Attachment Q EHW-1 Sketch - Roof Openings for Crane Removal.pdf
PDF 86 KB Posted
- Solicitation number
- N62470-20-R-1001
About this file
This document includes an attachment sketch and notes for crane removal locations on the roof of Explosive Handling Wharf Building No. 1, along with the related federal contract solicitation to procure two 120-ton overhead bridge cranes for the facility.
The solicitation calls for procuring two 120-ton double girder, outdoor cab operated overhead electric traveling ordnance handling cranes, each with a 30-ton auxiliary hoist and backup radio-controlled system, for installation at Explosive Handling Wharf Building No. 1 at Kings Bay, Georgia. The attachment sketch and notes provide details on preferred and alternative crane pick up locations on the roof, as well as specifications for allowable loads and restrictions to ensure no damage to existing structural steel during crane removal operations. The solicitation is issued by the Naval Facilities Engineering Command, Department of the Navy.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA CA
CB CB
CC CC
CD CD
CE CE
CF CF
CG CG
CH CH
/2
/2
40' - 0" +/- 40' - 0" +/- 40' - 0" +/- 40' - 0" +/- 40' - 0" +/- 40' - 0" +/- 40' - 0" +/-
M A
T C
H L
IN
E
S E
E S
H E
E T
S -1
M A
T C
H L
IN
E
S E
E S
H E
E T
S -1
/2
/2
HATCH TYPE 1: MOST DESIRABLE CRANE PICK POINT LOCATIONS
HATCH TYPE 2: ADDITIONAL CRANE PICK POINT LOCATIONS
ROOF VENTILATOR
SUPPORT BUILDING BELOW
WHARF INSIDE FACE BELOW
/2
TYP
1' - 0" 38' - 0"
31' - 11 3/4"
/2
/2
T Y
P
' - 4
/1
35' - 0 5/8"
/1
16' - 5 7/8"
/2
/1
16' - 9 7/8"7' - 6 15/16"
/1
16' - 7"
T Y
P
T Y
P
NOTES:
1. ROOF PURLINS AND CATWALK NOT SHOWN BETWEEN COLUMN
LINES 23 AND 27 FOR CLARITY. ROOF PURLINS MAY BE
TEMPORARILY REMOVED IF NOT SUPPORTING DECK FOR
CRANE REMOVAL OPERATIONS.
2. CRANDE REMOVAL OPERATIONS MAY NOT IMPACT OR DAMAGE
THE EXISTING STRUCTURAL STEEL.
3. NO STRUCTURAL STEEL MAY BE REMOVED FOR CRANE
REMOVAL OPERATIONS OUTSIDE OF ROOF PURLINS.
4. CRANE REMOVAL OPERATIONS MAY NOT OCCUR WITHIN THE
ROOF VENTILATOR.
5. REFER TO RECORD DRAWINGS FOR DESIGN ALLOWABLE LIVE
LOADS ON THE CONCRETE DECK.
CATWALK BELOW
ROOF PURLINS
ROOF CATWALK
16' - 6 13/16"
4' - 4 5/8"
' - 1
/1
23' - 2 1/8" matthew.e.muller Line matthew.e.muller Line matthew.e.muller Line matthew.e.muller Line matthew.e.muller Line matthew.e.muller Line
| Structural Plans |
| 3B - TRUSS CRANE PICK UP LOCATIONS FRAMING PLAN |
File details come from the government source that posted it. Updated .