This document is a specification for engineering control of asbestos containing materials for a Wholehouse Revitalization project at Naval Station Rota, Spain. The specification requires removal of exterior stucco finish and asphalt tar/vapor barrier known to contain asbestos, to be completed using negative pressure enclosure and other OSHA-approved techniques. It outlines requirements for medical surveillance, employee training, permits and licenses, local exhaust equipment, personal protective equipment, removal procedures, air sampling, waste disposal, and clearance sampling to ensure airborne fiber levels do not exceed allowable limits. The Navy will provide the work area and evacuate during abatement. Bidders must be licensed asbestos contractors and comply with EPA, OSHA and Navy regulations for hazardous materials abatement.
1366671Spec_Revision_0001_02_82_16.00_20.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Attachment_E_Schedule_B_v2.pdf | ||
| 1366671dwg_revisions_0001.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| 1366671dwg01of26_(V2).pdf | ||
| Attachment_C__Past_Performance_Quest.doc | DOC document | |
| Solicitation_P1601.pdf | ||
| Attachment_A_Work_Pass_Format.xls | XLS spreadsheet | |
| Attachment_B_Const_Experience_Proj_Data_Sht.doc | DOC document | |
| N6247019R5012_Pre_Solicitiation_Notice.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1601 Wholehouse Revitalize, Phase IV 1366671 Rota, Spain
SECTION 02 82 16.00 20
ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
08/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)
AIHA Z88.6 (2006) Respiratory Protection - Respirator Use-Physical Qualifications for Personnel
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE Z9.2 (2012) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
ASTM INTERNATIONAL (ASTM)
ASTM C732 (2006; R 2012) Aging Effects of Artificial Weathering on Latex Sealants
ASTM D2794 (1993; R 2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D522/D522M (2014) Mandrel Bend Test of Attached Organic Coatings
ASTM E119 (2016a) Standard Test Methods for Fire Tests of Building Construction and Materials
ASTM E1368 (2014) Visual Inspection of Asbestos Abatement Projects
ASTM E736 (2000; R 2011) Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members
ASTM E84 (2017) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
COMMANDER NAVY REGION EUROPE AFRICA SOUTHWEST ASIA (CNREURAFSWA)
FGS SPAIN (2014) Environmental Final Governing Standards Spain
SECTION 02 82 16.00 20 Page 1
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.103 Respiratory Protection
29 CFR 1926.1101 Asbestos
29 CFR 1926.200 Accident Prevention Signs and Tags
29 CFR 1926.51 Sanitation
29 CFR 1926.59 Hazard Communication
40 CFR 61-SUBPART A General Provisions
40 CFR 61-SUBPART M National Emission Standard for Asbestos
40 CFR 763 Asbestos
U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)
ND OPNAVINST 5100.23 (2005; Rev G) Navy Occupational Safety and Health (NAVOSH) Program Manual
UNDERWRITERS LABORATORIES (UL)
UL 586 (2009; Reprint Sep 2014) Standard for High-Efficiency Particulate, Air Filter Units
1.2 DEFINITIONS
1.2.1 ACM
Asbestos Containing Materials.
1.2.2 Amended Water
Water containing a wetting agent or surfactant with a maximum surface tension of 2.9 Pa.
1.2.3 Area Sampling
Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.
1.2.4 Asbestos
The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be at least one percent.
1.2.5 Asbestos Control Area
That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the
SECTION 02 82 16.00 20 Page 2 uncontrolled release of asbestos dust, fibers, or debris.
1.2.6 Asbestos Fibers
Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.
1.2.7 Asbestos Permissible Exposure Limit
0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other Federal legislation having legal jurisdiction for the protection of workers health.
1.2.8 Background
The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.
1.2.9 Category I Non-Friable ACM
Established by the National Emissions Standard for Hazardous Air Pollutants (NESHAP) and includes resilient flooring materials, asphaltic roofing materials, gaskets, and packings.
1.2.10 Category II Non-Friable ACM
Established by the National Emissions Standard for Hazardous Air Pollutants (NESHAP) and includes all other non-friable ACM not classified as Category I Non-Friable ACM.
1.2.11 Class I Asbestos Work
Activities defined by OSHA involving the removal of thermal system insulation (TSI) and surfacing ACM.
1.2.12 Class II Asbestos Work
Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile, and sheeting, roofing and siding shingles, and construction mastic. Removal of small amounts of these materials which would fit into a glovebag may be classified as a Class III job.
1.2.13 Class III Asbestos Work
Activities defined by OSHA that involve repair and maintenance operations, where ACM, including TSI and surfacing ACM, is likely to be disturbed.
Operations may include drilling, abrading, cutting, cable pulling, crawling through tunnels or attics and spaces above the ceiling, where asbestos is actively disturbed or asbestos-containing debris is actively disturbed.
SECTION 02 82 16.00 20 Page 3
1.2.14 Class IV Asbestos Work
Class IV asbestos work is maintenance and custodial activities where ACM and PACM is contacted but not disturbed and also applies to clean up of waste dust and debris from Class I, II, or III activities.
1.2.15 Contractor
The Contractor is that individual, or entity under contract to the Navy to perform the herein listed work.
1.2.16 Competent Person
A person meeting the requirements for competent person as specified in 29 CFR 1926.1101 and FGS SPAIN including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan ( 40 CFR 763 ) for project designer or supervisor, or its equivalent.
The competent person must have a current asbestos contractors or supervisors license.
1.2.17 Encapsulation
The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.
1.2.18 Encapsulants
Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.
a. Removal Encapsulant (can be used as a wetting agent)
b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)
c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage)
d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).
1.2.19 Friable Asbestos Material
One percent asbestos containing material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.
1.2.20 Glovebag Technique
Those asbestos removal and control techniques put forth in 29 CFR 1926.1101 Appendix G.
SECTION 02 82 16.00 20 Page 4
1.2.21 HEPA Filter Equipment
High efficiency particulate air (HEPA) filtered vacuum and/or exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters must retain 99.97 percent of particles
0.3 microns or larger as indicated in UL 586 .
1.2.22 Navy Consultant (NC)
That qualified person employed directly by the Government to monitor, sample, inspect the work or in some other way advise the Contracting Officer. The NC is normally a private consultant, but can be an employee of the Government.
1.2.23 Negative Pressure Enclosure (NPE)
That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101 .
1.2.24 Nonfriable Asbestos Material
Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.
1.2.25 Personal Sampling
Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101 .
1.2.26 Private Qualified Person (PQP)
That qualified person hired by the Contractor to perform the herein listed tasks.
1.2.27 Qualified Person (QP)
A Registered Architect, Professional Engineer, Certified Industrial Hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate Model Accreditation Plan as described in 40 CFR 763 as a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer; and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The QP must be qualified to perform visual inspections as indicated in ASTM E1368 and FGS SPAIN. The QP must be appropriately licensed.
1.2.28 TEM
Refers to Transmission Electron Microscopy.
1.2.29 Time Weighted Average (TWA)
The TWA is an 8-hour time weighted average airborne concentration of
SECTION 02 82 16.00 20 Page 5 asbestos fibers.
1.2.30 Wetting Agent
A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at most 2.9 Pa.
1.3 REQUIREMENTS
1.3.1 Description of Work
The work covered by this section includes the handling and control of asbestos containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures must be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification. The asbestos work includes the demolition and removal of suspect asbestos-containing material (ACM) associated with the project titled "Whole House Revitalization, Las Palmeras, Phase IV" located at Naval Station Rota, Spain, which is governed by 40 CFR 763 and FGS SPAIN. Known ACM includes the following:
exterior stucco finish and asphalt tar/vapor barrier under roof tiles.
See hazmat report for additional information.Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material may release airborne asbestos fibers during demolition and removal and therefore must be handled in accordance with the removal and disposal procedures as specified herein.
Provide negative pressure enclosure and other OSHA approved techniques as outlined in this specification. The Navy will evacuate the work area during the asbestos abatement work. All asbestos removal work must be supervised by a competent person as specified herein.
1.3.1.1 Coordination with the Contracting Officer
If any hazardous materials are identified coordinate with the Construction Manager (CM) and Contracting Officer to contact NAVFAC EV. Ensure that all asbestos-containing waste, hazardous waste (HW) and suspected HW are properly dispositioned by NAVFAC EV Personnel. Coordinate all asbestos-containing waste and HW disposal manifests with NAVFAC EV personnel.
1.3.2 Medical Requirements
Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101 .
1.3.2.1 Medical Examinations
Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 and FGS SPAIN. This requirement must have been satisfied within the 12 months prior to the start of work on this contract. The same medical examination must be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation. Specifically identify x-ray
SECTION 02 82 16.00 20 Page 6 films of asbestos workers to the consulting radiologist and mark medical record jackets with the word "ASBESTOS."
1.3.2.2 Medical Records
Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of 50 years after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to:
The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.
1.3.3 Employee Training
Submit certificates, prior to the start of work but after the main abatement submittal, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with 40 CFR 763 and FGS SPAIN; understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis. Certificates must be organized by individual worker, not grouped by type of certification. Post appropriate evidence of compliance with the training requirements of 40 CFR 763 . Train all personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent. The Contractor must document the training by providing: dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the Contracting Officer. Furnish each employee with respirator training and fit testing administered by the PQP as required by 29 CFR 1926.1101 .
Fully cover engineering and other hazard control techniques and procedures. All asbestos workers must have a current asbestos worker's license.
1.3.4 Permits , Licenses, and Notifications
Obtain necessary permits and licenses in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal and local authorities prior to the start of work. Notify the Contracting Officer in writing 20 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M and FGS SPAIN. Notify the Contracting Officer and other appropriate Government agencies in writing 20 working days prior to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations. Submit copies of all Notifications to the Contracting Officer.
1.3.5 Environment, Safety and Health Compliance
In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of Federal and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of 29 CFR 1926.1101 , 40 CFR 61-SUBPART A , SECTION 02 82 16.00 20 Page 7
40 CFR 61-SUBPART M , and ND OPNAVINST 5100.23 . Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government apply. The following laws, ordinances, criteria, rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials apply:
a. FGS SPAIN.
1.3.6 Respiratory Protection Program
Establish and implement a respirator program as required by AIHA Z88.6 , 29 CFR 1926.1101 , and 29 CFR 1926.103 . Submit a written description of the program to the Contracting Officer. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.
1.3.6.1 Respirator Program Records
Submit records of the respirator program as required by AIHA Z88.6 , 29 CFR 1926.103 , and 29 CFR 1926.1101 .
1.3.7 Asbestos Hazard Control Supervisor
The Contractor must be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.
1.3.8 Hazard Communication
Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Safety Data Sheets (SDS) for all materials brought to the site.
1.3.9 Asbestos Hazard Abatement Plan
Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the removal and demolition of materials containing asbestos. The plan, not to be combined with other hazard abatement plans, must be prepared, signed, and sealed by the PQP. Provide a Table of Contents for each abatement submittal, which must follow the sequence of requirements in the contract. Such plan must include but not be limited to the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection , the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms, removal method, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan must also include (both fire and medical emergency) response plans. The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos Hazard Control Supervisor, and PQP must meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work
SECTION 02 82 16.00 20 Page 8 procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan must be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work.
1.3.10 Testing Laboratory
Submit the name, address, and telephone number of each testing laboratory selected for the sampling, analysis, and reporting of bulk and airborne concentrations of asbestos fibers along with evidence that each laboratory selected holds the appropriate State license and/or permits and certification that each laboratory is American Industrial Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis.
The testing laboratory firm must be independent of the asbestos contractor and must have no employee or employer relationship which could constitute a conflict of interest.
1.3.11 Landfill Approval
Submit written evidence that the landfill is for asbestos disposal by the Spanish and local regulatory agencies. Within 3 working days after delivery, submit detailed delivery tickets, prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill. Submit a copy of the waste shipment records within 1 day of the shipment leaving the project site.
1.3.12 Medical Certification
Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR 1926.1101 and 29 CFR 1926.103 and FGS SPAIN as prescribed by law.
Submit certificates prior to the start of work but after the main abatement submittal.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval.. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Local Exhaust Equipment; G
Vacuums; G
SECTION 02 82 16.00 20 Page 9
Respirators; G
Pressure Differential Automatic Recording Instrument; G
Amended Water; G
Safety Data Sheets (SDS) For All Materials; G
Encapsulants; G
SD-06 Test Reports
Air Sampling Results; G
Pressure Differential Recordings For Local Exhaust System; G
Asbestos Disposal Quantity Report; G
Clearance Sampling; G
SD-07 Certificates
Asbestos Hazard Abatement Plan; G
Testing Laboratory; G
Private Qualified Person Documentation; G
Contractor's License; G
Competent Person; G
Worker's License; G
Landfill Approval; G
Employee Training; G
Medical Certification; G
Waste Shipment Records; G
Respiratory Protection Program; G
Delivery Tickets; G
Vacuums; G
Water Filtration Equipment; G
Ventilation Systems; G
Other Equipment Used To Contain Airborne Asbestos Fibers; G
Chemical Encapsulants; G
Notifications
Show compliance with ASSE/SAFE Z9.2 by providing manufacturers'
SECTION 02 82 16.00 20 Page 10 certifications.
SD-11 Closeout Submittals
Notifications; G
Rental Equipment; G
Respirator Program Records; G
Permits and Licenses; G
1.5 QUALITY ASSURANCE
1.5.1 Private Qualified Person Documentation
Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The PQP must be appropriately licensed. The PQP and the asbestos contractor must not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP must be a first tier subcontractor.
1.5.2 Competent Person Documentation
Submit training certification and a current Asbestos Contractor's and Supervisor's License.
1.5.3 Worker's License
Submit documentation that requires all workers have a current Asbestos Workers License along with a valid photo ID.
1.5.4 Contractor's License
Contractor must have current asbestos contractor's license. Submit a copy of the asbestos contractor's license .
1.5.5 Air Sampling Results
Complete fiber counting and provide results to the PQP and NC for review within 16 hours of the "time off" of the sample pump. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits. Submit sampling results to the Contracting Officer and the affected Contractor employees where required by law within 3 working days, signed by the testing laboratory employee performing air sampling, the employee that analyzed the sample, and the PQP.
Notify the Contractor and the Contracting Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to have asbestos fiber concentrations in excess of 0.01 fibers per cubic centimeter or background whichever is higher. In no circumstance must levels exceed 0.1 fibers per cubic centimeter.
SECTION 02 82 16.00 20 Page 11
1.5.6 Pressure Differential Recordings for Local Exhaust System
Provide a local exhaust system that creates a negative pressure of at least
0.51 mm of water relative to the pressure external to the enclosure and operate it continuously, 24 hours a day, until the temporary enclosure of the asbestos control area is removed. Submit pressure differential recordings for each work day to the PQP and NC for review and to the Contracting Officer within 24 hours from the end of each work day.
1.6 EQUIPMENT
1.6.1 Rental Equipment
Provide a copy of the written notification to the rental company concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.
PART 2 PRODUCTS
2.1 ENCAPSULANTS
Must conform to current USEPA requirements, must contain no toxic or hazardous substances as defined in 29 CFR 1926.59 , and must conform to the following performance requirements.
2.1.1 Removal Encapsulants
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
Impact Resistance - Minimum 245.5 mm/N ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test
2.1.2 Bridging Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
SECTION 02 82 16.00 20 Page 12
Requirement Test Standard
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
Impact Resistance - Minimum 245.5 mm/N ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test
2.1.3 Penetrating Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Cohesion/Adhesion Test - 729.5 N of force/meter
ASTM E119
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
Impact Resistance - Minimum 245.5 mm/N ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test
SECTION 02 82 16.00 20 Page 13
2.1.4 Lock-down Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Tested with fireproofing over encapsulant applied directly to steel member)
ASTM E119
Bond Strength: 1459 N of force/meter ASTM E736
(Tests compatibility with cementitious and fibrous fireproofing)
PART 3 EXECUTION
3.1 EQUIPMENT
At all times, provide the Contracting Officer or the Contracting Officer's Representative, with at least two complete sets of personal protective equipment as required for entry to and inspection of the asbestos control area. Provide equivalent training to the Contracting Officer or a designated representative as provided to Contractor employees in the use of the required personal protective equipment. Provide manufacturer's certificate of compliance for all equipment used to contain airborne asbestos fibers.
3.1.1 Respirators
Select respirators from those approved by the National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services.
3.1.1.1 Respirators for Handling Asbestos
Provide personnel engaged in pre-cleaning, cleanup, handling, removal and or demolition of asbestos materials with respiratory protection as indicated in 29 CFR 1926.1101 and 29 CFR 1926.103 .
3.1.2 Exterior Whole Body Protection
3.1.2.1 Outer Protective Clothing
Provide personnel exposed to asbestos with disposable "non-breathable," whole body outer protective clothing, head coverings, gloves, and foot coverings. Provide disposable plastic or rubber gloves to protect hands.
SECTION 02 82 16.00 20 Page 14
Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but must not be used alone. Make sleeves secure at the wrists, make foot coverings secure at the ankles, and make clothing secure at the neck by the use of tape.
3.1.2.2 Work Clothing
Provide cloth work clothes for wear under the outer protective clothing and foot coverings and either dispose of or properly decontaminate them as recommended by the PQP after each use.
3.1.2.3 Personal Decontamination Unit
Provide a temporary, negative pressure unit with a separate decontamination locker room and clean locker room with a shower that complies with 29 CFR 1926.51 (f)(4)(ii) through (V) in between for personnel required to wear whole body protective clothing. Provide two separate lockers for each asbestos worker, one in each locker room. Keep street clothing and street shoes in the clean locker. HEPA vacuum and remove asbestos contaminated disposable protective clothing while still wearing respirators at the boundary of the asbestos work area and seal in impermeable bags or containers for disposal. Do not wear work clothing between home and work. Locate showers between the decontamination locker room and the clean locker room and require that all employees shower before changing into street clothes. Collect used shower water and filter with approved water filtration equipment to remove asbestos contamination. Dispose of filters and residue as asbestos waste.
Discharge clean water to the sanitary system. Dispose of asbestos contaminated work clothing as asbestos contaminated waste .
Decontamination units must be physically attached to the asbestos control area. Build both a personnel decontamination unit and an equipment decontamination unit onto and integral with each asbestos control area.
3.1.2.4 Eye Protection
Provide goggles to personnel engaged in asbestos abatement operations when the use of a full face respirator is not required.
3.1.3 Warning Signs and Labels
Provide bilingual warning signs printed in English and Spanish at all approaches to asbestos control areas. Locate signs at such a distance that personnel may read the sign and take the necessary protective steps required before entering the area. Provide labels and affix to all asbestos materials, scrap, waste, debris, and other products contaminated with asbestos.
3.1.3.1 Warning Sign
Provide vertical format conforming to 29 CFR 1926.200 , and 29 CFR 1926.1101 minimum 500 by 355 mm displaying the following legend in the lower panel:
SECTION 02 82 16.00 20 Page 15
Legend Notation
DANGER 25 mm Sans Serif Gothic or Block
ASBESTOS 25 mm Sans Serif Gothic or Block
MAY CAUSE CANCER 6 mm Sans Serif Gothic or Block
CAUSES DAMAGE TO LUNGS 6 mm Sans Serif Gothic or Block
AUTHORIZED PERSONNEL ONLY 6 mm Sans Serif Gothic or Block
WEAR RESPIRATORY PROTECTION AND PROTECTIVE
CLOTHING IN THIS AREA
6 mm Sans Serif Gothic or Block
Spacing between lines must be at least equal to the height of the upper of any two lines.
3.1.3.2 Warning Labels
Provide labels conforming to 29 CFR 1926.1101 of sufficient size to be clearly legible, displaying the following legend:
DANGER
CONTAINS ASBESTOS FIBERS
MAY CAUSE CANCER
CAUSES DAMAGE TO LUNGS
DO NOT BREATHE DUST AVOID CREATING DUST
3.1.4 Local Exhaust System
Provide a local exhaust system in the asbestos control area in accordance with ASSE/SAFE Z9.2 and 29 CFR 1926.1101 that will provide at least four air changes per hour inside of the negative pressure enclosure. Local exhaust equipment must be operated 24 hours per day, until the asbestos control area is removed and must be leak proof to the filter and equipped with HEPA filters. Maintain a minimum pressure differential in the control area of minus 0.51 mm of water column relative to adjacent, unsealed areas. Provide continuous 24-hour per day monitoring of the pressure differential with a pressure differential automatic recording instrument. In no case must the building ventilation system be used as the local exhaust system for the asbestos control area. Filters on exhaust equipment must conform to ASSE/SAFE Z9.2 and UL 586 . The local exhaust system must terminate out of doors and remote from any public access or ventilation system intakes.
SECTION 02 82 16.00 20 Page 16
3.1.5 Tools
Vacuums must be leak proof to the filter and equipped with HEPA filters.
Filters on vacuums must conform to ASSE/SAFE Z9.2 and UL 586 . Do not use power tools to remove asbestos containing materials unless the tool is equipped with effective, integral HEPA filtered exhaust ventilation systems.
Remove all residual asbestos from reusable tools prior to storage or reuse.
3.1.6 Rental Equipment
If rental equipment is to be used, furnish written notification to the rental agency concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.
3.2 WORK PROCEDURE
Perform asbestos related work in accordance with 29 CFR 1926.1101 , 40 CFR 61-SUBPART M , and as specified herein. Use adequately wet removal procedures, negative pressure enclosure and other OSHA approved removal techniques. Personnel must wear and utilize protective clothing and equipment as specified herein. Eating, smoking, drinking, chewing gum, tobacco, or applying cosmetics must not be permitted in the asbestos work or control areas. Personnel of other trades not engaged in the removal and demolition of asbestos containing material must not be exposed at any time to airborne concentrations of asbestos unless all the personnel protection and training provisions of this specification are complied with by the trade personnel. Seal all roof top penetrations, except plumbing vents, prior to asbestos roofing work. Shut down the building heating, ventilating, and air conditioning system, cap the openings to the system, and provide temporary heating, and ventilation, and air conditioning prior to the commencement of asbestos work. Disconnect electrical service when wet removal is performed and provide temporary electrical service with verifiable ground fault circuit interrupter (GFCI) protection prior to the use of any water. All electrical work must be performed by a licensed electrician. If an asbestos fiber release or spill occurs inside or outside of the asbestos control area, stop work immediately, correct the condition to the satisfaction of the Contracting Officer including clearance sampling, prior to resumption of work.
3.2.1 Protection of Existing Work to Remain
Perform work without damage or contamination of adjacent work. Where such work is damaged or contaminated as verified by the Contracting Officer using visual inspection or sample analysis, it must be restored to its original condition or decontaminated by the Contractor at no expense to the Government as deemed appropriate by the Contracting Officer. This includes inadvertent spill of dirt, dust, or debris in which it is reasonable to conclude that asbestos may exist. When these spills occur, stop work immediately. Then clean up the spill. When satisfactory visual inspection and air sampling results are obtained from the PQP work may proceed at the discretion of the Contracting Officer.
3.2.2 Furnishings
Furniture and equipment will be removed from the area of work by the Government before asbestos work begins.
SECTION 02 82 16.00 20 Page 17
3.2.3 Asbestos Control Area Requirements
3.2.3.1 Negative Pressure Enclosure
Removal of asbestos-containing exterior stucco finish is a Class I removal activity and must be performed using a negative pressure full enclosure.
Block and seal openings in areas where the release of airborne asbestos fibers can be expected. Establish an asbestos negative pressure enclosure with the use of curtains, portable partitions, or other enclosures in order to prevent the escape of asbestos fibers from the contaminated asbestos work area. Negative pressure enclosure development must include protective covering of uncontaminated walls, and ceilings with a continuous membrane of two layers of minimum 0.15 mm plastic sheet sealed with tape to prevent water or other damage. Provide two layers of 0.15 mm plastic sheet over floors and extend a minimum of 300 mm up walls. Seal all joints with tape. Provide local exhaust system in the asbestos control area. Openings will be allowed in enclosures of asbestos control areas for personnel and equipment entry and exit, the supply and exhaust of air for the local exhaust system and the removal of properly containerized asbestos containing materials. Replace local exhaust system filters as required to maintain the efficiency of the system.
3.2.3.2 Regulated Area, Class II Removal
Removal of asbestos containing asphalt tar/vapor barrier is a Class II removal activity. Establish designated limits for the asbestos regulated work area with the use of red barrier tape and signs, and maintain all other requirements for asbestos control area except local exhaust. Conduct area monitoring of airborne fibers during the work shift at the designated limits of the asbestos work area and conduct personal samples of each worker engaged in the work. If the airborne fiber concentration of the workers or at designated limits at any time exceeds background or 0.01 fibers per cubic centimeter, whichever is greater, stop work immediately and correct the situation.
3.2.4 Removal Procedures
Wet asbestos material with a fine spray of amended water during removal, cutting, or other handling so as to reduce the emission of airborne fibers. Remove material and immediately place in 0.15 mm plastic disposal bags. Remove asbestos containing material in a gradual manner, with continuous application of the amended water or wetting agent in such a manner that no asbestos material is disturbed prior to being adequately wetted. Where unusual circumstances prohibit the use of 0.15 mm plastic bags, submit an alternate proposal for containment of asbestos fibers to the Contracting Officer for approval. For example, in the case where both piping and insulation are to be removed, the Contractor may elect to wet the insulation, wrap the pipes and insulation in plastic and remove the pipe by sections. Asbestos containing material must be containerized while wet. At no time must asbestos material be allowed to accumulate or become dry. Lower and otherwise handle asbestos containing material as indicated in 40 CFR 61-SUBPART M .
3.2.4.1 Exterior Stucco Finish
Removal of asbestos-containing stucco finish material must be removed utilizing a negative pressure regulated work area. Prepare work area as previously specified. Remove asbestos containing stuc co finish by removing entire block substrate. Use wet methods while removing block with stucco
SECTION 02 82 16.00 20 Page 18 sections and immediately place into 6-mil thickness disposal bag. Bag any asbestos debris which has fallen to the floor as asbestos-containing debris. Continue wet cleaning until surfaces are free of visible debris.
Place all debris in plastic disposal bags of 6 mil minimum thickness. Once the material is in the disposal bag, apply additional water as needed to achieve "adequately wet" conditions for NESHAP compliance. Bagged asbestos waste must be placed under negative pressure with the use of a HEPA vacuum, goose neck and duck tape to seal the bag, washed to remove any visible contamination and placed into a second 6 mil minimum thickness disposal bag. Asbestos containing material must be containerized while wet. Lower and otherwise handle asbestos containing materials as indicated in 40 CFR 61 - SUBPART M. If the quantity of airborne asbestos fibers monitored at the breathing zone of the workers or the designated limits at any time exceeds background or 0.01 fibers per cubic centimeter, whichever is greater, stop work, and immediately correct the situation.
3.2.4.2 Asphalt Tar/Vapor Barrier
Asbestos asphalt tar/vapor barrier must be removed utilizing a regulated work area as previously specified. Carefully remove material in man ageable sections if possible, by use of a blade/scraper while using wet methods.
Collect any loose debris with a HEPA filtered vacuum cleaner. As the material is removed from the HEPA vacuum, carefully place it in sealable plastic disposal bags of 6 mil minimum thickness. Once the material is in the disposal bag, apply additional water as needed to achieve "adequately wet" conditions for NESHAP compliance. Bagged asbestos waste must be placed under negative pressure with the use of a HEPA vacuum, goose neck and duct tape to seal the bag, washed to remove any visible contamination and placed into a second 6 mil minimum thickness disposal bag. Asbestos containing material must be containerized while wet. Lower and otherwise handle asbestos containing materials as indicated in 40 CFR 61 - SUBPART M. If the quantity of airborne asbestos fibers monitored at the breathing zone of the workers or the designated limits at any time exceeds background or 0.01 fibers per cubic centimeter, whichever is greater, stop work, and immediately correct the situation.
3.2.5 Air Sampling
Sampling of airborne concentrations of asbestos fibers must be performed in accordance with 29 CFR 1926.1101 and FGS SPAIN as specified herein.
Sampling performed in accordance with 29 CFR 1926.1101 and FGS SPAIN must be performed by the PQP. Sampling performed for environmental and quality control reasons must be performed by the PQP. Unless otherwise specified, use NIOSH Method 7400 for sampling and analysis. Monitoring may be duplicated by the Government at the discretion of the Contracting Officer. If the air sampling results obtained by the Government differ from those results obtained by the Contractor, the Government will determine which results predominate.
3.2.5.1 Sampling Prior to Asbestos Work
Provide area air sampling and establish the baseline one day prior to the masking and sealing operations for each demolition and removal site.
Establish the background by performing area sampling in similar but uncontaminated sites in the building.
3.2.5.2 Sampling During Asbestos Work
The PQP must provide personal and area sampling as indicated in
SECTION 02 82 16.00 20 Page 19
29 CFR 1926.1101 and governing environmental regulations. In addition, provided the same type of work is being performed, provide area sampling at least once every work shift close to the work inside the enclosure, outside the clean room entrance to the enclosure, and at the exhaust opening of the local exhaust system. If sampling outside the enclosure shows airborne levels have exceeded background or 0.01 fibers per cubic centimeter, whichever is greater, stop all work, correct the condition(s) causing the increase, and notify the Contracting Officer immediately.
Where alternate methods are used, perform personal and area air sampling at locations and frequencies that will accurately characterize the evolving airborne asbestos levels.
3.2.5.3 Sampling After Final Clean-Up (Clearance Sampling)
Provide area sampling of asbestos fibers and establish an airborne asbestos concentration of less than 0.01 fibers per cubic centimeter after final clean-up but before removal of the enclosure or the asbestos work control area. After final cleanup and the asbestos control area is dry but prior to clearance sampling, the PQP and NC must perform a visual inspection in accordance with ASTM E1368 to ensure that the asbestos control and work area is free of any accumulations of dirt, dust, or debris. Prepare a written report signed and dated by the PQP documenting that the asbestos control area is free of dust, dirt, and debris and all waste has been removed. Perform at least 2 samples per regulated area where ACM was abated. The asbestos fiber counts from these samples must be less than 0.01 fibers per cubic centimeter or be not greater than the background, whichever is greater. Should any of the final samples indicate a higher value, the Contractor must take appropriate actions to re-clean the area and must repeat the sampling and analysis at the Contractor's expense.
3.2.6 Lock-Down
Prior to removal of plastic barriers and after pre-clearance clean up of gross contamination, the PQP must conduct a visual inspection of all areas affected by the removal in accordance with ASTM E1368. Inspect for any visible fibers , and to ensure that encapsulants were applied evenly and appropriately. A post removal (lock-down) encapsulant must then be spray applied to ceiling, walls, floors and other areas exposed in the removal area. The exposed area must include but not be limited to plastic barriers, furnishings and articles to be discarded as well as dirty change room, air locks for bag removal and decontamination chambers.
3.2.7 Site Inspection
While performing asbestos engineering control work, the Contractor must be subject to on-site inspection by the Contracting Officer who may be assisted by or represented by safety or industrial hygiene personnel. If the work is found to be in violation of this specification, the Contracting Officer or his representative will issue a stop work order to be in effect immediately and until the violation is resolved. All related costs including standby time required to resolve the violation must be at the Contractor's expense.
3.3 CLEAN-UP AND DISPOSAL
3.3.1 Housekeeping
Essential parts of asbestos dust control are housekeeping and clean-up
SECTION 02 82 16.00 20 Page 20 procedures. Maintain surfaces of the asbestos control area free of accumulations of asbestos fibers. Give meticulous attention to restricting the spread of dust and debris; keep waste from being distributed over the general area. Use HEPA filtered vacuum cleaners. DO NOT BLOW DOWN THE SPACE WITH COMPRESSED AIR. When asbestos removal is complete, all asbestos waste is removed from the work-site, and final clean-up is completed, the Contracting Officer will attest that the area is safe before the signs can be removed. After final clean-up and acceptable airborne concentrations are attained but before the HEPA unit is turned off and the enclosure removed, remove all pre-filters on the building HVAC system and provide new pre-filters. Dispose of filters as asbestos contaminated materials. Reestablish HVAC mechanical, and electrical systems in proper working order. The Contracting Officer will visually inspect all surfaces within the enclosure for residual material or accumulated dust or debris. The Contractor must re-clean all areas showing dust or residual materials. If re-cleaning is required, air sample and establish an acceptable asbestos airborne concentration after re-cleaning. The Contracting Officer must agree that the area is safe in writing before unrestricted entry will be permitted. The Government must have the option to perform monitoring to determine if the areas are safe before entry is permitted.
3.3.2 Title to Materials
All waste materials, except as specified otherwise, must become the property of the Contractor and must be disposed of as specified in applicable local, State, and Federal regulations and herein.
3.3.3 Disposal of Asbestos
3.3.3.1 Procedure for Disposal
Coordinate all waste disposal manifests with the Contracting Officer Collect asbestos waste, asbestos contaminated water, scrap, debris, bags, containers, equipment, and asbestos contaminated clothing which may produce airborne concentrations of asbestos fibers and place in sealed fiber-proof, waterproof, non-returnable containers (e.g. double plastic bags 0.15 mm thick, cartons, drums or cans). Wastes within the containers must be adequately wet in accordance with 40 CFR 61-SUBPART M . Affix a warning and Department of Transportation (DOT) label to each container including the bags or use at least 0.15 mm thick bags with the approved warnings and DOT labeling preprinted on the bag. The name of the waste generator and the location at which the waste was generated must be clearly indicated on the outside of each container. Prevent contamination of the transport vehicle (especially if the transport vehicle is a rented truck likely to be used in the future for non-asbestos purposes). These precautions include lining the vehicle cargo area with plastic sheeting (similar to work area enclosure) and thorough cleaning of the cargo area after transport and unloading of asbestos debris is complete. Dispose of waste asbestos material at an Environmental Protection Agency (EPA) or State-approved asbestos landfill off Government property. For temporary storage, store sealed impermeable bags in asbestos waste drums or skids.
An area for interim storage of asbestos waste-containing drums or skids will be assigned by the Contracting Officer or his authorized representative.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .