This document is an amendment to a solicitation for the NAVFAC Atlantic OCONUS Aircraft Parking Apron Replacement opportunity. The amendment extends the proposal due date from July 8, 2022 to July 15, 2022. It provides responses to pre-proposal questions, revises drawings and specifications, and modifies the contract completion time from 548 days to 1100 days from notice to proceed. The amendment also includes revised price proposal forms to clarify requirements for optional items related to UXO surveys, soil removal and groundwater disposal. The solicitation is seeking offers from prime contractors and joint ventures to replace aircraft parking aprons at Naval Air Station Sigonella in Italy. The Department of the Navy, Naval Facilities Engineering Command is the contracting agency.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILCON P-118, EDI P-8A TAXIWAY & APRON UPGRADES AT NAVAL AIR STATION SIGONELLA, ITALY

PLEASE SEE SF-30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247021R0007

X 9B. DATED (SEE ITEM 11)

12-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jun-2022

CODE

COMNAVFACSYSCOM ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247021R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

The purpose of this amendment is to provide the following:

1. Extend the proposal due date

2. Pre-Proposal Inquiries (PPIs) responses

3. Revised Drawings and Specifications

4. Revise Solicitation

5. Additional Attachments

1. The proposal due date has been extended from Friday 08 July 2022 at 2:00 PM Norfolk, VA local time to Friday 15 July 2022 at 2:00 PM Norfolk, VA local time.

2. Pre-proposal Inquiries (PPIs) Responses

Questio n No.

REFERENCE QUESTION GOVERNMENT RESPONSE

Page Section Para.

19 6 2. Basis for Award

2.18 Certificate of Classificat ion

The RFP required SOA as per 2.1.8

CERTIFICATE

OF

CLASSIFICATI

ON: SOCIETÀ

ORGANISMI DI

ATTESTAZION

E (SOA)

CERTIFICATIO

N.

The following

SOA

Certifications are required, offeror must show that the necessary Certifications are in effect as of the date proposals are due, and must be submitted with the proposal:

Societa’ Organismi d’Attestazione (S.O.A.)

(Qualifying Agencies) work categories for this project in accordance with Italian Legislative Decree 18 April 2016, n.50.

The Prevailing Work Category:

OG-3 CLASS

VII (75%)

The Secondary Work Category:

OS-23 CLASS

IV (25%),

according the

SOA

classifications and definition this category of SOA is for demolition of reinforced concrete structures, see translated

The solicitation remains unchanged.

The SOA categories provided in the RFP are correct and allows for a more competitive market without sacrificing the ability to perform the works.

references for

SOA.

OS 23:

DEMOLITION

OF WORKS

It concerns the dismantling of industrial plants and the complete demolition of buildings with special equipment or with the use of explosives, the cutting of reinforced concrete structures and demolitions in general, including the collection of waste materials, their separation and possible recycling in the component industry.

OS 26: SPECIAL

FLOORING

AND

SUPERSTRUCT

URES

It concerns the construction, maintenance or renovation of flooring made of particular materials, natural or artificial, as they are subjected to considerable loads and stresses such as, by way of example, those of the airport runways.

We believe the appropriate SOA category that shall apply is

OS26 Class IV instead of OS23 Class IV. Please verify and if confirm amend the RFP.

20 32 01 11.51 1.4.2 Grinding or Scarifying Equipment Provide equipment capable of removing surface contaminates, paint build-up, or extraneous markings from the pavement surface without leaving any residue. If a weed torch is used to remove paint, the surface must be cleaned by hydro blast afterwards to remove surface contaminates and ash. Please confirrm this requirement

The solicitation remains unchanged.

Paint removal is not required prior to demolition, but may be required for other portions of the project.

applies to this project, and shall be done before demolition of concrete

21 32 01 11.51 1.6 TEST

SECTION

Prior to the start of work, remove paint on designated test areas not less than 15 m in length. Please confirm that this requiment must be considered prior to any demolition occurs

The solicitation remains unchanged.

Paint removal is not required prior to demolition, but may be required for other portions of the project.

22 SECTION 32

13 14.13 Page

3.5.7.1 Pavement

Thickness Greater Than 300

mm. For pavement thickness of 300 mm or more, install the reinforcement steel by the strike-off method wherein a layer of concrete is deposited on the underlying material, consolidated, and struck to the indicated elevation of the steel reinforcement.

Place the reinforcement upon the pre-struck surface, followed by placement of the remaining concrete and finishing in the required manner.

Follow the design for areas to be reinforced.

When placement of the second lift causes the steel to be displaced horizontally from its original position, provide provisions for increasing the thickness of the first lift and depressing the reinforcement into the unhardened concrete to the required elevation PLease confirm that the offeror shall follow the design for the areas to be reinforced, or confirm that all concrete pavement above 300 mm thickness shall be reinforced.

23 SECTION 32

13 14.13 Page

Submit American Concrete Institute certification for Contractor Quality Control staff. Please confirm that an equivalent European qualified person can be used.

Yes, it is possible to substitute with a quality manager certified in accordance with the ISO9001.

24 32 13 14.13, 1.3.1

Qualifications and resumes for petrographer, surveyor, concrete batch plant operator, and profilograph operator. All Contractor Quality Control personnel assigned to concrete construction are

Yes, it is possible to substitute personnel with equivalent Italian qualifications in accordance with the

ISO9001.

required to be American Concrete Institute (ACI) certified in the following grade: Please confirm that the equivalent Italian qualifications will be approved.

Additionally, please provide an Italian referenced norms considering the project will be constructed in Italy.

25 32 13 14.13, 1.3.3

Provide laboratory and testing facilities.

Submit accreditation of the commercial laboratory by an independent evaluation authority, indicating conformance to ASTM C1077or Italian standards (L. 1086/71 and art. 59 DPR 380/2001), including all applicable test procedures. The laboratories performing the tests are required to be accredited in accordance with ASTM C1077, including

ASTM

C78/C78M and

ASTM C1260.

Provide current accreditation and include the required and

Refer to Section 1.3.3 of the referenced specification section.

optional test methods, as specified. Please confirm the Italian equivalent laboratory standard can be used.

26 334 32 13 14.13 1.3.1 b Paragraph requires on-site American Concrete Institute

(ACI)

Transportation Inspector will be on-site when paving operations are on-going.

Given that this project is in Italy, is this position required or can a European equivalent be proposed?

Yes, a European equivalent can be used.

27 334 32 13 14.13 1.3.1 Many of the QC staff require being certified by the American Concrete Institute. Can QC staff be certified by the European equivalent?

Yes, a European equivalent can be used.

28 334 32 13 14.13 1.3.2 c Can the requirement to have the batch plant certified by the National Ready Mix Concrete Associate be waived? Or can the plant be certified by the European equivalent?

Solicitation remains unchanged.

29 345 32 13 14.13 2.3.1.2 Are local aggregates known to exhibit

ASR?

Some aggregates in the local area have been known to exhibit ASR.

30 Solicitat ion page

00 21 00 2.2.3 Optional Performance and Payment Bonds.

Requirement listed allows for Performance and Payment Bond in which the offeror and the surety obligate themselves in the amount of 100% of the Contract Price. This requirement is non typical, since on other contracts the Bond is always listed to be in 10% value of the contract Value.

10% Performance Guarantee.

Solicitation remains unchanged.

31 Solicitat ion Page

00 21 00 2.1.8 SOA certification listed are: The Prevailing Work Category: OG-3

CLASS VII

(75%) The Secondary Work Category:

OS-23 CLASS

IV (25%) -

Considering this being an Airfield paving project it may be more appropriate to adopt OS-26 which is referred to Special Paving with High load resistance projects

Solicitation remains unchanged. The SOA categories provided in the RFP are correct and allows for a more competitive market without sacrificing the ability to perform the works.

32 Tech Specs page

32 12 16 3.6 Par 3.6 - 4th row it is listing that laboratory shall maintain the Corps Certification for the duration of the project - What is the term corps referring too?

See Amendment detail below.

33 Tech Specs page

32 14.13 1.3.3 Laboratory Accreditation and Validation: In addition to accreditation to Italian standards this paragraph is requesting to obtain USACE validation by the MTC. This is a non-standard requirement for Italy, and Laboratories are certified based on ISO and other International applicable standards.

USACE is a military organization and not applicable in Europe.

See Amendment detail below.

34 Solicitat ion page

SPECIAL

JOINT

VENTURE

(JV)

REQUIREME

NTS

4 Paragraph 4 states that "Only Offers from Prime Contractors and Joint Ventures (JV) will be accepted. Offers from Associazione Temporanea di Imprese (ATI) or Offers using a contract of availment (contratto di avvalimento) will not be accepted for this procurement and will be considered noncompliant to the solicitation requirements".

Since, in accordance with Italian regulations, a notarized ATI is

The Government has considered your question. The solicitation will remain unchanged.

in all respects a form of JV which

(i) fully complies with all requirements set forth in the Submission requirements section and (ii) has usually been accepted by the US Government in all previous similar solicitations, we request you to confirm that paragraph 2 shall be interpreted as excluding from the procurement only those ATI that have not been formally established and notarized as of the date of the proposal submission.

Should the above not be the correct interpretation, we kindly ask for additional clarifications as to why an established Associazione Temporanea di Imprese would not be an admissible form of JV.

To such respect, we would like to highlight that if we were to establish a NewCo under Italian law for the submission of the offer and performance of the work, the

NewCo would not possess the certifications required for the submission of the proposal, as they would remain with the shareholders of the NewCo. Such problem would not exist in the case of an ATI.

PLease note that this change was accepted in prior similar procurement held by NAVFAC in SIgonella for project of similar size and complexity.

35 Att E - Price Proposal Form and Health and Safety Plan

CLIN 0002 -

Option Item 1

The paragraph states: "Price to conduct survey for UXO in accordance with Health and Safety Plan (Piano Sicurezza e Coordinamento), Decree No. 81, Decree No. 82 Law No. 177. and GEN-BST 001 in areas where the site improvements occur and below existing grade, and locations where construction equipment (such as, but not limited to excavators, dump trucks, grader) are operating.

Minimum depth of survey must be

Procedures for UXO clearance must be reviewed and approved by the 10th reparto using approved scanning technique for each phase of the construction.

1m below utility location or site improvement."

The health and Safety plan at section 6.1.2 states that a geophysical survey is required for the areas subject to pavement replacement and excavation for new drainage piping and the results of the survey will determine the need for UXO survey.

Based on experience working in the area and on the same type of pavement, we anticipate encountering welded wire mesh reinforcement in the concrete pavement. this is not liklely going to allow reliable results form a georadar survey for the identification of buried metallic bodies. We request clarification on which type of geophysical survey should be executed in order to obtain reliable results to determine the need for an UXO survey. Please clarify what are the results that will trigger the need for a complete UXO survey. In particular, if the geophysical survey shall be executed by the UXO specialized company already and the required authorizations from 10th reparto are to be obtained for the geophysical survey.

36 Att E - Price Proposal Form and Health and Safety Plan

CLIN 0002 -

Option Item 1

Based on the fact that previous construction was executed in the same area and that this project does not require any deeper excavation we request that the requirement for UXO clearance and associated surveys is removed from the Health and Safety Plan and from the option clins.

Solicitation remains unchanged.

Propose in accordance with the solicitation.

37 Att E - Price Proposal Form

CLIN 0002 -

Option Item 1

Please confirm that the price required is one lump sum price for the execution of a complete survey on all the areas listed in phases A through I. Please clarify if, in case UXO survey is needed, the approval from 10th reparto infrastrutture is to be obtained prior to starting

Procedures for UXO clearance must be reviewed and approved by the 10th reparto. CLIN 0002 Option Item 1 includes all areas listed in phases A through I.

pavement demolition for each phase.

38 Att E - Price Proposal Form

CLIN 0003 -

Option Item 2

CLIN Definition states: "removal, stockpiling, testing and off station disposal of 3,000 cubic meters of contaminated soil." in order to be able to provide a lump sum price we request these clarifications:

1. Is stockpiling going to be possible directly on the concrete pavement in the construciotn area with a plastic sheet underneath and a plastic sheet to cover it?

Assuming maximum height of 1.5 meters in the airfield area this would required 2000 sqm of storage space (40x50m).

If storage in the construciotn area will not be possible, how far is the storage location going to be? We need to be able to acccount for loading and transportaiton to the local storage area if this will be outside the construction area.

Before off site disposal temporary stockpiling will

See Attachment E – Revised Price Proposal Form be required for the period between sampling and analytical resuylts for disposal.

2. What level of soil contamination is to be considered?

Should the contaminated soil be considered Hazardous Material?

39 Att E - Price Proposal Form

CLIN 0004 -

Option Item 3

CLIN Definition states: "removal, testing and off station disposal of 160,000 liters of contaminated groundwater." in order to be able to provide a lump sum price we request these clarifications:

1. Groundwater will have to be analyzed prior to off site disposal and some time will pass between sample colleciton and analytical results. Is the Government going to pèrovide temporary storage for the grounwater?

Should this be included in the price provided?

2. What level of groundwater contamination is to be considered?

Should the contaminated groundwater be considered Hazardous Material?

See Attachment E - Revised Price Proposal Form

3. Specification and Drawing Revisions:

DOCUMENT 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

3.6 TESTING LABORATORY

DELETE the word "Corps" in the 4th sentence.

DOCUMENT 32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

1.3.1 Contractor Quality Control Staff

DELETE:

Reference Section 01 45 00.00 10 QUALITY CONTROL for Contractor personnel qualification requirements. Submit American Concrete Institute certification for Contractor Quality Control staff.

Qualifications and resumes for petrographer, surveyor, concrete batch plant operator, and profilograph operator. All Contractor Quality Control personnel assigned to concrete construction are required to be American Concrete Institute (ACI) certified in the following grade:

ADD:

Reference Section 01 45 00.00 10 QUALITY CONTROL for Contractor personnel qualification requirements. Submit American Concrete Institute or equivalent ISO9000 certification for Contractor Quality Control staff. Qualifications and resumes for petrographer, surveyor, concrete batch plant operator, and profilograph operator. All Contractor Quality Control personnel assigned to concrete construction are required to be American Concrete Institute (ACI) or equivalent ISO9000 certified in the following grade:

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

On NAVFAC Dwg No. 14078988 (CS502)

DELETE: Detail D1

ADD: Detail D1 shown on Sketch SK-1

On NAVFAC Dwg Nos. 14078963 - 14078971 (C-003 – C-011)

ADD: Phasing Notes shown on Sketch SK-2.

4. Revise Solicitation

Current:

1.1.5 The contract completion time for P-118 is 548 calendar days from Notice to Proceed.

Revised:

1.1.5 The contract completion time for P-118 is 1100 calendar days from Notice to Proceed.

Current:

2.2.3 Performance Guarantee

Contract Timing: Regardless of when performance and payment bonds or the Performance Guarantee and Performance Guarantee Letter are provided, the contract time for purposes of fixing the completion date, default, and liquidated damages shall begin to run 548 days from the notice to proceed.

Revised:

2.2.3 Performance Guarantee

Contract Timing: Regardless of when performance and payment bonds or the Performance Guarantee and Performance Guarantee Letter are provided, the contract time for purposes of fixing the completion date, default, and liquidated damages shall begin to run 1100 days from the notice to proceed.

Clause Revision 52.211-10. See Amendment detail below.

5. Additional Attachments:

Attachment E – Revised Price Proposal Form Attachment M – P118 SK-1 Attachment N – P118 SK-2

**End of Amendment**

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 1100 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)