Attachment F, Price Proposal Sheet.pdf
PDF 121 KB Posted
- Solicitation number
- N62470-20-R-1001
About this file
This price proposal form solicits pricing for two 120-ton bridge cranes at Explosive Handling Wharf Building No. 1 at Kings Bay, Georgia. Offerors are asked to provide unit pricing and extended totals for three contract line items (CLINs): CLIN 0001 for one 120-ton bridge crane, CLIN 0002 for a second 120-ton bridge crane, and CLIN 0003 for removal of two existing cranes. The work includes design, fabrication, assembly, testing, delivery, installation, inspection, and field testing of the new cranes in accordance with solicitation N62470-20-R-1001. The completion date for all CLINs is September 30, 2022. The form requires acknowledgement of any solicitation amendments and provides for signature and date by the offeror.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F
PRICE PROPOSAL FORM
NAVFAC SOLICITATION N62470-20-R-1001 - TWO (2) 120-TON CRANES AT EXPLOSIVE
HANDLING WHARF BUILDING NO.1. (EHW-1), KINGS BAY, GA
BASE PRICE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 ONE 120T BRIDGE CRANE 1 EA $ $
The Contractor shall design, fabricate, assemble, shop test, deliver, install, inspect, field test one (1) 120 ton bridge crane at EHW-1 Kings Bay, GA. All work shall be in accordance with
Solicitation N62470-20-R-1001, the specifications, drawings, and related technical data; all as directed by the Contracting Officer.
TOTAL OF CLIN 0001 $
0002 ONE 120T BRIGE CRANE 1 EA $ $
The Contractor shall design, fabricate, assemble, shop test, deliver, install, inspect, field test one (1) 120 ton bridge crane at EHW-1 Kings Bay, GA. All work shall be in accordance with
Solicitation N62470-20-R-1001, the specifications, drawings, and related technical data; all as directed by the Contracting Officer.
TOTAL OF CLIN 0002 $
0003 CRANE REMOVAL 1 EA $ $
The Contractor shall provide all supervision, labor, equipment and materials to remove two (2) existing cranes at EHW-1, Kings Bay, GA. All work shall be in accordance with
Solicitation N62470-20-R-1001, the specifications, drawings, and related technical data; all as directed by the Contracting Officer.
TOTAL OF CLIN 0003 $
TOTAL PRICE FOR THE SUM OF ITEMS 0001, 0002 and 0003: $
1. CONTRACT LINE ITEM NOTES:
a. At time of award, separate CLINs will be created for the 3% withholding from CLIN 0001, CLIN 0002 and CLIN
0003 for warranty period performance. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended offer. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
2. The contract completion date for CLIN’s 0001, 0002, and 0003 is 30 September 2022.
3. The Government may reject an offer if it is materially unbalanced. An offer is unbalanced when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly or understated as indicated by the application of cost or price analysis.
AMENDMENTS ACKNOWLEDGED:
Amendment No. Date Amendment No. Date
Offeror:
Address:
Phone:
Fax & email
Signature
Date:
File details come from the government source that posted it. Updated .