQUIREMENTS
Offerors will submit their proposals and all other requested information to the Solicitation Module in the PIEE website.
Elaborate brochures or other presentations beyond that sufficient to present a complete and effective proposal are not desired. Organization, clarity, accuracy of information, and completeness are desired.
L.5 EVALUATION FACTORS
1. The solicitation requires the evaluation of price and the following non-price factors.
Factor 1 – Corporate Experience Factor 2 – Technical/Management Approach Factor 3 – Safety Factor 4 – Small Business Utilization Factor 5 – Past Performance on Recent, Relevant Projects
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-price evaluation is the technical factors, Factors 1,2,3, 4, are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor, Factor 5. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price (Volume I):
(1) Solicitation Submittal Requirements: Submit one (1) electronic copy of the price proposal via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. The price proposal electronic copies shall be submitted to the “Volume I: Price Proposal” within the PIEE Solicitation Module Offer Template Tab. The price proposal electronic copies shall be submitted in Adobe Portable Document Format (PDF) and Microsoft (MS) Excel format, and shall be Microsoft Office Version 2016 compatible with a font no smaller than 11 point. Price proposals shall include a separate tab for each item specified below.
Tab A. Identify the Company profile to include, the Offeror’s name, address, names of two (2) points of contact (including title, phone number and email address), the Unique Entity Identifier (UEI) and CAGE code;
Tab B. Completed and signed Standard Form 33 (SF-33)
Tab C. Acknowledgement of all solicitation amendment(s) (SF-30’s) related to this RFP.
Tab D. CONTRACTOR PROPOSAL CERTIFICATION ____________________________________________ (Name of Offeror) warrants that its proposal _____________________________ (of date or other identifier) incorporated herein by reference, including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during the execution thereof. The contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objectives.
Tab E. Representations and Certifications (ref: https://www.sam.gov).
Tab F. Any offeror proposing as a partnership, joint venture, other teaming arrangement, or resource of a parent company/subsidiary/affiliate shall submit the following information:
(i.) Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, UEI, and CAGE Code.
(ii.) Submit signed letters of commitment from the team members. The commitment letter shall clearly identify the expected relationship, role and responsibility of the team member.
(iii.) If proposing as a Joint Venture, submit a signed copy of the Joint Venture Agreement.
When proposing as a joint venture, all members of the joint venture shall sign the SF33 unless a written agreement by the joint venture is furnished with the proposal designating that one firm with the authority to bind the other member(s) of the joint venture. If the joint venture is subject to the SBA Mentor-Protégé Program, a copy of the SBA approval of the joint venture arrangement shall be included. In addition, Joint Ventures shall specify if they are populated or unpopulated. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
TAB G. Completed Attachment J-3- Schedule for the base and all option years in U.S. Dollars:
Note: Firm fixed-price task orders will be negotiated for the services required under this contract using the fully burdened labor rates and percent mark-ups for travel and other direct costs proposed under Attachment J-3 Schedule, for the base year and each option year (if exercised). However, the quantities listed in Attachment J-3 Schedule are estimates only and will not be ordered with the award of the basic contract. Actual quantities ordered over the duration of the contract are expected to vary and are not limited to those estimated in Attachment J-3 Schedule and shall not exceed the total contract not-to-exceed amount of $90,000,000.00 (base period and all option years).
Attachment J-3 Schedule shall be completed as follows (items a-e):
a. Offerors shall enter unit prices, percent mark-ups, extended prices and total amounts as indicated on Attachment J-3 Schedule of Services, for the base period and all option years. All labor rates and extended prices shall be rounded to two (2) decimal places and the rounded prices will be used for evaluation purposes.
b. In the event there is a difference between a labor rate and the extended total amount (i.e. Hourly labor rate x estimated hours = extended total) the labor rate will be held to be the intended offer and the extended price and total price will be recomputed accordingly. If the offeror provides a total amount for a labor category(s) listed in Attachment J-3 Schedule of Services, but fails to enter the unit price, the extended price divided by the estimated labor hours will be held to the intended unit price or labor rate.
c. Proposed burdened labor rates shall reflect composite fully burdened hourly labor rates for prime/Joint Venture contractor, as applicable, performing work under the contract. Burdened hourly labor rates shall include the following costs: direct labor, fringe benefits, overhead, phone service (cellular and landline), all computer charges for computer workstations and laptops including standard software packages, general and administrative costs, and profit.
Additionally, administrative costs for contract management, invoicing and other task order administrative tasks will not be separately negotiated, and shall be incorporated in the indirect costs included in the fully burdened hourly labor rates. Additional burdened labor classifications for the prime/JV will not be added to the contract or negotiated under individual task orders.
d. Applicable travel costs will be negotiated under individual task orders. Travel, subsistence and per diem costs negotiated under task orders shall be in compliance with current Joint Travel Regulation rates. The estimated travel costs listed in Attachment J-3 are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. The prime/JV travel costs will be multiplied by the percentage shown on the schedule for direct costs and profit applied to travel. The multiplier percentage proposed shall include all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to travel. No additional indirect costs or profit will be applied to the prime contractor’s travel except as included in the multiplier percentage listed in the Attachment J-3 Schedule.
e. Supplies/equipment/other direct costs will be negotiated under individual task orders. The estimated supplies/equipment/other direct costs listed in Attachment J-3- Schedule are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. These costs include, but are not limited, to equipment, supplies, material, reproduction, and shipping. The prime/JV/subcontractor “other direct costs” will be multiplied by the percentage shown on the schedule for indirect costs and profit applied to “other direct costs.” The multiplier percentage proposed shall include all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to “other direct costs.” No additional indirect costs or profit will be applied to the prime contractor’s “other direct costs’ except as included in the multiplier percentage listed in the schedule.
f. Subcontractor costs will be negotiated under individual task orders. The estimated subcontractor costs listed in Attachment J-3 are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. The prime/joint venture subcontractor costs will be multiplied by the percentage shown on the schedule for indirect costs and profit applied to subcontractor costs. The multiplier percentage includes all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to subcontractor costs. No additional indirect costs or profit will be applied to the prime contractor’s subcontractor costs, except as included in the multiplier percentage listed in the schedule.
Tab H. Please submit the below items (a through c) with your price proposal in a separate file. Although this information is required to be submitted with your firm’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. In order to be eligible for award, your firm must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards.
a. Provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or at least by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements submit the latest three complete fiscal year financial statements for each Joint Venture company and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
b. One (1) signed Bank Reference demonstrating adequate financial resources. If your firm has a line of credit, provide information on how many figures can your firm borrow against the line of credit (i.e. “medium 6 figures”,-exact line of credit is not required).
c. Three (3) signed credit references. Credit references must verify that your firm pays its creditors timely and in accordance with the terms negotiated with the creditor.
d. The Government may request additional information if needed to determine responsibility.
Tab I. Compensation Plan for Professional Employees. Provide a total compensation plan in accordance with FAR 52.222-46, Evaluation of Compensation for Professional Employees (FEB 1993), setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract. Advise if you have different compensation plans for various skill levels. Although this information is required to be submitted with your firm’s price proposal, this information will not be evaluated as part of the price proposal. This information will be utilized as additional basis of your responsibility determination should your firm be considered for award.
Tab J. If applicable and proposing as other than a small business, Offeror shall provide Attachment E Individual Small Business Subcontracting Plan. If you are other than a small business, submit a “Draft” Small Business Subcontracting Plan for this contract. Identify in terms of dollar value and percentage of the total acquisition, the extent of work you will perform as the prime contractor.
SMALL BUSINESS SUBCONTRACTING PLAN (Reference FAR 52.219-9 Alt II and DFARS 252.219-7003) NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting plan goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals.
SB 40%
SDB 5%
HUBZone SB 3%
WOSB 9%
SDVOSB 3%
VOSB 3%
Small businesses identified by name in offerors’ proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219- 7003(e).
(1) Non-Price Submittal Requirements: Submit one (1) electronic copy of the non-price proposal via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. The non-price proposal electronic copies shall be submitted to the “Volume II: Non-Price Proposal” within the PIEE Solicitation Module Offer Template Tab. The non-price proposal electronic copies shall be submitted in Adobe Portable Document Format (PDF). The non-price proposal shall not exceed forty (40) single-sided or twenty (20) double-sided pages with a font no smaller than 11 point. Pages exceeding this page limitation will not be evaluated.
Note: The page limit count does not include the following: Blank tab dividers, cover pages, commitment letters from team members or Joint Venture agreements, Past Performance Questionnaires (PPQs), CPARS, Attachment D – Small Business Participation Commitment Document, and Attachment E– Small Business Subcontracting Plan.
Tab A-Offerors shall include a cover page that provides: name and address of the prime contractor, UEI, Cage Code and the name, title, email, and phone number of two (2) authorized representatives.
Tab B- Any offeror proposing as a partnership, joint venture, other teaming arrangement, or resource of a parent company/subsidiary/affiliate shall submit the following information:
a. Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, UEI, and CAGE Code.
b. Submit a signed letter of commitment from the team members. The commitment letter shall clearly identify the expected relationship, role and responsibility of the team member.
c. If proposing as a Joint Venture, provide the UEI; CAGE Code and a signed copy of the Joint Venture Agreement.
Tab C- Non-Price Factors.
(1) Factor 1, Corporate Experience:
(i) Solicitation Submittal Requirements: The offeror shall provide a minimum of one (1) and a maximum of eight (8) examples of recent and relevant contract actions to be documented through use of Corporate Experience Project Data Form (Attachment J-1). Examples submitted shall be recent and relevant contract actions that were similar in size (no less than $150,000, applicable for items 1-4 only), scope, and complexity to the requirements described in the Performance Work Statement (PWS) and completed within the last seven (7) years preceding the release date of the solicitation.
For purposes of this evaluation, offerors shall submit contract actions that demonstrate each of the following areas of experience (items one (1) through five (5) below), either separately or combined as part of the same contract action:
1) At least one contract action demonstrating the ability to perform utility system risk assessments and produce recommendations that include operational, maintenance, and capital improvements.
2) At least one contract action demonstrating the ability to perform, for electricity, either (1) utility rate analysis or (2) analysis of alternatives for competitive purchase including recommendations for achieving lower or more equitable cost of service.
3) At least one contract action demonstrating the ability to perform utility management assessments and comprehensive staffing studies for public works or utilities departments.
4) At least one contract action demonstrating the ability to develop and/or execute utilities privatization programs for the Department of Defense or outsourcing of utilities functions for other public/governmental entities.
5) At least one contract action demonstrating the ability to develop and deliver technical training for utilities system management, operation, or maintenance. (NOTE: Contract actions submitted to demonstrate experience for item 5 only are exempt from the $150,000 size requirement)
If the Offeror is a Joint Venture (JV), and the JV has shared relevant experience, at least one of the relevant projects should be submitted for the JV entity. If the JV does not have shared relevant experience, relevant experience shall be submitted for each JV partner. Offerors are still limited to a total of eight (8) relevant experience examples.
For each contract action the Offerors shall complete the Corporate Experience Project Data Form included as Attachment J.1. All information shall be provided as requested on the form.
If the offeror uses affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF33) or subcontractors to demonstrate corporate experience, the offeror shall clearly demonstrate that the affiliates/subsidiaries/parent/LLC/LTD member companies or subcontractors will have meaningful involvement in the performance of this contract.
IMPORTANT: It is the offeror’s responsibility to clearly explain and demonstrate to the Government how its work experience and the experience…