This amendment to a solicitation provides revisions to requirements for a federal contract opportunity issued by the Naval Facilities Engineering Command to replace an aircraft parking apron at Naval Air Station Sigonella in Italy. Key details include extending the proposal due date from June 24 to July 8, 2022 at 2:00 PM local time in Norfolk, Virginia in response to offeror questions. The amendment also removes the requirement for a design quality control manager from the required project organizational chart and answers additional offeror questions received to clarify technical requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILCON P-118, EDI P-8A TAXIWAY & APRON UPGRADES AT NAVAL AIR STATION SIGONELLA, ITALY
PLEASE SEE SF-30 BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247021R0007
X 9B. DATED (SEE ITEM 11)
12-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jun-2022
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247021R0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to provide the following:
1. Extend the proposal due date
2. Pre-Proposal Inquiries (PPIs) responses
3. Solicitation Revisions
1. The proposal due date has been extended from Friday 24 June at 2:00 PM Norfolk, VA local time to Friday 08 July 2022 at 2:00 PM Norfolk, VA local time.
2. Pre-proposal Inquiries (PPIs) Responses
Question No.
REFERENCE QUESTION GOVERNMENT
RESPONSE Page Section Para.
2 In reference to RFP the required prevailing category of SOA is OG 3 Class VII, which means that the threshold of the works is up to Euro 15M according to SOA thresholds.
Factor 1 Corporate experience, to evaluate a relevant project is further defined as new construction or full depth reconstruction of an aircraft parking apron with a minimum area of three-thousand (3,000) square meters (SM), constructed of concrete However, the evaluation criteria does not specify a
FACTOR 1 will remain unchanged.
minimum project size (value) for factor 1 project to be considered relevant.
This is a risk to the Government as the defined 3,000 square meters of Apron is not similar in size or complexity to the proposed work. Will the Government add a new evaluation criteria such that all projects presented in Factor 1 shall be a minimum of 10M Euro final cost for aircraft parking apron work, that will be in the best interest of the Government and to allow a fair competition.
3 14 Factor 3 Factor 3 of solicitation requires to include a Project organizational chart that lists the key positions (Project Manager, Site Safety & Health Officer, Design QCM, Construction QCM, Superintendent, and subcontractors).
Since this is not a design-build project we believe Design QCM shall not be required. Please confirm or advise if shall be considered
See amendment detail below.
4 Is the Government open to the use of alternative access to the site to benefit the Government?
The Government will consider alternative proposed access points. Such points must be coordinated with the Contracting Officer and Airfield Mgr.
5 Will the Government provide an extension of the due date by one week to allow time to properly address all technical pending questions and submit a fair and reasonable price and compliant technical proposal?
See Amendment detail above extending the proposal due date.
6 In reference to the site supervision, please clarify and confirm that they shall be directly hired by offerors not from subcontractors, to ensure proper control and quality.
See Specification
SECTION 01 30 00
ADMINISTRATIVE
REQUIREMENTS.
Additional qualifications will not be added.
7 SECTION 01 31
23.13 20
1.4.3 Field
Administration:
Within 30 days of Contract Award, provide a tablet computer with a Common Access Card (CAC) reader at the job site for Government use only. The tablet computer must have a web browser, built-in camera, and cellular data connectivity. Provide a tablet computer with a rugged case suitable for use in a construction environment. The tablet computer must be fully charged and made available at all times for Government use to facilitate the input of construction data at the job site. After completion of the work, reset the tablet computer to factory default settings. The tablet computer
Specification Section 01 31 23.13 20 will remains the property of the Contractor and must be removed from the site. There are restrictions on use of WIFI on military bases.
Cellular data connectivity and availability, and use of WIFI requires coordination with and approval by the Contracting Officer.
Please confirm this requirement applies to this project, since this is the first time we see this requirement
8 Please provide a basis of design, so we can verify the calculations performed and the design selection. This document shall be part of the RFP package
Basis of Design will not be provided during the solicitation phase.
9 Reviewing the provided drawings we observed they are not stamped and sealed in all pages.
Please confirm the provided design is the approved final verison of design.
The drawings provided via the solicitation notice are the approved final drawings.
10 11 3.2.1 a Factor 1- For the purpose of this evaluation, the 3,000 square meter threshold for new construction or full-depth reconstruction of an aircraft parking apron is significantly lower than the proposed work and we believe it does not demonstrate relevancy in terms of size and complexity.
Will the Government
FACTOR 1 will increase the minimum threshold from 3 ,000 squre meters to 10,000 square meters?
11 Are water and power available to the contractor?
See Specification
SECTION 01 50 00
TEMPORARY
CONSTRUCTION
FACILITIES AND
CONTROLS 3.3
AVAILABILITY
AND USE OF
UTILITY SERVICES
12 Can contractor invoice for materials on-site if item is shown on cost loaded schedule? This is of critical importance given current market conditions and pricing fluctuations.
See Specification
SECTION 01 20
00.00 20 PRICE AND
PAYMENT
PROCEDURES 1.6.2
Payment for Onsite and Offsite Materials
13 Solicitation
00 21 00 2.1.8 Requirement listed:
In the case of a JV, all members of the JOV must have the SOA Certifications.
The leading member of the JV muyst have the SOA Certification for the Prevailing Work Category - Question:
Is it allowed to have JV members with SOA certification compositely qualify for QG-3 Class VII.
i.e. , cumulatively reach the Class VII adding up their individual classification for the same category?
The leading member of the JV must have the SOA certification in the Prevailing Work Category. A Horizontal Joint- Venture, where companies can compositely qualify, is not permitted.
14 Solicitation
00 21 00 2.1.8 Secondary Work Category OS-23 Class IV (25%). For companies qualified in the Prevailing Work Category but not qualified in the Minor Work
In the case of a JV, all members of the JV must have the SOA certifications. A Horizontal Joint- Venture, where companies can
Category and pertinent Classification it is allowed to subcontract of form Joint Venture with other company detaining this classification.
Question: If the subcontract or teaming agreement can be made with 2 or more companies holding the SOA OS-23 classification with Class less than IV, i.e summary of the subcontractor's certification to add up to Class IV.
compositely qualify, is not permitted.
15 Solicitation page 18 of
SPECIAL JOINT
VENTURE (JV)
REQUIREMENTS
2 and 3 The paragraphs state:
THE JOINT
VENTURE MUST
PROVIDE ONE (1)
CAGE CODE FOR
THE JOINT
VENTURE ITSELF,
ONE (1) UEI
NUMBER FOR THE
JOINT VENTURE
ITSELF, AND ONE
(1) UEI NUMBER
FOR EACH
MEMBER
COMPRISING THE
JOINT VENTURE.
THE JOINT
VENTURE MUST
BE REGISTERED
IN THE SYSTEM
FOR AWARD
MANAGEMENT
(SAM) USING THE
NAME OF THE
JOINT VENTURE.
JV offerors shall provide with their proposal a notarized legal document that establishes the JV.
The JV Agreement shall take effect upon the submission of the proposal and remain
See Amendment detail above extending proposal due date.
irrevocable until one
(1) year after the work has been finally inspected and accepted by the Government.
Submission of the notarized legal document that establishes the JV shall be furnished with the price proposal in its original language version along with a certified English translation of the notarized JV. The Joint Venture must be formed and valid at the time of submission of the proposal. The validated notarized legal document must include language that each member of the JV will be jointly and severally liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the
JV.
Based on the above and the timeframe required for the preparation and notarization of JV agreement and the timeframe required for the obtainment of Cage code for the Joint Venture, that can be requested only after JV is formed and notarized, we request an extension of the proposal due date of three weeks
16 Solicitation page 7 of
2.1.8 2 Paragraph states:"In the case of a JV, all members of the JV must have the SOA certifications. The leading member of the JV must have the SOA certification in the Prevailing Work Category."
The purpose of a JV is to bring together different expertise in order to form the best team to respond to project needs. We think that it is of advantage to the Government to remove this requirement in order to allow the inclusion in the JV of a larger range of players such as Engineering and Project Management companies, US companies with large experience working for the US DoD, specialized consultants that support the creation of the most effective project team. We respectfully request this requirement to be removed from the Solicitation, given the Best Value nature of the RFP and the statements in the other paragraphs of section 2
The Government has considered your question. Solicitation will remain unchanged.
17 Solicitation page 5 of
1.1.5 1 Paragraph states: " The contract Completion Time fo P-118 is 548 calendar days from Notice to Proceed". Please clarify if with Notice to Proceed it is intended Contract award or the Notice
Notice to proceed will be granted by the Local Sigonella Contracting Officer after required submittals have been satisfied.
to proceed released after Pre-construciton meeting and approval of all project plans.
18 Solicitation page 11 of
3.2.1; Factor 1 1 Paragraph states " ...To be considered, projects submitted for the offeror must have been completed within the past ten
(10) years from the date of issuance of this RFP...". In order to allow a more thorough representation of Corporate experience with regards to the specific definition of "relevant projects" we request the possibility to also submit projects that are over 70% complete with preliminary CPARS rating released by the Goverment and for which the Aircraft Parking Apron Pavement portion is already completed.
The Government has considered your question. Solicitation will remain unchanged.
3. Solicitation Revisions:
CURRENT:
Factor 3 – Technical Solution:
(a) Solicitation Submittal Requirements:
Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. Include the following:
Summary of the technical approach, including the means/methods, material and tools to be utilized to complete the work; mitigation plans for anticipated problems, logistical challenges and site constraints.
A Project organizational chart that lists the key positions (Project Manager, Site Safety & Health Officer, Design QCM, Construction QCM, Superintendent, and subcontractors). The organizational chart shall clearly identify the lines of authority between the entities. If the experience of a significant subcontractor is being claimed in Factor 1, the firm must be named in the above narrative and organizational chart.
Provide a project schedule with a Gantt chart. Include the contract duration, and all major aspects of construction project. The contract timeframe identified in the RFP defines the acceptable contract duration; a shorter contract duration is desirable. The Government will evaluate a comparison of the contractor’s proposed contract duration and the acceptable contract duration. The Government’s evaluation of the contractor’s proposed schedule is a means of determining whether the contractor understands the scope of work and approaches the tasks in a logical and effective manner. Provide a narrative that explains the proposed contract duration, scheduling innovations and methods to provide a shorter contract duration.
Narrative shall not exceed five (5) double-sided pages (or ten (10) single-sided pages). In addition, provide one single-sided schedule Gantt chart to graphically present the contract duration. The Gantt chart may be on a single 11x17 or A3 page that will not count against the page limitation for the narrative.
(b) Basis of Evaluation:
The Government will evaluate the narrative and schedule considering the extent to which the Offeror demonstrates a clear understanding of the engineering requirements of the project. The Government will evaluate the offeror’s technical solution to determine adherence to the technical requirements of the RFP, including adherence to the provided schedule milestones.
REVISED TO:
Factor 3 – Technical Solution:
(a) Solicitation Submittal Requirements:
Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. Include the following:
Summary of the technical approach, including the means/methods, material and tools to be utilized to complete the work; mitigation plans for anticipated problems, logistical challenges and site constraints.
A Project organizational chart that lists the key positions (Project Manager, Site Safety & Health Officer, Construction QCM, Superintendent, and subcontractors). The organizational chart shall clearly identify the lines of authority between the entities. If the experience of a significant subcontractor is being claimed in Factor 1, the firm must be named in the above narrative and organizational chart.
Provide a project schedule with a Gantt chart. Include the contract duration, and all major aspects of construction project. The contract timeframe identified in the RFP defines the acceptable contract duration; a shorter contract duration is desirable. The Government will evaluate a comparison of the contractor’s proposed contract duration and the acceptable contract duration. The Government’s evaluation of the contractor’s proposed schedule is a means of determining whether the contractor understands the scope of work and approaches the tasks in a logical and effective manner. Provide a narrative that explains the proposed contract duration, scheduling innovations and methods to provide a shorter contract duration.
Narrative shall not exceed five (5) double-sided pages (or ten (10) single-sided pages). In addition, provide one single-sided schedule Gantt chart to graphically present the contract duration. The Gantt chart may be on a single 11x17 or A3 page that will not count against the page limitation for the narrative.
(b) Basis of Evaluation:
The Government will evaluate the narrative and schedule considering the extent to which the Offeror demonstrates a clear understanding of the engineering requirements of the project. The Government will evaluate the offeror’s technical solution to determine adherence to the technical requirements of the RFP, including adherence to the provided schedule milestones.
**END OF AMENDMENT**