This document contains an amendment to a solicitation for the construction of P130 Communications Station at Naval Air Station Sigonella in Italy.
The amendment provides responses to pre-proposal inquiries, revises specifications and the CLIN structure. It changes the descriptions for CLIN 0001 to focus on constructing P130 Communications Center, CLIN 0002 to address demolition of various buildings, and CLIN 0003 to procure and install furniture, fixtures and equipment. The amendment also adds CLIN 0004 for providing audio/visual work. The proposal due date remains August 11, 2020. The Navy's Naval Facilities Engineering Command is the issuing agency.
The amendment addresses questions on technical documentation, confirms association temporary enterprises can submit offers, and clarifies requirements for various aspects of the project scope. It revises specifications and attachments, including a new Schedule B price proposal form. The period of performance is 1,710 calendar days from notice to proceed.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILCON PROJECT P130, COMMUNICATIONS STATION, NAVAL AIR STATION SIGONELLA, ITALY
The proposal due date is August 11, 2020 @ 2:00 PM (EDT) and remains unchanged.
PLEASE SEE SF-30 BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247020R4003
X 9B. DATED (SEE ITEM 11)
06-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2020
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247020R4003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is for the following:
1. Pre-Proposal Inquires (PPIs) Responses
2. Solicitation Revisions (Clauses/CLIN structure)
3. RFP Revisions
4. Revised Schedule B Price Proposal Form dated: 07242020
5. Attachments
1. Pre-Proposal Inquiry (PPI) Responses:
PPI
REFERENCE
QUESTION GOVERNMENT RESPONSE
Page Section Para.
1 RFP page 20 of 56 002100
Instructions to bidders
4.3
Pre-proposal inquiries are due no later than 15 business day before the solicitation closing date.
Considering that a site visit has not been planned yet, we would respectfully request that PPIs be due at least 10 calendar days after the site visit.
A formal site visit will not be scheduled for this solicitation.
Review the solicitation, respective amendments, RFP specs, drawings, and photos then submit proposal package accordingly.
2 RFP page 17 of 56 002100
Instructions to bidders
4.2
Proposal Submission Instructions request that proposals be = delivered in paper. We would like the Government to consider that in this period of COVID emergency courier deliveries are unreliable and take longer that usual. I.e. to send a parcel from Europe to Norfolk it takes a minimum of 4 working days. For this reason we would respectfully request the Government to consider
Deliveries of proposals shall follow instructions provided in the original solicitation as amended by subsequent amendments.
accepting electronic delivery of proposals either via e-mail or via secured websites (such as AMRDEC or similar, we know that USACE uses these safe transmission methods).
3 RFP page 17 of 56 002100
Instructions to bidders
4.2
Proposal Submission Instructions request that proposals be delivered in paper. If this requirement is not changed, we would like to know if packages to the Mail Room can be delivered also during Saturday and Sunday, what are the Mail Room openin hours and if please there is a number that can be given to the courier to call in case of need. We anticipate that due to COVID restrictions physical delivery might cause some problems, as we have recently experienced.
Comply per RFP requirements.
4 RFP page 20 of 56 002100
Instructions to bidders
4.3
If the delivery methodology is not changed (i.e. if proposals are still requested to be sent in paper format) we would kindly request the Government to reply to PPIs or issue amendments not later than 7 calendar days before the deadline of proposals. This request is made because we need to consider 7 calendar days to actually mail the package, and therefore would not be able to handle "last-minute" amendments. We apologize for the inconvenience and hope that you will understand the rationale for our request.
The Government does not intend to change proposal delivery instructions at this time. Deliveries of proposals shall follow instructions provided in the original solicitation as amended by subsequent amendments.
5 RFP page 17 of 56 002100
Instructions to bidders
4.2
Proposal Submission Instructions: We kindly ask if you can provide to the bidders the Bill of quantities in order to quickly evaluate the Project elements.
A Bill of Quantities will not be provided.
6 RFP page 17 of 56 002100
Instructions to bidders
4.2
Proposal Submission Instructions : We have found some references for vendors within the technical documentation, and also some indications relating not allowed suppliers. We kindly ask if it’s possible to have a complete Vendor list for the main item to be provided.
A vendor list will not be provided. Please submit specific questions related to the technical documentation.
7 RFP page 5 of 56 002100
Instructions to bidders
Instructuions to Bidders - Table of Contents - Attachments:
We have read that it should exist a “Schedule B Price proposal form (Attachment E)”, that we have not found in the documentation received.
Can you please clarify?
Attachment E: Schedule B Price Proposal Form was provided in Amendment 0001. See also Amendment 0002 for revised Attachment E: Price Proposal Form.
8 RFP page 17 of 56 002100
Instructions to bidders
4.2
Proposal Submission Instructions: In the Bid documentation we have received many drawings provided as pdf files: can you please provide the bidders with the relevant files in dwg format?
DWG files will not be provided during the solicitation process.
9 RFP page 17 of 56 002100
Instructions to bidders
4.2
Proposal Submission Instructions: Can you please confirm if the active network elements must be provided?
Please clarify this question.
Please submit specific questions related to the technical documentation.
10 RFP page 20 of 56 002100
Instructions to bidders
4.3
Pre-proposal inquires:
In order to be able to prepare an economically advantageous offer, we need an extension: for instance it should be not easy to receive quotations from some vendors in short time;
since the bid closing date is in a period when many industry are closed for holiday we need an extension of at least a month and a half.
Comply with RFP requirements. Proposal due date is 11 August 2020 and remains unchanged.
11 19 Section 00
21 00 - Instructions
4.2.1
Please confirm that an ATI (Associazione Temporanea di Imprese), incorporated under and in compliance with the Italian law - including what is stated in the following paragraphs (letters a, b, c, d) - is admitted to submit an offer for this solicitation:
a. The ATI must be already established by means of a notarized agreement before submitting an offer for this solicitation and this agreement shall be submitted along with the proposal;
b. all members of the said ATI must grant a special, collective and irrevocable mandate with powers of representation
ATI's will be permitted per RFP requirements.
to the Leader, which will be duly vested with the authority to legally bind all members and will be the sole representative in dealing with the client for all matters regarding the contract;
c. what is stated under letter b) above must be provided for in the said notarized agreement;
d. in order to be admitted to submit an offer for this solicitation, it is sufficient that only the members of the ATI should have a DUNS Number and a CAGE Code.
12 12 Section 00
21 00 - Instructions
3.2.1
Please confirm that, with reference to Factor 1 – Corporate Experience and Factor 3 – Past Performance, if the ATI does not have shared relevant experience, projects submitted for a single ATI member will be rated as favorably as projects completed by the ATI/JV entity.
Per Solicitation Page 19 of 56:
Associazione Temporanea d'Imprese (ATI) will be considered a Joint Venture (JV) for the purposes of evaluation and will be subject to the same requirements as of the Joint Ventures (JV).
SF1442-BLOCK 13A. A
due date on 11th August has been stated.
Considering the technological complexity and specific size of the project and considering that the lockdown period has been closely completed, we request to provide a 1 month extension of the deadline in order to allow us to provide a proper technical and commercial proposal
Comply with RFP requirements. Proposal due date is 11August 2020 and remains unchanged.
Attachment G -
WO799152_spc_01of04 pag 481
02 41 00
PAG 13
3.3.3.
C
DEMOLITION AND
DECONSTRUCTION
When the area of the building 585 is demolished, should the antenna on the floor which points to Monte Lauro, Niscemi, be integrally recovered?
Should the optical cables be kept for future use or be removed?
Please refer to Civil Demolition (CD) and Telecommunication Site (TS) drawings.
Attachment G -
WO799152_spc_01of04 pag 481
02 41 00
PAG 13
3.3.3.
C
DEMOLITION AND
DECONSTRUCTION
When the area of the building 585 is demolished, should the optical cables be kept for future use or be removed?
Refer to TS107 for existing cabling splicing.
Attachment G -
WO799152_spc_03of04 25 08 10
ELECTRICITY
METERING
For the monitoring system, should electronic equipment to connect to the network of central control be provided?
As specified, the ION smart meter has to have a module able to be connected to the base monitoring network.
Attachment G -
WO799152_spc_03of04 25 08 10
ELECTRICITY
METERING
For the monitoring system, should the equipment be DoDIN Approved Product List (APL) approved?
Install specified meter.
Attachment G -
WO799152_spc_04of04 26 31 00
SOLAR
PHOTOVOLTAIC (PV)
COMPONENTS
For the monitoring system, should electronic
There is just a meter at the panelboard. No networking.
equipment to connect to the network of central control be provided?
Attachment G -
26 31 00
SOLAR
PHOTOVOLTAIC (PV)
COMPONENTS
For the monitoring system, should the equipment be DoDIN Approved Product List (APL) approved?
This is Not Applicable.
Attachment G -
28 10 05
ELECTRONIC
SECURITY SYSTEMS
(ESS)
Should the electronic equipment for the ESS be provided?
ESS equipment is provided by the government.
Attachment G -
33 82 00
TELECOMMUNICATI
ONS OUTSIDE PLANT
(OSP)
Some of the cables have to enter and exit various buildings. According to the Drawing TS601, for example, Cable 2 will start from P130 and end in Building 465. Should the cable enter and exit every building with the same amount of fibers?
No. In your example, cable 10 is brought to Bldg. 452. All other cables continue on through ductbank without entering.
OPEN QUESTION:
In the Drawing TS601 it’s stated:
PROVIDE FOR
EXTENDING ALL
EXISTING CIRCUITS
FROM BUILDING 585
TO P-130 NECESSARY
FOR OPERATION
How many circuits should be extended to P130?
What is the amount of fibers to bring to P130?
In which room should the the cable end?
Will the service be interrupted when the circuit is to be extended?
If yes, for how long will the service be interrupted?
The amount of OSP fiber is indicated on TS601. Riser diagram is shown on TN603.
P130 should be fully operational before 585 is demolished. No interruption of service is planned.
In the project, it is not mentioned a Rectfire 48V with batteries to feed equipment SDH, SWDM and microwave which are present in Building 585. Are these to be provided/necessary?
Also, copper cables are not indicated in the project. How will the DSN telephones work?
The Microwave existing at Building 585 which connects NAS2 to Niscemi will be installed in the new building. Is there an existing truss to connect the Antenna?
No copper will come into building. All phones are VOIP.
Antenna supports are on roof.
This building has two independent and redundant UPS systems, plus redundant generators. The 48V batteries were determined as not needed.
In the current running projects P655 and P407, there are several fiber optic connections to the building 585. In the new P130 however, there is no evidence of these connections. Should they be provided?
No. They will be included in everything from 585 that gets extended to P130.
3. RFP Revisions:
Revise Specifications as follows:
SECTION 01 30 01.00 20 DESIGN, PROCUREMENT, AND INSTALLATION OF FURNITURE,
FIXTURES, AND EQUIPMENT
The revised specification accompanies this Amendment.
SECTION 28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
Delete specification. Not Used.
SECTION 28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
Delete specification. Not Used.
END OF CHANGES
5. Attachments (Attached Separately)
1. ATTACHMENT E: REVISED SCHEDULE B PRICE PROPOSAL FORM DATED 07242020
2. REVISED SPECIFICATION: SECTION 01 30 01.00 20 (AMENDMENT 0002)
SECTION 00 10 00 - SOLICITATION
CLIN 0001
The CLIN description has changed from P130 Communications Station, Italy to BASE PRICE: CONSTRUCT P130 Communication.
The CLIN extended description has changed from:
Price for the entire work for MILCON Project P130 Communications Station at NAS Sigonella, Italy, in accordance with specifications and drawings, but excluding work described in Contract Line Item Number (CLIN) 0002 and CLIN 0003. Work Order # 799152.
To:
Price for the entire work to construct P130 Communications Center, NAS Sigonella, Italy in accordance with WO #799152 specifications and drawings described in ATTACHMENT E
SCHEDULE B PRICE PROPOSAL FORM.
CLIN 0002
The CLIN description has changed from Option Item No. 1 - Demolition of Bldgs to OPTION ITEM No. 1: DEMOLITION OF BLDGS.
The CLIN extended description has changed from:
Price for demolition of buildings numbers 581, 585, 580, 579, 750, 585TR2, 585TR1, 580TR4, 580TR3, 580TR2 and 580TR1, in accordance with specifications and drawings, but excluding work described in CLIN 0001 and CLIN 0003.
Price for demolition of buildings numbers 581, 585, 580, 579, 750, 585TR2, 585TR1, 580TR4, 580TR3, 580TR2, 580TR1 in accordance with WO #799152 specifications and drawings described in ATTACHMENT E: SCHEDULE B PRICE PROPOSAL FORM.
The option status has changed from No Status to Option.
CLIN 0003
The CLIN description has changed from Planned Modification Item 1 - FF&E to
PLANNED MODIFICATION ITEM 1 - FF&E.
The CLIN extended description has changed from:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specifications for the project and in accordance with the following schedule, but excluding work described in CLIN 0001 and CLIN 0002.
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) in accordance with WO #799152 plans and specifications described in ATTACHMENT E:
SCHEDULE B PRICE PROPOSAL FORM.
The option status has changed from No Status to Option.
CLIN 0004 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 Each
OPTION PLANNED MODIFICATION ITEM 2 - A/V
FFP
Price for providing work in connection with all labor, material, equipment, transportation and supervision required for the Audio/Visual (A/V) complete in accordance with WO #799152 plans and specifications described in
ATTACHMENT E: SCHEDULE B PRICE PROPOSAL FORM.
FOB: Destination
NET AMT
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0004:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later not later than 1,710 calendar days after receiving the notice to proceed.
*The time stated for completion shall include final cleanup of the premises.
(End of clause)
The following have been deleted:
252.227-7015 Technical Data--Commercial Items FEB 2014
(End of Summary of Changes)