This is a pre-solicitation notice for Base Operations Support (BOS) services at Naval Air Station Patuxent River in Maryland. The Navy seeks to award an indefinite delivery indefinite quantity contract for recurring and non-recurring BOS work items. The single-award contract will have a one-year base period and four one-year options. Recurring work includes facility management, facility investment, swimming pools, wastewater, and utilities management. Non-recurring work will be issued through task orders on either a unit-priced or negotiated basis. The solicitation number is N6247018R3006 and proposals are due by February 28, 2019. The NAICS code is 561210 with a small business size standard of $38.5M.
N62470-18-R-3006_Amendment_0003.pdf
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
BASE OPERATIONS SUPPORT (BOS) SERVICES AT PAX RIVER, MARYLAND
This amendment is issued to provide revisions to Sections C, F, H, L, and M, J attachments, and to provide responses to various pre-aw ard inquiries received. Althought Section A is included in this Amendment, no changes w ere made to Section A. (SEE CONTINUATION PAGE)
CS: Kari Webler, kari.w ebler@navy.mil, 757-322-4083
1. CONTRACT ID CODE PAGE OF PAGES
J 1 196
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247018R3006
X 9B. DATED (SEE ITEM 11)
14-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Feb-2019
CODE
NAVAL FACILITIES ENGINEERING COMMAND
ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247018R3006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is to disseminate the below information.
1.) Section C – Various revisions throughout the following technical specifications are provided. See note below.
0200000 – Management and Administration 1502000 – Facility Investment 1503040 – Other (Swimming Pools) 1604000 – Wastewater
2.) Section F – Various revisions throughout the section are provided. See note below.
3.) Section H - Various revisions throughout the section are provided. See note below.
4.) Section J – The below list of attachments have been revised.
J-4 FTE Spreadsheet (Amendment 0003)
J-8 Small Business Subcontracting Plan (Template) (Amendment 0003) J-0200000-15 ELINs (Amendment 0003) J-1502000 Facility Investment (Amendment 0003) J-1503040 Other (Swimming Pools) (Amendment 0003)
5.) Section J – Amendment 0003 pre-award inquiry responses are provided.
6.) Section L – Various revisions throughout the section are provided. See note below.
7.) Section M – Various revisions throughout the section are provided. See note below.
NOTE: Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.
SECTION A - SOLICITATION/CONTRACT FORM
The following have been modified:
SECTION A
NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC), ATLANTIC
6506 HAMPTON BLVD
NORFOLK, VIRGINIA 23508-1278
NAVFAC RFP NUMBER: N62470-18-R-3006
BASE OPERATIONS SUPPORT (BOS) SERVICES AT
NAVAL AIR STATION PATUXENT RIVER (NAS PAX RIVER), PATUXENT RIVER, MARYLAND;
WEBSTER FIELD IN ST. INIGOES, MARYLAND; SOLOMONS ANNEX IN SOLOMONS, MARYLAND
AND POINT LOOKOUT IN ST. MARY’S COUNTY, MARYLAND
NOTICE: PROPOSALS ARE DUE BY 2:00 P.M. (Norfolk, Virginia Local Time) ON 28 FEBRUARY 2019
Proposal is to be submitted to office listed below:
Naval Facilities Engineering Command (NAVFAC), Atlantic Attn: Kari Webler, Code ACQ22 6506 Hampton Blvd, Mail Room Norfolk, Virginia 23508-1278
PRE-PROPOSAL CONFERENCE/SITE VISIT:
A pre-proposal conference and site-visit will not be held.
Technical Reference Center: The Technical Library at Naval Air Station Patuxent River is available to prospective contractors during regular working hours from 22 January 2019 through 01 February 2019. Reference materials and documents may be reviewed in the technical library only and shall not be removed from the technical library.
Limited copying of information is available free of charge, additional printing may be allowed at the contractor’s expense. Documents that are labeled FOUO or other classification shall not be copied or removed from the technical library.
For access and coordination of visits to the technical library please contact Karl Battle at (301) 757-6553 or karl.d.battle@navy.mil.
A.1 CONTRACT TITLE
Base Operations Support (BOS) Services at Naval Air Station (NAS) Patuxent (PAX) River, Maryland
A.2 TYPE OF CONTRACT
This acquisition will result in a Single Award of an Indefinite Delivery Indefinite Quantity (IDIQ), performance based contract for BOS services at NAS PAX River, Maryland that is comprised of both Recurring and Non- Recurring Work items.
A.3 COMPETITION REQUIREMENTS/SET-ASIDE
This procurement is unrestricted.
A.4 NAICS CODE
The NAICS code assigned to this procurement is 561210, Facility Support Services, having a small business size standard of $38.5M. Refer to Section K, Representations, Certifications and Other Statements of Offerors.
A.5 REQUEST FOR PROPOSAL (RFP) FILES
It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from either Navy Electronic Commerce Online (NECO) website (www.neco.gov) or Federal Business Opportunities (www.fbo.gov).
Offerors are advised to check both of the aforementioned websites on a regular basis, as technological difficulties sometimes prevent the Government from simultaneously uploading to both sites. Unprotected editable electronic file copies of the RFP documents, including Word, Excel, and/or Adobe files will not be provided. Please plan accordingly.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
ANNEX 0200000
Table of Contents
Spec Item Title
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Formal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Pre-Performance Meeting
2.3.5 Production Meetings
2.3.6 Permits and Licenses
2.3.7 Insurance
2.3.7.1 Certificate of Insurance
2.3.7.2 Minimum Insurance Amounts
2.3.8 Protection of Government Property
2.3.9 Government Information Technology (IT) System
2.3.10 Directives, Instructions, and References
2.3.11 Invoicing Procedures
2.3.12 Forms
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities (GFU)
2.4.3 Government-Furnished Materials (GFM)
2.4.4 Government-Furnished Equipment (GFE)
2.4.5 Government-Furnished Services (GFS)
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 NAVFAC MAXIMO
2.6.6.1 MAXIMO Data
2.6.6.2 MAXIMO Method of Data Entry
2.6.6.3 MAXIMO Access
2.6.6.4 MAXIMO Training
2.6.7 Quality Management System (QMS)
2.6.7.1 Quality Management (QM) Plan
2.6.7.2 Quality Inspection and Surveillance
2.6.7.3 Quality Inspection and Surveillance Report
2.6.8 Property Management Plan
2.6.9 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental Program Manager
2.7.1.5 Energy Manager
2.7.1.6 Security Manager
2.7.1.7 Utility Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 Defense Biometric Identification System (DBIDS)
2.8.4.2 One-Day Passes
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Access to Sensitive Unclassified Information
2.8.9 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
2.9.3.5 Fall Prevention and Protection Plan
2.9.4 Crane Operations
2.9.4.1 Crane Inspections
2.9.4.2 Rigging Gear
2.9.4.3 Crane Operators
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 ODS Management and Requirements for Refrigerant Recycling
2.10.2.2 Non-Hazardous Waste Disposal
2.10.2.3 Hazardous Waste Disposal
2.10.2.4 Spill Prevention, Containment, and Clean-up
2.10.2.5 Hazardous Material Management
2.10.2.6 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.7 Pollution Prevention
2.10.2.8 Salvage
2.10.2.9 Asbestos Containing Material (ACM)
2.10.2.10 Protection of Historical, Archaeological, and Natural Resources
2.10.2.11 Air Quality
2.10.2.12 Safe Drinking Water Act
2.10.2.13 Clean Water Act
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Notification to the Government for Work Above the Recurring Work Limitations
2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.14.3 Service Orders
2.15 Non-recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Work Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Material and Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-recurring work ELINS
2.16 Inventory Data Quantity Variation
0200000 – Management and Administration Spec Item Title Description 2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General Information
2.2.1 Government Regular
Working Hours The Government’s regular working hours are from 0600-1600, five days per week, Monday through Friday, except observed Federal holidays. The availability of facilities may vary within the 0730 –1600 timeframe.
Exceptions to the regular hours of operation are detailed in subsequent sections of this Performance Work Statement (PWS). Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior Contracting Officer (KO) approval.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government’s regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage Determinations Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General Administrative
Requirements
2.3.1 Required Conferences
and Meetings
The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend meetings as shown in J-0200000- 03.
2.3.2 Training for
Maintenance and
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided
Spec Item Title Description
Operation of New and Replacement Systems and Equipment training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from Naval Facilities Engineering Command (NAVFAC), the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractor’s teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
2.3.3.1 Formal Partnering The initial session should be scheduled concurrent with the Pre- Performance Conference and held no later than 30 days after award. The initial Partnering Meeting will be at least one day in duration and held at a Government provided facility as designated by the KO – OR – at a neutral location off the installation that is acceptable to the Contractor and to the Government. Follow-on sessions should be scheduled every three to six months and typically last a half day or less. The frequency, duration, and locations of follow-on sessions should be agreed to by both parties during the initial Partnering Meeting. The Contractor shall pay all costs associated with the partnering effort including facilitator, meeting room, and other incidental items. Before the partnering session, the Contractor shall coordinate with the facilitator the requirements for incidental items (audio-visual equipment, computer(s), two easels, flipchart paper, colored markers, note paper, pens/pencils, colored flash cards, etc.) and have these items available at the partnering session. The Contractor will provide copies of any documents used for the Partnering Meeting for distribution to all attendees. The facilitator must be acceptable to both the Contractor and the Government. The participants shall pay their own costs for meals, lodging, and transportation associated with partnering.
2.3.3.2 Contract Partnering
Administration
Upon award, the Administrative Contracting Officer (ACO) will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. Commence discussions with the Contractor to select a facilitator and location that are acceptable to both partners. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
* President/Vice President
* Project Manager
* Quality Manager
* Site Safety and Health Officer Sub-contractor Reps
2.3.4 Pre-Performance
Meeting
After submission of the Quality Management (QM) Plan, and prior to the start of work, meet with the Contracting Officer to present the QM program required by this Contract. The purpose of this meeting is to develop a mutual understanding of the QM details, including documentation, administration for on-site and off-site work, and the coordination of the Contractor's management, production and QM personnel. At the meeting, the Contractor will be required to explain in detail how Quality Management System will be implemented for each specification item. As a minimum, the Contractor's personnel required to attend shall include an officer of the firm, the project manager, QM Manager and subcontractor representatives. Each subcontractor who will be assigned QM responsibilities shall have a principal of the firm at the meeting. Minutes of the meeting will be prepared by the QM Manager and signed by the Contractor, and the Contracting Officer. A copy of the signed minutes shall be provided to all attendees by the Contractor.
Repeat the coordination and mutual understanding meeting when a new QM Manager is appointed.
2.3.5 Production Meetings After the start of performance, the Quality Manager shall conduct production meetings once every two weeks or as requested by the contracting officer at a site specified by the contracting officers with the project superintendent. The Quality Manager shall prepare the minutes of the meeting and provide a copy to the Contracting Officer within 2 working days after the meeting. The Contracting Officer may attend these meetings. The Quality Manager shall notify the Contracting Officer at least 48 hours in advance of each meeting. As a minimum, the following shall be accomplished at each meeting:
a. Review the minutes of the previous meeting;
b. Review the schedule and the status of work:
(1) Work or testing accomplished since last meeting
(2) Rework items identified since last meeting
(3) Rework items completed since last meeting;
c. Review the status of deliverables:
(1) Deliverables reviewed and approved since last meeting
(2) Deliverables required in the near future;
d. Review the work to be accomplished in the next 2 weeks and documentation required:
(1) Establish completion dates for rework items
(2) Update the schedule showing planned and actual dates including testing and any other inspection required by this contract
(3) Discuss service methods and the approach that will be used to provide quality services by planning ahead and identifying potential problems for each specification item.
(4) Documentation required;
(5) Discuss Activity Hazard Analyses (AHA):
e. Resolve QM and production problems:
(1) Assist in resolving Request for Information (RFI) issues; and
f. Address items that may require revising the QM plan:
(1) Changes in QM organization personnel
(2) Changes in procedures.
g. Review health and safety plan
2.3.6 Permits and Licenses The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.7 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.7.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.7.2 Minimum Insurance
Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen’s Compensation: As required by Federal and state worker’s compensation and occupational disease statutes
Employer’s Liability coverage: $100,000, except in states where worker’s compensation may not be written by private carriers
Other as required by state law
2.3.8 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.9 Government
Information Technology (IT) System
The Navy uses Navy Marine Corps Internet (NMCI) for Information Technology (IT) systems. Additional information about NMCI may be obtained at http://www.eds.com/nmci.
2.3.10 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-04. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.11 Invoicing Procedures Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-05 for sample.
2.3.12 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-06.
2.4 Government-Furnished
Property, Materials and Services
2.4.1 Government-Furnished
Facilities (GFF)
The Government will provide facilities listed in J-0200000-07. The Contractor shall maintain the Government furnished facilities at the Contractor’s expense. The Contractor shall obtain written approval from the KO prior to making any modifications or alterations to the facilities.
Any such modifications or alterations approved by the Government will be made at the expense of the Contractor.
2.4.2 Government-Furnished
Utilities (GFU)
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.3 Government-Furnished
Materials (GFM)
The Government will not provide materials for the Contractor’s use on this contract.
2.4.4 Government-Furnished
Equipment (GFE)
The Government will not provide equipment for the Contractor’s use on this contract.
2.4.5 Government-Furnished
Services (GFS)
The Government will not provide services to the Contractor on this contract.
2.5 Contractor-Furnished Except for items identified as Government Furnished, the Contractor shall
Items provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards.
Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3 Work Schedule The Contractor’s work shall not interfere with normal Government business. In those cases, where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
2.6.4 Deliverables Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.
Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website.
Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.
2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers at least five days in advance. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.6 NAVFAC MAXIMO MAXIMO is the Computerized Maintenance Management System (CMMS) used by the Government for work order history, asset management, and condition assessment. The Contractor shall provide all required data for NAVFAC MAXIMO as identified below per Section F:
2.6.6.1 MAXIMO Data Required data fields for work orders are indicated in the Service Provider Information provided in J-0200000-08. Asset inventory data requirements are indicated in the Asset Information provided in J-0200000-09, including additional data for Utilities assets listed in Specification Information in J-0200000-10. Required data for documenting condition assessments is indicated in the Characteristic Meter Reading Information provided in J-0200000-11.
Specified data shall be provided for all work performed in 0501050 Airfield Facilities, 1501000 Facility Management, 1502000 Facility Investment, 1503040 Other (Swimming Pools), 1601000 Utilities Management, 1604000 Wastewater and 1606000 Water. Further instructional information detailing the process for submitting the specified information for NAVFAC MAXIMO Data Reporting is provided in J- 0200000-12.
The Service Provider, Asset, Specification, and Characteristic Meter Reading Interfaces are used in multiple processes for loading data into MAXIMO by the Government and the format may be updated periodically.
As part of the update the Contractor may be asked to modify the file to add/move columns in their submission. The Contractor also shall provide up to 10 extra data elements or columns with as many as 150 characters per element for the Government to define during contract performance at no additional cost to the Government. The Government will provide the Contractor 60 calendar days notice of modifications to the Service Provider, Asset, Specification, or Characteristic Meter Reading Interfaces file format.
The Government’s MAXIMO is not available for the Contractor’s use as a work management system.
2.6.6.2 MAXIMO Method of
Data Entry
The Contractor shall provide data for NAVFAC MAXIMO using the methods detailed below:
DIRECT ENTRY: The Contractor shall manually enter required work order and condition assessment data directly into NAVFAC MAXIMO.
The Contractor shall ensure all information is updated by the end of each workday for all work performed.
If the Contractor does not have access to NAVFAC MAXIMO at contract start, work order and condition assessment data shall be submitted in a pipe delimited flat-file following the NAVFAC MAXIMO Data Reporting process described in J-0200000-12 per Section F. Any failures in processing of the flat-file shall be corrected and resubmitted by the Contractor. In order to demonstrate the ability to properly format the flat-file, the Contractor shall provide a Sample Pipe Delimited Flat-file prior to contract performance per Section F. Flat file submission of work order and condition assessment data will be allowed for a period not to exceed six months unless an extension is approved in writing by the KO.
FLAT FILE: The Contractor shall electronically record and report compiled service performance data for exportation of asset and specification data to NAVFAC MAXIMO. The Contractor shall submit asset and specification data in a spreadsheet flat-file following the NAVFAC MAXIMO Data Reporting process described in J-0200000-12 per Section F.
2.6.6.3 MAXIMO Access The process for obtaining access and establishing MAXIMO accounts are detailed in the NAVFAC MAXIMO System Access Procedures provided in J-0200000-13.
Once accounts have been established, MAXIMO can be accessed at https://maximo.navfac.navy.mil
The Contractor shall provide all necessary computer equipment and Internet Service Provider (ISP) accounts to access MAXIMO for Direct Entry of required data.
A maximum of five MAXIMO accounts will be approved for the Contractor. Changes of personnel requiring MAXIMO accounts more than once per year may result in required compensation to the Government for the administrative costs in processing account requests.
The Contractor shall provide a list of personnel requiring MAXIMO accounts per Section F.
2.6.6.4 MAXIMO Training The Government will provide or make available initial training on NAVFAC MAXIMO to Contractor personnel responsible for direct entry of work order, asset, specification, and condition assessment data.
Additional training will be provided by the Government when there are significant changes to the NAVFAC MAXIMO software or data entry requirements. Training due to changeover of personnel will be the responsibility for the Contractor. The Contractor will be provided a general user guide, local instructions, and other materials by the Government as reference material for the use of NAVFAC MAXIMO.
2.6.7 Quality Management
System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor’s QMS program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.7.1 Quality Management
(QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Management of Section F Deliverables
• Communication with government (customers)
2.6.7.2 Quality Inspection and
Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.
2.6.7.3 Quality Inspection and
Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month.
The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.8 Property Management
Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F.
2.6.9 System and Equipment
Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced.
Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7 Personnel
Requirements
The Contractor shall comply with the personnel requirements stated below.
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
2.7.1.1 Project Manager (PM) The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government’s regular working hours and shall be available on-site within one hour after the Government’s regular working hours.
The PM shall have at least five years of recent experience in managing a workforce providing services on contracts of similar size, scope and complexity.
2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate shall be on-site within during the Government’s regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.
The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:
The Quality Manager shall have at least five years of recent experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager shall not be the same person as the
SSHO.
2.7.1.3 Site Safety and Health
Officer (SSHO)
The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project.
Provide a Safety oversight team that includes a minimum of one
Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor’s safety program and government-accepted Accident Prevention Plan. The SSHO’s training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the Contractor’s Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.
The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:
The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years of recent experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO shall not be the same person as the project manager.
2.7.1.4 Environmental Program
Manager
The Contractor shall provide an Environmental Program Manager whose primary duty and responsibility is to Manage the Environmental Compliance program and ensure Contractor operations adhere to the goals and policies of the Environmental Management System, and other specified Sustainability requirements affecting this contract. The Environmental shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation.
The Environmental Manager shall have a minimum two years of recent experience with environmental procedures similar to those of this contract;
familiarity with Environmental Management Systems (EMS); and knowledge of environmental regulations and policy that are applicable to operations similar to those of this contract.
2.7.1.5 Energy Manager The Contractor shall provide an Energy Manager whose primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the Installation Energy Plan, and other specified Sustainability requirements affecting this contract. The Energy Manager shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation and energy policy.
The Energy Manager shall have a minimum two years of recent experience with energy procedures similar to those of this contract; and knowledge of energy regulations and federal energy laws and policy (including energy and water reduction requirements and renewable energy requirements) that are applicable to operations similar to those of this contract.
2.7.1.6 Security Manager The Contractor shall provide a Security Manager whose primary duty and responsibility ensure is to ensure Contractor operations adhere to the policies of the DoD and installation security requirements. The Security Manager shall develop, implement and monitor security policies and regulations.
The Security Manager shall have a minimum two years of recent experience with security procedures similar to those of this contract;
familiarity with laws and policy that are applicable to operations similar to those of this contract.
The Security Manager may be the same person as the Project Manager.
2.7.1.7 Utility Manager The Contractor shall provide a Utility Manager whose primary duty and responsibility ensure is to ensure the utility system are operational and maintained to meet the installation mission and adheres to the policies of the DoD and installation utility requirements. The Utility Manager shall implement and monitor utility policies and regulations.
The Utility Manager shall have a minimum two years of recent experience with utility systems similar to those of this contract; familiarity with regulations, laws and policy that are applicable to utility operations similar to those of this contract.
The Utility Manager may be the same person as the Energy Manager.
2.7.2 Employee
Requirements
The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
2.7.2.1 Employee Certification
and Training
The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request.
2.7.2.2 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.3 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.4 Identification as
Contractor Employee Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
2.7.2.5 Removal of Employees The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.7.2.6 Proof of Legal
Residency
No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is furnished per Section F.
2.7.3 Enterprise-wide
Contractor Manpower Reporting Application (eCMRA)
The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .