Attachment E - Revised Price Proposal Form.pdf

PDF 230 KB Posted

Attached to
NAVFAC Atlantic OCONUS Aircraft Parking Apron Replacement
Solicitation number
N6247021R0007
Issued by

About this file

This document contains a revised price proposal form and solicitation for a federal contract opportunity to replace an aircraft parking apron at a Naval facility overseas. The price proposal form requests lump sum pricing for two contract line items, with the base price for full project scope under CLIN 0001 and an optional item for conducting an unexploded ordnance survey under CLIN 0002. Award will be made on the total of CLIN 0001 and any exercised options. Pricing must remain firm for 180 days and through 1100 calendar days if options are exercised. The related solicitation was issued by the Naval Facilities Engineering Command Atlantic for OCONUS aircraft parking apron replacement under solicitation number N6247021R0007.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAS Sigonella – P118 WON1576978

Document 00 22 13.00 20 Page 1

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - BASE PRICE. Price includes the following:

Price for the entire work in accordance with the drawings and specifications.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN

0001 Full Project Scope - P118 EDI P‐8A Taxiway & Apron Upgrades

Naval Air Station Sigonella

Sigonella, Italy

CLIN 0002. Option Item No. 1 - Price includes the following:

Price to conduct survey for UXO in accordance with Health and Safety Plan

(Piano Sicurezza e Coordinamento), Decree No. 81, Decree No. 82 Law No. 177.

and GEN-BST 001 in areas where the site improvements occur and below existing grade, and locations where construction equipment (such as, but not limited to excavators, dump trucks, grader) are operating. Minimum depth of survey must be 1m below utility location or site improvement. UXO surveying will consider the construction / ground improvement schedule. Refer to GEN-

BST 001 for anticipated surveying requirements. UXO work plan and report finding to be coordinated with 10th Reparto Infrastructure. Price shall include fees for review and approval by the 10th Reparto Infrastructure.

CLIN DESCRIPTION TOTAL PRICE OF

CLIN

0002 Conduct UXO Survey

NAS Sigonella – P118 WON1576978

Document 00 22 13.00 20 Page 2

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Item(s) 0001, and

0002.

b. The Government reserves the unilateral right to award CLIN 0002 to the

Contractor at the proposed price within 180 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, and CLIN 0002. No provision is made for economic price adjustment. If options are exercised, the contract completion date remains 1100 calendar days.

c. Evaluation of Options (JUL 1990). The Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).

d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the quantities.

An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

e. If CLIN 0002 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

f. Offerors must submit their bid in U.S. Dollars. Contract award and payment will be made in U.S. Dollars.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Document --