This document is an invitation for bids for a wholehouse revitalization project at Naval Station Rota, Spain. The solicitation requests pricing for base work and 33 option items involving renovation of 167 housing units in Phase IV of the project.
The base work includes interior and exterior renovation of 67 units, with the contractor to provide lump sum pricing. There are also 33 contract line items (CLINs) requesting unit pricing for optional repair work such as asbestos abatement, roof repairs, flooring replacement and exterior renovations. Pricing is also requested to complete additional units of housing in increments of 4, 6 or 10 units. The Navy will unilaterally award optional CLINs within 120 days of contract award at the proposed prices. The solicitation requires firm fixed pricing for all CLINs and adjustment of bonds if options are exercised. The performance bond must be 100% of the aggregate amount. Award will be made to the lowest priced offer meeting the solicitation's requirements.
Attachment_E_Schedule_B_v2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| 1366671Spec_Revision_0001_02_82_16.00_20.pdf | ||
| 1366671dwg_revisions_0001.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| 1366671dwg01of26_(V2).pdf | ||
| Attachment_C__Past_Performance_Quest.doc | DOC document | |
| Solicitation_P1601.pdf | ||
| Attachment_A_Work_Pass_Format.xls | XLS spreadsheet | |
| Attachment_B_Const_Experience_Proj_Data_Sht.doc | DOC document | |
| N6247019R5012_Pre_Solicitiation_Notice.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1601 Wholehouse Revitalization, Phase IV 1582904
Rota, Spain
Document 00 22 13.00 20 Page 1
SCHEDULE B
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following aspects of the
P1601 Project:
CLIN 0001AA. Price for the described work for the P1601 Wholehouse
Revitalization Phase IV project, complete to the line 5 feet outside the building perimeter, in accordance with the drawings and specifications, but excluding work described in CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033.
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0001AA
0001AA P1601 Wholehouse Revitalization
Phase IV project, complete to the line 5 feet outside the building perimeter for the following Base
Bid Housing Units, (67 units):
722, 723, 724, 725, 726, 727, 730, 731, 732, 733, 734, 735, 740, 741, 742, 743, 744, 745, 746, 747, 936, 937, 943, 944, 945, 946, 947, 1000, 1001, 1002, 1003, 1004, 1005, 1006, 1007, 1008, 1009, 1010, 1011, 1014, 1015, 1016, 1017, 1018, 1019, 1020, 1021, 1022, 1023, 1024, 1025, 1026, 1027, 1032, 1033, 1036, 1037, 1040, 1041, 1044, 1045, 1048, 1049, 1052, 1053, 1060, 1061.
CLIN 0001AB. Price for the entire site work for the P1601 Wholehouse
Revitalization Phase IV project, outside the line 5 feet outside the building perimeter, complete in accordance with drawings and specifications, but excluding work described in CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, Document 00 22 13.00 20 Page 2
CLIN DESCRIPTION TOTAL PRICE FOR
0001AB
0001AB P1601 Wholehouse Revitalization
Phase IV project Site Work for the following Base Bid Housing Units, (67 units): 722, 723, 724, 725, 726, 727, 730, 731, 732, 733, 734, 735, 740, 741, 742, 743, 744, 745, 746, 747, 936, 937, 943, 944, 945, 946, 947, 1000, 1001, 1002, 1003, 1004, 1005, 1006, 1007, 1008, 1009, 1010, 1011, 1014, 1015, 1016, 1017, 1018, 1019, 1020, 1021, 1022, 1023, 1024, 1025, 1026, 1027, 1032, 1033, 1036, 1037, 1040, 1041, 1044, 1045, 1048, 1049, 1052, 1053, 1060, 1061.
CLIN 0002. Option Item No. 1. Price for removal and legal disposal of
Mercury-containing Lamps, complete in accordance with drawings, specifications, Hazardous Materials Survey Report and Addendum to
Hazardous Materials Survey Report included in the project, but excluding work described in CLINs 0001, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033.
CLIN ITEM UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0002 (UNIT
PRICE X NO.
UNITS)
0002 Remove and legally dispose of Mercury-containing lamps
Light
Tubes
$_______ 1,050 $_______
CLIN 0003. Option Item No. 2. Price for removal and legal disposal of asbestos-containing materials in stucco and in roof, complete in accordance with drawings, specifications, Hazardous Materials Survey
Report included in the project, but excluding work described in CLINs
0001, 0002, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033.
Document 00 22 13.00 20 Page 3
CLIN ITEM UNIT UNIT PRICE NO.
UNITS
TOTAL PRICE FOR
CLIN 0003AA and
0003AB (UNIT
PRICE X NO. OF
UNITS)
0003AA Remove and dispose asbestos-containing materials in stucco
Square meters
$_____ 12,000 $_____
0003AB Remove and dispose asbestos-containing materials in roof
Square meters
$_____ 4,000 $_____
CLIN 0004. Option Item No. 3. Price for Repair No. R-02, Repair damaged, loose, spalling or cracking Fascia/Eave construction and stucco finish complete in accordance with drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033.
CLIN 0004 (UNIT
PRICE X NO.
UNITS)
0004 Repair damaged, loose, spalling or cracking Fascia/Eave construction and stucco finish
LM $_______ 1,000 $_______
CLIN 0005. Option Item No. 4. Price for Repair No. R-03, Repair damaged, loose, spalling or cracking stucco finish on undersides of Eaves and
Roof Deck complete in accordance with drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, CLIN 0005(UNIT
PRICE X NO.
UNITS)
0005 Repair damaged, loose, spalling or cracking stucco finish on undersides of Eaves and Roof
Deck
SM $_______ 2,500 $_______
Document 00 22 13.00 20 Page 4
CLIN 0006. Option Item No. 5. Price for Repair No. R-11, Repair crack in
CMU/clay masonry and plaster finish wall complete in accordance with drawings and specifications, but excluding work described in CLINs
0001, 0002, 0003, 0004, 0005, 0007, 0008, 0009, 0010, 0011, 0012, 0013, CLIN ITEM UNIT
LM
UNIT PRICE NO. UNITS
TOTAL PRICE FOR
CLIN 0006(UNIT
PRICE X NO.
UNITS)
0006 Repair crack in
CMU/clay masonry and plaster finish wall
LM $_______ 900 $_______
CLIN 0007. Option Item No. 6. Price for Repair No. R-12, Repair damaged, loose, spalling or cracking stucco finish on exterior walls complete in accordance with drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and
0033.
CLIN 0007(UNIT
PRICE X NO.
UNITS)
0007 Repair damaged, loose, spalling or cracking stucco finish on exterior walls
SM $_______ 4,400 $_______
CLIN 0008. Option Item No. 7. Price for Repair No. R-13, Repoint exterior face brick complete in accordance with drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, CLIN 0008 (UNIT
PRICE X NO.
UNITS)
Document 00 22 13.00 20 Page 5
CLIN 0008 (UNIT
PRICE X NO.
UNITS)
0008 Repoint exterior face brick
LM $_______ 300 $_______
CLIN 0009. Option Item No. 8. Price for Repair No. R-21, Replace damaged or missing floor concrete floor slab complete in accordance with drawings and specifications, but excluding work described in CLINs
0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0010, 0011, 0012, 0013, CLIN 0009 (UNIT
PRICE X NO.
UNITS)
0009 Replace damaged or missing floor concrete floor slab
SM $_______ 1,400 $_______
CLIN 0010. Option Item No. 9. Price for Repair No. R-22, Remove and replace damaged or settling exterior paving tile complete in accordance with drawings and specifications, but excluding work described in CLINs
0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0011, 0012, 0013, CLIN 0010 (UNIT
PRICE X NO.
UNITS)
0010 Remove and replace damaged or settling exterior paving tile
SM $_______ 600 $_______
CLIN 0011. Option Item No. 10. Price for Repair No. R-23, Repoint exterior paving tile joints complete in accordance with drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0012, 0013, 0014, 0015, 0016, Document 00 22 13.00 20 Page 6
CLIN 0011 (UNIT
PRICE X NO.
UNITS)
0011 Repoint exterior paving tile joints
LM $_______ 4,000 $_______
CLIN 0012. Option Item No. 11. Price for Repair No. R-24, Remove and replace damaged exterior paving base tile complete in accordance with drawings and specifications, but excluding work described in CLINs
0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0013, CLIN 0012 (UNIT
PRICE X NO.
UNITS)
0012 Remove and replace damaged exterior paving base tile
LM $_______ 1,300 $_______
CLIN 0013. Option Item No. 11. Price for Repair No. R-31, Replace damaged persiannas complete in accordance with drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0014, 0015, 0016, 0017, 0018, CLIN 0013(UNIT
PRICE X NO.
UNITS)
0013 Replace damaged persiannas
EA $_______ 10 $_______
Document 00 22 13.00 20 Page 7
CLIN 0014. Option Item No. 13. Price for Repair No. R-32, Replace damaged window screen complete in accordance with drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0015, 0016, 0017, 0018, CLIN 0014 (UNIT
PRICE X NO.
UNITS)
0014 Replace damaged window screen
EA $_______ 30 $_______
CLIN 0015. Option Item No. 14 - Price for the entire work for the additional four (4) housing units noted, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033.
0015 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1012, 1013, 1028, 1029.
ADD
CLIN 0016. Option Item No. 15 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, Document 00 22 13.00 20 Page 8
0016 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1030, 1031, 1062, 1063.
CLIN 0017. Option Item No. 16 - Price for the entire work for the additional six (6) housing units noted, complete to the line 5 feet outside the building perimeter and for the entire site work for the six
(6) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0017 Revitalization of six (6) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the six (6) additional housing units noted, outside the line 5 feet outside the building perimeter:
1034, 1035, 1064, 1065, 1066, 1067.
CLIN 0018. Option Item No. 17 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, Document 00 22 13.00 20 Page 9
0018 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1038, 1039, 1068, 1069.
CLIN 0019. Option Item No. 18 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0019 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1042, 1043, 1070, 1071.
CLIN 0020. Option Item No. 19 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0021, 0022, 0023, 0024, 0025, 0026, 0027, Document 00 22 13.00 20 Page 10
0020 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1046, 1047, 1072, 1073.
CLIN 0021. Option Item No. 20 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0022, 0023, 0024, 0025, 0026, 0027, 0021 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1050, 1051, 1074, 1075.
CLIN 0022. Option Item No. 21 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0023, 0024, 0025, 0026, 0027, Document 00 22 13.00 20 Page 11
0022 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1054, 1055, 1076, 1077.
CLIN 0023. Option Item No. 22 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0024, 0025, 0026, 0027, 0023 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1056, 1057, 1058, 1059.
CLIN 0024. Option Item No. 23 - Price for the entire work for the outside the building perimeter and for the entire site work for the six
(6) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0025, 0026, 0027, 0028, Document 00 22 13.00 20 Page 12
0024 Revitalization of six (6) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the six (6) additional housing units noted, outside the line 5 feet outside the building perimeter:
1078, 1079, 1080, 1081, 1082, 1083.
CLIN 0025. Option Item No. 24 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0026, 0027, 0025 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
938, 939, 940, 941.
CLIN 0026. Option Item No. 25 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0027, Document 00 22 13.00 20 Page 13
0026 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1108, 1109, 1110, 1111.
CLIN 0027. Option Item No. 26 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1112, 1113, 1114, 1115.
CLIN 0028. Option Item No. 27 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0027, 0029, 0030, 0031, 0032, and 0033.
Document 00 22 13.00 20 Page 14
0028 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1148, 1149, 1150, 1151.
CLIN 0029. Option Item No. 28 - Price for the entire work for the outside the building perimeter and for the entire site work for the six
(6) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0030, 0031, 0032, and 0033.
0029 Revitalization of six (6) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the six (6) additional housing units noted, outside the line 5 feet outside the building perimeter:
1154, 1155, 1156, 1157, 1158, 1159.
CLIN 0030. Option Item No. 29 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0027, 0028, 0029, 0031, 0032, and 0033.
Document 00 22 13.00 20 Page 15
0030 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1138, 1139, 1140, 1141.
CLIN 0031. Option Item No. 30 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0027, 0028, 0029, 0030, 0032, and 0033.
0031 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1142, 1143, 1144, 1145.
CLIN 0032. Option Item No. 31 - Price for the entire work for the outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0027, 0028, 0029, 0030, 0031, and 0033.
Document 00 22 13.00 20 Page 16
0032 Revitalization of four (4) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the four (4) additional housing units noted, outside the line 5 feet outside the building perimeter:
1146, 1147, 1152, 1153.
CLIN 0033. Option Item No. 32 - Price for the entire work for the additional five (5) housing units noted, complete to the line 5 feet outside the building perimeter and for the entire site work for the five (5) additional housing units noted, outside the line 5 feet outside the building perimeter noted in accordance with the drawings and specifications, but excluding work described in CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0027, 0028, 0029, 0030, 0031, and 0032.
0033 Revitalization of five (5) additional units of housing, complete to the line 5 feet outside the building perimeter and for the entire site work for the five (5) additional housing units noted, outside the line 5 feet outside the building perimeter:
958, 959, 962, 963, 1227.
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items (CLIN) 0001.
For CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033 to the Contractor at the proposed price within 120 calendar days after the contract award. A firm fixed price is required for CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, Document 00 22 13.00 20 Page 17
0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033. For CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014, Offeror shall divide the total amount of each CLIN by 150 (the total amount of housing units if all additional housing unit options are exercised) and enter the resultant “per housing unit” cost for these option repairs in each respective CLIN (0002 through 0014). Do not separately incorporate this amount into each CLIN for revitalization of units of housing in CLINs 0001, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031 0032 and 0033.
Rather, the Government will consider the “per housing unit” costs for the option repairs listed in CLINs 0002 through 0014 in the context of
CLINs 0015 through 0033, as they are considered for award. Stated differently, CLINs 0001, and 0015 through 0033 should be priced exclusive of the additional repairs identified in CLINs 0002 through
0014. The price of the additional repairs identified in CLINs 0002 through 0014 shall only be listed in those CLINs (0002 through 0014) on a “per housing unit” basis. No provision is made for economic price adjustment. If Option is exercised within 120 calendar days after the contract award, the contract completion date remains unchanged.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation, not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001.
In accordance with FAR 52.217-5 Evaluation of Options, evaluation of
Options will not obligate the Government to exercise the Option(s).
d. The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of price analysis techniques. A proposal may be rejected if the
Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
e. Bonding is required for all CLIN 0001 items. If CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030, 0031, 0032, and 0033 are awarded, adjustment to bonding and consent of surety is required for the number and amount of CLINs awarded. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
1.2.1 CLIN-specific Bid Notes
a. For CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014 unit pricing: Units indicated are estimated based on field observation, field sampling, and laboratory testing by
Environmental Engineer. Actual quantities may vary and Government makes no warranty as to the total quantities that may be encountered or the quantities indicated in the CLIN schedule. Estimated and actual quantities of the unit-priced items will be handled in accordance with
52.211-18 - Variation in Estimated Quantity.
Document 00 22 13.00 20 Page 18
b. For CLIN 0002, Remove and legally dispose of Mercury-containing lamps:
May be disposed of as universal waste. Include packaging in approved boxes or containers and disposal intact in Unit Price. Weighed quantity includes packaging. Quantity will be validated and approved by field measurement by the Contracting Officer, after packaging for disposal but prior to sealing packaging and removal from the site.
c. For CLIN 0003, Remove and legally dispose of asbestos-containing materials: Provide unit price for removal separate from unit price for disposal, as indicated in CLIN schedule. Include packaging for disposal in Unit price. Removal quantity will be validated and approved by field measurement by the Contracting Officer, prior to in-situ removal.
Disposal quantity will be validated and approved by the Contracting officer after in-situ removal but prior to sealing packaging and removal from the site.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --